00-1397-012 f,
v Gol
G - - -
.o. 4 - -
_�_...V ..._ H I �A hl - -
f 3/4"
31,C
COLD WATER _ HOT WATER
SUPPLY / SUPPLY ZUBILLAGA DESIGN Inc,
GATE VALVE J PLUMBING NOTES atat CORAL WAY, svlrE
3/4" RELIEF LINE MIAMI. FLORIDA . 33143
I. OUTSIDE OF BUILDING TEL 305-443-8140
a ' SPILL 6" ABOVE FINISHED GENERAL
12- GROUND
ASME PRESSURE do TEMPERATURE 1. Provide (furnish and install) all necessary materials and labor for a completely
2�� RELIEF VALVE operational plumbing system as shown on the drawings and herein specified. Install
FAMILY ROOM I f j in accordance with the South Florida building code and local ordinances.
I ELECTRIC WATER HEATER ARCHITECTURE
y a �,f GKIg�• h�l�. WITH 5–YEAR WARRANTY, I i . 2. Scope of work:
CERTIFICATION No. A110003002
/ GLASS LINED TANK, DOUBLE !' A. Sanitary collection
. . 1pEI ELEMENT NON—CONCURRENT + e. Domestic hot and cold water
I�•Fu� p
I ENERGY EFFlCIENT INSULATION �''i�. �
I MEETING ASHRAE 9OA-1980 +'II RELIEF PIPE TO HAVE AN OPEN END C. Air conditioning condensate.
MINIMUM INSULATION R-16 TO DRAIN OUTSIDE OF BLDG. 6" ABV. GR.
3. Pay for all fees, inspection and connection charges required.
4 DEEP DRAIN PAN (WHEN conditions, dimensions with pipe, fixtures, and equipment
I INSTALLED ABOVE 1st FLR.) 4. Verify at job site all space con P P
2 I I '� sizes
trades.rication or installation. Coordinate requirements to avoid interference
t
t DRAIN VALVE
5. Submit shop drawings for Architect / Engineer approval before proceeding with the
7.
purchase or installation of equipment and materials.
ELECTRIC WATER HEATER DETAIL M
6. Guarantee ail work 1 free of defects in materials and workmanship for a period of one year M
II 1
dc N.T.S. o dote of acceptance.
year fr m t•7
MATERIALS
1. Provide shut — off valves for each fixtures and air chambers where shown and where
LL
KITCHEN BATH q proper:P y
' I I BEDROOM re wired for ro er' erformance of the system.
DINING ROOM 2. Provide dielectric fittings to the connect piping to equipment of dissimilar metals. #� .=
I I use clamps and fasteners of similar metals or isolate them from piping and slabs to E
1
ou prevent corrosion. .0 PIPING �Cbll O
— d cold water: copper tubing type "K" or "L" with solder join.
— -N- _ 1. Domestic hot an Pp 9 YP
Wog bronze valves 125 p.s.i. min. provide pre—molded fiberglass insulation, ho
7„ water lines.
6„ 2. Sanitary waste and vent: cost iron piping under slaybs, cast iron no—hufr or,copper
towels g° �
a' fffflTl I ' , jurisdiction. W
D.W.V. above P.V.C. drain pipe and fitting may be used when allow by the local c
TMT 011k;ff; ky a•h,u• 3. A/C condensate: P.V.C. schedule 40 pipe and fittings. E
0000
2" ?�/G CoND.� tN — ldG�r� ty�. — BATH I p��j� p .
�PI�.I_ �U
o
LO
1
LIVING ROOM BEDROOM II IY
9"
SCI i.`� % y ..
I � ` i
a.
l'
- W.I.C. I
1 L.
• � I `\� � dig • � DATE: 10-25-00
BXTH 14 1 / 1
- fir
WAN 100,
I I REVISIONS:
PILL- (o' ►��'`�� y'
FRONT PORCH
-__���0�. IFo F(e)<I V _ I� IMP r
C�1FF � N7 5"S
I -A D �Q
t y�15 ' �• �Q G I SCALE: NOTED
�Gi - � .Q�
• L�c,�•°P';�i� ..I�xI 5 I'' G. W, till l- `{ �' -9 ,
rt../� I BEDROOM
BY: O.D.
C O L D' H OT . WATER 1 %j Q M � � ' (r JUAN J. ZUBILLAGA
nVIA ,.,I C REO, ARCHITECT
PLUMBING PLAN 1/4 =1 .0 .
�' ��• �.
,
�, l e
'k
--------
t , �i,
"
cLECTRIC WATER HEATER SCHEDULE - ® �, {t; ; W
PLUMBING FIXTURE SCHEDULE III o �
UNIT DESIGNATION
SYMBOL, FlXTURE TYPE SIZE C.W. H.W. DESCRIPTION
I MANUFACTURER o c A, G/ 4 1 i3
MODEL' No.
it n ,f� p,�
---- _ _ SSA050 c.L� WG ��• GLOSB I 3V
- \)
GALLONS CAPACITY o � ' If ��
I,ev �.avA.o Y ,�'` �" yp k oil. , P
SERVICE TEMPERATURE 2a�. 2 I �.Lt, 1f
II / � CONSULTANT.
UPPER ELEMENT 500 PSI
5 5 I o I'd E 2 2 3 % ��, G ,
LOWER ELEMENT p _ P�ov�D� 4�j1-S' dl�p ti�GlwE I
TOTAL .WATTS 50 , �, I �� I ,► I j .rte 00, K� '
�J; hI IJ V_ :. I�Z /�, �� � O) / • °� ir
ELECT. SERVICE AVAILABLE 2 0 - - �o y11� IG T
LOCATION s t_ �.. , 'r j I ► t�F i d �i
�. -�
REMARKS r ° �L M• I ool.lc, q
' ♦0 I�
DAiV I TARP I SOME T RIC PAGE:
N15. P-1