Loading...
00-0262-010 -11 I i i J REVISION$ BY ! • f • i J J J J PLUMBING SYMBOL LEGEND ' - . .. SYMBEIL DESCRIPTION w }�. SANITARY LINE Q; °-- -,- --— VENT LINE O SEI ""`"r STORM DRAIN LINE NN _ _ ----�- --►- SAFEWAS TE LINE 11) ® v �____r_ CD----~ CONDENSATE LINE QO GENERAL PLUMBING NOTES= PLUMBING FIXTURE CCJNNECT'ION SCH •LE COLD WATER LINE � �� 1. A. ALL WORK SHALL BE DONE in accordance with the South Florida NOT WATER LINE "' NO. DESCRIPTION DRAIN `elATER --- ` Building Code and with all applicable regulations. COLD HOT REMARKS HOT WATER RETURN B. DRAWINGS: Refer- to all drawings for coordination of the P-1 .WATER CLOSET' 3" _ G -- GAS LINE Q '' � �;� �'r•. '; plumbing work. 1/2 -- MUST NOT FLUSH WITH MORE THAN 1.6 GALL b. C. ARRANGE AND PAY for all permits, licenses, inspections _ COUG CLEANOUT ON GRADE ► 4, P-2 LAVATORY �n w and tests. Obtain the required certificates and present 1 1/�" t/2" 1/2" FAUCET- TO FLOW 2.0 GPM MAX. FCO FLUSH CLEAN OUT W to owner. -, - - WC❑ WALL CLEAN OUT P-3 BATH TUB • J �, D. GUARANTEE: The completed installation shall be fully 2" 1/2" t/2" SHOV4ERHEAQ TO FLOW 2.5 GPM MAX. • i , �.;.,.�, guaranteed against defective materials and/or improper ---- - _ FD FLOOR DRAIN y� workmanship for a minimum of one year for material and P-`T BIDET 1 1/2" 1/2" 1/2" FLOOR MOUNTED. VTR VENT THRU ROOF u4Y ern;,.• labor. --------T--_. ___ ._ --_--- - - ----. -�-- - — --- - Cj CAST IRON PIPE C� N E. ALL HORIZON FAL SANITARY PIPING shall slope at 1/8 inch per foot minimum, unless noted otherwise. DS DOWN SPOUT 4J q RWL RAIN WATER LEADER � � N , J 2. SHOP DRAWINGS: Contractor shall submit for approval, within 30 days of signing contract, a minimum of rive copies of fully o descriptive literature, including but not limited to: water O � o o heaters, and plumbing fixtures. No work shall proceed without K:\PDETAJL\PlEG1 Q the approval of these submittals. - 3. PLUMBING FIXTURES: Fixtures shall be as specified and shall be furnished and installed by this contractor. Fixtures shall be complete with drains, traps, supplies and any other accessory . required. I , 4. MATERIALS: A. PIPING: a. Soil, waste and vent, and storm: Sanitary pipe, PVC, OWY, - (W—H, Schedule 40. b. Domestic water: Copper pipe, Type L with sweat wrought FOYER 1� • copper fittings. Type 'M' in concealed spaces is E1/r �I + acceptable. Isolate in from concrete with P piping EXIS�1 „", insulating material. ,, c. Condensate drain: DWC PVC. l S rORA Er �• d. Domestic water supply assembly. Chrome finish tubing with angle shut off valves. , / CL 5. ALL AUTOMATIC ELECTRIC water heaters shall meet the standards of the latest energy fficient code. 9Y Y EX/SrG CL EXIST G � E XIS TG 8£OROOM BEOROOM DINNING ROOM °"'� • 6. PIPING TEST AND DISINFECiiONS: A. Test: All sanitary and domestic water supply piping shall ;! be tested for leaks before piping is concealed or connected 4 to equipment and plumbing fixtures. / ELECT. i' :.>�► B. Disinfection: All domestic water piping shall be C� 9.23' PANft disinfected by introducing a solution of calcium I , hypochlorite of 50 ports per million of chloride and as LLJ per AWWA Standards. A� p' 7. YALtiES: Domestic water valves shall be of bronze body, � sweat ends. ' (� • ;' _ 8. HOSE BIBBS: Shall be 3/4 inch. rough brass construction with - shut off valve and vacuum breaker. 00 Exlsr c � 00 9. ALL OQT O0RS FLOOR clean outs shall be tenninated up to grade MASTER BEDROOM CL RANGE I/2" and shall be marked. � '-1 E x r` 10. CONTRACTOR SHALL COORDINATE exact location of sanitary, IS G 8E0ROOM �- C I K1 rCN£N and domestic water piping before starting any wok. Notify £XIS r'G 1'h Architect/Engineer of any deAatlons from design drawings. BAtN EX1S rG 10. CONTRACTOR SHALL PAY for any engineering services related /� MASTER I 8A rNR00M ' =< 3/4” J o to the revision of drawings as a result of any changes O �J J originated by the contractor. CL CN /sr G '( C M/L Y ROOM II�3l4" QA i W. � � J LQ 3"V rR ° P_/ 2';�LESS ORA/N 9114 _P t� , w ANTI•SIALO VALVE I- ._ --- !� (0 3"1/8%l2 SLOPE .% Oat$ 4"$A N1 r. SEWER CONNEC r r0 F.XIS�q NE-I N `'£X/sr'G SEP r/C rANK. COOL r $cal• PLUM81NG PLAN SAN. � 4rawn 114 0 Job l FUI %y /� - 3 Ot` Shoots, . y� 14 1 T. 11%00t0 OM N0.i000M CLLAA0AlN1•