Loading...
00-0270-016 MECHANICAL SPECIFICATIONS - CAR LOS 1.0 GENERAL 6.0 DUCTWORK 9.0 00NDENS'�i? WATER PIPING 14.0 CONTROLS FIGUEROA 1.01 PROVIDE COMPLETE, PROPERLY FUNCTIONING SYSTEMS. 601 ALL SUPPLY AIR AND RETURN•AIR•DUCTWORK SHALL BE 9.01 `PIP'E AND FI TTIN(:;S: -ALL-CONDENSER.WATER PIPING SHALL.BE 14.01 GENERAL: PROVIDE ELECTRIC,.ELECTRONIC OR COMBINATION IRA 1.02 DRAWINGS ARE DIAGRAMMATIC. PRODUCE ACCURATE SHOP DRAWINGS CONSTRUCTED OF FIBROUS GLASS DUCT BOARD UNLESS OTHERWISE -TYF-E L 4ARD DIN CO=FE'z TUBING WITH CAST BRONZE FITTINGS CONTROLS FOR NEW EQUIPMENT. AND PROVIDE MINOR COMPONENTS REQUIRED TO OBTAIN COMPLETE INDICATED. CONSTRUCTION AND INSTALLATION SHALL COMPLY SOLvER JOIN'T'S. 1-UkN614 ,4ND INSTALL DIELECTRIC 14.02 ROOM THERMOSTATS SHALL HAVE INTERNAL SETTINGS, PLAIN AND PROPER SYSTEMS. WITH SMACNA FIBROUS GLASS DUCT CONSTRUCTION STANDARDS. COUPLINGS OR UNIONS AT ALL CONNECTIONS BETWEEN DISSIMILAR CASING AND ADJUSTABLE DIFFERENTIAL. 1.03 MANUFACTURER'S NAMES ESTABLISH TYPE, CLASS AND QUALITY. ro.02 ALL OUTSIDE AIR AND EXHAUST AIR DUCTWORK SHALL BE METALS. ALL ELBOWS THROUGHOUT PIPING SYSTEM SHALL BE 1402 ALL TRANSFORMERS AND CONTROL DEVICES FOR ELECTRIC AND 1.04 COORDINATE ALL WORK WITH OTHER TRADES. CONSTRUCTED'OF GALVANIZED'SHEET'STEEL. DUCTWORK SHALL BE LONG RADIUS TYPE. ELECTRONIC CONTROLS SHALL BE PROVIDED.' 1.05 ALL COMPONENTS SHALL BE STANDARD CATALOGED PRODUCTS OF FABRICATED IN ACCORDANCE WITH THE 1975 ASHRAE HANDBOOK- 9.02 GATE, GLOBE AND ANGLE VALVES: ALL GATE, GLOBE AND ANGLE 14.03 ALL WIRING REQUIRED FOR ELECTRIC AND ELECTRONIC CONTROL APPROVED U.S. MANUFACTURERS, SUBSTANTIATED BY PUBLISHED EQUIPMENT, CHAPTER I, TABLE 4 AND SMACNA LOW VELOCITY VALVES SHALL BE DESIGNED FOR A WORKING PRESSURE OF 115 SYSTEMS SHALL BE FURNISHED AND INSTALLED UNDER THE DATA, SHALL ESSENTIALLY DUPLICATE EQUIPMENT AND MATERIALS DUCT CONSTRUCTION STANDARDS, EXCEPT AS OTHERWISE PSI WOG. VALVES 2-1/2' AND LARGER SHALL BE IRON BODY, SECTION, ELECTRICAL WORK. THIS CONTRACTOR SHALL PROVIDE THAT HAVE BEEN IN SATISFACTORY USE FOR A PERIOD OF TWO INDICATED HEREIN. BRASS-TRIMMED, WITH BOLTED BONNET AND FLANGED ENDS± 2' COMPLETE DIAGRAMS AND INSTRUCTIONS AS REQUIRED FOR YEARS, AND SHALL BE NEW AND FREE FROM DEFECTS. 6.03 PROVIDE ALL SQUARE ELBOWS WITH DOUBLE THICKNESS TURNING AND SMALLER SHALL BE ALL BRASS, WITH SOLID WEDGE DISCS. INSTALLATION UNDER THAT SECTION. 