00-1035-005 ■ ■
AIM Aom
A. r
&4W% AO=k ru F AV%k r UtTl 4wo %woo R mud I ,
1 lin 9 fo r 1 M a v ra
buUTH MIAMI MEDICAL t) qUARE
7300 SOUTHWEST 62nd , PLACE/ FIFTH FLOOR
SOUTH MIAMI , FLORIDA
DRAWING LIST:
SUNSET DRIVE COVER SHEET AND GENERAL NOTES
A-1 EXISTING DEMOLITION PLANS AND GENERAL NOTES
V A-2 FLOOR PLAN AND INTERIOR ELEVATIONS
SOUTH MIAMI g
MEDICAL SQUARE A-3 REFLECTED CEILING PLAN, TYPICAL WALL SECTION, AND SCHEDULES
N A-4 FURNITURE PLAN
FP-1 FIRE PROTECTION PLAN
V) P-1 PLUMBING FLOOR PLAN
M-1 MECHANICAL FLOOR PLAN
S.W. 74th. STREET E-1 ELECTRICAL FLOOR PLAN
E-2 ELECTRICAL CEILING PLAN
E-3 ELECTRICAL SCHEDULE
SOUTH MIAMI Jg�
GENERAL HOSPITAL
NORTH
SITE LOCATION PLAN
N.T.S.
GENERAL NOTES:
1- IN THE EVENT THAT DISCREPANCIES OR AMBIGUITIES AND/OR OMISSIONS FROM THE SPECIFICATIONS OR 7- ALL ITEMS USED IN CONSTRUCTION, BUT NOT SPECIFICALLY MENTIONED HEREIN SHALL CONFORM TO ALL 15- DRAWINGS ARE GRAPHIC"SHOWING RELATIVE LOCATIONS AND CONNECTIONS AND SHALL NOT BE SCALED AT
DRAWINGS ARE FOUND, OR SHOULD THERE BE DOUBT AS TO THEIR MEANING, THE ARCHITECT SHALL BE LOCAL CODES AND STATE ORDINANCES AS TO APPLICATION AND USE. ANY TIME.
NOTIFIED IN WRITING IN ORDER TO PROVIDE A WRITTEN CLARIFICATION. 8- THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLETE THE PROJECT. 16- GENERAL CONTRACTOR IS RESPONSIBLE FOR THE SAFETY AND SECURITY OF ALLAREAS AFFECTED BY
CONSTRUCTION, THIS RESPONSIBILITY EXTENDS FROM THE BEGINNING TO CONSTRUCTION (BUILDING
2- THE GENERAL CONTRACTOR IS TO PATCH OR REPAIR ANY EXISTING OR NEW OPENINGS THROUGH EXISTING 9- ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS, EQUIPMENT AND ELECTRICAL PERMIT)TO COMPLETION OF CONSTRUCTION, 24 HOURS A DAY/7 DAYS A WEEK.
RATED PARTITIONS AS REQUIRED TO SATISFY THE RATED INTEGRITY OF THE EXISTING PARTITION. REQUIREMENTS REQUESTED ON THE DRAWINGS TO BE INSTALLED. ELECTRICAL CONTRACTORS BID SHALL
BE BASED ON ALL DRAWINGS &SPECS. 17- ALL LOOSE DEBRIS ABOVE CEILING MUST BE REMOVED IF NOT BEING USED, IF BEING USED IT MUST BE
3- THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY BARRIERS, LIGHTING, 10- GENERAL CONTRACTOR IS RESPONSIBLE FOR THE TOTAL SCOPE OF THE WORK INCLUDING COORDINATION SECURED PROPERLY.
