00-0441-034 - - - REVISIONS BY
Z
- N
8
CAP FOR FUTURE FLU" 51NG FIXTURE SCHEDULE V v y -�- °
CONNECTION SOLAR
AIfR CONDITIONING SCHEDULE �
OR HEAT RECOVERY TRAP FIXTURE HOT COLD
HEAT TRAP MARK
SIZE UNITS WATER WATER MANUFACTURER NOM. NOM. ESP- IN. :ELCCT. TOTAL COOLING CAP. 3/T O/A DIMENSIONS WEIGHT ELECT. SERVICE
UNIT AND MODEL NO. TONS CFM WG. HEAT KW LA/HP BTUH fit 957 6 6-17 W CFM WxLxH (IN.) LBS. VOLTS/PH/Hz SEE
GATE vAL GATE VALVE WC 3" 4 - 1'2 " AHU RHEEM 0142 R5HA21J115UGAI 1400 -•'`0 10 21 x 235 x 52 150 208-230/1/(00 12.4
HEAT TRAP LAV 11/4 1 '/2 '/z `---- ---_
COLD WATER, 3/4" 11142 U RHEEM 3.5 11.9 29,300/41,000 36 x 40 x 43 313 208-230/1/60 "
N.W. TO FIXTURES SH 2" 2 1/2 1/21, RAMB042JAZ
Z
HOT WATER, 3/4" UNION SK 11/211 2 1/ " 1i " W 4
0
z 2 z W 0)
WM 2" 4 1/2
PRESSURE d TEMPERATURE
RELIEF VALVE (ASME APPRVD.) 1/ ' NOTES: � O
DUJ 1 2 SW 2 /2 - = r� O N
1/2 " UJ/VALVE L 0
I O
O
HB - - - VAC. BREAKER N Q o) U W
3/4" Cu RELIEF D I5CHARGE H 0 W Z
LINE, TO OUTSIDE GREEN TUB 2" 2 I/ 1/ V) - O V) Q
ELECTRIC AREA, TERMINATE (o" z 2 W 0 Z W
HEATER ABOVE FIN. GRADE 1 1 T O 0 U 0
80 GAL. BD 2 1 /2 /2 = O
2-6.0 KW of Z J
EF-89 FAN SCHEDULE 0 0
DRAIN VAL 1) FIXTURES TO COMPLY W/SFBC TABLE 46-R-2 Z Q I X 0
MANUFACTURER ELECT. SERVICE DIMENSIONS WEIGHT O W W p
FAN AND MODEL NO. RPM HP CFM 8 S.P. VOLTS/PH/Hz WxLxH (IN.) LBS. REMARKS n J U
2) ALL SHOWERS k BATH/SHOWER COMBINATIONS SHALL =
BE PROTECTED WITH A CONTROL VALVE OF THE W/ GRILLE 3"-P DUCT p
EX, FAN NUTONE C35OG 1500 1/90 50 •� 1/S" 115/1/60 9 X 9 X 4 ro
PRESSURE BALANCE, THERMOSTSTIC MIXING OR COM- 8 ROOF CAP °
BINATION TYPE. HANDLE POSITION STOPS MANUFACTURER'S
INSTRUCTIONS AT TIME OF INSTALLATION TO A MAXIMUM
-�° �°- MIXED WATER OUTLET TEMPERATURE OF 120" F. S 1 31 I H V no W
WA I R HE A I E R P IF INCA D IAGFRAM
OZ
NO SCALE c9
Z
AIR CONDITIONING SYSTEM - GENERAL NOTES: O
RIGID FIBERGLASS DUCT (R-6)
1. DUCTWORK SHALL BE 1 1/2" THICK, 3 POUNDS PER CUBIC FOOT DENSITY ' O Z
PLUMBING GENERAL NOTES AND SPEC IF ICAT IONS:
FIBERGLASS WITH VAPOR BARRIER, UNLESS OTHERWISE SPECIFIED. ~ K
DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE O 3
WITH MANUFACTURER'S SPECIFICATIONS AND ACCORDING TO "ASHRAE"
I. A. SCOPE OF WORK: AND "SMACNA" STANDARDS. Z
SPIN COLLAR DUCT DIMENSIONS ARE IN INCHES AND CORRESPOND TO INSIDE
DIMENSIONS WIDTH X HEIGHT. DUCT SYSTEM SHALL COMPLY WITH °
THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY SHOWN ON THE "NFPA" STANDARD NO. 90A AND/OR 905. DUCTWORK AND COMPONENTS vi
DRAWINGS, SPECIFIED HEREIN AND/OR AS NEEDED FOR A COMPLETE i1 i SHALL BE CLASS 1 MATERIALS IN ACCORDANCE WITH U.L. IV
SYSTEM, INCLUDING BUT NOT NECESSARILY LIMITED TO: TESTS.
