To: The Honorable Mayor & Members of the City Commission
Via: W. Ajibola Balogun, City Manager
From: Jose Olivo, P.E.
Public Works & Engineering Department
Date: September 1, 2009 Agenda Item No.:;
Subject: Approval of Professional Service Work Order for preparation and evaluation of
Alternate FPL Transmission Line Corridor Report Application with the Florida
Department of Environmental Protection.
Request: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
SOUTH MIAMI, FLORIDA, PROVIDING THE CITY MANAGER TO USE THE
NECESSARY AUTHORITY TO USE UP TO $86,000.00 FROM THE
UNDESIGNATED CONTINGENCY CASH RESERVE FUND TO ISSUE A
WORK ORDER TO KIMLEY -HORN AND ASSOCIATES, INC. (KHA) FOR
ENGINEERING CONSULTING SERVICES FOR THE PREPARATION AND
EVALUATION OF AN ALTERNATE FPL TRANSMISSION LINE CORRIDOR
REPORT APPLICATION WITH THE FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION (FDEP) IN AN AMOUNT OF $86,000.00 TO
BE CHARGED TO THE PROFESSIONAL ENGINEERING SERVICES
ACCOUNT NUMBER 001 -1790- 519 -3100; PROVIDING FOR AN EFFECTIVE
DATE.
Request: Authorizing the City Manager to approve professional service work order for
engineering consulting services for the preparation and evaluation of an alternate
FPL transmission line corridor study for application with FDEP in accordance with
F.S. 403.5271.
Reason/Need: The residents of the City of South Miami and City Commission have
objected to the East Route proposed by FPL for the installation of an
overhead transmission line that would run along the U.S. 1 corridor.
Back in December 2008, at the request of the City Manager, the Public
Works- Engineering Department developed three (3) alternate FPL
transmission line corridor routes that would lessen the impact on health,
safety and quality of life for densely populated areas and basic elements
encompassing a working community such as hospitals, schools,
businesses, infrastructure improvements, etc.
The (3) three alternate transmission line corridor routes developed were
as follows:
Alternate no. 1: begins at FPL's Davis substation located at 13701 SW
127th Ave, and runs east adjacent to S.R. 874, then northeast along S.R.
874 to S.R. 826, then north along S.R. 826 to S.R. 836, then east along
S.R. 836 to the downtown Miami Substation
Alternate No. 2: Begins near U.S. 1 and S.W. 100th Street, and then runs
north on S.R. 826, then east on S.W. 56th Street and then north on S.W.
72nd Street
Alternate No. 3: Begins near U.S. 1 and S.W. 100th Street, then north on
S.R. 826, then northeast along C.S.X. R.R. and then north on S.W. 72nd
Street.
All three (3) proposed alternate transmission line corridor routes Were
then presented to FPL for their review and consideration, after which FFL
rendered the alternate routes as "not practical ".
Since then, on June 30t'', 2009, FPL filed a Site Certification Application
with FDEP for a new 230 KV overhead transmission in accordance with
Florida Statutes (F.S.) Chapter 403. in which FPL shows the preferred
corridor routes along U.S. 1 from S.W. 131St Street to FPL's downtown
substation. The proposed FPL corridor route runs through the Village of
Pinecrest, City of South Miami and City of Coral Gables.
As a result, on August 24, 2009 a meeting was held with the Vice - Mayor,
City Manager, Planning Director, and Public Works- Engineering Director
where it was agreed to move forward with the following (see attached
meeting minutes):
City will file a notice of Proposed Alternate Corridor for a
Transmission Line with FDEP by October 8th, 2009 in accordance
with Chapter 403.5271, F.S.
The City's proposed alternate corridors will be Alternate No. 1 and
Alternate No. 4 as shown in the attached Exhibit "A ". Alternate
No.1 begins at FPL's Davis substation located at 13701 SW ' 127 Ih
Ave, and runs east adjacent to S.R. 874, then northeast along
S.R. 874 to SR 826, then north along S.R. 826 to S.R. 836, then
east along S.R. 836 to the downtown Miami Substation. Alternate
No. 1 is consistent with what the City Commission approved via
Resolution No. 67 -09 -12876 on April 7th, 2009 (see attached).
New Alternate No. 4 discussed at the meeting is basically the
same U.S. 1 corridor route proposed by FPL, except constructed
underground within the City of South Miami limits from S.W. 800
Street to S.W. 57" Ave.
Retain the services of Kimley -Horn and Associates (city approved
engineering consultant) to evaluate the City's two (2) alternate
route corridors based on the qualitative and quantitative criteria as
established by FPL. The alternate corridor study would then be
filed with FDEP by October 8th, 2009 as part of the application
process to meet the proposed initial timeline schedule filed with
the State of Florida Division of Administrative Hearings (see
attached)
Cost: $86,000.00
Page 2 of 3
Funding Source: $86,000.00 will be funded from the City's undesignated contingency cash
reserve fund.
Backup Documentation:
❑ Proposed Resolution
❑ Exhibit "A" Proposed Alternate Corridor Routes No. 1 and No. 4
❑ Resolution No. 67 -09 -12876
❑ Meeting Minutes dated August 24, 2009
❑ State of Florida Division of Administrative Hearings Document No. 09-
3575 EPP Proposed Initial Schedule
❑ KHA's Work Order (Proposal) for Professional Engineering Services
Page 3 of 3
I RESOLUTION NO.:
2
3 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH
4 MIAMI, FLORIDA, PROVIDING THE CITY MANAGER TO USE THE NECESSARY
5 AUTHORITY TO USE UP TO $86,000.00 FROM THE UNDESIGNATED CONTINGENCY
6 CASH RESERVE FUND TO ' ISSUE A WORK ORDER TO KIMLEY -HORN AND
7 ASSOCIATES, INC. (KHA) FOR ENGINEERING CONSULTING SERVICES FOR THE
8 PREPARATION AND EVALUATION OF AN. ALTERNATE FPL TRANSMISSION LINE
9 CORRIDOR REPORT APPLICATION WITH THE FLORIDA DEPARTMENT OF
10 ENVIRONMENTAL PROTECTION (FDEP) IN AN AMOUNT OF $86,000.00 TO BE
11 CHARGED TO THE PROFESSIONAL ENGINEERING SERVICES ACCOUNT NUMBER
12 001 - 1790 - 519 -3100; PROVIDING FOR AN EFFECTIVE DATE.
13
14 WHEREAS, Florida Power and Light (FPL) has filed a Site Certification Application with FDEP for a new
15 230 KV overhead transmission which shows the preferred corridor route along U.S. 1 from S.W. 1315 Street to
16 FPL's downtown substation. The proposed FPL corridor route runs through the Village of Pinecrest, City of South
17 Miami and City of Coral Gables; and
18
1.9 WHEREAS, the proposed FPL corridor route along U.S. 1 will impact the health, safety and quality of
20 life for densely populated areas and associated elements encompassing a working community such as
21 hospitals, schools, businesses, infrastructure improvements, etc.
22
23 WHEREAS, the Mayor and City Commission wishes to file a notice of Proposed Alternate Corridors for a
24 Transmission Line with FDEP in accordance with F.S. 403.5271; and
25
26 WHEREAS, the Mayor and City Commission authorize the City Manager to secure the services of KHA for
27 the preparation and evaluation of an alternate FPL corridor report application with FDEP; and
28
29 WHEREAS, the total cost of the professional services will be $86,000.00 funded from the City's
30 undesignated contingency cash reserve fund; and
31
32 WHEREAS, the City Commission has not budgeted any amount in the fiscal year 2008 -2009 for these
33 expenses.