18 WHEN THE CONTRACT DOCUMENTS STATE 'OR EQUAL' OR NAME OTHER MANUFACTURERS IT IS THE
COVERINGS, FIRE PREVENTION AND OTHER EQUIPMENT TO PROTECT THE SAFETY OF ALL PERSONS AND OF ALL TRADES. IT IS THE CONTRACTOR'S RESPONSIBILITY THAT ALL MAJOR SUBCONTRACTORS REVIEW ALL
PROPERTY THROUGHOUT THE ENTIRE CONSTRUCTION CONTRACT. DRAWINGS & SPECS BEFORE BIDDING THE WORK-IN-LIEU OF ONLY REVIEWING DRAWINGS AND SPECS OF RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE THAT THE ITEMS PROPOSED ARE EQUAL IN ALL
. 4- THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH OTHER
RESPECTIVE TRADE ASPECTS AND APPROVED BY ARCHITECT/ENGINEER.
TRADES AND THEIR WORK TO ENSURE COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS. 11- SINCE THE WORK TO BE DONE INVOLVES EXISTING CONDITIONS, GENERAL CONTRACTOR SHALL NOTIFY THE 19- GENERAL CONTRACTOR MUST PROVIDE TEMPORARY PARTITIONS RATED AND/OR DUST PROOF, AS REQUIRED
ARCHITECT, IN WRITING OF ANY CONFLICT BETWEEN EXISTING AND NEW MECHANICAL, PLUMBING AND/OR TO DO WORK WITHOUT CONTAMINATING THEY DO NOT BLOCK REQUIRED MEANS OF EGRESS.
5- THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD BEFORE COMMENCING ANY ELECTRICAL WORK. 20- GENERAL CONTRACTOR TO COMPLY WITH ASTM E-84, NFPA-255 INTERIOR FINISH REQUIREMENTS ARE; EXITS
PORTION OF THE WORK AND SHALL NOTIFY THE ARCHITECT IN WRITING IMMEDIATELY IF THERE ARE ANY 12- DUE TO THE NATURE OF ALL REMODELINGS AND ALTERATIONS, ANY FINISHES, MILLWORK PARTITIONS, A/ACCESS TO EXITS A,B/OTHER SPACES A,B,
DISCREPANCIES AND/OR DEVIATIONS FROM THE DRAWINGS REQUIRED IN ORDER TO ACCOMMODATE EQUIPMENT, ROOMS, OR CONSTRUCTION NOTED AS EXISTING TO REMAIN WHICH ARE ALTERED OR DAMAGED
EXISTING CONDITIONS. COMMENCEMENT OF WORK SHALL CONSTITUTE FULL ACCEPTANCE OF SITE DUE TO CONSTRUCTION SHALL BE REPLACED BY CONTRACTOR, 21- PROVIDE ONE ABC TYPE, "2-A" RATED FIRE EXTINGUISHER FOR EACH 2500 SQ. FT. SHALL BE MOUNTED TOP
CONDITIONS. 13- SECTIONS/DETAILS ARE NOTED TYPICAL ON PLANS MAY NOT BE NOTED AT EACH APPLICABLE CONDITION, OF EXTINGUISHER NOT TO EXCEED 5 FT. ABOVE FLOOR. SEE FLOOR PLAN FOR LOCATIONS.
6- THE CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL OPENINGS FOR MECHANICAL, ELECTRICAL HOWEVER, THEY MAY BE USED MORE THAN ONCE.
AND PLUMBING EQUIPMENT WITH SUBCONTRACTORS AS WELL AS SHOP DRAWINGS AS APPROVED BY 14- GENERAL CONTRACTOR IS TO PROTECT EXISTING ADJACENT AREAS TO WHERE WORK IS TO BE PERFORMED.
ARCHITECT, BEFORE PROCEEDING WITH THE WORK, ANY EXISTING FINISH DAMAGED DUE TO WORK PERFORMED SHALL BE REPAIRED/REPLACED AS REQUIRED BY
THE OWNER OR ARCHITECT.
SEQUERA & GAVARRETE, P.A.
ARCHITECTURE, PLANNING, INTERIOR DESIGN MEP ENGINEERING
611 PONCE DE LEON BOULEVARD MECHANICAL, PLUMBING, & ELECTRICAL ENGINEERS
CORAL GABLES, FLORIDA 33134 10590 NW 27th. STREET, SUITE 101
PHONE: (305) 441-1556 MIAMI, FLORIDA 33172
FAX: (305) 445-2374 PHONE: (305) 471-0160
FAX: (305) 593-2530