0
1. DOMESTIC GOLD AND HOT WATER PIPING SYSTEMS 2. COORDINATE LOCATIONS, SIZES AND OPENINGS WITH OTHER TRADES O 3
ON THE JOB. A/C CONTRACTOR SHALL PROVIDE THE COMPLETE DUCT 0 ex
2 .SANITARY DRAIN AND VENT SYSTEMS SYSTEM WITH TURNING VANES AT ALL ELBOWS, SPLITTERS AND -�
3. PLUMBING FIXTURES AND TRIM DAMPERS, AS REQUIRED.
4. AIR CONDITIONING CONDENSATE DRAINS A/C CONTRACTOR SHALL USE THE BEST PRACTICES OF THE TRADE IN W % 3
5. PRESSURE AND TEMPERATURE RELIEF FROM WATER HEATER THE FABRICATION AND INSTALLATION OF THE SYSTEM. i5
6. PIPING INSULATION O
INSULATED FLEXIBLE DUCT GLASS 3. DIFFUSERS SHALL BE SELECTED, LOCATED, AND BALANCED IN ORDER Q 3
I. SUPPORTS AND HANGERS 1 1/2" WITH POLYETHELENE JACKET THAT THEY DELIVER THE REQUIRED CFM TO THE ENTIRE ROOM EVENLY Q p IL in:
AND DRAFT FREE TO MAINTAIN THE FOLLOWING DESIGN CONDITIONS: f--F �- N 7
B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST AND STEEL WIRE REINFORCING n, 'A
EDITION OF THE "SOUTH FLORIDA BUILDING CODE" CH. 46 LOCAL ORDINANCES INSIDE OUTSIDE RELATIVE UL
AND IN COMPLIANCE WITH THE "FLORIDA ENERGY EFFICIENCY CODE FOR COOLING - 76° DB 91° DB - _9° W5
HUMIDITY
BUILDING CONSTRUCTION", AND "HRS" REGULATIONS. IN THE EVENT OF
HEATING - 10 05 45° - DB 50% TO 60% O o
CONFLICT BETWEEN ANY CODE OR REGULATIONS, THE MORE STRINGENT U1 J
4. ALL FAN UNITS, MOTORS, COMPRESSORS, ETC. SHALL BE ISOLATED, D W 0
REQUIREMENTS WILL GOVERN. DIFFUSER AS REQUIRED TO OPERATE QUIETLY SO THAT N005JECTIONA5LE SOUND H -4 o
WILL BE HEARD IN THE HABITABLE SPACES DUE TO AIR VELOCITY, -1 0
2. CONTRACTOR TO VERIFY AT SITE THE LOCATION, ELEVATION AND SIZE OF ALL MOTOR HUM, VIBRATION, OR MECHANICAL MOVEMENT.
EXISTING LINES FOR CONNECTION BEFORE INSTALLATION OF ANY PIPING. > O J
3. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS f I 5. A/C SYSTEM SHALL HAVE DISPOSABLE AIR FILLERS LOCATED AS p al W
OR SNOGK ABSORBERS AS INDICATED ON PLANS. TY�'ICAL DIFFUSER CONNECT ION DETAIL 11 p w CX
REQUIRED FOR EASY ACCESSIBILITY. Q
W
4. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH THE APPROVED MATERIALS, NO SCALE
SHALL HAVE SMOOTH IMPERVIOUS SURFACES AND SHALL BE FREE FROM DEFECTS 6. A/C SYSTEM SHALL BE CONTROLLED BY A THERMOSTAT. MOUNT
AND CONCEALED FOULING SURFACES. ALL FIXTURE TRIM TO BE CHROME PLATED.
