Loading...
00-0366-019 1 INN III I Nh 11 Ili-r 11 I I I -- .- _— —�C------ _ r^ - -------- —m rm�,rrr - FROM OTHER DETECTOR (I APPCA )) IONIZATION SMOKE DETECTOR AIR CONDITIONING GENER A1 NOTES B (SEE HY AC PLANS) z DETECTOR TEST PANEL #- - - — OR FIR E ALARM PANEL S F L T &�&T E I &C f 4 E D u L E GENERAL: EQUIPMENT AND PIPING: IF .A z o � I � rl - PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY - REFRIGERANT PIPING. SEAMLESS COPPER TYPE 'L' AND PoILER JNIt NO. I (5 Tons) 2 (4 torts) ` MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL HARD OR SOFT DRAWN ON AGR COPPER TUBING WITH z 2a CONDENSING o AIR CONDITIONING, HEATING AND VENTILATING SYSTEM AS WROUGHT COPPER SOLDER JOINT FITTINGS, SOLDER Ir'DICA-oR _ SERVES Ist FLOOR 2nd FLOOR I �� \ I / � � \ I g [e SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED SHALL BE 95/5 APPLIED WITH SUITABLE FLUX. YDC \ / UNIT �I I I TOTAL CAPACITY BTU/HR 56,500 46 000 '1 a INSTALL IN ACCORDANCE WITH THE SOUTH FLORIDA - INSULATE ALL REFRIGERANT SUCTION PIPING WITH 1/2' oR / z BUILDING CODE, ASHRAE, SMACNA, NF.PA., AND LOCAL SENS CAPACITY BTU/HR 43,600 33,200 CLOSED DELL POLYETHYLENE PREMOLDEO PIPE W ORDINANCES. 12m \� INSULATION, WITH AN APPROVED PIPE AND SMOKE VAC � POWER < CONTROL CFM SUPPLY 2,000 1,600 I 3:- SCOPE OF WORD : JACKET. PAINT ALL EXPOSED INSULATION WITH TWO CONNECTIONS hII I ° CFM 0/AIR PROVIDE THE FOLLOWING COMPLETE SYSTEMS : GOATS OF WHITE LATEX PAINT, uLLISTED AUDIBLE ALAI!f 6' MIN. 400 200 F 6' MIN, A. SUPPLY DUCT SYSTEM AND DIFFUSERS. - PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOU) OCCUPIED D AREA O `�4' MIN. HEATER KW QI C `� Z OR THROUGH ID 10 d! a B. EXHAUST SYSTEM FOR BATHROOMS VOLTAGE HEAT-COOL THERMOSTATS WITH ON-OFF AUTO BUILONG FIRE C. AIR CONDITIONING UNITS WITH REFRIGERANT PIPING SUB-BASE SWITCH, FURNISHED BY THE EQUIPMENT ALARM SYSTEM t0 BE SECURED t0 SLAB WITH C6) I/z°m ESP-IN WG./ HP 030/ I, \ z 0,30/ l/3 AND CONTROLS. IF APPLICABLE REMINGTON POWER FASTENERS TEMP. AIR ENT. OIL DB MANUFACTURER - PAY FOR ALL FEES, INSPECTIONS AND CONNECTION \ i G.U. FLA/ CU FAN /lUB O - ALL AIR CONDITIONING COMPRESSORS SHALL BE BASE FLOOD4E ANGLE WELDED TO A/C COMP. 50/67 80/61 y' ° , 28.9/ 2 0 21.9/ 2.0 _ CHARGES REQUIRED. LIQUID LINE WARRANTED FOR A MINIMUM OF FIVE YEARS AFTER DATE VOLTAGE , _ 1-60-240 W o - VERIFY AT JOB 51TE ALL SPACE CONDITIONS, DIMENSIONS OF ACCEPTANCE OF THE PROJECT. W/O INSULATION wr..