00-1316-019 DIVISION 16 - ELECTRICAL DO NOT SCALE DRAWINGS. CONTRACTOR MUST VERIFY ALL Q DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR 1 . General 8. Identification ;_ OMISSIONS. NO VARIATIONS OR MODIFICATIONS TO WORK SF;OWN;SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN 1. APPROVAL. ALL PREVIOUS ISSUES OF THIS DRAWING ARE Examine the site conditions very carefully and the scope of 5. Where outlets are removed or circuits interrupted or broken, 1. All equipment shall be identified using nameplates and labels. SGFEFiSEDr-D BY THE LATEST REVISION. ALL DRAWINGS propose AND SPECIFICATIONS REMAIN THE PROPERTY OF work together with the work of all other trades and include provide the required relocation, reconnection or rearrangement to MORRISON HERSHFIELD CORPORATION. NEITHER in the bid price all costs for work such as equipment and wiring restore service to all items, outlets, etc. not made obsolete by this 2. Nameplates shall be 1/8" thick plastic engraving sheet, white MORRISON HERSHFIELD CORPORATION NOR THE ARCHITECT WILL made necessary to accommodate the electrical systems shown and work. face, black core, engraved with equipment identification and attached BE PROVIDING CONSTRUCTION REVIEW OF THIS PROJECT. systems of other trades. to equipment with self-tapping screws. Chemical adhesion plates are 6. Mounting heights of all wiring devices shall be verified with the not acceptable. Letters shall be minimum 1/4" high. 2. Submittal of bid indicates Contractor is cognizant of all job site owner prior to installation. conditions and work to be performed under this contract. 3. Labels shall be embossed plastic with minimum 1/4" high letters. 3. Perform detailed verification of work prior to ordering the 3. Conductors and Connectors Labels shall be used for identifying conduit, cables, junction boxes, receptacles etc. electrical equipment and commencing construction. Issue a written 1. Unless noted otherwise, all conductors shall be copper, minimum notice to the Architect of any discrepancies. size #12 AWG, with thermoplastic insulation conforming to NEMA WC5 4. Wording on nameplates and labels must be approved by the 4. Obtain all permits, pay associated fees and schedule inspection. or cross-linked polyethylene insulation conforming to NEMA WC7. Engineer prior to manufacturing. (Types THHN or THWN). Insulation shall be rated for 90(C. Conductors 5. Submit shop drawings, product data and samples in accordance shall be color coded in accordance with NEC. 9. Testing and Commissioning with Division 1. Indicate details of construction, dimensions, 2. All conductor used for grounding shall be copper and shall have 1. Upon completion of work, conduct continuity, short circuit, and fall capacities, weights and electrical performance characteristics of green insulation. potential ground tests for approval. Submit test reports to project equipment or material. Where applicable include wiring and single line manager. Clean premises or all debris resulting from work and leave diagrams. Advertising or sales literature will not be acceptable as 3. For copper conductors #6 AWG and smaller use 3M SCOTCH-LOK work in a complete and undamaged condition. ship drawings. or T&B STA-KON compression type connectors with integral or separate insulation caps. For copper conductors larger than #6 AWG 2. Carry out testing and commissioning of all major electrical 6. Provide all labor, material, equipment, insurance and services to equipment such as distribution boards, generator, automatic transfer ui complete this project in accordance with the contract documents and use solderless, ident hex screw or bolt type pressure connectors or e q p double compression c-clamp connectors, unless specified otherwise switch, motor starters etc. Engage the services of suppliers of present it as fully operational to the satisfaction of the owner. on drawings. equipment in facilitating testing and commissioning. 7. Carry out work in accordance with all governing state, county and 4. Unless noted otherwise all lugs shall be tin plated copper, 3. Testing and commissioning of generator set, automatic transfer local codes and O.S.H.A. two-hole, long barrel, compression type. switch, solid-state circuit breaker and PDU shall be carried out in 8. Coordinate the work of power, grounding and telco at equipment presence of the Engineers. Notify the engineer seven (7) working with supplier prior to rough - in. Final terminations to be at the 5. Conductor lengths shall be continuous from termination to days in advance of the test date. termination without splices. Splices are not acceptable. If splices are direction of the equipment supplier. 4. Coordinate all testing procedures and times with the project unavoidable prior approval from the engineer must be obtained. 9 P p j 9. Prior to beginning work coordinate all power and telco work with manager and the equipment supplier. the local utility company as it may apply to this site. All work to 4. Raceways, Cable Racks and Boxes 5. Powers quality testing as specified under "Power Quality comply with the rules and regulations of the utilities involved. 1. All conduit shall be UL labeled. Assurance". 10. Provide all cutting and patching necessary for the installation of 2. Unless noted otherwise, conduit installed outdoors shall be IMC the electrical work. Any damage done to the work already in place with liquid tight fittings, conduit inside building in areas where by reason of this work shall be repaired at the contractor's expense conduit is safe from mechanical damage and where concealed in by a qualified mechanic experienced in such work. Patching shall be dry-wall, metal flashing etc. shall be EMT. Conduit in high traffic uniform in appearance and shall match the surrounding surface. Do area, in areas of risk of physical damage and in stairwells shall be 7 not cut structural members without approval of the construction manager. RMC. 11. Core drilling through walls and floors for conduit and cable 3. All empty conduit installed for future installation of wires and 6 installation is to be provided by the general contractor at locations cables shall have a pull cord. 5 determined by the structural engineer. Refer to structural drawings and coordinate with general contractor for installation of conduits 4. Sheet metal boxes shall conform to NEMA OS1; cast-metal and cables through walls and floors. boxes shall conform to NEMA 81 and shall be sized in accordance 4 12. Where cable or conduits pass through floors and fire rated walls, with NEC unless noted otherwise. 