00-0768-025 _ y A
REVISIONS BY
19
CAP FOR FUTURE �='LU1�L�,11�iC� FIXTURE SCHEDUL_E
CONNECTION SOLAR AIR CO�ID IT' IO�l ING1
OR HEAT RECOVERY o
HEAT TRAP MARK TRAP FIXTURE HOT COLD - _
SIZE UNITS WATER WATER MANUFACTURER NOM. NOM. ESP IN. ELECT. TOTAL COOLING CAP. 3/T O/A DIMENSIONS WEIGHT ELECT. SERVICE m
UNIT AND MODEL NO. TONS CFM WG. HEAT KW FLA/HP BTUH 6 957 4 r0-i7.-LJ - C�"'1; W:c;=xH ( .) LBB. VOLTS/PH/Hz SEE a.
GATE VAL GATE VALVE WC 3" 4 - ri2" _ = Z
AHU RHEEM 1400 .40 3-3/1/2 __ _ r ^
0142 HA21J11SU A2 10 �1 x-2�... x-52 150 208-230/1/60 12.4 �
HEAT TRAP i '� i r RB
LAV 1 �¢ 1 /2 /2
COLD WATER, 3/4" #U Rl-IEEM 3_rJ 1-1.9 29,300/41000 36 x 40 x 43 313 208-230/1/I:oO =_
H.W. To FIXTURES SH 2" 2 i/2 r/2�, 12 RAM5042JAZ E
HOT WATER, 3/4" UNION SK 11/2 11 11 2 '/z r/2" W 0
rl-- o
~ N 0) CO 01
PRESSURE 4 TEMPERATURE WM 211 4 'i2 ri2 (n I C
RELIEF VALVE (ASME APPRVD.) DW lr/2" SW 2 �/2 - NOTES: :E n 0 N
� � Lo I O
'/2" W/VAL VE 4 �
N ro p p
HB - - - VAC. BREAKER Q j LO W
3/4" Cu RELIEF DISCHARGE
ELECTRIC LINE, TO OUTSIDE GREEN TUB 2" 2 i/2 r/2 W - O0 ..
W
HEALER AREA, TERMINATE 6" � O " � E
80 GAL. ABOVE FIN. GRADE BD 2" 1 '/2" r/2" = L- j n U Iv
2-6.0 KW [if Z J
EF-.89
FAN 5CHEDUL-E O O
W
- �
DRAIN VALVE,,, 1) FIXTURES TO COMPLY W/SFBC TABLE 46-R-2 z Q Q Z
# MANUFACTURER RPM HP GFM 8" S.P. ELECT. SERVICE DIMENSIONS WEIGHT MARKS O : J W O
X 2) ALL SHOWERS 4 BATH/SHOWER COMBINATIONS SHALL
FAN AND MODEL NO. VOLTS/PH/Hz WxLxH (IN.) LBS. (D W U
BE PROTECTED WITH A CONTROL VALVE OF THE W/ GRILLE 3"� DUCT p I- 0
EX. FAN NUTONE C35OG 1800 1/90 5O ,1 1/8" 115/1/60 9 X 9 X 4 6 F A
PRESSURE BALANCE, THERMOSTSTIC ROOF CAP MIXING OR COM- s
BINATION TYPE. HANDLE POSITION STOPS MANUFACTURER'S N
INSTRUCTIONS AT TIME OF INSTALLATION TO A MAXIMUM
UU A-r'E R HEATER F I F I I� D I AG �A� MIXED WATER OUTLET TEMPERATURE OF 120° F. S 1 a � 11 H � �1 b' a® w
I �l O $
O SCA!_E
t9 0 _�►
Z �
AIR C D ON IT ION ING SYSTEM - GENERAL NOTES: O '
RIGID FIBERGLASS DUCT (R-6)
I. DUCTWORK SHALL BE 1 1/2" THICK,
3 POUNDS PER CUBIC 1=001 DENSITY 0 z
PL.UI�BNG GENER,A . NOTES ,4Np SPECC,4TON5: FIBERGLASS WITH VAPOR BARRIER, UNLESS OTHERWISE SPECIFIED.
DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE O ,
WITH MANUFACTURER'S SPECIFICATIONS AND ACCORDING TO "ASHRAE" N z• -"
I. A. SCOPE OF WORK: AND "SMACNA" STANDARDS.
SPIN COLLAR DUCT DIMENSIONS ARE IN INCHES AND CORRESPOND TO INSIDE
DIMENSIONS WIDTH X. HEIGHT. DUCT SYSTEM SHALL COMPLY WITH
THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY SHOWN ON THE
"NFPA" STANDARD NO. 90A AND/OR 908. DUCTWORK AND COMPONENTS
DRAWINGS, SPECIFIED HEREIN AND/OR AS NEEDED FOR A COMPLETE I i TESTS BE CLASS 1 MATERIALS IN ACCORDANCE WITH U.L. 181
SYSTEM, INCLUDING BUT NOT NECESSARILY LIMITED TO:
2. COORDINATE LOCATIONS, SIZES AND OPENINGS WITH OTHER TRADES O
1. DOMESTIC COLD AND HOT WATER PIPING SYSTEMS ON THE JOB. A/C CONTRACTOR SHALL PROVIDE THE COMPLETE DUCT (p
2. SANITARY DRAIN AND VENT SYSTEMS SYSTEM WITH TURNING VANES AT ALL ELBOWS, 81-LITTERS AND
3. PLUMBING FIXTURES AND TRIM DAMPERS, AS REQUIRED.
4. AIR CONDITIONING CONDENSATE DRAINS A/C CONTRACTOR SHALL USE THE BEST PRACTICES OF THE TRADE IN
THE FABRICATION AND INSTALLATION OF THE SYSTEM. W
5. PRESSURE AND TEMPERATURE RELIEF FROM WATER HEATER O
6. PIPING INSULATION INSULATED FLEXIBLE DUCT GLASS 3. DIFFUSERS SHALL BE SELECTED, LOCATED, AND BALANCED IN ORDER �. 4
1. SUPPORTS AND HANGERS 1 1/2" WITH POLYETHELENE JACKET THAT THEY DELIVER THE REQUIRED CFM TO THE ENTIRE ROOM EVENLY c,AND STEEL WIRE REINFORCING AND DRAFT FREE TO MAINTAIN THE FOLLOWING DESIGN CONDITIONS:
B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST INSIDE OUTSIDE RELATIVE E
EDITION OF THE "SOUTH FLORIDA BUILDING CODE" CH. 46 LOCAL ORDINANCES COOLING: - '16° pB 91° DB - l9° WB HUMIDITY �J
AND IN COMPLIANCE WITH THE FLORIDA ENERGY EFFICIENCY CODE FOR HEATING; - 10 DB 45 - DB 5096 TO 6096
BUILDING CONSTRUCTION", AND 11HR8" REGULATIONS. IN THE EVENT OF -1 �cl)y
CONFLICT BETWEEN ANY CODE OR REGULATIONS, THE MORE STRINGENT 1-1-- W
4. ALL FAN UNITS, MOTORS, COMPRESSORS, ETC. SHALL BE ISOLATED,
REQUIREMENTS WILL GOVERN. DIFFUSER AS REQUIRED TO OPERATE QUIETLY 80 THAT NOOBJECTIONABLE SOUND
WILL BE HEARD IN THE HABITABLE SPACES DUE TO AIR VELOCITY,
2. CONTRACTOR t0 VERIFY AT SITE THE LOCATION, ELEVATION AND SIZE OF ALL MOTOR NUM, VIBRATION, OR MECHANICAL MOVEMENT. +-4
EXISTING LINES FOR CONNECTION BEFORE INSTALLATION OF ANY PIPING.
w
+-4 o �
5. A/C SYSTEM SHALL HAVE DISPOSABLE AIR FILTERS LOCATED AS
3. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS I REQUIRED FOR EASY ACCESSIBILITY. Ila
OR SHOCK ABSORBERS AS INDICATED ON PLANS. �YP ICAL_ D IFFU5E R CON E OT ION [DETAIL_
0
q n
4. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH THE APPROVED MATERIALS, NO SCALE 6. A/C SYSTEM SHALL BE CONTROLLED BY A THERMOSTAT. MOUNT
SHALL HAVE SMOOTH IMPERVIOUS SURFACES AND SHALL BE FREE FROM DEFECTS THERMOSTAT 5'-0" ABOVE FINISHED FLOOR, U.O.N.
AND CONCEALED FOULING SURFACES. ALL FIXTURE TRIM t0 BE CHROME PLATED. O Y=
FIXTURES SHALL BE PROVIDED WITH SUPPORTS, HANGERS, ETC. W
1. ALL GRILLS AND DIFFUSERS TO BE OF ALUMINUM CONSTRUCTION. DIF-
5. WASTE LINES TO BE PVC BCH. 40. SLOPE ALL UNDERGROUND SANITARY PIPES AT 1/8"/FT. FUSERS SHALL HAVE HIDDEN OPPOSED BLADE DAMPERS. PROVIDE GASKETS
V ALL ABOVE GROUND WASTE/VENT BRANCHES At i/4"/FT SLOPE. SUPPLY DUCT ON ALL GRILLES AND DIFFUSERS. TITUS OR AIREGUIDE, FINISHED COLOR O
6 BY ARCHITECT. � o
. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY AND ANY WASTE PIPING AT
EVERY CHANGE OF DIRECTION, AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS S. UNDERCUT DOORS 1" AFF., AS INDICATED. (L
IV
AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. U
+-+ = z
1. VENT LINES TO EXTEND S" MIN_ ABOVE ROOF AND FLASH WITH LEAD. REFRIGERANT LINE F---71
TO OUTSIDE I 9. ALL REFRIGERANT PIPING SHALL BE COPPER - TYPE L - U
i ACR TYPE DEHYDRATED AND SEALED. ALL FITTINGS SHALL BE , E
I �i QL
8. WATER PIPE BELOW GROUND SHALL BE COPPER TYPE "K" ABOVE GROUND 70 BE CONDENSING UNIT ����� I WROUGHT COPPER ALL JOINTS SHALL BE MADE WITH HIGH �
TEMPERATURE BRAZING ALLOY OF NOT LESS THAN 5% SILVER. Q
COPPER TYPE "L". OR APPROVED CPVG OR POLYBUTELYNE AS REQUIRED BY OWNER PIPING INSTALLATION NOT LESS THAN 3/4" THICK "ARMAFLEX".