• 1-60 240 AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR CONCRETE BASE W/ ¢ da NSTALLATION. COORDINATE REQUIREMENTS TO AVOID AIR DISTRIBUTION PRODUCTS : 6 X 6 - 10/10 WWF 6 MIN MANUFACTURER RF'tEEM; RHEEM v Q p O ?. NTERFERENGE WITH OTHER TRADES. E YA O RA T OR FAN MOTOR - PROVIDE SUPPLY DUCTS AND DIFFUSERS AUXILIARY CCNTACT TO AHU MODEL J' a - GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AS INDICATED ON THE DRAWINGS. SHUT DOI.N UNIT IN CASE 4' SCHEDULE "+►� RBHA-�4 ry RBHA-21 � o OF SMOKE SENSING SEAL ENTRANCE OF REFRIGERANT \ 40 .V.C. I AND WORKMANSHI FOR A 10 OF ON YEAR FROM ERA P PPE P R PERIOD E E R R G.U. MO _ DEL ° DATE OF ACCEPTANCE, PROVIDE ALL NECESSARY SLEEVES BEFORE CONCRETE 15 POURED AIR CONDITIONING DUCT SMOKE DETECTOR (AHU-1) LINES INTO P.Y.G. PIPE W/ INCREASE 51ZE 060 � . 098 VA' Y W AND COORDINATE PLANS AND LOCATION OF DUCTS WITH TRUSS IMPERMEABLE, RESILENt MATERIAL AS REQUIRED BY to MANUFACTURER PRIOR TO COMMENCING WITH THE WORK IF CONFLICT LENGTH AND ROUTING SEER/EER 102�,,.� 10.2: DUCTWORK: ARISES AND NOTIFICATION WAS NOT DONE TO OWNER AND ARCHITECT, SUPPLY DUCT LIQUID/SUCTION SIZE-IN M - GENERAL ALL DUCT SIZES SHOWN A CLEAR INSIDE IT SHALL BE THE RESPONSIBILITY OF THE A/C CONTRACTOR TO FIND PPL D �SUGTION LINE W/ 1-I/2' e a m D RE A SOLUTION. o DIMENSIONS. ®� f UNIT O�� f ! VAPOR BARRIERION 2.�STALL AHU-1 R-SMOKE DETECTOR IN SUPPLY W - MIN. INSULATION VALUE FOR FLEXIBLE AND RIGID - PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION PL DUCT _ DUCTS IN UNCONDITIONED SPACES 15 R-6. WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL N,T.S, � - DUCTWORK TRUNK LINES AND DROPS MAY VARY FROM DRAWINGS. ---� c PLAN DUE TO TRUSS CONFIGURATIONS. o INSTALLATION: // Z - PROVIDE DOUBLE THICKNESS TURNING VANES At ALL _ INSTALL ALL EQUIPMENT IN ACCORDANCE TO THE /; — UNIT TIGHT TO DUCT SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR W/ 2' FOAM SEAL Z MANUFACTURER'S MANUAL AND RECOMMENDATIONS INSTALL SINGLE THICKNESS INSTEAD. z PAYING SPECIAL ATTENTION TO REQUIRED CLEARANCES ZI FOR INSTALLATION, OPERAVON AND SERVICE. w a a ' EXHAUST DUCTS, COND, DRAIN SEE PLBG. DWG) OA CALCULATIONS (j� O ABED N - DUCTS FROM TOILET ROOMS SHALL DISCHARGE TO THE OUTSIDE OF THE �" BUILDING, S HA LL BE TERMINATED NOT LE SS THAN ,&' ABOVE THE FINISHED p� ROOF SURFACE AND SHALL BE SCREENED WITH A CORROSION RESISTANT A.S. .R. .E. 62 — 07) v MATERIAL HAVING A MESH SIZE NO LARGER THAN I/2'. (PROVIDED GOOSE NECK OR RAIN CAP ON ROOF TERMINATIONS). REFE C RIGERANT AREA 50. FT, O/A CFM A/C FM N - ALL EXHAUST DUCTS SHALL BE CONSTRUCTED OF SHEET METAL AND TERMINATE (NET)* REQUIRED REQUIRED UNIT DE51GNED U OUTSIDE THE BUILDING AND SHALL BE EQUIPPED WITH A BAGKDRAFT DAMPER a, ti* o FIRST 20 CFM FLOOR 1,345 PERSON 400 .,fA{ { - 400 ^ ` ' o SECOND 20 CFM f -- :)16C ON 4ECT SWITCH �,s= ,. o EE ECT DWG.) FLOOR 1025 PERSON 200 AHU-2 200 N. - HVAC DESIGN MQUIIZES• YES NO H ° * AIR HANDING • o DUCT SMOKE DETECTOR ✓ UNIT FIRE DAMPER (S) ✓ j �_'s o SMOKE DAMPER (S) ✓ FIRE RATED ENCLOSURE ✓ RON FREE STANDING d'x NEOPHRENE PAD I , a FIRE RATED ROOF (FOUR CORNERS) Zr SECURE TO AHU THRU Z C'N ISOLATORS AND TO CEILING ASSEMBLY ✓ I)/ '3OLT. FIRE 5TOPPING 2' A/C COND. DRAIN LINE ' r zi FROM A.H.U.