1.06 WHERE CONTACT OF DISSIMILAR MATERIALS MAY CAUSE CORROSION VANES. CONSTRUCT ROUND DUCT ELBOWS OF NOT LESS THAN FIVE GLOBE AND ANGLE VALVES SHALL HAVE PLUG TYPE DISCS AND 15.0 CONTROL SYSTEM OPERATION OR ELECTROLYTIC ACTION, SEPARATE MATERIALS BY MEANS OF (5) SECTIONS. RENEWABLE SEATS. ALL VALVES SHALL BE DESIGNED TO ENABLE 15.01 NEW UNITS: SYNTHETIC RUBBER OR PLASTIC GASKETS, GROMMETS AND 604 CONSTRUCT ALL TRANSFORMATIONS IN DUCT SIZE AND SHAPE WITH RE-PACKING UNDER PRESSURE WHEN WIDE OPEN. A. NEW AIR CONDITIONING SYSTEM SHALL BE CONTROLLED p p ISOLATION FITTINGS, AS REQUIRED: A MAXIMUM ANGLE OF 15 DEGREES BETWEEN THE DUCT CENTERLINE 9.03 BALANCING VALVES: ALL BALANCING VALVES SHALL BE DESIGNED FROM FULLY AUTOMATIC PROGRAMMABLE THERMOSTAT 1.01 CODES AND STANDARDS: ALL WORK SHALL CONFORM TO THE AND ANY SIDE OF THE TRANSITION. ALL BRANCHES SHALL ENTER FOR A WORKING PRESSURE OF 250 PSI WOG MINIMUM. VALVES LOCATED AS SHOWN. ARCHITECTURE REQUIREMENTS OF THE FOLLOWING STANDARDS AND CODES AS THE MAIN AT LARGE END OF TRANSITION OR BEFORE TRANSITION. SHALL BE FURNISHED WITH AN ADJUSTABLE OPEN-POSITION STOP. B. ON CALL FOR COOLING FROM THE ROOM THERMOSTAT, THE INTERIOR DESIGN MODIFIED BY LOCAL ORDINANCES: ro.05 SEAL ALL JOINTS IN DUCTWORK WITH AN APPROVED FIRE - VALVES 2-1/2" AND LARGER SHALL HAVE FLANG=ED ENDS, 2' AND COMPRESSOR SHALL BE ENERGIZED. A. NFPA 9OA - AIR CONDITIONING AND VENTILATION SYSTEMS. RETARDANT GLASS FIBER REINFORCED HIGH VELOCITY DUCT SMALLER SHALL HAVE SCREWED ENDS. VALVES SHALL BE TOUR E C. SYSTEM SHALL CHANGE FROM COOLING TO HEATING A R o 0 0 9 8 4 4 B. SOUTH FLORIDA BUILDING CODE. SEALANT UNLESS OTHERWISE INDICATED. ANDERSSON MODELS STAD OR STAF. AUTOMATICALLY WITH A 2 DEGREE DEADBAND IN BETWEEN. 4080 SW 84th AVENUE C. UNDERWRITERS' LABORATORIES. 6.06 PROVIDE ALL VOLUME DAMPERS REQUIRED FOR COMPLETE CONTROL 9.04 FURNISH AND INSTALL DIELECTRIC COUPLINGS OR UNIONS AT ALL ON CALL FOR HEATING FROM THE ROOM THERMOSTAT, THE MIAMI, FLORIDA 33155 D. SMACNA OF AIR DISTRIBUTION. VOLUME DAMPERS SHALL BE CONSTRUCTED CONNECTIONS BETWEEN DISSIMILAR METALS. ELECTRIC REVERSING VALVE SHALL BE ENERGIZED. 