Loading...
7401 SW 62 AVE (6200 SW 73 ST) ERPB-09-056-002 ABBREVIATIONS GENERAL NOTES GENERAL DEMOLITION NOTES DRAWING INDEX .......... ............ A ACOUS. ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS-1, THE 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ARCHITECTURE ADA AMERICANS WITH DISABILITIES ACT LAM LAMINATED FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY/COUNTY ZONING CODES, WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE Bermello Ajamil & Partners, Inc. ADJ ADJUSTABLE LT LIGHT NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS COVER AFF ABOVE FINISH FLOOR LTWT LIGHT WEIGHT REGULATIONS. FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND AO.0 INDEX Architecture Engineering Planning AGG AGGREGATE LF OR UN FT LINEAR FEET DAYS OF WEEK TO BE WORKED. A1.0 SEVENTH FLOOR ROOF LEVEL PLAN -NEW WORK Interior Design Landscape Architecture A.C. AIR CONDITIONING 02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE A1.1 ROOF PLAN AREA 'A' 2601 South Bayshore Drive 10th Floor ALUM ALUMINUM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED A1.2 ROOF PLAN AREA '8' Miami, Florida 33133 ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PROGRESS OF OWNER'S ON SITE OPERATIONS. A1.3 ROOF PLAN AREA 'C' B BM BEAM MAX MAXIMUM PRIOR TO SUBMISSION OF BID. A2.0 EXTERIOR ELEVATION 305)859-2050 Fax (305)860-3700 BLK BLOCK MECH MECHANICAL - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND A3.0 ENELARGED PLAN AND DETAILS BLKG BLOCKING MET OR MTL METAL 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA A4.0 ENELARGED PLAN AND DETAILS BOT BOTTOM MIN MINIMUM THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE A5.0 DETAILS STRUCTURAL ENGINNER: BLDG BUILDING MISC MISCELLANEOUS COMMENCEMENT OF WORK. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, B TO LKHD BULKHEAD MACH MACHINE EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED REMOVAL MANUF MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE STRUCTURAL ENGINEER INFORMATION C CAB CABINET DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE STRUCTURAL Doll b DU%INE°�A1�P'� &s CARP CARPET N NFPA NATIONAL FIRE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. WITH ARCHITECT PRIOR TO START OF WORK. CLG CEILING PREVENTION ASSOCIATION Dom+a DONNELL C&PLIM CEM CEMENT NIC NOT IN CONTRACT 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, ❑PED'O a MXXXMC&pRM C L CENTER LINE NOM NOMINAL SURFACE/RECESSED LIGHT FIXTURES, LIGHT QUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, 03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE ❑Nw►k AL � / DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF S-1 STRUCTURAL SHEET 1 illy `"'°T MMM. CER CERAMIC NTS NOT TO SCALE INTERCOM SPEAKERS, FIRE ALARM HORNS/STROBES/SWITCHES, HEAT/SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES S-2 STRUCTURAL SHEET 2 C.T. CERAMIC TILE SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR S-3 STRUCTURAL SHEET 3 CO CLEAN OUT O OC ON CENTER THAT WILL AFFECT OWNERS NORMAL OPERATIONS INCLUDING BUT NOT UNITED TO LOUD LOISES AND PRODUCTS WITH OH OR OPP.HD. OPPOSITE HAND SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND STRONG ODORS. S-4 STRUCTURAL SHEET 4 CL OR CLOS CLOSET NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE S-5 STRUCTURAL SHEET 5 COL COLUMN OD OUTSIDE DIAMETER RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL CONC CONCRETE OFF OFFICE 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES CALCULATIONS CMU CONCRETE MASONRY UNIT OPNG OPENING INSTALLATION) UPON COMPLETION OF REPAIR WORK. TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY CONST CONSTRUCTION OSHA OCCUPATIONAL SAFETY 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. CONT CONTINUOUS AND HEALTH ADMINISTRATION CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WITH THE WORK. 05. PARTIAL DEMOLITION AND REMOVAL- STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. CG CORNER GUARD CR CRASH