Loading...
00-1414-013 NEW 1 1/4" CONNECTION TO EIRE PROTECTION SPECIFICATIONS LEGEND , .^ SYMBOLS. � � , .... ..r,. r.d . ..:, FLOOR FIRE MAIN. 1. FURNISH ALL MATERIAL, LABOR AND SERVICE FOR THE INSTALLATION, TESTING, ADJUSTING A-- BS I `:E V I A, I i-O IN S AND PLACING INTO SERVICE OF THE ARE PROTECTION EQUIPMENT AS COMPLETE AND ............... .. .......... ..... EXIST FIRE ..._..... .............._ . ... �HEREBY,GINCLUDING MISCELLANEOUSIEDERVICESVALV VALVES, PRESSURE GAUGES ANDLIED h_ COND�TI9N1 A/c -AIR NG- ASSOCIATED NECESSARY APPURTENANCES, WHETHER SHOWN OR NOT. ALL WORK MUST BE DONE IN AFF ABOVE F NISh FLOOR ENGINEER ACCORDANCE WITH THE APPLICABLE LOCAL BUILDING DEPARTMENT, NFPA BTU/HR - 'GUI THERMAL Wi PER HOUR RECOMMENDATIONS AND COMPLYING WITH THE RECOMMENDATION OF INDUSTRIAL RISK CFM GUBiC FEE i PER ivili liJTE NEW FLUSH SPRINKLER °FDB DEGREE FARENHEIT DRY BULB INSURERS. °FWB DEGREE FARENHEIT WET BULB K1 03 T, 5001 . HEAD-PLATE TO MATCH DG DOOR GRILLE L` CEILING COLOR. 2. PIPING SHALL BE STEEL, SCHEDULE 40, BLACK, AND IN ACCORDANCE WITH SPECIFICATIONS DIFF DIFFUSER ., _.- ASTM A120 OR A53. SCHEDULE 40 BLACK STEEL PIPE SHALL BE JOINTED BY SCREWED DN DOWN ...................................................................... JOINTS IN ACCORDANCE WITH SPECIFICATION ANSI B2, .BY WELDED JOINTS IN ACCORDANCE ENT ENTERING ....... WITH SPECIFICATIONS ANSI B31.10, ANSI B31.1.Oa AND ANSI B31.1.Ob, OR MECHANICAL EXH EXHAUST CLIENT F GROOVED COUPLINGS. F.C.U. FAN COIL UNIT ......................:...................................................................................................... .......,:.::............:.............................................. 1" F.D. FIRE DAMPER ............: 3 BUT NOT LESS FITTINGS SHALL BE ABLE TO WITHSTAND THE WORKING PRESSURES INVOLVED FIN FINISHED F.L.A. ,..,_ THAN 175 PSI COLD WATER. FITTINGS SHALL COMPLY TO ANSI STANDARDS. FULL LOAD AMPERES FLEX FLEXIBLE 1" 4. ALL VALVES SHALL BE U.L. LISTED AS REQUIRED. FLD FULLO LOUVER DOOR America's „ FPM FEET PER MINUTE IT 1 5 TED STANDARD SPRAY HEADS WITH /2 ORIFICE AND GR. GRILLE NOMINAL 1657 TEMPERATURE RATING. HOR HORIZONTAL Capital 6 HORSEPOWER Partners . HYDROSTATIC TEST NFPA 24, CHAPTER 8 ISOL. ISOLATOR SP KW KILOWATT 7. PIPE ENDS SHALL BE REAMED TO REMOVE ALL BURRS, AND PIPE SECTIONS SHALL BE LBS POUNDS CLEANED INSIDE TO REMOVE ALL CHIPS AND FOREIGN MATERIAL PRIOR TO MAKING UP JOINTS. LRA LOCKED ROTOR AMPERES APPROVED JOINT COMPOUND SHALL BE APPLIED TO THE THREADS OF THE PIPE AND NOT IN O.A. OUTSIDE AIR 444 Brickell