305 220 8997 E. ASHRAE OF 16 GAGE SHEET METAL, DAMPERS UP TO 12 INCHES IN WIDTH 9.05 AIR VENTS: PROVIDE APPROVED AIR VENTS AT ALL HIGH POINTS 16.0 FILTERS F. NFPA 13 - INSTALLATION OF SPRINKLER SYSTEMS. MAY BE SINGLE BLADE AND OVER 12 INCHES SHALL BE MULTI- IN CONDENSER WATER SYSTEM, VENTS SHALL BE AUTOMATIC TYPE 16.01 PROVIDE ONE SET OF THROWAWAY FILTERS TO BE USED DURING 2.0 SPECIAL CONDITIONS BLADE WITH A MAXIMUM BLADE WIDTH OF 9 INCHES. SINGLE UNLESS OTHERWISE INDICATED. AUTOMATIC AIR VENTS SHALL BE CONSTRUCTION. FILTERS SHALL BE VISCOUS IMPINGEMENT TYPE, 2.01 ALL PROPOSALS TO PERFORM WORK UNDER THIS SPECIFICATION BLADE DAMPERS SHALL BE PROVIDED WITH 1-1/2 X 1/8 INCH ALL-BRASS, WITH SELF-CLOSING FLOAT-OPERATED VALVE, WITH GLASS FIBER MEDIA AND DISPOSABLE FRAMES± THICKNESS SHALL BE BASED ON A THOROUGH INVESTIGATION OF ACTUAL GALVANIZED STEEL CHANNEL FRAME. EACH DAMPER BLADE SHALL DESIGNED FOR 150 PSI WWP. MANUAL AIR VENTS SHALL BE OF MEDIA SHALL BE I" AS STANDARD FOR THE UNIT CONDITIONS AT THE JOBSITE, AND SHALL INCLUDE ALL WORK BE SECURELY ATTACHED TO A 1/2 INCH DIAMETER STEEL PIVOT BRASS PLUG COCKS, DESIGNED FOR A WORKING PRESSURE OF 12r7 MANUFACTURER. F REQUIRED TO INTRODUCE SYSTEM COMPONENTS INTO EXISTING ROD MOUNTED IN BRONZE FRAME INSERTS± EACH ROD SHALL BE PSI WOG. PROVIDE EACH AUTOMATIC AIR VENT WITH A 1/4' OD 16 02 NEW FILTERS ARE TO BE INSTALLED IN THE UNITS PRIOR TO f �. STRUCTURES, AND TO CONNECT TO OR MODIFY EXISTING SYSTEM EXTENDED TO A LOCKING QUADRANT WITH INDICATING DEVICE SOFT COPPER TUBING BLOW-OFF CONNECTION EXTENDED TO FINAL TEST AND BALANCING. THESE FILTERS SHALL ALSO BE •� • s�; AS NECESSITATED BY THE INSTALLATION. ALL SUCH WORK SHALL MOUNTED ON THE SIDE OF THE DUCT. NEAREST FLOOR DRAIN OR COIL DRAIN PAN. THROWAWAY TYPE AS SPECIFIED ABOVE. PROVIDE ONE ADDITIONAL �G v BE PERFORMED WITHOUT ADDITIONS TO THE CONTRACT COST. 6.01 ALL DUCT PENETRATIONS THROUGH FIRE OR SMOKE RATED WALLS 9.06 INSTALLATION: ALL HORIZONTAL PIPING SHALL BE RUN LEVEL COMPLETE SPARE SET OF FILTERS TO BE USED AFTER TEST AND 2.02 WHERE INDICATED EXISTING SYSTEM COMPONENTS SHALL BE AND FLOORS SHALL BE SEALED WITH A UL LISTED SYSTEM TO OR PITCHED UP TOWARD THE AIR VENT CONNECTIONS. ALL SIZE BALANCE. CAREFULLY REMOVED OR RELOCATED. EACH RESULTING OPENING IN MAINTAIN THE FIRE AND SMOKE INTEGRITY OF THE WALL OF REDUCTIONS IN HORIZONTAL PIPING SHALL BE MADE WITH 11.0 VIBRATION ISOLATORS THE BUILDING STRUCTURE SHALL BE PROPERLY PATCHED AND FLOOR ECCENTRIC REDUCING FITTINGS,KEEPING THE TOP OF THE 11.01 HORIZONTAL AIR CONDITIONING UNITS SHALL BE INSTALLED WITH Q• ,' FINISHED WITH THE SAME MATERIALS AS THOSE ADJACENT TO THE 6.08 FLEXIBLE DUCTS SHALL BE OF THE INSULATED WIRE REINFORCED PIPING AT THE SAME LEVEL ON EITHER