07-29-08 Presentation E2Neighborhood "Mango Terrace" r � - • INCORPORATED k 1927 1-C)K1� Traffic Study South Miami ,Florida Kimley -Horn and Associates, Inc. Introduction To address traffic issues in the "Mango Terrace Neighborhood" Study area bounded by three major arterials SW 67th Ave. (Ludlam Road) SW 72nd St. (Sunset Drive) SW 80th St. Residents concerned about cut - through traffic and excessive speeds South Miami s X71' Neighborhood Traffic Study . _ _ Study Progress Two workshops with residents to identify issues (December `07 &January `08) Draft traffic improvement plan presented to residents (April `08) Miami -Dade Public Works Department reviewed recommendations (May `08) Revised traffic improvement plan presented to residents (June `08) Issues Identified Cut - through traffic on neighborhood streets due to Ludlam Elementary School and congestion on major roadways Streets identified as potential cut - through routes include SW 68th Ct., SW 69th Ct., SW 74th St. , SW 7 5th Ter. , SW 68th Ave., SW 69th Ave. Parents park on the grass shoulder along SW 67th Ave. and SW 74th St. in the vicinity of I i irl I n m P1mmnntn rxi <<'hool Illegal parking on shoulder of SW 74th St. Issues Identified Average speeds within the neighborhood are generally between 25 and 30 mph - supports lowering speed limit to 25 mph Long queue on the eastbound approach of SW 80th St. at SW 67th Ave. and on the northbound and eastbound approaches of SW 67th Ave. at SW 72nd St. during the A.M. peak period Major streets operate at acceptable LOS during the A.M. and P.M. peak periods, except for eastbound direction of SW 801h St. during the A _ nPak nPrind Heavy congestion on eastbound SW 80th St. during morning peak period Elements of Improvement Plan ► Regulatory signs Lower speed limits Prohibit specific movements ► Traffic calming measures Redesigning of streets to encourage slower traffic speeds ► Intersection improvements n Signal timing modifications �vtnnrl haft—ti irn ctnrn n Inngth Regulatory Signs Reduced speed limit (25 mph) All local streets Turn restrictions SW 67th Ave. & SW 74th St. SW 6 7th Ave . & SW 75th St. SW 72nd St. & SW 691h Ct. Traffic Calming Plan Traffic Circle SW 68t" Ave. and SW 751" Ter. SW 68th Ave. and SW 781h Ter. Curb Extension SW 6 8th Ave . and SW 7 7th Te r. SW 68th Ct. and SW 74th St. SW 69th Ave. and SW 75th Ter. SW 69th Ave. and SW 77th Ter. Traffic Calming Plan y Gateway Treatment SW 67t" Ave. and SW 741" St. SW 67th Ave. and SW 75th Ter. SW 6 7th Ave . and SW 761h Te r. SW 6 7th Ave . and SW 7 7th Te r. SW 6 7th Ave . and SW 7 8th Te r. SW 68th Ave. and SW 72nd St. SW 68th Ct. and SW 72nd St. SW 68th Ave. and SW 80th St. SW 69th Ave. and SW 80th St. Signal Timing Improvements SW 67thAve. and SW 72nd St. Increase green time for the north /south through movement U.S. 1 and SW 80t" St. Increase green time for the eastbound approach SW 67thAve. and SW 80t" St. Increase green time for the east /west movements Turn Lane Improvements Increase left -turn storage length on eastbound approach at SW 67thAve. and SW 80t" St. Could help minimize cut - through traffic on neighborhood streets Miami -Dade Public Works Department recommendation Cost Estimate Improvement Type Locations Unit Cost Base Cost Contingency (15 %) Design, Permitting, and Mobilization 30% Order of Magnitude Cost Speed limit signs 15 $500 $7,500 - - $7,500 Turn restriction signs 4 $500 $2,000 1$2,000 Curb extension 4 $5,000 $20,000 $3,000 $6,000 $29,000 Textured intersection 2 $10,000 $20,000 F$3,000 $6,000 $29,000 Traffic circle 2 1$25,000 $50,000 $7,500 $15,000 1$72,500 Gateway entry features 9 $15,000 $135,000 $20,250 $40,500 $195,750 Forced turn island 1 $5,000 $5,000 $750 $1,500 1$7,250 Total Cost $239,500 $349500 $69,000 $343,000 K. _�_ _ T..__ I )vements at SW 80th Street and SW a t th Avenue by the Miami -Dade County Public Works Dept. + i -rr- FIGURE 5. TRAFFIC CALMING IMPROVEMENT PLAN SOUTH MIAMI NEIGHBORHOOD TRAFFIC STUDY M nKimisy -rorr and knocatos, 1 NOT TO SCALE J � TRAFFIC CALMING OPTIONS 1. TRAFFIC DIVERTER Qzb- 2 TRAFFIC CIRCLE db 1 CURB EXTENSION 4. TEXTURED PAVEMENT GA- E #':AY TREATME`+ PROPOSED IMPROVEMENT LOCATION PROPOSED SECOND PHASE MPROVEWENT PROPOSED TURNING RESTRICTIONS EXISTING TURNING RESTRICTIONS - iirrR