RAIL P PR PAIR 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE CU CUBIC PASS PASSENGER O6• PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PENT PENTHOUSE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. D DEPT DEPARTMENT PC PRECAST STARTING WORK. DET./ID TL DETAIL PJ PANEL JOINT A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL DIA DIAMETER PLAS PLASTER 08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. DIM DIMENSION POL POLISHED THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND DN DOWN PMLD PREMOULDED THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DS DOWN SPOUT PNL PANEL DEMOLITION OPERATIONS. DWG DRAWING 09• ALL WALL/CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH DF DRINKING FOUNTAIN O QT QUARRY TILE EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, C. PROTECT FLOORS/CARPETS NTH SUITABLE COVERINGS WHEN NECESSARY. QTM QUARRY TILE MINIATURES CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. E E.A. EXPOSED AGGREGATE D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE EA EACH R RAD RADIUS 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND EL ELEVATION GRADE) R RISER 11, THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. ELE ELEVATION FACADE) REINF REINFORCED AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO-WAY TAPE SCREWS, NAILS, ETC. WILL NOT BE ELEV ELEVATOR REQ'D REQUIRED WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. PERMITTED. (SEE DRAWING #13 ON SHEET A-6.0) EP ELECTRICAL PANEL RF ROOF EQ EQUAL RD ROOF DRAIN 12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND F. REMOVE PROTECTIONS AT COMPLETION OF WORK. EQUIP EQUIPMENT RM ROOM ACCESSIBLE AT ALL TIMES. EXIST EXISTING RO ROUGH OPENING G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 1009 NEGATIVE PRESSURE BY USE OF SUITABLE FANS EXP.JT. OR EJ EXPANSION JOINT REFL OR REF REFLECTED 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. EXP EXPOSED RWL RAIN WATER LEADER EXT EXTERIOR 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT ELEC ELECTRICAL CONTAMINATION OF DUCT SYSTEM. EWC ELECTRIC WATER COILER 8 SECT SECTION 15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK SHT SHEET WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. F FT FEET SHT MET OR SM SHEET METAL THAN NORMAL WEEKDAY WORKING HOURS FIN FINISH SIM SIMILAR 08. MAINTAIN EXISTING BUILDING SYSTEMS/UTIUTIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST FE FIRE EXTINGUISHER SQ SQUARE 16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE AREWATCH. FEC FIRE EXTINGUISHER CABINET STD STANDARD ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. FC FIRE CABINET SS STAINLESS STEEL - DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED FL FLOOR STL STEEL 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING N. N AM AND SATURDAY & SUNDAY 24 HOURS. ' FD FLOOR DRAIN STOR STORAGE BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. Pip p,QO FLUOR FLUORESCENT STRUCT STRUCTURAL 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. F.R. FIRE RATING SUSP SUSPENDED - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. FS FULL SIZE SPECS SPECIFICATIONS 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE 09. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL N FV FIELD VERIFY RESPONSIBLE FOR THOR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND/OR REPLACED AT NO OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE S FVC FIRE VALVE CABINET ADDTIONAL COST TO OWNER. T,o T TEL TELEPHONE PHASE UNDER CONSTRUCTION, W 0OUT APPROVAL FROM THE OWNER. Q GALV GALVANIZED J GA GAUGE TEMP T01. OILETRED 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. 