SIDE OF THE REDUCER. SPRING TYPE ISOLATION MOUNTS SUCH AS MODEL 555-100 AS ,- • � '• OPENING. FABRIC OR METAL TYPE. FLEXIBLE DUCTS SHALL NOT EXCEED 8' 9.01 TESTING: AFTER ALL PIPING HAS BEEN INSTALLED, BUT BEFORE MANUFACTURED BY THE AMBER/BOOTH COMPANY OF HOUSTON, U F 3.0 SHOP DRAWINGS IN LENGTH. DUCTS SHALL BE FACTORY INSULATED WITH 1' PIPING 15 OR CONCEALED, SYSTEM SHALL BE TESTED TEXAS. 3.01 SUBMIT COPIES OF THE FOLLOWING SHOP DRAWINGS: THICK, 3/4 PCF GLASS FIBER WITH AN APPROVED FIRE- HYDROSTATICALLY AT A PRESSURE OF 150 PSIG FOR A PERIOD OF IS.O AUXILIARY DRAIN PANS Ca A. DETAILED INFORMATION FOR ALL EQUIPMENT, DAMPERS, RETARDANT VAPOR BARRIER FINISH. DUCTS SHALL CONFORM TO 4 HOURS. IF,ANY LEAKS ARE DETECTED, THE DEFECTIVE PIPE, 18.01 AUXILIARY DRAIN PANS SHALL BE CONSTRUCTED OF 18 GAUGE In ROOF VENTS, AIR DISTRIBUTION DEVICES AND THE REQUIREMENTS FOR CLASS I CONNECTORS WHEN TESTED IN FITTINGS OR'JOINTS SHALL BE REMOVED AND REPLACED. GALVANIZED STEEL AND SHALL BE NOT LESS THAN 2' DEEP. AUXILIARIES. ACCORDANCE WITH SECTIONS 3 THRU 21 OF STANDARD FOR AIR PEENING OR CAULKING OF LEAKS WILL NOT BE PERMITTED. 18.02 ALL JOINTS AND SEAMS SHALL BE SOLDERED LIQUID TIGHT. B. DETAILED LAYOUTS OF EACH EQUIPMENT AREA, SHOWING DUCTS (UL-181-1986). FLEXIBLE DUCT SHALL ALSO COMPLY AFTER REPAIRS ARE COMPLETED, THE HYDROSTATIC TEST SHALL 18.03 DRAIN PAN LIP SHALL HAVE A PIPED CONNECTION WITH DRAIN ALL EQUIPMENT, PIPING AND DUCTWORK WITH THE REQUIREMENTS OF NFPA 'BOA. COMPOSITE BENDS AND BE REPEATED AS REQUIRED TO DEMONSTRATE THE ACCEPTABILITY PIPING CONNECTED TO PRIMARY CONDENSATE DRAIN PIPING. C. COMPLETE COMPOSITE DIAGRAMS, DESCRIPTIONS AND TURNS IN EXCESS OF 90 DEGREES SHALL BE AVOIDED. OF EACH SYSTEM TO THE ENGINEER 18.04 PAN SHALL EXTEND UNDER AND 1' BEYOND UNIT CASING ON ALL SEQUENCE OF OPERATION FOR CONTROL SYSTEMS IN THEIR CONNECTIONS OF FLEXIBLE DUCTS TO CEILING DIFFUSERS AND 9.08 FINAL CONNECTIONS TO UNITS SHALL BE MADE WITH 200 PSIG, SIDES. ENTIRETY, SHOWING THE SPECIFIC EQUIPMENT FURNISHED. DUCT TAPS SHALL BE MADE AIR TIGHT WITH A STAINLESS STEEL 2 FOOT LONG, BRAIDED, STAINLESS STEEL, FIRE RATED HOSES 19.0 FIRE/SMOKE DAMPERS D. COMPLETE DETAILS OF ALL HANGERS, SUPPORTS AND BAND CLAMP WITH WORM GEAR AND SCREW. COMPLETE WITH ADAPTORS. 