34
35 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OT THE CITY OF
36 SOUTH MIAMI, FLORIDA THAT:
37
38 Section 1: The City Manager is authorized to utilize up to $86,000.00 of the City's Undesignated
39 Contingency Cash Reserve Fund to pay for expenses associated with the preparation and evaluation of an
40 alternate FPL transmission line corridor report application to be filed with FDEP as a notice of Proposed Alternate
41 Corridors for a Transmission Line with FDEP in accordance with F.S. 403.5271
42
43 Section 2: The City Commission authorizes the City Manager to execute a professional service work order
44 with KHA in an amount of $86,000.00 for the evaluation of an alternate FPL transmission line corridor report
45 application to be filed with FDEP to be charged to the professional engineering services account number 001 -1790-
46 519 -3100.
47
48 Section 3: The total cost of the professional services will be $86,000.00 funded from the City's
49 Undesignated Contingency Cash Reserve Fund.
50
51 Section 4: The attached exhibit is incorporate by reference into this resolution.
52
53
54
55
56
1
2
3
4
6
7
8
9
10
11
12
13
14
15
PASSED AND ADOPTED this
ATTEST:
CITY CLERK
READ AND APPROVED AS TO FORM:
CITY ATTORNEY
day of 12009.
APPROVED:
MAYOR
COMMISSION VOTE:
Mayor Feliu:
Vice Mayor Beasley:
Commissioner Palmer:
Commissioner Newman:
Commissioner Sellars:
City of South Miami: PROPOSED ALTERNATE FPL ROUTES - Exhibit A
City of South Miami Public Works & Engineering, 8/26/2009. Shown on map by FPL, 3/30/09
BROWARD
COUNTY
MIAMI -DADE
COUNTY
City of South Miami
shown in green
FPL Preferred Route:
US 1 Overhead
shown in blue
M�
J
Alternate 1
W
shown in violet a
®, 3
�aTr
L-
L -29
96TH_ST
:...:�� �J!.r ::
,5�,. - -�Jtr :`.'�. ::�' qtr.: ` {- ''. : -�J.cr :`: �...,•..:
Z
z.
- 1..1 TH=HY
lG
=i g0i
EVERGLADES
NATIONAL' PARK
{
J.
-- t
R /Ck
9ACkF�,
eta
� -Cy
.qtr
,
M�
J
Alternate 1
W
shown in violet a
®, 3
�aTr
L-
ATLANTI
OCEAN
Alternate 4:
Route
underground
portion
FPL TURKEY POINT
. UNITS 6 & 7
TRANSMISSION LINES
Legend
OFPL Substation
Open FPL Right -of -Way
Available for Use
Preferred West Route
Secondary West Route
Preferred East Route
-- - -= Limited Access Roads
Major Road
r-r-r, T-{ Canals
® Miami Substation Approach Area
Municipalities
County Boundary
i Turkey Point Plant Property
1,1� 0 2 n.
t' �r r6i"
G -.
96TH_ST
Z
/
- 1..1 TH=HY
-�L IA_TUT:T,LE G
=i g0i
{
MIAMI
-- t
R /Ck
9ACkF�,
eta
� -Cy
ATLANTI
OCEAN
Alternate 4:
Route
underground
portion
FPL TURKEY POINT
. UNITS 6 & 7
TRANSMISSION LINES
Legend
OFPL Substation
Open FPL Right -of -Way
Available for Use
Preferred West Route
Secondary West Route
Preferred East Route
-- - -= Limited Access Roads
Major Road
r-r-r, T-{ Canals
® Miami Substation Approach Area
Municipalities
County Boundary
i Turkey Point Plant Property
1,1� 0 2 n.
t' �r r6i"
G -.
RESOLUTION NO. 67-09-12876
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF SOUTH MIAMI, FLORIDA, RELATING TO
OPPOSING THE PROPOSED ROUTES ALONG THE LUDLUM
TRAIL OR ALONG US HIGHWAY 1, FOR THE FPL
TRANSMISSION LINE: AND PROPOSING THE EVALUATION OF
AN ALTERNATE ROUTE ALONG SR 826, SR 836 OR SR 874;
PROVIDING FOR TRANSMITTAL TO THE STATE, AGENCIES,
AND OTHER COMMUNITIES; PROVIDING AN EFFECTIVE DATE.
WHEREAS, Florida Power and Light (FPL) is considering the construction of a
transmission line in order to increase capacity and connect the turkey point power station
to downtown Miami and points North; and,
WHEREAS, one proposed FPL route 'is along US Highway 1 and a second
potential route is the railroad corridor along the Ludlum Trail through the City of South
Miami; and,
WHEREAS, the Ludlum Trail proposed route runs adjacent to and in close
proximity to established residential neighborhoods and two existing schools; and,
WHEREAS, the proposed US Highway 1 route runs adjacent to and in close
proximity to an established residential neighborhood, hospitals, schools and other
occupied commercial buildings; and,
WHEREAS, locating transmission lines through densely populated areas imposes
an unreasonable burden on the affected community due to exposure to EMF, audible
noise, visual impact and danger of collapsed lines; and,
WHEREAS, the siting of electric transmission power lines along public highway
right -of -ways and other corridors with relatively small right-of-ways poses significant, . .
health and safety concerns; and,
WHEREAS, the siting of electric transmission power lines along public highway
right-of-ways with larger buffers and wider right -of -ways such as State Road 826, State
Road 836, and State Road 874 for example, minimizes impacts on residential
communities, businesses, hospitals and schools; and,
Additions shown by underlining and deletions shown by ^veFs#iki*g.
Res. No. 67 -09 -12876
WHEREAS, the Mayor and City Commission seek to lobby the State Legislature
relating to same.
NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA;
Section I. That the Mayor and City Commission does hereby state its
opposition to the Ludlam Trail route and the U.S. Highway 1 route for the proposed
transmission line proposed by FPL, and propose the relocation of the FPL transmission
lines along larger public highway rights -of -way, including, but not limited to SR 826, 836
and 874.
Section 2. In the event that one of the routes through the City of South Miami
is ultimately selected that the Mayor and Commission formally request FPL to place the
transmission lines running through the City under ground to reduce the adverse impacts
of electric magnetic fields on the citizens and visitors to South Miami.
Section 3. The Mayor and City Commission encourage FPL to work with the
Department of Transportation to identify transmission line routes that minimize exposure
to population centers.
Section 4. The Mayor and City Commission directs the City Clerk to transmit
a certified copy of this resolution to the Governor, Senate President, House Speaker, the
Chair and Members of the Miami -Dade County State Legislative Delegation, the
Presiding Officer and Members of the municipalities in Miami -Dade County and the
Executive Director of the Miami- League of Cities, and the Florida Department of
Environmental Protection and FPL.
Section S. This resolution shall take effect immediately upon approval.
PASSED AND ADOPTED this 7th day of April , 2009.
ATTEST:
A.APPOVED:
Y CLERK
.COMMISSION VO
5 -0
REA ROVED AS TO FORM:
Mayor Feliu:
Yea
Vice Mayor Beasley:
Yea
Commissioner Palmer.
