Loading...
00-1316-009 i DO NOT SCALE DRAWINGS CONTRACTOR MUST VERIFY ALL DIMISIONS AND ADVISE CONSULTANTS OF ANY ERRORS - OR OMMISSIONS. NO VARIATIONS OR MODIFICATIONS TO _ - 'YORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL. ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED BY THE LATEST REVISION. ALL DRAWINGS AND SPECIFICATIONS REMAIN THE PROPERTY', OF MORRISON HERSHFIELD CORPORATION. NEITHER MORRISON HERSHFIELD NOR THE ARCHITECT WILL BE PROVIDING CONSTRUCTION REVIEW OF THIS PROJECT. MONOPOLE FOUNDATION NOTE 1 ) DESIG COMPLIES WITH �Pi ASC 7-93 AND S.F.B.C. •••,•..d•••••,���>,1�, L�T ST EDITION ` = •_° 4 N L4 •. ; 0 r v a. : • 9 o ¢� o o •.. �, . 1 lei I CHOON HONG TAN Y PROFESSIONAL ENGINEER EXISTING GLUE LAMINATE fi��` N T498 2 FLORIDA STRUCTURE (TYPICAL) K r 4 +14:0 6 s 1�M\ L � � cl RON HARRIS f IS G T CT R ,. �, N PROFESSIONAL ENGINEER `` STATE OF FLORIDA e ll # 34128 NJFOUNDATION OF MONOPOLE ONLY t" RN 7 NEW 6" THICK CONCRETE r' 6 SLAB W/ #4 REBAR EACH WAY @12"OC Kip' REFER TO ENGINEERED DOCUMENTS BY 5 TELESTRUCTURES FOR MONOPOLE INFORMATION _J LU H O U �, 4 o LU I 17'-6 3/4" I � I 3 N z E DTI N G PARTITI O 11 "W x 12" D CONCRETE PROPOSED MONOPOLE 2 MONOLITHIC FOOTING �� SEE FOUNDATION DETAIL THIS SHEET WITH 2 # 5 CONTINOUS NEW SLAB E `1ING SLAB 1 11/10/00 ISSUED FOR PERMIT' 6" S A 09/19/00 ISSUED FOR REVIEW 16V o j No. Date Action I St.3 NON BEARING PARTITION ' - ,,; N ®BELL SOUTH Mobility � METAL STUD PARTITION ATTACHED TO MONOPOLE 'z PARTITION FLUSH W/ INSIDE OF COLUMN_,,,,--- FRAMING 4141 4" THICK CONCRETE STOOP MO R R I S 0 N ' 48" D IA. X 25'-0" C O N C. , „ ,- „ �� - �� �� -- _.__ - _��._._.__ ___ — --- ---- - -- ------- 1000 W McNab Road. suite 300, Pompano Bch,Fl orida 33069 WITH 8x8 THICK EDGE WITH H E R S H F I E L D 1 #5 CONTINOUS & 6x6 AUGER SEE DETAIL 3 –4 10 2 1/2" 4 –0 10 2 1/2" 3 –q Tel: (954) 781-0177 Fax: (954) 781-0593 'I # 10 /10 WWM ( ) ewe j) 3 1/2" 3 1/2" FOUNDATION LAYOUT DRILLED SHAFT INFORMATION TOWER LOADING N „ NUMBER OF "X” "y, SHAFT EMBEDMENT LONG. AXIAL OTM SHEAR 25 —0 SHAFTS DIM DIM DIA' DEPTH"L" REBAR COMP. 3 '/2" 5'-7 1/2" 3'-2" 15'-1 1 " a) 31 '-8" O O (IN) (FT) (KIPS) (FT-KIPS) (IQPS) I FT-K >k 48" 25' 24-#9 1 15.4 K 1037.0 32.0 K A O A NOTES: 25'-0" 1. DRILLED SHAFT INSTALLED IN ACCORDANCE WITH ACI-336 (LATEST EDITION). Project: 2. CONCRETE WORK SHALL BE IN ACCORDANCE WITH ACI-318 (LATEST EDITION). FH GO CELL SITE CONCRETE SHALL HAVE A MINIMUM 28 DAY STRENGTH OF 4,000 PSI. PROPERTY LINE ANCHOR BOLTS PER 3.ALL REINFORCING STEEL SHALL BE DEFORMED BILLET STEEL CONFORMING HOPE LUTHERAN CHURCH . — . . . . . — . — . — ' — ' — . — ' — . — . — ' — . — ' — ' — . — . - - - - - - - ' — ' — - — - — - — - — - — - — - — - — - — — TOWER DRAWINGS TOASTMA-615, GRADE 60. 6330 BIRD ROAD 4.ALL REINFORCING STEEL SHALL HAVE A MIN. THREE (3) INCHES COVERAGE. 5. RWH ENGINEERING WILL NOT BE RESPONSIBLE FOR FOUNDATION INTEGRITY MIAMI, FLORIDA IF TOWER IS SET WITHIN 72 HRS. OF CONCRETE PLACEMENT, OR WITHOUT DIA. —I PRIOR VERIFICATION OF CONCRETE STRENGTH. Drawing Title: 6. FINAL LENGTH OF FOUNDATION MAY VARY DEPENDING ON ACTUAL IN SITU SOIL CONDITIONS RELATIVE TO BORING DATA SUPPLIED. FOUNDATION f 611 3 CLEARANCE — 7.TEMPORARY OR PERMANENT CASING WILL BE UTILIZED FROM THE BOTTOM V F_)� F_1� 4 TIES @ OF THE EXISTING STRUCTURES FOOTING TO THE TOP OF ROCK (+/-4'BELOW EXISTING GRADE). PLAN 8.TIE BAR SPACING MAY BE ADJUSTED AS NEEDED. 9. TOWER FOUNDATION DESIGN BASED ON SOIL BORING DATA I I I I I I 4 TIES @ PROVIDED BY: GEOSYNTEC PROJECT#FE0209AN 6 C-C 10. TOWER LAYOUT AND FOUNDATION DESIGN LOADING CONDITIONS SUPPLIED BY: TELESTRUCTURES/BELLSOUTH PROJECT#81458 REMAINING Scale: Project No. FOUNDATION PLAN TIES@ AS SHOWN bate: �I� �I� Ig" I 3" LONGITUDINAL REINFORCING Designer: Date: EQUALLY SPACED RL 10/27/00 S1 .11 1/4" = i'—o" � r I� I '/ Drawn B Checked B B B DATE: BELLSOUTH MOBILITY y y r I� T 1 2/23/01 69'POLE FOUNDATION PJ D R L �� •� ORTH HOPE LUTHERAN CHURCH Drawing File: Client Approval SCALE: FHGO SITE #4 TIE BARS 18"MIN.LAP NONE MIAMI,FLORIDA i SECTION"A-A' BARS SPACED PER Revision No. Drawing No. SECTION"B-B" FOUNDATION SCHEDULE APPR'D BY: �' ENGINEERING,INC. S1 . 1