11101 DAMPERS SHALL BE COMBINATION FIRE/SMOKE TYPE DESIGNED TO VIBRATION ISOLATORS. TO AIR OUTLETS AND INLETS 10.0 OUTSIDE AIR LOUVER PROVIDE POINT-OF-ORIGIN FIRE CONTAINMENT AND SMOKE 3.02 SHOP DRAWINGS SHALL INCLUDE CAPACITIES, OPERATING 1.01 TEST AND RATE ALL AIR OUTLETS AND INLETS IN ACCORDANCE 10.01 THE NEW OUTSIDE AIR LOUVER FOR THE HVAC SYSTEMS SHALL BE CONTROL. PRESSURES AND TEMPERATURES, SERVICE RATINGS, SOUND POWER WITH ADC EQUIPMENT TEST CODE 106284, AND PROVIDE THE SUCH AS RUSKIN MODEL ELF 315D, 19.02 FRAME SHALL BE 5" X 16 GAUGE GALVANIZED STEEL CHANNEL. LEVELS, PHYSICAL STRUCTURE, WEIGHTS, AND DIMENSIONS AS PROPER SIZE AND TYPE TO OBTAIN SATISFACTORY DISTRIBUTION 10.02 LOUVER SHALL BE COMPLETE WITH 3/4' X 0.051' EXPANDED 19.03 BLADES SHALL BE AIRFOIL SHAPED, DOUBLE SKIN CONSTRUCTION REQUIRED. ALL PERFORMANCE DATA AND DIMENSIONS SHALL BE OF THE SPECIFIED AIR QUANTITIES WITHIN EACH SPACE. FLATTENED ALUMINUM BIRDSCREEN IN A REMOVABLE FRAME. WITH 14 GAUGE EQUIVALENT THICKNESS. MAXIMUM BLADE WIDTH CERTIFIED BY THE MANUFACTURER WITH AUTHORIZED FACTORY CONSTRUCT ALL GRILLES, REGISTERS AND DIFFUSERS ENTIRELY 11.0 CONDENSATE DRAIN PIPING SHALL BE 6". SIGNATURE. OF ALUMINUM WITH PAINTED FINISH UNLESS OTHERWISE 11.01 DRAINAGE PIPING SHALL BE TYPE DWV COPPER TUBING WITH 19.04 ALL SEALS SHALL BE METALLIC. 3.03 NO EQUIPMENT OR MATERIALS SHALL BE PURCHASED OR INSTALLED INDICATED. PROVIDE EACH AIR OUTLET AND INLET WITH A DRAINAGE PATTERN SOLDERED FITTINGS. ALL ELBOWS SHALL BE 19.05 LINKAGES SHALL BE CONCEALED IN THE FRAME. PRIOR TO FINAL APPROVAL OF SHOP DRAWINGS. SYNTHETIC SPONGE RUBBER GASKET TO FORM A TIGHT SEAL LONG RADIUS SWEEPS, THE MINIMUM SIZE OF DRAIN SHALL NOT 19.06 AXLES SHALL BE 1/2' PLATED STEEL HEX. 4.O TESTING AND BALANCING BETWEEN FRAME AND MOUNTING SURFACE. BE LESS THAN THE SIZE OF THE EQUIPMENT DRAIN OUTLET. 19.01 BEARINGS SHALL BE STAINLESS STEEL SLEEVES PRESSED INTO 4.01 SUBJECT THE COMPLETED SYSTEMS AND ALL COMPONENTS THEREOF 1.02 ALL CEILING RETURN AIR GRILLES SHALL BE SQUARE GRID TYPE, SLOPE LINE TO DRAIN AT NOT LESS THAN 1/6' PER FOOT. FRAME. TO OPERATING TESTS, AS SPECIFIED HEREIN, AND A$ REQUIRED WITH 1/2 X 1/2 INCH GRID 1/2 INCH DEEP, FREE AREA SHALL 1102 FURNISH AND INSTALL DIELECTRIC COUPLINGS AT ALL 19.08 FINISH SHALL BE MILL GALVANIZED. TO DEMONSTRATE ACCEPTABILITY OF SYSTEMS. TESTS SHALL BE NOT BE LESS THAN 90 PERCENT. 24' X 24" GRILLES SHALL CONNECTIONS BETWEEN DISSIMILAR METALS. 