-2 4 a, 1 OVERFLOW PAN Z SMOKE CONTROL �/ I, a RELIEF LINE DRAIN DOWN t0 FIRST FLOOR DOWN t0 FIRST FLOOR 6' ABOVE GRADE I a a a (TO OUTSIDE) (TO OUTSIDE) REF, LINES ® e <� UP t0 SECOND FLOOR 1' OvEI�FLOW PAN �� 4'd° WALL CAP DRAIN DOWN TO FIRST FLOOR , I • I o , W/ I (TO OUTSIDE) 1 I BIRD SCREEN -===_tip--_-_-- _ --_ _=_=_----------------__ 2' A/C COND. DRAIN LINE ,4/C LNf T 110L�NTING L,, — 1 I mo, t I --� - - --------------- -- - ___ _ 4 LONG. PAD ------------------ -- - - -_= a RELIEF LINE -= DOWN TO FIRST FLOOR - I ---------- --- ---DOWN TO FIRST FLOOR 3/�-- -�--- --- I - ___ � (t0 OUTSIDE) I L i 1 I (TO OUTSIDE) REP. LINES DOWN! 8 DUCT Ram I II CU.-2 GU.-I FOR OUTSIDE AIR Ramp— REF. TOIFIRST FLOOR W/ MVD I --- ----------- ------ - _. - 1 I � ----------_--.---- '�_ -- ------------- I / o- - J �'I c I W H. I _ ,-- A.H.u.-z ROOM 4 U ';'�3,4T+-�, ; I I j STOR. UP / UNDER SLAB o - 6 x 6 CD S x 8 CD --- r---- - EF- , 1 50 CFM ":O'I 50 CFM 8 x S CD I ® < `�1 50 GFM I - - - THE NECK PANEL MATERIAL RDDM #3 rz 9x9CD ' 44 I^Z 9 x 9 CD FOR ALL DIFFUSERS SHALL BE '-�' V 200 CFM - 250 CFM �I �--r 24 x :4 PAINTED STEEL I � o x Imo CFM I ( i SITTING I ' ,,��'---- AREA A G o oo OFFICE 1 _ ao 6x9GD 6x9GD ---- 150 CFM 200 CFM E� I i II �< I x h------ 9 x 9 CD V SITTING I F 250 CFM AREA X �9x9CD o 6 x 9 CD �� X �,,� '� 250 CFM r KITC�--BEN 16'x16' RG ,00 CFM 6 x 9 cD Ism cFM z : `' 8'� n5 CFM �I ROOM #2 - ->'' R/A 5110 j FRONT I DESK 8 m 10'0 DUCT x 11-01 FOROUTSIDE AIR __- S UP I 9 x 9 CD e' 250 CFM 10'a Dn. W/ T , I � I I I I r A/C COND. DRAIN LINE MVD. r r --- 6' ABOVE GRADE -_ --------------------------- =- ' 4 t _ --LOW VELOCITY kt x I - SUPPLY AIR DUCT I r �- OFFICE #2 (SEE PLAN VIEw) SITTING L---- 16x16 RG F $` I, AREA SITTING � 9x9GD F,'� ;` 200 CFM 8 PORCH o FOR `�'� AREA n�. CONFERENCE x j METAL ROUND FITTING ROOM �r 50 CFM � TO 5EOUOUTSIDDEE IR'`NWILAATION � 1 9 x 9 CD � PROVIDE INSULATION GUARD "r, � I � ! � x6CD 6x9CD �.I WHERE NECESSARY �' 9 x 9 CD - 9x9CDj 2 00 CFM � �` g'� 115 CFM --- ,' -2 �_ � 9 x 3 CD 250 CFM 250 CFM F �° \ AIR FLOW PC01"( #1 100 GFM � Fj 4',P UP TO I M I . I I ROOF CAP � � � I x 'r / ADJUSTABLE VOLUME rn J F/AT O FLEX DUCELI:TIE DAMPER j ------- -------- r JACKETAND STEEL ------------------ -� ---- - WIRE REINFORCING .., ,; 0 -----1----- ---I- --- I III � SEAL JOINT WITH - AIR FLOW EPDXY t DUCT TAPE , Ramp - w ______________ _________ ___----_---