Avenue REPLACE EXISTING DIFFUSER THE FITTING WHEN MAKING UP JOINTS. PIPE SHALL NOT EXTEND INTO THE WATERWAY OF R.A. RETURN AIR Suite 900 THE FITTING. /LD AIR THROUGH LOUVERED DOOR WITH NEW 2-WAY 10X10 CEILING REG. REGISTER A A i -- NEW 7"� ...... ............. :....................... . ... DIFFUSER EQUAL TO TITUS TDC 8 Miami, FL REQ'D REQUIRED .. .............................................................................. ......... ....................................................:. M F . . ZING, PACT G, AND NSTALLATIONASHALL BE INS ... (WITH OPPOSED BLADE DAMPER APPROVEDGBYHULL AND/OR SUPPORTED RPM REVOLUTIONS MPER YMINUTE EXIST DUCT VERIFY COLOR TO MATCH CEILING ACCORDANCE WITH NATIONAL FIRE PROTECTION ASSOCIATION STANDARD No. 13 SP.D. SPLITTER DAMPER .... ............................. 130 CFM SPRINKLER SYSTEMS , EXCEPT AS OTHERWISE SHOWN ON DRAWINGS OR SPECIFIED HEREIN. SP STATIC PRESSURE EXACT LOCATION) TEMP. TEMPERATURE NEW 10X10 CD 9. DRAWINGS SHOW THE INTENT AND GENERAL ARRANGEMENT OF THE SYSTEM. T ST T THERMOSTAT 1W 125 CFM Int Renovations for ...... .. REPLACE EXISTING U. UNDERCUT DOOR Interior Renov � ns IN EAR DIFFUSER - 1 WAY \ SPRINKLER HEADS, V.D. VOLUME DAMPER Main Lobby and 2=$LOT 95 CFM EACH ADJUST PIPING PER VERT. VERTICAL Elevator Cabs at 3' LONG. EACH. _ .. NEW CEILING HEIGHT W/ PROOF WITH N 0 TE S . W.P. WATER AND PROVIDE NEW 1-W ONE WAY Sunset FLUSH SPRINKLER 2-w TWO WAY Professional Center PROVIDE NEW HEAD-PLATE TO MATCH 1. SHOP DRAWINGS SHALL BE SUBMITTED ON ALL FIRE PROTECTION WORK, 3-W THREE WAY TITUS ML-38 CEILING COLOR. ALL WORK SHALL COMPLY WITH LOCAL CODES AND F.F.P.A. STANDARDS 4-W FOUR WAY 59'75 Sunset Drive LINEAR RETURN. "° 13, 14, 20, AND 24 AND THE SYSTEM MUST BE APPROVED BY F.M. OT THERMOSTAT (5'-O" ABOVE FINISH FLOOR) SOL1t11 Miami, FL 3' LONG EACH REMOVE CEILING DIFFUSER & 20x12 DUCT SIZE IN INCHES (FIRST FIG. SIZE SHOWN) 2. ALL PIPE SIZES TO BE SHOWN IN SHOP DRAWINGS AND SUPPORTED BY INCREASE TOTAL CFM TRANSITION FROM EXISTING HYDRAULIC COMPUTATIONS. DUCT FLEXIBLE CONNECTION 2 N T TO THIS FLOOR BY 100 ......... ......... ............... 0 DUCT (2)7"0 UM AND CONNECT 3. PROVIDE SUPERVISORY (STATUS) SWITCH FOR SUCTION SIDE OF FIRE PUMP. DUCT 0 CO CFM - REBALANCE AIR .... VIBRATION ISOLATORS 4 ROOF MANIFOLD MUST BE "UL" LISTED. T NEW „7 TITUS ML 38 LINEAR DIFFUSER TED. QUANTITIES AS NOTED. "3 ', ', ; , X °� -°-� ��- -� �-�� °-�°-- -°� -- IS OR 4A ETC. NUMBER & LETTER NEXT TO CLG. DIFF. 5 INDICATES TITUS PATTERN TYPE. Project;(WITH END CAPS). ALL VALVES CONTROLLING WATER SUPPLIES FOR SPRINKLER SYSTEM OR N PORTIONS....... ......... THEREOF SHALL NOT BE LOCATED MORE THAN 7 —0 ABOVE _ THE FLOOR 410 i ............................................................. ................... NOT ALL SYMBOLS & ABBREVIATIONS ARE USED NOTE: O 0 ................................................... 