10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUS . GC GENERAL CONTRACTOR T TREADS AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. GL GLASS T TYPICAL 21. PROVIDE WALK-OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK-OFF MATS MUST BE CLEANED OR - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, " 6 5 7 4 GEI GR GRAB BAR TR TELEPHONE RECEPTACLE GANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. POLLUTION AND DAMAGE TO EXISTING FINISHES. GGYYP GYPSUM THK THICK GYP BD GYPSUM WALLBOARD 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR U UL UNDERWRITER MECHANICAL, ELECTRICAL AND PLUMBING NTH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT H HC HANDICAPPED LABORATORIES SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A-6.2, A-10.0 AND A-10.1 FOR SEALING TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S HRDW HARDWARE FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS HT HEIGHT V VERT VERTICAL RATING OF THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. WITHOUT UNDUE DELAY. HM HOLLOW METAL REVISIONS: HORIZ HORIZONTAL W g VAPOR ARRIER 23. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM 1 IN INCH VWC VINYL WALL COVERING SUB-CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE DEBRIS REMOVAL TO BE DONE AFTER INCAND INCANDESCENT CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING REGULAR WORKING HOURS. ID INSIDE DIAMETER W VWC-GYP WALL COVERING - GYPSUM BOARD INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS - OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS INSUL INSULATION VWC-PLAS WALL COVERING - PLASTER PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND/OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIDIFFERENCE EN INT INTERIOR WC WET COLUMN GENERAL CONTRACTOR WRITING PRIOR BID DUE DATE. FAILURE N DO SO WILL NOT BE ALLOWED ON A BASIS CE FROM CONDITIONS INFERRED OR INDICATED ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. INV INVERT YIP WATERPROOFING ON THE DRAWINGS. WD WOOD - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. J JST JOIST W/0 WITHOUT 13. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE JC JANITOR'S CLOSET WC WATER CLOSET PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND PROJECT NAME: Y YD YARD SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION SOUTH MIAMI HOSPITAL OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. EAST TOWER SCREENING PROJECT ADDRESS: 7400 S.W.62nd Ave. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS VICINITY MAP & PROJECT LOCATION South Miami,Florida 33143 KEY PLAN DOOR SYMBOL WALL CONSTRUCTION �,-0�WALL TYPE HOSPITAL PROJECT ;h 10 DOOR NUMBER LOCATION LOCATION 1-" ELEVATION INSULATION CONCRETE GRAVEL or CEMENT CONCRETE �Y . NUMBER °• Blanket PRECAST CRUSHED (MORTAR j H STONE PLASTER ROOM NAME EXTERIOR & INTERIOR 4 X- 0 2 f ..._.Ji�......- -.! ..._ r � t € OFFICE- ROOM NAME _ :-� _4 . ELEVATION SYMBOL t { ` --, FINISH SCHEDULE XXX ROOM NUMBER SHEET NUMBER r t € Er : i is l9 ' i r t �� t TILE SOLID CONC. CONCRETE MARBLE t `8 - __41 EARTH Ceramic or MAS. UNIT MASONRY CONSTRUCTION DETAIL ' M i"11 1 DETAIL NUMBER t t .. '€i �` �� r� , 73rd g,� N Structural UNIT BUILDING. PARTIAL - DETAIL NUMBER SYMBOL €� _ - SHEET NUMBER r - . €R� SHEET NUMBER & DETAIL SECTION � <<r� o COMM. NO. 40018.100 SYMBOL A 1 � ) SHEET YWD IYOOD HOOD BRICK ._ _ €1 % ��s% `� - METAL Finkhed Blocking Blocking Large WINDOW TYPES WINDOW TYPE �� 4/\\ / _� SCALE: vs^=r o• 10 COLUMN REFERENCE -- NUMBER OR LETTER '>' �' Continuous Intermittent Scale DATE: SEPTEMBER 18, zoos DRAWN: AZ r ............ . CHECKED: B.H GENERAL NOTES ABCDEFG NOTE ,�� CADD FILE: H:PROJECrs GLASS GLASS INSULATION TOP OF CONCRETE ELEVATION 0.00 .:,� , 'jam ��. V � ,�_. .._ SLAB ELEVATION -- Small Large Rigid DETAIL NUMBER f�"f �' 4 9 owro� �.. 1 €� : 1 J - DRAWING TITLE: Scale Scale ,,••,. �,• �• r"- ��°°"�°t ,. J DRAWING TITLES 1 ABCDEF ' "' °f.. ' ---' €, ' n � 1 ;= INDEX DRAWING REVISIONS REVISION NUMBER _„. --�` _-....._.._ -1 SCALE: 1 T - --. 1 �i F.. ..�.m_. - t PR. i i t It e :€ � Camp STEEL STEEL. PLYYa00D N[ o N Small Scale Large Scale SHEET NUMBER Adjacent Zoning /" NOTE THIS DRAWING X NOTE / � SHEET NO. DEMOLITION NOTE ' :ol Of um mami Zoning wo bitI pdatedftv2001, i A0u0