Yea
L ' igueredo,
Commissioner Beckman:
Yea
Office of City Attorney
Commissioner Newman:
Yea
Page 2 of 2
Meeting Notes
FPL Proposed Transmission Line Corridor Meeting
Date: August 24, 2009
Time: 11:00 AM
Place: City Commission Chambers
Attendees: Vice Mayor, Brian Beasley
Ajibola Balogun, City Manager
Jose Olivo, Public Works Director
Sandy Youkilis, Planning and Zoning
Thomas Vageline, Planning Director
Subject: Coordination of City Efforts as Related to the FPL Proposed Transmission
Line Corridor
1. There was a discussion of the timeline for the application submitted by FPL
for the requested approval of the transmission line corridor proposal. The
dates for the optional informational meetings have been set as August 31,
2009 for the Power Plant portion of the application and September 2, 2009 for
the Transmission Line portion of the application.
2. There is an announcement on the City web -page and on Channel 77 to allow
citizens to be aware of these dates for the meetings.
3. City staff will be attending the September 2, 2009 meeting.
4. Pursuant to the timeline for the application processing, City to file notice of
proposed alternate corridor(s) for the transmission line.
5. The proposed City alternate corridor sub mission will require significant
technical work. Presently there are 3 alternative corridors (See attached
Exhibits) and the under grounding of the US 1 (Dixie Highway), within the
limits of the City of South Miami, portion of the line to be studied by the City.
A consultant will be required to address the technical work required.
6. It was decided to narrow the number of alternate corridors the City would
proposed to one. This would be the SR 874 NE to SR 826 N to SR 836 E.
This would keep the transmission line along the expressways for the length of
the route needed in keeping with the approved resolution no. 67 -09 -12876
adopted on April 11, 2009.
7. The consultant will be asked to provide a proposed scope of work for the
alternate corridor selected and the under grounding study for US 1 (Dixie
Highway) within the limits of the City of South Miami.
8. All 3 alternative corridors and the under grounding of the transmission line
along US 1 (Dixie Highway) within the limits of the City of South Miami to
be presented to the City Commission for discussion.
9. The draft letter from the Vice Mayor to DEP regarding the issues the City has
with the FPL application was discussed and finalized.
Planning genesis/FPL Power Lines 2008 +NM meeting notes 8 -24 -2009
1 f - -4f �—f- -, _ -+ -z_ r 4 4: o ooz 0 o4 oe o oe oe Ass'n p 1" �l
Mb
•
`:
i ,. - 4
S' 1 SM Doartlary
- 4 • _ - -
+
..
+ to intersect w'FPL p•r* a^
.. '
y. - 6W route at West c au
7.
- it
T
i
���t �Z��
+�y r"'
..a. TJ .
� � .} ��
•� .. .. ! 0.' ref„ -.M ,r .� �•,t �. } c_it •,,
!-\ C e4
�Y , ''
.. .. .. .
_•
.mow � t- �i
1 . ...
`�
Zj
� ~
- -' yr
G. _ ,i•5' rJ >y->�-
y � �. �-
,.
.J 'Yj. t,r .�. :` �4 i(+] 'il +.�'�u .i i
h,
t 7
-?
,u., I�. - �' ��: :7"
ti rYA-� c�, 'r' `•.�`-
.`
l '�i
,�
.....7
., '' "`���.
."; q •
`'`
.'i
-,
JJ �}
-° -� iE�` .,q Ira � ..7 'lr
�^
( ( o o+ oz oa o4 015 06 oe o, ae 113
. .. .. x
1 S boundary
f -
+ i•
All 2
-
•- $ - -
w ^ $ to ntersw w FPL proposod
. -
• - - -
v •, - F/W route at West F!ag!v <+
_
h. 1 .. t _� .1
rye° 'iJ` -=�.
J •
• '� t
�
7.
III —c• �-
� P
i
` .,�Y
"� —o
T � -tea,• 1
g
,r•„�, .`• - +i ,-.. -��- ,`
'off-
�
t.'_ ., . _1 �; ,,
,- ,• ...1- .
-
'. 1. •L� � i/ •• .'
.. _ .#.V 1'.7: � r:4. i N
p %
t
+
,If ,
�1�' 7� ����� ��IIS� �?i6
1� o of oz oa ai os as of oe ee '
tJ):�.x�s,,� ;,� c����o
�..•t����:..��e�Q�Q.
MAes `
--
SM beaMa'.
C
T
-' r o
e
`
w�'
"'1 �'••a
All "
+ *°
.^
_.
- to nlersoct w FPL Proposers
- - -
, PW route at Afest Flag* St
ji
�
l ,.
_
•�, .s - - ter,•,. i }� �»-
� • -
'
fir_ ', .•r _
44 7
o
•_
Z
,-,
by � �._ Y.. .. ,�' , ) �,:•'' o ��,.�,� ,
iNV�
PROPOSED
INITIAL SCHEDULE
Pursuant to Section 403.5064(4), Florida Statutes, the State of Florida Department of
Environmental Protection files the attached Proposed Initial Schedule in this matter, and asks
that the Administrative Law Judge adopt the Proposed Initial Schedule.
Respectfully submitted this 7th day of July, 2009.
oni L. Stu evant, Assistant General
Counsel Florida Bar I.D. No. 0661821
STATE OF FLORIDA DEPARTMENT
OF ENVIRONMENTAL PROTECTION
3900 Commonwealth Boulevard, M.S. 35
Tallahassee, Florida 32399 -3000
(850) 245 -2257 / FAX 245 — 2302
fa
STATE OF FLORIDA
DIVISION OF ADMINISTRATIVE HEARINGS
'� %�`�;, 43 *.'�
IN RE: FLORIDA POWER AND LIGHT COMPANY
`96
TURKEY POINT UNITS 6 & 7 . P
DOAH Case No 09- -.T-PIP
POWER PLANT SITING APP. PA03.45A3 DEP OGC Case
No. 09 -3107:
PROPOSED
INITIAL SCHEDULE
Pursuant to Section 403.5064(4), Florida Statutes, the State of Florida Department of
Environmental Protection files the attached Proposed Initial Schedule in this matter, and asks
that the Administrative Law Judge adopt the Proposed Initial Schedule.
Respectfully submitted this 7th day of July, 2009.
oni L. Stu evant, Assistant General
Counsel Florida Bar I.D. No. 0661821
STATE OF FLORIDA DEPARTMENT
OF ENVIRONMENTAL PROTECTION
3900 Commonwealth Boulevard, M.S. 35
Tallahassee, Florida 32399 -3000
(850) 245 -2257 / FAX 245 — 2302
FPL TURKEY POINT UNITS 6 & 7
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that a true and correct copy of the foregoing has been furnished by
ELECTRONIC MAIL ONLY this NI, day of 2009, to:
Peter Cunningham
Carolyn Raepple
Hopping Green & Sams, P.A.
P.O. Box 6526
Tallahassee, FL 32314
peterchgslaw.corn
craeppleAhgslaw.com
Michael S. Tamarro, Senior Attorney
Florida Power & Light Company
700 Universe Boulevard
Juno Beach, Florida 33408
michael.tamarroAfpl.com
Jennifer Brubaker, Asst. Gen. Cnsl.
Florida Public Service Commission
2450 Shumard.Oak Blvd.
Tallahassee, FL 32399 -0850
ibrubakepsc.state.fl.us
Matthew G. Davis, Asst. Gen. Cnsl.
Department of Community Affairs*
2555 Shumard Oak Blvd.
Tallahassee, FL 32399 -2100
matthew.davisdca.state.fl.us
Emily Norton, Asst. Gen. Cnsl.