THERMOSTAT 5'-O" ABOVE FINISHED FLOOR, U.O.N. O °
FIXTURES SHALL BE PROVIDED WITH SUPPORTS, HANGERS, ETC. ZO O Z
-1. ALL GRILLS AND DIFFUSERS TO BE OF ALUMINUM CONSTRUCTION. DIF- O
5. WASTE LINES TO BE PVC SCH. 40. SLOPE ALL UNDERGROUND SANITARY PIPES AT 1/8"/FT. FUSERS SHALL HAVE HIDDEN OPPOSED BLADE DAMPERS. PROVIDE GASKETS LL Z '
ALL ABOVE GROUND WASTE/VENT BRANCHES AT 1i4"/FT SLOPE. SUPPLY DUCT ON ALL GRILLES AND DIFFUSERS. TITUS OR AIREGUIDE, FINISHED COLOR O Q Z
BY ARCHITECT. Q[ I
6. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY AND ANY WASTE PIPING AT
EVERY CHANGE OF DIRECTION, AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS 6. UNDERCUT DOORS 1" A.FF., AS INDICATED. (� /- L) 0 <
AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. !�1- UU=CC ul
1. VENT LINES TO EXTEND c3" MIN. ABOVE ROOF AND FLASH WITH LEAD. REFRIGERANT LINES _-,1 9. ALL REFRIGERANT PIPING SHALL BE COPPER - TYPE L - U V Z W
TO OUTSIDE I 1 ACR TYPE, DEHYDRATED AND SEALED. ALL FITTINGS SHALL BE
8. WATER PIPE BELOW GROUND SHALL BE COPPER TYPE "K" ABOVE GROUND TO BE CONDENSING UNIT > I I WROUGHT COPPER ALL JOINTS SHALL BE MADE WITH HIGH Z
COPPER TYPE "L". OR APPROVED CPVC OR POLYBUTELYNE AS REQUIRED BY OWNER ��--�� TEMPERATURE BRAZING ALLOY OF NOT LESS THAN 5°ra SILVER 1 Q
PIPING INSTALLATION NOT LESS THAN 3/4" THICK "ARMAFLEX". I—
LIQUID AND SUCTION LINES SHALL BE SIZED ACCORDING TO o 0 H
11. PIPING EQUIPMENT MANUFACTURER'S RECOMMENDATIONS FOR EQUIVALENT T 13
LENGTH OF PIPING RUN FOR CONNECTED TONNAGE. ALL PIPING a _
11 ACCESSORIES SHALL BE CONSTRUCTED AS SUGGESTED BY EQUIPMENT a
A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT PROPER CEILING MANUFACTURER ALL PIPING SHALL BE EVACUATED PER GOOD REVERSE
INTERVALS ACCORDING WITH CODE. R/A - - I I o
PIPING PRACTICE BEFORE START-UP. ,=
3/4" CONDENSATE I a
B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH FOUNDATION SLABS OR DRAIN w/ 3" TRAP 1�I I j�/
MASONRY WALLS, CAULK OPENINGS BETWEEN PIPE AND SLEEVES. UNION AND C.O TO I I i MODEL
GREEN AREA I I PARTITION Wr 4
C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR CEILINGS, PROVIDE 1 °
ESCUTCHEONS FIRMLY SECURED TO THE PIPES AND OF SUFFICIENT OUTSIDE STL. A.H.U. SUPPORT I 1 CONDENSING ° SCALE "- '_ "
DIAMETER TO COVER THE SLEEVED OPENINGS FOR THE PIPES. PROVIDE I I / UNIT � 1/4 -1 O
CHROMIUM PLATED ESCUTCHEONS IN BATHROOMS. I i /� CHECKED BY M.�. 0.
NO COMBUSTIBLE I 8
9. INSPECTIONS AND TESTS I I i DRAWN BY CCU. y gn
MATERIALS WITHIN
A. CONTRACTOR SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS TO THE A.H.U. ROOM I lW/H UNDER) PIPE INSULATIO CONCRETE
AUTHORITIES HAVING JURISDICTION, AS THE WORK PROGRESSES. ALL I I i DATE O�✓-20-98 W
SYSTEMS SHALL BE TESTED BY CODE AND/OR LOCAL REGULATIONS. LOUVRE DOOR- I 1 PAD
o JOB 13628 W
B. DRAINAGE PIPING: BEFORE INSTALLATION OF ANY DRAINS, THE ENDS OF I I FLOOR �:` : '� x
SYSTEMS SHALL BE CAPPED AND ALL LINES FILLED WITH THE WATER TO THE a SHEET
HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE BY AN c W
OWNER REPRESENTATIVE. 3/s" POWER DRIVEN STUDS
OR LAG BOLTS W/SHIELDS =
10. STERILIZE ALL WATER LINES WITH A MIXTURE OF TWO (2) POUNDS OF CHLORINATED 'v TO WITHSTAND OVER 120 g OF SHEETS W
LIME TO EACH 1.000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE). M.P.N. WINDS °
RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER REFRIGERANT LINE
BEFORE PLACING IN SERVICE. TO AHU IN PVC SLEEVE
11. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN-SERVICE TEST AIR HANDLER UNIT CONDENSING UNIT A'
AFTER COMPLETION OF THE INSTALLATION.
INSTALLATION DETAIL GUERRERO/GONZALEZ INSTALLATION DETAIL
r
,z
ENGINEERS, INC. ..
NO SCALE NO SCALE Michael C. Guerrero, P.E. ?� �
Mechanical Eng. Lic. x{15235
(G Rafael L. Gonzalez, P.E.
Electrical Eng. Lic. #11057 { ' , . '•
11420 N. Kendall Dr., Suite 200 .
Miami, Florida 33176
Tel. (305) 595-8525, Fax (305) 596-9077 'N" T.7 1 1