6 PROVIDE A 1 MIN DRAIN PIPE A ND VALVE FOR EACH FLOOR Sol ..__ .. ih 2 7. ACTIVATE A LOCAL ALARM ON THE GENERAL MECHANICAL NOTES 0 FLOOR WHERE FLOW IS DEFECTED WATER FLOW DEVICES SHALL ACTIVA . ;. 1 F ..... „ 8. LING DEVICES SHALL ANNUNCIATE AT THE CENTRAL THE CONTRACTOR SHALL PROVIDE COORDINATED SHOP DRAWINGS 0 ............. .. WATER FLOW SIGNALING ALL MECHANICAL CONTROL STATION. .: .A CDE PLUMBENG AND FIRE PROTECTION �. ARCHITECTURAL AND ELECTRIC ALL BETWEEN THE H V STRUCTURAL, AL THE DRAWING SHALL BE ;> 9. ALL SPRINKLER HEADS SHALL ORIFICE, STD. / BE OF A LARGE ENOUGH SCALE TO ALLOW FOR THE PROPER COORDINATION OF ALL TRADES. ALL LOCATIONS OF POSSIBLE 10. HOSE CONNECTIONS MUST BE SUPPLIED BY A 2 1/2" LINE CONNECTED TO CONFLICT WILL BE CLEARLY NOTED FOR RESOLUTION BY THE � .. THESE CONNECTIONS CANNOT BE SUPPLIED BY THE SPRINKLER RISER T ARCHITECT/ENGINEER ANY ITEMS NOT SHOWN AS POSSIBLE SYSTEM • CONFLICTS ON THESE SHOP DRAWINGS WILL BE CONSIGNED TO HAVE BEEN RESOLVED AT NO ADDITIONAL COST BY THE INDIVIDUAL TRADE ;..... ................:.. " 11 MANUFACTURE CONCERNED ALL FIRE PROTECTION EQUIPMENT SHALL BE OF SAME ........ . ... WITH PROPER SYSTEM U.L. RATINGS A A PACKAGE SYSTEM. 12 CONTRACTOR.... ........ . 2 INSTANCES INVOLVING CEILING CLEARANCE THE TRADES SEPARATE PERMIT REQUIRED FOR FIRE PROTECTION CONTRA FOR ALL INSTAN S • PRIORITIES ARE AS FOLLOWS N. i3EWA TO E.- � . r+ FIRE SPRINKLER HEAD (FLUSH W/CLG•) A. GRAVITY SEWER, RAINWATER, CONDENSATE AND ACID WASTE PIPING. ............ .... PIPE SIZE AS PER HYDRAULIC COMPUTATIONS QUIPMENT. �< B H V A C DUCTWORK AND E ��:. FIRE SPRINKLER C FIRE PROTECTION MAINS n LER UPRIGHT HEAD D. H.V.A.C. REFRIGERANT LINES. \ ..................................................................................................................................... ES .. ................................................................................... ELBOW DOWN E FIRE PROTECTION BRANCH LINES. = F. PLUMBING PRESSURE LINES. _. G ELECTRICAL CONDUIT Gonzalez ......... . . - reu TEE DOWN Ab ........................................................ ...................................................................................................................................................... ..... 