Fish and Wildlife Conservation Comm.
620 S. Meridian Street
Tallahassee, FL 32399 -1600
emily.nortonAmvfwc. corn
Kimberly Menchion, Asst. Gen. Cnsl.
Department of Transportation*
605 Suwannee Street, MS 58
Tallahassee, FL 32399 -0450
Kimberly.Menchion @,dot. state.fl.us
Ruth Holmes, Asst. Gen. Cnsl.
South Florida Water Mgt. District*
3301 Gun Club Road
West Palm Beach, FL 33406
rho1mesAsfwmd.00v
[updated 07- 07 -09]
Sam Goren, Esq.'
Goren, Cherof, Doody, Ezrol
South Florida Regional Planning Council
3099 E. Commercial Blvd., Suite 200
Ft. Lauderdale, FL 33308
sgorencitvatty.corn
John McInnis, Asst. County Attorney
Miami -Dade County Attorney
111 NW First Street, Suite 2810
Miami, FL 33128
idmAmiamidade.gov
Julie 0. Bru, Esquire
City of Miami, City Attorney
444 SW 2nd Ave., Suite 945
Miami, Florida 33130
JOBmAmiamigov.com
Jimmy L. Morales, Esquire
City of Dora!, City Attorney
Stearns Weaver Miller Weissler Alhadeff
& Sitterson, P.A.
150 West Flagler Street, Suite 2200
Miami, FL 33130
moral es(a stearnsweaver. corn
Melvin Wolfe, Esquire
Town of Medley, Town Attorney
7777 NW 7200 Avenue
Medley, Florida 33166
medleyAbel lsouth.net
cc: igmoasAtownofinedley.com
Cynthia A. Everett, P.A.
Village of Pinecrest, City Attorney
7700 N. Kendall Dr., Suite 703
Miami, Florida 33156
caecaeverett. corn
Elizabeth M. Hernandez, Esquire
City of Coral Gables, City Attorney
405 Biltmore Way
Coral Gables, Florida 33134
ehernandezAcoralgables. corn
Luis Figueredo, Esquire
City of South Miami, City Attorney
Figueredo, Boutsis and Montalbo, P.A.
18001 Old Cutler Road, Suite 556
Palmetto Bay, Florida 33157
Ifiqueredo fbm- law.corn
cc: Imaresfbm - law.com
Eve A. Boutsis, Esquire
Village of Palmetto Bay, City Attorney
Figueredo, Boutsis and Montalbo, P.A.
18001 Old Cutler Road, Suite 556
Palmetto Bay, Florida 33157
eboutsisfbm - law.com
Richard Jay Weiss, Esquire
City of Homestead, City Attorney
Weiss, Serota, Helfman, Pastoriza,
Cole, & Boniski, P.L.
2525 Ponce de Leon Boulevard, Suite 700
Coral Gables, Florida 33134
rweiss (wsh-law. corn
Regme Monestime, Esquire
City of Florida City, City Attorney
The Monestime Firm, P.A.
909 N. Miami Beach Boulevard, Suite 501
North Miami Beach, Florida 33162.
reoinemonestimebellsouth.net
reginemonestime florid acitV.gov
'Toni Sturtevant, Assistant General Counsel
PROPOSED INITIAL SCHEDULE FOR REVIEW OF SITE CERTIFICATION APPLICATION FOR
FLORIDA POWER AND LIGHT COMPANY'S TURKEY POINT UNITS 6 & 7
POWER PLANT SITING APP. PA03 -45A3 DEP OGC Case No. 09 -3107
DOAH Case No. 09- -EPP
Date/Day
Requirement/ Deadline
Statute
Applies
to:
June 30, 2009
FPL files the SCA with DEP and with other agencies
403.504(3)
Tuesday
identified in §403.507(2)(a), F.S.
403.5064(1)
[1],[2]
July 7, 2009
DEP requests that DOAH assign an All and files a
403.5064(4)
Tuesday
proposed schedule.
403.5065(1)
July 7, 2009
DEP provides FPL and DOAH with a list of additional
403.5064(2)
Tuesday
agencies or persons entitled to notice.
July 14, 2009
FPL distributes copies of the SCA to any additional
403.5064(2)
[1], [2]
Tuesday
agencies identified by DEP.
DOAH appoints an ALJ (who, whenever practicable,
July 14, 2009
shall have prior experience or training in electrical
403.5065(1)
Tuesday
power plant certification proceedings) and All issues
403.5064(4)
[1], [2]
an order establishing the schedule.
July 15, 2009
Deadline for DEP to file�4opy of the SCA with the
403.5065(1)
[1] ' [2]
Wednesday
403.525(1)(c)
403.5064(6)
July 17, 2009
DEP publishes Florida Administrative Weekly notice of
40331)3(4)0403.5251(4)
[1], [2]
Friday
filing the application.
403.5363(1)(b)l.
403.5363(3)(a)
403.5064(6)
July 21, 2009
403.5115(1)(b)
[1], [2]
Tuesday
FPL publishes newspaper notice of filing of the SCA.
403.5251(4)
AGENCIES submit recommendations regarding the
completeness of the transmission portion of the SCA to
July 30. 2009
;C
DEP. If an aeencv recommends the application
any r%naA1111a1
403.5252(1)(a)
121
Thursday
complete, the agency must also submit its preliminary
403.526(1)
statement of issues on transmission to DEP and all
parties.
July 30, 2009
AGENCIES submit recommendations regarding the
)
[ ]
Thursday
completeness of the plant and non - transmission portion
403.5066(1)(252
of the SCA to DEP.
[1] Applies only to Main Site and Associated Facilities
121, A plies only to specified Transmission Line Corridors
1 [2]] Applies to both
PROPOSED INITIAL SCHL_JLE FOR REVIEW OF SITE CERTIFICATION APPLICATION FOR
FLORIDA POWER AND LIGHT COMPANY'S TURKEY POINT UNITS 6 & 7
Date/Day
Requirement/ Deadline
Statute
4plie
to:
EP issues 1st Completeness Determination on the
Aug. 6, 2009
transmission portion of the SCA (schedule assumes
403.5252(1)(b)
[2]
Thursday
application incomplete).
DEP issues 1st Completeness Determination on the
Au 10, 2009
g'
plant and non - transmission portion of the SCA
403.5066(1)(b)
[
Monday
schedule assumes application incomplete).
Aug. 1 4 , z 009
PL makes good faith effort to provide direct notice (via
403.5115(6 }(a)
[1), [2]
Friday
U.S. mail or hand - delivery) to local landowners
(identified in § 403.5115) of the filing of the application.
LOCAL GOVERNMENTS issue determination of land
se /zoning consistency for power plant site and
Au g. 14, 2009
associated facilities that are not exempt from the
403.50665(2)(a)
[1], [2]
Friday
definition of development (schedule assumes
and (b)
application complete as to land use and zoning).
Aug. 20, 2009
FPL files response to DEP's 1 st determination that the
transmission portion of the SCA is incomplete (schedule
403.5252(2)
[2]
Thursday
assumes FPL files additional information).
FPL files position statement in response to DEP's 1 st
,Aug. 25, 2009
determination that the plant and non - transmission
403.5066(2)
[1j
Tuesday
portion of the SCA is incomplete (schedule assumes
FPL advises it will file additional information).
Aug. 31, 2009
Monday
FPL files with DEP a list of the landowners and
in accordance with § 403.5115, F.S.