19.09 FUSIBLE LINK SHALL BE 165 DEGREES F. H PERFORMED BY AN APPROVED AGENCY AND AT THE CONTRACTOR'S HAVE TYPE 3 BORDER FOR LAY-IN INSTALLATION. GRILLES 12.0 PIPE HANGERS AND SUPPORTS 19.10 MAXIMUM SINGLE SECTION SIZE SHALL BE 30" W X 36' H. EXPENSE. SHALL BE TITUS WITH STYLE 5OF CORE OR AS APPROVED. 12.01 SPACING: 1/2" TO 3/4' - 3.5 FEET MAXIMUM, 1' TO 1-1/4" - 19.11 DAMPERS SHALL BE UL LISTED AS UL555 FIRE DAMPER AND 4.02 RECORD AND TABULATE ALL DATA NECESSARY TO DEMONSTRATE THE 1.03 NEW CEILING DIFFUSERS WITH A 24" X 24" FACE SHALL BE 45 FEET MAXIMUM, 1-1/2' TO 2" - 55 FEET MAXIMUM, 2-1/2" UL555S SMOKE DAMPERS QUALIFIED AT 250 DEGREES F. DAMPER CAPACITY OF EACH NEW SYSTEM COMPONENT UNDER ACTUAL PERFORATED FACE, CURVED BLADE, 1, 2, 3 OR 4-WAY AND LARGER - 1.5 FEET MAXIMUM. OPERATORS SHALL ALSO BE RATED FOR 25O DEGREES F. AND OPERATING CONDITIONS. DATA FOR EACH ITEM OF EQUIPMENT DEFLECTORS WITH A 2' X 2' LAY-IN TYPE FRAME. DIFFUSERS 12.02 HANGERS FOR AND SUPPORTS SHALL BE GALVANIZED WROUGHT SHALL BE OF THE ELECTRIC TYPE, 120 VOLT, SINGLE PHASE. SHALL BE RECORDED SIMULTANEOUSLY WITH DATA FROM ALL SHALL HAVE A ROUND NECK OF THE SIZE INDICATED. DIFFUSERS STEEL CLAMP OR CLEVIS TYPE, PLACED OUTSIDE THE 1112 DAMPER OPERATION SHALL BE FAIL SAFE TO CLOSE ASSOCIATED EQUIPMENT, TOGETHER WITH COINCIDENT OUTSIDE SHALL BE PROVIDED COMPLETE WITH OPPOSED BLADE DAMPERS INSULATION, OR ISOLATED FROM UNINSULATED PIPE BY MEANS OF AUTOMATICALLY IF THE OPERATIONAL POWER IS INTERRUPTED. AIR DRY BULB AND WET BULB TEMPERATURES. DATA SHALL SUCH AS TITUS MODEL AG-15. THE CEILING DIFFUSERS SHALL BE RIBBED SYNTHETIC RUBBER ISOLATION PADS, 1113 DAMPER AND SLEEVE SHALL BE FURNISHED AS ONE, COMPLETE, INCLUDE: SUCH AS TITUS MODEL PCS-AA. 13.0 INSULATION RATED ASSEMBLY. A. SUPPLY, RETURN AND OUTSIDE AIR QUANTITIES FOR NEW 1.04 PROVIDE AIR VOLUME EXTRACTORS AT ALL RECTANGULAR BRANCH 13.01 INSULATION SECTIONS OR SEGMENTS SHALL BE PROPERLY CUT AND 19.14 INSTALLATION OF DAMPERS SHALL COMPLY WITH ALL AIR CONDITIONING UNITS. DUCT TAKE-OFFS. AIR VOLUME EXTRACTORS SHALL BE CAPABLE FITTED TO EACH SURFACE, TIGHTLY BUTTED TOGETHER AND REQUIREMENTS OF NFPA 9OA AND UL555. �•I B. AIR VOLUMES AND VELOCITIES FOR NEW AIR CONDITIONING OF PROVIDING A COMPLETE SHUT-OFF AND SHALL BE EQUIPPED SECURED WITH STAINLESS STEEL BANDS OR 14 GAUGE COPPERWELD 19.15 DAMPERS SHALL BE RUSKIN MODEL F5D60 OR AS APPROVED. UNIT FANS, COOLING COILS AND AIR CLEANING WITH A MANUAL OPERATOR WITH GRADULATED DIAL TYPE WIRE ON 9" MAXIMUM CENTERS. ALL SEAMS AND JOINTS SHALL 20.0 GUARANTEE ASSEMBLIES. INDICATOR