3. EACH TRADE SHALL RUN HIS/HER LINES, DUCTS, AND EQUIPMENT Alas, Inc. TEE UP IN AS EFFICIENT A MANNER AS POSSIBLE CONSERVING CEILING AIR Architecture INSTALLED AS 42 5 Aurora a St t SPACE IN ALL INSTANCES ALL ITEMS SHALL BE 7 r Street SP F. O.S. & Y. OR GATE VALVE TIGHT TO THE ITEMS INSTALLED ABOVE THEM AS POSSIBLE, IN Suite F CONSIDERATION OF THE REQUIREMENTS OF SUBSEQUENT TRADES. NO F ,Coral Gables, 33146 _ EXCESSIVE CLEARANCE TOLERANCES OR DISORGANIZED INSTALLATION ( 305 ) s, F —4573 CHECK VALVE SHALL BE ALLOWED. THE MECHANICAL ENGINEER SHALL HAVE THE FINAL SAY AS TO WHETHER OR NOT A CONFLICT COULD HAVE BEEN Lic: AA0002495 FLOW SWITCH AVOIDED BY FOLLOWING DIFFERENT, MORE EFFICIENT ROUTING OR k. SUSPENSION THAN THAT USED, REGARDLESS OF COSTS OR TIME EMPLOYED BY THE CONTRACTOR. ............. EXIST. FIRE........................... EXIST. ARE LINE 4. THE STRICT ADHERENCE TO THE ABOVE WILL NECESSITATE ADDITIONAL F ARE LINE ELBOWS, BENDS, OFFSETS, RE-ROUTING AND LENGTHS IN EXCESS OF REVISIONS THOSE SHOWN. THESE ARE TO BE INCLUDED IN THE BASE BID AT NO : ADDITIONAL COST TO THE OWNER. SIDEWALL SPRINKLER 5. THE DISCONNECT SWITCHES AND STARTERS FOR THE MECHANICAL EQUIPMENT ARE CALLED FOR ON THE SPECIFICATIONS. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE SPECIFICATIONS AND COORDINATE GENERAL H ° V. A . C . NOTE S . THESE ELECTRIAL ITEMS WITH THE ELECTRICAL SUBCONTRACTOR, EXPECIALLY AS TO WHICH ITEMS ARE SUPPLIED BY WHOM. 1. SCOPE OF WORK REPLACE EXISTING SPRINKLER HEADS, WORK SHALL INCLUDE ALL LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS 3. AIR DISTRIBUTION ADJUST PIPING PER NEW CEILING IN CONNECTION WITH THE FURNISHING AND INSTALLATION OF ALL AIR CONDITIONING, HEATING a) ALL AIR OUTLETS AND INLETS SHALL BE TITUS, OR EQUAL, AND OF ALL ALUMINUM CONSTRUCTION HEIGHT AND PROVIDE NEW FLUSH SPRINKLER AND VENTILATION WORK AS SHOWN ON DRAWINGS, HEREIN SPECIFIED Al REQUIRED BY SITE OF THE SIZE AND TYPES SHOWN ON DRAWINGS. CONDITION. EQUIPMENT SHALL BE PROVIDED AS SCHEDULED. ON DRAWINGS OR EQUAL EQUIPMENT b) FIRE DAMPERS AS APPROVED BY LOCAL GOVERNING AUTHORITIES SHALL BE INSTALLED IN HEAD-PLATE TO MATCH CEILING COLOR. SUBMITTED FOR APPROVAL. ALL DUCTWORK PASSING THRU A FLOOR, ROOF, FIRE PARTITION OR FIRE WALL (PROVIDE ACCESS) AS SHOWN ON THE DRAWINGS 2. DUCTWORK c) CONTRACTOR SHALL PROVIDE POSITIVE MEANS FOR BALANCING EACH INDIVIDUAL AIR CONDITIONING a) DUCT MATERIALS SHALL BE GLASS FIBER BOARDS OR INSULATED METAL FOR INDOORS AIR SUPPLY AIR OUTLET, AS PER SCHEDULES & DRAWINGS. SYSTEMS SHALL BE REPLACE EXISTING DIFFUSER CONDITIONED SUPPLY AND RETURN DUCTWORK AND METAL FOR EXHAUST, AND NON—CONDITIONED BALANCED AGAINST THE ACTUAL INSTALLED STATIC PRESSURE WITH NEW 3-WAY 10X10 CEILING OUTSIDE AIR. EXTERIOR (EXPOSED TO WEATHER) AIR CONDITIONED SUPPLY & RETURN DUCTWORK DIFFUSER EQUAL TO TITUS TDC SHALL BE INSULATED METAL, MADE TOTALLY WATER PROOF. 