403.5115(6)(b)
[1], [2]
residences notified
LOCAL GOVERNMENTS (or the Regional Planning
Council) provide notice to all parties if electing to hold
optional informational public meeting. (The Regional.
Aug. 31, 2009
Planning Council may hold such a meeting if a local
403.50663(3)
government does not.) Notice must be provided not less
tr)
than 5 days prior to the meeting, excluding Saturdays,
,J
Sundays, and holidays.)
LOCAL GOVERNMENTS (or the Regional Planning
Council) provide newspaper notice of informational
public meeting. (The Regional Planning Council may
[1]� [2]
Sept. 1, 2009
hold such a meeting if a local government does not.
403.50663 3)
Tuesday
Notice must be published not less than 7 days prior to
403.5115(5
the meeting.)
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
5
PROPOSED INITIAL SCHEL JLE FOR REVIEW OF SITE CERTIFICMITON APPLICATION FOR
FLORIDA POWER AND LIGHT COMPANY'S TURKEY POINT UNITS 6 & 7
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
Statute
Applies
Date/Day
Requirement/ Deadline
to:
GENCIES submit recommendations regarding the
completeness of the transmission portion of the SCA to
EP in response to FPL's additional information. If an
[2]
Sept. 3, 2009
agency recommends the application is complete, the
403.5353 4)
Thursday
agency must also submit a preliminary statement of
403.526(1
slues on transmission to DEP and all parties..
Sept. 4 2009
p
DEP publishes Florida Administrative Weekly notice of
local government's determination of land use and
403.50665(2)(c)
[1]
Friday
zoning consistency.
403.5115(4)(c)
Sept. 4, 2009
FPL publishes newspaper notice of local government's
403.50665 2)(e)
[1]
Friday
determination of land use and zoning consistency.
40 (c)
LOCAL GOVERNMENTS (or the Regional Planning
Council) hold optional informational public meeting.
403.50663(1)
[1], [2]
Sept. 8, 2009
(The Regional Planning Council may hold such a
Tuesday
meeting if a local government does not.)
Sept. 9, 2009
FPL files additional information in response to DEP's
Wednesday
1st determination that the plant and non- transmission
403.5066(2)(b)
[ 1
portion of the SCA is incomplete.
Sept. 10,
DEP issues 2nd Completeness Determination and its
2009
preli minary statement of issues on the transmission
403.5252(4)
[2]
Thursday
portion of the SCA (schedule assumes application
403.526(1)
complete).
Sept. 14,
NON TASTED AGENCIES and PUBLIC INTEREST
2009
GROUPS file notice of intent to be a party to the
403.508(3)(e)
[1], [2]
Monday
proceeding.
Sept. 24,
AGENCIES submit recommendations regarding the
2009
completeness of the plant and non - transmission portion
403.5066(4)
[1 ]
Thursday
of the SCA to DEP in response to FPL's additional
information.
Sept. 25,
SUBSTANTIALLY AFFECTED PERSON files petition
2009
for hearing on a local government's land use
403.50665(4) [
1
Friday
determination.
Sept. 28,
AGENCIES issue reports on FPL's proposed
2009
transmission line corridors as to matters within their
403.526(2)(a) [2]
Monday
jurisdiction.
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
PROPOSED V;ITIAL SCHEDut1E FOR REVIEW OF SITE CERTIFICtifION APPLICATION FOR
FLORIDA POWER AND LIGHT COMPANY'S TURFY POINT UNITS 6 & 7
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
7
Statute
Applies
to:
Date/Day
Re uirement/ Deadline
EP issues 2nd Completeness Determination on the
Oct. 1, 2009
plant and non - transmission portion of the SCA
403.5066(4)
[1]
Thursday
(schedule assumes application complete).
Oct. 2, 2009
PL
schedules hearing on land use (if a petition for
403.508(1)(a)
[
Friday
hearing was filed by a substantially affected person).
ARTY files notice of proposed alternate corridor(s) for
transmission line (NOTE: Alternate corridors must
403.5064(4)
[2]
Oct. 8, 2009
include the same terminal and intermediate substations
Thursday
or substation expansions as FPL's proposed corridor(s).
EP publishes Florida Administrative Weekly notice of
Oct. 9, 2009
land use hearing before the
403.508(1)(b)
[1]
Friday
ALI (if a petition for hearing was filed by a substantially
403.5115(4)(d)
affected person).
PL publishes newspaper notice of land use hearing
Oct. 9, 2009
before the All (if a petition for hearing was filed by a
[
Friday
substantially affected person).
03.5118( )((
403.5115(1)(4)
GENCIES HEADED BY A COLLEGIAL BODY (e.g.,
Oct. 13, 2009
WMD, Counties) issue reports on FPL's proposed
403.526(2)(d)
[2]
Tuesday
transmission line corridors as to matters within their
jurisdiction.
FPL and DEP file notices of acceptance or rejection of
alternate corridor. (If FPL and DEP accept, alternate
proponent must submit data in support of alternate
403.5271(1)(b)l
[2]
Oct. 15, 2009
corridor. If FPL or DEP reject, alternate corridor is not
Thursday
proper for certification — schedule assumes FPL and
EP accept alternate corridor.)
Oct. 23, 2009
DEP issues Project Analysis on FPL's proposed
403.526(3)
[2]
Friday
transmission line corridors.
Oct. 26, 2009
through Oct.
4-T
conducts hearing on the challenge to the
403.508(1)(a)
[
28, 2009
determination of land use consistency (schedule
Monday -
Wednesday
ssumes a 3 -day hearing).
PROPONENT OF ALTERNATE CORRIDOR submits
Nov.
data on alternate corridor needed for preparation of
403.5271 (1 )( d )
[
Thur sday
agency supplementary reports on proposed alternate
403.518(6)
corridor and pays the appropriate a lication fee.
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
7
PROPOSED IN AL SCHELJLE FOR REVIEW OF SITE CERTIRu- 11ION APPLICATION FOR
FLORIDA POWER AND LIGHT COMPANY'S TURKEY POINT UNITS 6 & 7
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
8
Statute
40es
Date/Day
Re uirement/ Deadline
to:
PROPONENT OF ALTERNATE CORRIDOR makes
Nov. 9, 2009
ood faith effort to notify all local landowners whose
403.5115(7)(a)
[2]
Monday
property or residences are within 1/4-mile of the
proposed transmission line corridor boundaries.
Nov. 10, 2009
AGENCIES file preliminary statement of issues for the
403.507(1)
[
Tuesday
power plant and non - transmission associated facilities.
Nov. 20, 2009
AGENCIES file with DEP any issues concerning
403.5271(1)(e)f
[
Friday
completeness of alternate corridor data.
PROPONENT OF ALTERNATE CORRIDOR files with
Nov. 23, 2009
DEP a list of the landowners and residences notified of
403.5115(7)(6)
[2]
M o n d a y
the alternate corridors.
Nov. 30, 2009
DEP issues 1st determination of completeness of
403.5271(1)(e)f
[2]
Monday
alternate corridor (schedule assumes incomplete).
PSC issues Agency Report/Need Determination.
Now�.30 2009
t 0n�tL
�OTE: PSC issued its Need
403.507(4)(x)
[1]
Determination on April 11, 2008.)
Nov. 30, 2009
ALJ issues Recommended Order from hearing on land
403.508(l)(d)
[
Monday
use consistency.