LIQUID AND SUCTION LINES SHALL BE SIZED ACCORDING TO 0
EQUIPMENT MANUFACTURER'S RECOMMENDATIONS FOR EQUIVALENT O
11. PIPING LENGTH OF PIPING RUN FOR CONNECTED TONNAGE. ALL PIPING a _
ACCESSORIES SHALL BE CONSTRUCTED AS SUGGESTED BY EQUIPMENT REVERSE
A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT PROPER CEILING MANUFACTURER. ALL PIPING SHALL BE EVACUATED PER GOOD
INTERVALS ACCORDING WITH CODE. R/A � I 1 0
PIPING PRACTICE BEFORE START-UP. a
3/4" CONDENSATE I a
Uj
B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH FOUNDATION SLABS OR DRAIN w/ 3" TRAP I I i MODEL A
MASONRY WALLS, CAULK OPENINGS BETWEEN PIPE AND SLEEVES. UNION AND C.0 TO I
LOT 2
GREEN AREA I I PARTITION 04 o
C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR CEILINGS, PROVIDE I I CONDENSING ° SCALE 1/4 =1
'_p"
ESCUTCHEONS FIRMLY SECURED TO THE PIPES AND OF SUFFICIENT OUTSIDE STL. A.H.U. SUPPORT
DIAMETER TO COVER THE SLEEVED OPENINGS FOR THE PIPES. PROVIDE I I UNIT o S2
CHROMIUM PLACED ESCUTCHEONS IN BATHROOMS.
CHECKED BY �"J3. E
S. INSPECTIONS AND TESTS NO COMBUSTIBLE I I m DRAWN BY GG.
MATERIALS WITHIN =
A. CONTRACTOR SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS TO THE A.H.U. ROOM
1 (W/H UNDER) PIPE INSULATIO CONCRETE i DATE 05-20-W
AUTHORITIES HAVING JURISDICTION, AS THE WORK PROGRESSES. ALL PAD -
SYSTEMS SHALL BE TESTED BY CODE AND/OR LOCAL REGULATIONS. LOUVRE DOOR I i o JOB S628
31
EL
B. DRAINAGE PIPING: BEFORE INSTALLATION OF ANY DRAINS, THE ENDS OF I I FLOOR
_.. .. ... :.,...;.. a SHEET
SYSTEMS SHALL BE CAPPED AND ALL LINES FILLED WITH THE WATER TO THE
HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION 28 MADE BY AN
3/s" POWER DRIVEN STUDS jAk\/IP7'
OWNER REPRESENTATIVE. \� OR LAG BOLTS W/SHIELDS . .-
10. STERILIZE ALL WATER LINES WITH A MIXTURE OF TWO (2) POUNDS OF CHLORINATED t0 WITHSTAND OVER 120 S OF SHEETS
M.P.H. WINDS
LIME TO EACH 1.000 GALLONS OF WATER C50 PPM OF AVAILABLE CHLORINE). REFRIGERANT LINE
EF
RRIRI
RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER R IN PVC SLEEVE 5� 1.
BEFORE PLACING IN SERVICE. F .
11. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN-SERVICE TEST AlR } ANE XER UNIT CONF.)EI ,51I r-:z UNIT
AFTER COMPLETION OF THE INSTALLATION. $N5TALLAT ION DETAIL GUERRERO/GONZALEZ � -� • ,� } � I,.
IN5TAL-L_AT ION DET A IL-
,4 NO SCALE ENGINEERS, INC. r
�� Michael C. Guerrero, P.E.
NO 5C
Mechanical Eng. Uc. #15235
Rafael L Gonzalez, P.E.
Electrical Eng. Uc. #11057
11420 N. Kendall Dr., Suite 200 1 a
GMiami. Florida 33176
Tel. (305) 595-8525• Fax (305) 596-9077 ARCR N 7' 7 1 2