AND LOCKING OUT MOUNTED IN AN ACCESSIBLE BE THOROUGHLY SEALED WITH AN APPROVED FIRE-RETARDANT 20.01 ALL EQUIPMENT SHALL BE GUARANTEED TO HAVE THE SPECIFIED I ® � C. ENTERING AND LEAVING AIR DRY BULB AND WET BULB LOCATION. AIR EXTRACTORS SHALL BE FACTORY FABRICATED AND JOINT SEALER AS RECOMMENDED BY THE INSULATION CAPACITIES AND TO OPERATE WITHOUT OBJECTIONABLE NOISE OR TEMPERATURES FOR NEW COOLING COILS, ASSEMBLED. EXTRACTORS SHALL BE TITUS MODEL AG-45. WHERE MANUFACTURER, VIBRATION UNDER INSTALLED CONDITIONS. D. ENTERING AND LEAVING WATER TEMPERATURE AND PRESSURE LENGTH OF EXTRACTOR EXCEEDS 12', PROVIDE A TITUS XY- 13.02 CONDENSATE DRAIN LINES AND FITTINGS SHALL BE INSULATED 20.02 PROVIDE A WRITTEN WARRANTY COVERING ALL EQUIPMENT, FOR EACH NEW WATER COOLED CONDENSER. 02644-1 ROLLER SUPPORT. WITH FOAM PLASTIC PIPE INSULATION SUCH AS AP ARMAFLEX OR MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM E. AIR VOLUMES AND VELOCITIES AT EACH INLET AND 8.0 AIR CONDITIONING UNITS AS APPROVED, CONDENSATE DRAIN LINE INSULATION SHALL BE THE DATE OF FINAL ACCEPTANCE OF BENEFICIAL USE BY THE y� OUTLET. 801 UNITS SHALL BE FACTORY ASSEMBLED± ARRANGEMENT, TYPE AND 1/2' THICK. WHERE POSSIBLE, SLIDE INSULATION ON WITHOUT OWNER, WHICHEVER IS EARLIER± THIS SHALL INCLUDE AN pJ� F. MEASURED VOLTAGE AND CURRENT INPUT FOR EACH NEW CAPACITY OF EACH COMPONENT SHALL BE AS SHOWN AND SPLITTING. WHERE THIS IS NOT POSSIBLE, USE AGREEMENT TO REPLACE ALL DEFECTIVE EQUIPMENT OR MATERIALS E MOTOR SCHEDULED ON THE DRAWINGS. UNIT SHALL BE COMPLETE WITH MANUFACTURER'S RECOMMENDED ADHESIVE TO CEMENT JOINTS AND REPAIR ALL DEFECTIVE WORKMANSHIP DURING THE WARRANTY 4.04 SUBMIT TEST DATA FORMAT FOR APPROVAL PRIOR TO BEGINNING CENTRIFUGAL FANS, OPEN SQUIRREL CAGE FAN MOTOR, HERMETIC TOGETHER ADDITIONALLY SECURE WITH TAPE OR 14 GAUGE PERIOD WITHOUT COST TO THE OWNER p®d OF TESTS. UPON COMPLETION OF TESTING AND BALANCING COMPRESSOR, MAGNETIC STARTERS, COAXIAL TUBE CONDENSER, COPPERWELD WIRE ON 9" CENTERS. FINISH EXPOSED INSULATION 20.03 THE FIVE-YEAR FACTORY WARRANTY ON EACH MOTOR-COMPRESSOR ry PROCEDURES, SUBMIT FOUR (4) COPIES OF ALL TEST DATA FOR EXTENDED SURFACE COOLING COIL WITH COPPER TUBES AND WITH TWO COATS OF WHITE LATEX PAINT OR ARMAFLEX FINISH. SHALL BE FILLED OUT IN THE OWNER'S NAME AND GIVEN TO THE RECORD AND APPROVAL. ALUMINUM FINS AND I' OR 2' THICK THROWAWAY FILTERS. 