PROPONENT OFALTERNATE CORRIDOR submits
corrective data in response to DEP's determination of
403.5271(1)(e)2
[2]
Dec. 14, 2009
incompleteness. If no data is submitted, alternate
Monday
corridor is deemed withdrawn.
Dec. 22, 2009
LISTED AGENCIES file notices of intent to be a party to
403.508(3)(b)
[2]
Tuesday
the Certification Hearing.
Dec. 24, 2009
AGENCIES file with DEP any issues concerning
403.5271(1)(e)3
[1]
Thursday
completeness of alternate corridor data.
Dec. 28, 2009
DEP issues 2nd determination of completeness of
403.5271(1)(e)3
2
Monday
alternate corridor (schedule assumes complete - if
incomplete, alternate corridor is deemed withdrawn).
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
8
PROPOSED INITIAL SCHtL)ULE FOR REVIEW OF SITE CERTIFICATION APPLICATION FOR
FLORIDA POWER AND LIGHT COMPANY'S TURKEY POINT UNITS 6 & 7
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
9.
Statute
4plies
to:
Date/Day
Requirementl Deadline
Monday Jan. 11, 2010
AGENCIES issue reports on the power plant and non-
transmission associated facilities as to matters within
403.507(2)(a)
1
heir jurisdiction.
Jan. 15, 2010
DEP publishes Florida Administrative Weekly notice of
403.5115(4)(e)
1
Friday
Siting Board Hearing on Land Use.
403.51403.0(2P)15(1)(e)
Jan. 15, 2010
FPL publishes newspaper notice of Certification
[1], [2]
Friday
Hearing and notice of the deadline for filing notice of
intent to be a party.
Jan. 21, 2010
AGENCIES file with DEP supplementary reports on
403.5271(1)(1)
2
Thursday
alternate corridor that has been determined complete.
SITING BOARD hearing on land use consistency.
Jan. 26, 2010*
403.508(1)(d)
1
Tuesday
AGENCIES HEADED BY A COLLEGIAL BODY file with
Jan. 28, 2010
DEP supplementary reports on alternate corridor that
403.5271(1)(h)
2
Thursday
has been determined complete.
Feb. 5, 2010
DEP publishes Florida Administrative Weekly notice of
403.508(2 (b)
[1], [2]
Friday
Certification Hearing.
403.51 15((4))
PROPONENTOFALTERNATECORRIDORpubhshes
Feb. 5, 2010
newspaper notice of alternate corridor. If not timely
403.5271(1)(c)
2
Friday
published, alternate corridor is deemed withdrawn.
403.5363(2)(d)
Feb. 8, 2010
DEP files Project Analysis on the power plant and non-
403.507(5)
1
Monday
transmission associated facilities.
DEP files Project Analysis on alternate corridor(s).
Feb. 15, 2010
403.5271 (1)(i)
2
Monday
Feb. 19, 2010
INTERVENORS file motions toicltmveneinthe
403.508(3)(e)
[1], [2]
Friday
Certification Hearing.
Feb. 22, 2010
Earliest date to request that AU cancel the Certification
403.508(6)(a)
[11,[21
Monday
Hearing and relinquish jurisdiction to DEP if all patties
stipulate.
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
9.
PROPOSED INITIAL SCHLLJLE FOR REVIEW OF SITE CERTIFIGATION APPLICATION FOR
iq rwine pnWFR nNn i IrHT COMPANY'S TURKEY POINT UNITS 6 & 7
* Note: As of 07- 07 -09, the 2010 Cabinet Agenda schedule had not been set. Dates subject to change.
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
10
Applies
Date/Day
Requirement/ Deadline
Statute
to:
Deadline for AU to issue order granting or denying the
403.508 6 O(b)
[IJ, [2J
Mar. 1, 2010
request to relinquish jurisdiction based on earliest request
Monday
date to cancel Certification Hearing.
Mar. 11, 2010
Deadline for PARTIES to submit Proposed Recommende a
403.508 )(6 )() d 2
[11, 12)
Thursday
Orders to DEP ifAUhas relinquished jurisdiction (based on
earliest relinquish date).
Mar. 12, 2010
DEP to have published Florida Administrative Weekly notice
403.508(6)(c)
[1], [2]
of cancellation of Certification Hearing ifAU has relinquished
403.5115(4)(6)
Friday
jurisdiction.
Mar. 17, 2010
FPL to have published newspaper notice of cancellation of
403.508(6)(c),
[1], [2]
Wednesday
Certification Hearing ifAUhas relinquished jurisdiction.
403.5115(1)0
Mar. 22, 2010
conducts certification hearing (schedule assumes a
403.508(2)(a)
[1], [2]
through
2 day hearing).
April 20, 2010
April 12, 2010
Deadline for DEP Secretary to issue Final Order on
403.508(6)(d)1
[1], [2]
Monday
Certification ifAUhas relinquished jurisdiction.
403.509(1)(a)
June 21, 2010
An issues Recommended Order (schedule assumes
403.508(5)
[1], [2]
Monday
hearing transcripts are filed 10 working days after the
hearin concludes).
Aug. 6, 2010
DEP Florida Administrative Weekly notice of Siting
403.5115(4)(1)
[1], [2]
Friday
Board Hearing on Certification.
Aug. 17, 2010
Anticipated date for Sff NG BOARD HEARING on
403.509(1)(b)
[1], [2]
Tuesday*
Certification.
* Note: As of 07- 07 -09, the 2010 Cabinet Agenda schedule had not been set. Dates subject to change.
Applies only to Main Site and Associated Facilities
Applies only to specified Transmission Line Corridors
10
Kimley -Horn
and Associates, Inc.
August 25, 2009
Mr. Jose H. Olivo Jr. PE, Director
City of South Miami. Department of Public Works
4795 SW 75 Avenue
South Miami, Florida 33155
Re: Proposed FPL Transi+nission Lines
Alternate Corridor Study
Dear Mr. Olivo:
Kimley -Horn and Associates, Inc., (hereinafter referred to as "Consultant" or
"KHA ") is pleased to submit this letter agreement to The City of South Miami
(hereinafter referred to as "City" or the "Client ") for professional consulting
services relating to the project known as "Alternate Corridor Evaluation for
Proposed FPL Transmission. Lines ". Except as specified below, the terms of this
agreement shall be in accordance with the "Professional Service Agreement —
General Engineering Services" (the' "Agreement ") between the City of South
Miami and Kimley -Ho.rn and. Associates, Inc., as approved by the City
Commission on March 17, 2009. Our project understanding, assumptions, scope
of services and fees follow.
PROJECT UNDERSTANDING
On June 30, 2009, FPL filed a Site Certification Application with FDEP for new
230 -kV overhead transmission lines as part of the proposed Turkey Pointnuclear
expansion in accordance with Florida Statutes (F. S.) Chapter 403. One of the
corridors preferred by FPL for the proposed power lines, referred to as "East
Route "; would run. along U.S. 1 from about SW 131" Street to FPL's downtown
Miami Substation, which is located .NE of where. 1-95 and Metrorail. diverge. This
"East Route" crosses portions of the Cities of South Miami; Pinecrest, Coral
Gables and Miami. Most of these municipalities have expressed objections to the
"East Route" for different reasons. More detailed information about the "East
Route' proposed by FPL is available from the FPL website at the link below:
http : / /www fpl cons /environ.mcht/liriCS /tp.Slltml
IN
TEL 305.673.2025
FAX 305.673.4882
E
Suite 400
1691 Michigan Avenue
Miami Beach, Florida
33139
EN KimieyHorn FPL Alternate Corridor study, August 25, 2009, Page 2 of 10
i and Associates, Inc.
