Loading...
00-0404-012 lill�<11 .'sw. Af a i AIR CONDITIONING NOTES F 1.0 GENERAL Q Co.- o g 1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY 0 a 0 � o o ,r4 MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL V) AIR CONDITIONING, HEATING AND VENTILATING SYSTEM AS w SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED ce INSTALL IN ACCORDANCE WITH THE SOUTH FLORIDA BUILDING CODE, ASHRAE, SMACNA, NFPA, AND LOCAL KITCHEN FAMILY ORDINANCES. BATH ® BATH MASTER z° 1.2 SCOPE OF WORK , PROVIDE THE FOLLOWING COMPLETE SYSTEMS A. SUPPLY DUCT SYSTEM FOR NEW DINING. 1.3 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED. O r-- I �' 1.4 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS Z �-+�L '��` W I� N C AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR m I� O _c INSTALLATION. COORDINATE REQUIREMENTS TO AVOID ` ° O � INTERFERENCE WITH OTHER TRADES. 1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT / ENGINEER LOW WALL (0 0) APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR —' INSTALLATION OF EQUIPMENT AND MATERIALS. .0 \6" ROUND � 0 1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS 17 AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. w 0 2.0 MATERIALS , , W Z t BEDROOM 2 2.1 DUCTWORK GARAGE DINING I LIVING RM. rn 0 L 2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE ® i i 0 0- Q DIMENSIONS. BEDROOM 3 0 r- 2.1.2 MATERIAL. FIVE POUNDS DENSITY 13/2 " THICK GLASSFIBER 175 CFM 0 DESIGNED, CONSTRUCTED AND INSTALLED IN ACCORDANCE i i W 6 WITH SMACNA'S LOW PRESURE DUCT MANUAL. ALL DUCT JOINTS SHALL BE SEALED AND TAPED. 2.1.3 PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL 0 SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS INSTEAD. i �fr 2.1.4 PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY �,+y"7 KIM OUTLET AND AT EACH DUCT BRANCH. U 2.7 AIR DISTRIBUTION PRODUCTS W L ' (0 2.7.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS I-- AS INDICATED ON THE DRAWINGS. COV. ENTRY — v <Ify 2.7.2 PROVIDE EXTRUDED ALL ALUMINIUM AIR DISTRIBUTION 0� PRODUCTS. I 2.7.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL 0 DRAWINGS. 2.7.4 PROVIDE OPPOSED BLADE KEY OPERATED DAMPERS U BEHIND ALL AIR SUPPLY OUTLETS. Q iA.J L GRILLE SCHEDULE wo �� L t MANUF.: AIR GUIDE �. CO MODEL CB W/ O.B.D. o ", ALUM. CONSTRUCTION r '•. x , a s FURNISH GRILLE BOOTS FOR FLEX DUCTS. j y DUCT SCHEDULE MECHANICAL P �e R FIBERGLASS DUCTS: OWENS—CORNING OR EQUAL, R-6 » 1 1/2- THK, NEOPRENE COATED 1 /4 FOIL FACED, CLASS I FIBERGLASS DUCTWORK: FLEX—AIRE MC SYSTEM: CPE INNER CORE V r� FOIL TAPE: NASHUA No.324 ,.x'� z .. 5 W O E-- W LOW VELOCITY W SUPPLY AIR DUCTS f (SEE PLAN VIEW) AIR FLOW W I-- Q SEAL JOINT WITH I LL DUCT SEALER & 0 TAPE LA Q � 0 DRAW BAND rAIR SPINL"A FI� DUCT (R-6) WITH DAMPER �-- SPIN COLLAR FITTING z = WITH DAMPER SEAL J WI O DUCT S R Q TAPE DIFFUSER REGISTER Ljl JOB No. 0009 CAD FILE: MON-n DATE: 4-12-00 FLEXIBLE DUCT CONNECTION DETAIL nts. m i I