13.03 PROVIDE INSULATING SADDLES FOR INSULATED LINES AT EACH OWNER PRIOR TO FINAL ACCEPTANCE OF WORK PERFORMED UNDER 5.O IDENTIFICATION AND RECORD DRAWINGS 8.02 ALL COMPONENTS OF UNITS SHALL BE ENCLOSED IN A SUITABLE PIPE SUPPORT. THE INSULATION SADDLE SHALL BE 16 GAUGE THIS SECTION. 5.01 IDENTIFY ALL EQUIPMENT, SWITCHES, STARTERS AND CONTROLS APPARATUS CASING CONSTRUCTED OF STEEL PANELS WITH STEEL GALVANIZED STEEL INSTALLED BETWEEN HANGER AND INSULATION BY MEANS OF ENGRAVED VINYL PLASTIC NAMEPLATES. PROVIDE ANGLE FRAMING OR BRACING WITH PROPERLY LOCATED ACCESS AND SHALL BE TWICE AS LONG AS OUTSIDE DIAMETER OF COMPLETE CONTROL DIAGRAMS WITH OUTLINE OPERATING DOORS FOR INSPECTION AND MAINTENANCE. CASINGS SHALL BE INSULATION. INSTRUCTIONS, PROPERLY CODED TO IDENTIFICATION PLATES. LINED THROUGHOUT WITH FIRE-RETARDANT SYNTHETIC RUBBER- 5.02 PROVIDE A COMPLETE SET OF RECORD DRAWINGS, SHOWING THE COATED GLASS FIBER INSULATION. COATED SIDE OF INSULATION 6--d EXACT INSTALLED LOCATION OF EACH COMPONENT OF THE AIR SHALL BE THE EXPOSED SIDE. CONDITIONING SYSTEMS, MANUFACTURER'S NAMES AND 8.03 COOLING COILS SHALL BE PROVIDED WITH AN ADEQUATELY DESIGNATIONS FOR ALL NEW MAJOR ITEMS OF EQUIPMENT, AND INSULATED STEEL DRAIN PAN. DRAIN PAN SURFACES SHALL BE FINAL AIR QUANTITIES, OPERATING PRESSURES AND TWO GAGES HEAVIER THAN THE UNIT CASING. a---1 TEMPERATURES. 8.04 ALL STEEL SURFACES SHALL BE PROVIDED WITH AN APPROVED CORROSION RESISTANT COATING. 8.05 THE ENTIRE UNIT, INCLUDING THE FILTER SECTION SHALL BE INSULATED ADEQUATELY TO PREVENT EXTERIOR CONDENSATION. I -� 806 WATER COOLED CONDENSERS SHALL BE COAXIAL TUBE DESIGN. CONDENSERS SHALL HAVE A PRESSURE RELIEF VALVE AND LIQUID LINE VALVE. CONDENSERS SHALL BE EQUIPPED WITH A LIQUID SUBCOOLER AND SHALL BE DESIGNED FOR 300 PSIG REFRIGERANT SIDE PRESSURE AND 15O PSIG WATER SIDE PRESSURE. EACH REFRIGERANT CIRCUIT SHALL HAVE A SEPARATE CONDENSER. 8.01 COMPRESSORS SHALL BE HERMETIC TYPE AND SHALL HAVE CRANKCASE HEATERS. 8.08 MOTOR-COMPRESSORS SHALL HAVE A 5 YEAR EXTENDED WARRANTY. Q0 8.09 THERMOSTATIC EXPANSION VALVES FOR EACH SECTION OF THE COOLING COIL SHALL HAVE A BROAD MODULATING RANGE. EXTERNAL EQUALIZING LINES SHALL BE TAPPED INTO SUCTION LINES DOWNSTREAM OF THE EXPANSION VALVE SENSING BULBS. Revisions Job No. Sheet No. Date 09/09/99 M- 3 Puga and Associates, Inc. Engineers/Consultants Drawn by # EB 0005813 GSR/GLM 4970 S.W. 72 Avenue, #107 Appr. by Miami, Florida 33155 JDP 3 of 3 (305) 661-7700