3 seal core drilled openings around conduits or cables using UL listed 5. Safety Switches and Protective Devices fire-stopping sealant. 2 13. Ensure that all light, power, heat, telephone and other electrical 1. Provide molded case, bolt-on type, and thermal magnetic trip and mechanical systems and services in the building remain circuit breakers as shown and as required for this project. Multiple operational during the course of this project. Provide temporary pole breakers shall be single handle, common trip. Provide handle services as required. Include all costs for temporary services in the locking devices where indicated. Interrupting rating to match required A 11/10/00 ISSUED FOR BUILDING PERMIT Bid Price. Remove all existing equipment, wiring etc. not being for available fault currents. re-used under new schemes, whether shown on drawings or not. 2. Main circuit breaker at the service entrance shall be solid-state No. Date Action 14. Fabrication and installation of the complete electrical system type with adjustable time-current characteristics. Time-current shall be done in a first class workmanship by qualified personnel characteristics shall be field adjusted by the company performing the experienced in such work and shall schedule the work in an orderly coordination study. 0-B >l�ELLSO TH Mobility manner so as not to impede progress of the project. 3. Hire the services of a company specializing in coordination studies ,� 15. During progress of the work, maintain an accurate record of the to carry out a selective coordination study of all protective devices,installation of the electrical systems, locating each circuit precisely feeders, transformer etc. Provide a complete and detailed report to the engineer. Carry cost of the coordination study in bid price. ' and dimensioning equipment, conduit and cable locations. Upon M O R R IS O N completion of the installation, transfer all record data to black line 6. Service and Distribution prints of the original drawings and submit these drawings as record H E R S H F I E L D 1000 W McNab Road Suite 300 Pompano `Bch Florida 33069 drawings to the engineer. 1. Contractor to coordinate with Landlord for connection of Tel: (954 ) 781-0177 Fax: (954 ) 781-0193 temporary and permanent power to the site. The temporary power 16. At the completion of the project provide three sets of operation and all hook up costs to be paid by Contractor. Contractor to obtain r,,r and maintenance manuals, bound in 3-ring binders, duly labeled, and necessary permits, pay all associated fees and schedule inspections containing complete list of replacement parts, shop drawings and t of service with local authorities having jurisdiction. catalog information of all major equipment, such as, distribution boards, transformers, luminaries, panel boards, panel schedule, motor 2. Main distribution board configuration shall be based on the design starters, PDU, TVSS, Security system, cable racks, etc. intent. 17. Complete job shall be guaranteed for a period of time of one 3. Submit product data as specified in "Electrical GeneralQ 1�7 ao (1) year after the date of job acceptance by owner. Any work, Requirements". _ material or equipment found the be faulty during that period shall be 4. All service and distribution equipment in the electrical room shall Project: corrected at once, upon written notification, at the expense of the be equipped with drip shields. Contractor. FHGO CELL SITE 5. Verify all dimensions and clearances by field measurements before 2. Basic Materials and Methods Installation. HOPE LUTHERAN CHURCH 6. Branch circuit panel boards shall be of the type and ratings as 6330 BIRD ROAD 1. Installation, materials, equipment and workmanship shall conform shown on drawings. Panel boards shall be Cutler-Hammer type to the applicable provisions of the National Electrical Safety Code PRL2a or approved equal. Distribution board shall be Cutler-Hammer MIAMI FLORIDA (NEC), applicable state Electrical Codes, the National Electrical Safety type Pow-R-Line 4B or approved equal. Code (NESC) and the terms, conditions and regulations of the Drawing Title: 7. Panel boards and splitters shall have copper mains and shall be authority having lawful jurisdiction pertaining to the work required. All of the characteristics as noted on the drawings. Provide an isolated ELECTRICAL material, equipment and devices shall conform to the applicable ground bar with ground jumper to panel tub. After completion of standards of the Underwriters Laboratories Inc. (UL). The label of and wiring, type directory showing a clear description of each circuit SPECIFICATIONS listing by UL is mandatory. being controlled from panel and place in metal frame inside door. 2. All materials and equipment shall be new. Materials and Equipment 8. Transformer shall be dry type, conform to NEMA TR1 and shall be shall be the standard products of manufacturer's current design. Any equipped with noise and vibration insolation pads. first-class product made by a reputable manufacturer may be used providing it conforms to the contract requirements and meets the Scale: Project No. approval of the engineer and the owner. Approvals shall be obtained 7. Grounding N.T.S. 6003708 prior to installation. 1. All safety grounding of the electrical equipment shall be carried Designer: Date: v 3. Arrange conduit, wiring, equipment, and other work generally as out in accordance with NEC. K.M.H. NOV/00 te: shown, providing proper clearances and access. Carefully examine all contract drawings and fit the work in each location without 2. Ground lugs are specified under "Conductors and Connectors". Drawn By: Checked By: substantial alteration. Where departures are proposed because of field 3. All ground lug and compression connections shall be coated with R.G.C. K.M.H. conditions or other causes, prepare and submit detailed drawings for anti-oxidant agent, such as ND-OX, Noalox, Penetrox or Koprshield. Drawing File: Client Approval acceptance. The right is reserved to make reasonable changes in 4. Main ground bar located in equipment room shall be supplied by telus. location of equipment, conduit, and wiring up to the time of rough-in or fabrication. Revision No. Drawing No. 8� 4. The contract drawings are generally diagrammatic and all offsets, lam Jo" bends, fittings and accessories are not necessarily shown. Provide all xZ° m_6 such items as may be required to fit the work to the conditions. O E5 . 1 I Eoo cn� �5a r^