It is our understanding that the City of South Miami objects to the "East Route'
proposed by FPL and wishes to file a notice of "Proposed Alternate Corridors for
a Transmission Lure" for consideration of two (2) alternate corridors in
accordance with Chapter 403.5271, F.S. The two alternate corridors are as
follows:
I) Beginning at FPL's Davis Substation, located at 13701 SW 127th Avenue,
overhead transmission lines running east along an existing FPL easement
to S.R.874, then northeast along S.R.874 to S.R.826 (Palmetto
.Expressway), then north along S.R.826 to S.R.836, then east along S.R.836
to the. downtown Miami Substation located at 1.22 SW P Street.
'2) Essentially the same U.S.1 "East Route" proposed by FPL, except that the
system would be installed underground within the City of South Miami,
between SW 80th Street (Davis Road) and SW 57th Avenue (Red Road).
As part of this filing, the City is requesting that KHA prepare an alternate
corridor study in order to evaluate the two (2) alternate corridors described
above. It is our understanding that this study will be based on a specific set of
quantitative and qualitative criteria developed by FPL and included herein as
"Exhibit B ". This alternate corridor study would be file. d with the FDEP as part
of the certification proceeding.
KHA does not guarantee that the alternate corridors proposed by the City of
South Miami will be found to be feasible or acceptable by FDEP or FPL. During
the course of this study, if it is determined by the City or KHA that any portions)
of these corridors should change; KHA will submit a supplemental scope of
services and fee for the additional work associated with the revised alignment.
ASSUMPTIONS
1) The deadline for filing the notice of proposed alternate corridors is October
8, 2009.
2) If FPL and FDEP accept the alternate corridors, the deadline for submitting
additional data in support of the alternate corridor is November 5, 2009.
3) The City will be responsible for publishing the newspaper notice of
alternate corridor in accordance with Chapter 403.5363(2), F.S.
4) The City will prepare mailing labels and send mail notifications to all
owners of properties within' /4 -mile of the proposed alternate corridors.
5) Due to the short turn - around time for delivery of this project, it may not be
possible to obtain records of all existing underground utilities within the
alternate corridors in time to incorporate in the deliverables. KHA will
request and try to obtain readily- available utility records.
6) It .is assumed that most the information necessary for this evaluation will be
readily available and obtained through the City of South Miami, FPL
(through City staff) and Miami -Dade County. Additional efforts needed to
produce this information from other sources will be considered additional
services.
C1 andAssociates, Inc.
Kim'' NoCn FPL Alternate Corridor Study, August 25, 2004, Page 3 of 10
_ _. _
SCOPE OF SERVICES
Task 1.0 — Field Reconnaissance and Data Collection:
During this phase; KHA,w.ill perform the following services:
1) Attend one "kick -off' meeting with City of South Miami Public Works
Department staff.
2) Review all information provided by the City pertaining to FPL's Electrical
Transmission. Line Siting Application.
3) Request from FPL (through City staff) specific information on the types of
transmission facilities being proposed and types of existing FPL utilities
along the two proposed. alternate corridors.
4) Drive each proposed alternate corridor to take photographs and make notes
of existing conditions
5) Submit requests to the following agencies for the information below along
the two proposed alternate corridors:
(a) USES - 1:24,000 Quadrangle Maps
(b) Miami -Dade County - Right -of -way maps
(c) Miami -Dade County — All available GIS layer information
(d) Miami -Dade County Planning. Department - planned developments
(e) MDX / F.DOT / Miami -Dade County - Planned roadway construction
projects
(f) Miami -Dade County— Database of archaeological sites
(g) Miami -Dade County Historic Preservation Officer - Historic districts
(h) Miami -Dade County Park and Recreation Department Locations of
parks, trails, greenways and conservation lands
6) Solicit unit costs from FPL contractors for different materials and
construction methods (overhead and underground)
7) Perform glide slope analysis as required by FAA where corridor alignment
is in close proximity to Miami International Airport.
At the end of this task, KHA will. provide the City with a report of existing
conditions and an aerial. map showing the proposed alternate corridors and the
information collected during Task 1.
Task 2.0 — Alternate: Corridor Study Report
During this phase, KHA will perform the following services:
1) Evaluate the two (2) alternate corridors described in the Project
Understand u>g based on a specific set of quantitative and qualitative
criteria developed by FPL and included herein as "Lxhibif B ".
2) Provide Engineer's preliminary opinion of probable costs for construction
of each alternative.
KimleyHorn FPL Alternate Corridor Study, August 25, 2009, Page 4 of 10
6.2! im"., and Associates, Inc.
3) Perform a constructability review of the alternate corridors
4) Rank each alternate corridor based on the above criteria.
5) Prepare an Alternate Corridor Study Report containing the findings from
Task 1, analysis and rankings from Task 2, and highest ranking alternate
corridor.
At the end of this task; KHA will provide the City with three copies of the
Alternate Corridor Study Report and updated aerial map.
Task 3.0 —Assistance with Filing of Proposed Alternate Corridor
KHA will assist the City of South Miami with the filing of the Notice of
Proposed Alternate Corridor in accordance with Chapter 403.5271(1)(a); F.S.
by providing the following services:
1) Delineate the alternate corridor boundaries on USGS 1:24,000 quadrangle
map
2) Provide a description of the proposed alternate corridor
3) Assist the City in preparing a statement of reasons the proposed alternate
corridor should be certified
KHA does not make any guarantees that any of the alternate corridors proposed
by the City will be accepted by FDEP and FPL. If one of the alternate corridors is
accepted by FDEP and FPL, KHA will remain available to perform the following
as additional services:
1) Submit additional information that may be requested by FDEP through a
determination of incompleteness if the information requested is in addition
to what was prepared as part of Tasks 1.0 and 2.0 above.
2) Assist the City by sending mailings to owners whose properties are located
within, ' /4 -mile from the proposed alternate corridor, and assist with filing
the list of landowners with FDEP.
Task 4.0 - Additional Services
Any services not specifically provided for in the above scope will be considered
additional services. If additional services are requested by the City, KHA will
submit a supplemental scope and fee for the additional services requested.
Additional services we can provide include; but are not limited to, the following:
1. Preparing mailing labels and sending mass mailings
2. Assisting the City in preparing newspaper advertisements
3. Site planning
4. Environmental engineering
5. Traffic engineering and design
6. Roadway design
7. Design of public infrastructure improvements
KimleyHorn FPL Alternate Corridor Study, August 25, 2009, Page 5 of 10
and Associates, Inc.
8. Landscape architecture
9. Revisions to the two alternate corridors described in the Project
Understanding
10. Services required by additional governmental regulations, which might be
put into effect after the date of this agreement
11. Revisions to invoices or additional invoice back-up coordination
12. Plans for maintenance of traffic (MOT) during construction
13. Erosion control plans and NPDES permitting
14. Dewatering plans
15. Attendance to meetings, hearings, presentations in addition to those
described in the tasks above
16. Deliverables not specifically outlined in the above tasks
17. Any other service not specifically listed in "Scope of Services
TO BE PROVIDED BY CLIENT
The following items are to be provided to KHA by the Client:
1. Scheduled dates established by FDEP_ for all. submittals of FPL's
Transmission. Line Siting application process
2. Copies of FPL's Electrical Transmission Line Siting Application
3. The City will request the .following from FPL and provide to KHA:
a) Details and specifications of the transmission facilities proposed by FPL
b) Types of existing FPL utilities along the proposed alternate corridors.