4. VIBRATION ISOLATION b) GLASS FIBER DUCTWORK SHALL BE OWENS—CORNING RECTANGULAR DUCT SYSTEM TYPE 800—FRK PROVIDE SUPPORTS OR MOUNTS FOR ALL EQUIPMENT LOCATED WITHIN THE BUILDING STRUCTURE (WITH OPPOSED BLADE DAMPER). OR EQUAL, CONFORMING TO APPLICATION MANUAL PUB. #15—MS 11993C POWERED BY ONE HORSEPOWER OR LARGER MOTOR. FLEXIBLE PIPING CONNECTIONS SHALL COLOR TO MATCH CEILING c) METAL DUCTS SHALL BE IN ACCORDANCE WITH LATEST ISSUE OF THE LOW VELOCITY DUCT BE PROVIDED FOR ALL PIPING CONNECTED TO EQUIPMENT MOUNTED OF SUPPORTED BY 180 CFM EACH. CONSTRUCTION STANDARDS, PUBLISHED BY THE "SHEET METAL AND AIR CONDITIONING CONTRACTORS VIBRATION ISOLATORS. NATIONAL ASSOCIATION, INC" AND THE LATEST PUBLICATION OF GUIDE & DATA BOOK OF .................................................................................................:.........:.................. THE AMERICAl SOCIETY OF HEATING, REFRIGERATION & AIR CONDITIONING ENGINEERS. 5. TESTS d) EXTERIOR METAL DUCT INSULATION FOR INDOORS SHALL BE ONE INCH THICK, 25 LB. PER ALL TESTS SHALL BE PERFORMED AS REQUIRED DURING THE DIFFERENT STAGES,.OF File name: \sunset\04—pIan.dwg CU. FT. FIBERGLASS FLEXIBLE BLANKET INSULATION WITH U.L. APPROVED FIRE RESISTING WORK AND A FINAL 24 HOUR MINIMUM RUNNING TEST SHALL BE .DONE'AFTR,A-�'-0THER Osumi w ALUMINUM FOIL VAPOR SEAL FACING AND A MINIMUM "K" OF 0.24 AT 75° F MEAN TEMPERATURE. TESTS AND BALANCING OPERATIONS HAVE BEEN DONE. r, t INSTALLATION AS PER MANUFACTURER PUBLISHED RECOMMENTATIONS. t�,C�s� 'r �Rq` DATE e) EXTERIOR METAL DUCT INSULATION FOR OUTDOOR DUCTWORK EXPOSED TO WEATHER SHALL 6. GUARANTEE ;` oip:rC•fi ?;; 11-20-00 BE TWO 2 INCHES THICK, 6 LBS. PER CU. FT. FIBERGLASS RIGID BOARD INSULATION WITH CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE COVERING LL RKMANIRP!A`ND•' t , DUPLEX VAPOR BARRIER AND A "K" OF 0.22 AT 75' F. INSTALLAATION SHALL BE MADE 100% MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE CC EP l4bE.. N. l SHEET WATER PROOF AND IN ACCORDANCE WITH MANUFACTURER PUBLISHED RECOMMENDATIONS. , NEW MECHANICAL PLAN 3/8"=V-0" '� �A � N GI N EER S M I F.C�y F gal: . . j SHIPPING AVENUE G.A.A. Inc. 2000 FLORIDA 33146 �\ B 0004473 444-8210 f '