4. Alignments proposed by the City for the two alternate corridors
5. Payment of all application fees
6. Newspaper advertisements required by the application process
7. Prepare mailing labels and send mail notifications to all owners of properties
within t/4 -mile of the proposed alternate corridors.
8. Any information requested by KHA from FPL to perform this analysis
SCHEDULE
KHA will provide its services in order to meet the following schedule established
by FDEP for FPL's Transmission Line Siting application process:
10/8/09- Deadline for filing Notice of Proposed Alternate Corridors.
11/5/09- Deadline for submitting additional data in support of the alternate
corridors.
11/23/69- File with FDEP a list of landowners whose properties are located
within t/4 -mile of the proposed alternate corridor.
12/14/09- Submit corrective data to FDEP in response to determination of
incompleteness.
2/5/10- Deadline for publishing newspaper notice of alternate corridor.
CIKimley -Hom }:PL Alternatc Corridor Study, August 25, 2009, Page 6 of 1.0
and Associates, Inc.
FEE AND BILLING
The consultant will accomplish the services outlined in Tasks 1.0 through 3.0 of
the Scope of Services for the lump sum fee of $86;000.00 and as shown in the
table below. Office expenses have been included within the lump sum amount
and would include in -house duplicating, facsimile, local mileage, telephone,
postage, in -house blueprinting, word processing, and cellular telephone use.
The services under Task 4.0, "Additional Services ", may be performed hourly
based on actual time worked times the Contract hourly "rates, or a supplemental
scope of services may be provided for these services if requested by the City. As
'to this task, office expenses will be invoiced as 5.85% of the labor fee, and would
include in -house duplicating, facsimile, ,local mileage, telephone, postage, in-
house blueprinting, word processing, and cellular telephone use.
For all tasks, other direct and reimbursable expenses such as large -scale
reproductions, board- mounts, long distance travel; mass mailings, etc., the City
will pay the Consultant the direct costs as per Section 4.0, "Basis of
Compensation ", of the Agreement.
Lump Sum Services
Task Description Fee
1.0 Field Reconnaissance and Data Collection . ............................... $35,000.00
2.0 Alternate Corridor Study Report ..................................... :.......... $45,000.00
3.0 Assistance with .Filing of f Proposed Alternate Corridor ...............$6,000.00
TOTALS $86,000.00
KimieyNorn FPS Alternate Corridor Study, August 25, 2009, Page 7 of 10
6L1 =F1 and Associates, Inc.
CLOSURE
The terms and conditions of the "Professional Set-vice Agreement — General
Engineering Services" (the "Agreement ") between the City of South .Miami
(Client) and Kimley -Horn and Associates, Inc., (Consultant) as approved by the
City Commission on March. 17, 2009, shall govern. this scope of services.
If you concur with the foregoing and wish to direct us to proceed with the
aforementioned services, please issue a written Work. Authorization to the .
consultant referencing this document as Exhibit "A ". Fees and time stated in
this agreement are valid for sixty (60) days after the date of issuance by the
consultant.
I appreciate this opportunity to submit a letter agreement. Please contact Juan
Jimenez at (305) 673 -2025 if you have any questions.
Very truly yours,
KIM.LEY -HORN AND ASSOCIATES, INC.
Aaron E. Buehler, PE Juan E. Jim nez, P:E.
vice- President /Associate Project ManagerlAssociate
Agreed to this day of , 2009
CITY OF SOUTH MIAMI
Approved by:
Date:
h�f:`•.ifar};r;;rr�Sonth Miami, City ofTP1. Povrerlines .Ruute Aaalysis,KI'1A Scol:e.2009- 08- 25.FPL Alt Cnrridor Study.doe
Klmiey HOCn FP.t, Alternate Corridor Study, August 25, 2009, Page 8 of 10
1 and Associates, Inc.
OP-1 in KlmleyHorn FPL Alternate Corridor Study, August 25, 2009, Pagc 2 of 1.0
n and Associates, Inc.
QUANTITATIVE CRITERIA USED S ATE ALTERNATIVE ROUTES
T ROUTES
• Nutnber of.buildings within 200 fl of route centerline
• Number of school properties within 200 ft of route centerline t 140S P 1 TI'S
• Number of nou -FPL parcels /lots crossed
• Length of route not following FPL -owned right- of-way or other transmission line easements
• Length of route not following other linear features (roads, railroads, canals, etc.)
• Length of route through existing parks /recreation areas /designated conservation lands
• Length of forested wetlands crossed
• Length of nonforested wetlands crossed
• Number of eagle nests /wading bird colonies within 0.5 mile
• Engineering /construction cost estimates
u
KlmleyHorn rPL, Alternate Corridor Study, August 25, 2009, Page 3 of 10
L_111111111111111"_ and Associates, Inc.
QUALITATIVE CRITERIA USED TO EVALUATE ALTERNATIVE ROUTES
EAST ROUTES
• Available space within existing FPL rights -of -way, easements, or fee -owned property
• Available right -of -way along roads, transmission lines, and railroads
• Road plans (new roads, extensions, widening projects)
Proposed development plans
• Proximity of existing development to collocation rights -of -way
• Types of development in proximity
• Proximity and orientation of public airports and private airstrips
• Ingress /egress at Miami substation and crossing the Miami River
• Bridge crossings
• Constnlctability
• Acquisition status of existing and proposed conservation lands and /or greenways
• Ability to avoid or minimize wetland impacts
• Ability to avoid or minimize impacts to parks, recreation, and conservation lands
• Proximity to historical districts, roads, and /or structures
• Review of potential underground scenarios where overhead is not feasible
• Potential listed species presence
• Crossing of Native American lands
• Potential use of local access roads /trails
• Proximity to known archaeological locations
• Miami -Dade Metrorail and /or Busway right -of -way availability and use
• Vegetative landscapes along streets (tall trees)
C
m QQv33
E c F
]L co �
® � O
h
C
7
C C ¢
a r,
c _
opp
L 6
9 y"i
-m O
c �
C
U
m
D
0
E '£
J �
V
- y
E
U
c
°CJ r:
a
c E m C
Z Z u v
-
e. V a c �:
O
0
0
� o
� x
Vr Vi
i € v
c vi
O N
J c O
N
V3 N!
N �f
�O
Vi 69
° c 0
� c o
q
N N
V O N
w C 7
C o
N =
O O O
M �
49 W 69.
r
o
-
C
vi
L1 �ci
vi
N
L
69
NJ fA
O'O
O
h
O
N
M
vJ f/1
vJ
o
0
n
N
en
a
et -
c
r N
e
v
vi
r. o
D L
L
F
� F
C
u.
r•
C ,p O h
L L
lA p
4:
ri
�t
vi
i m a s
L
s x
r �
e
d
C
O
L
O
L
U
d
c
L
C
O
•_
m
C
d
m
-
Q
U
d
F =
a
u
p
-
m
3
V
d
h
C
'y
L_
d
v
d
a
c'
Y
F cS
o
0
0
C
C � Z
r
N
M
Y v:
O
0
0
� o
� x
Vr Vi
i € v
c vi
O N
J c O
N
V3 N!
N �f
�O
Vi 69
° c 0
� c o
q
N N
V O N
w C 7
C o
N =