6230 SW 70 ST EB-09-022-008 5i
Go
LL►MBING GENES NO _� P--------------------------------------------------------------------- 0
1. not used 16. UNLESS SEPIAS OF THE DRAWINGS ARE TO BE FURNISHED BY THE I !
ARCHITECT/ENGINEER FOR PREPARATION OF RECORD DRAWINGS. k
FURNISH ARCHITECT/ENGINEER WITH 2 SETS OF ACCURATELY MARKED
ORIGINALS AS INSTALLED.
E p
2. THE ENGINEER SHALL BE THE FINAL INTERPRETER OF THE WORK COPIES OF THE DRAWINGS, INDICATING ALL CHANGES FROM
PLUMBING SYMBOLS 1T. FURNISH OWNER W ALL GUARANTEES FOR EQUIPMENT OR I 2" COND. DRAIN "
PROVIDED UNDER E ENGINEER'S CONTRACT W E ARCHITECT.
MATERIALS ENDING BEYOND THE GUARANTEE O PERVIOUS E PERIOD a I /4 hb /SOV �t V
3. ANY CO ESTIMATION FOR THIS WORKS L BE BASED ON THE SPECIFIED IN THE GENE CONDITIONS OF ESE
j i stubb for electrical so I GROUND.
SOIL WASTE HOSE BI
PRO D DOCUMENTS. SPECIFICATIONS. round.
BUILDING DEPARTMENT -----------------_------_-__---_ ----------- _----_----_ --------- _____
°---° °°°°°-m- VENT DIAL THERMOMETER
4. ANY AND ALL INTENDED CHANGES TO THE PLANS SHALL FIRST BE
16. PLUMBING SYSTEMS SHALL BE PROVIDED COMPLETE. SHOULD A
COMMUNICATED TO THE ARCHITECT IN WRITTEN FORM USING CHANGE
. COLD WATER FLEXIBLE CONNECTOR
SYSTEM OR ANY PART THEREOF A
ORDER FORMAT. CHANGE ORDERS SHALL BE INITIATED BY THE OWNER REQUIREMENTS, NEC Y
ONLY. REQUIRED Y THE ARCHITECTURE/ENGINEER, SHALL E MADE TO HOT WATER RISE UP E s p
4.1 EQUIPMENT SPECIFIED SHALL BE ADHERED TO. HOWEVER, OWNER HAS BRING PERFORMANCE UP TO SPECIFIED REQUIREMEMTS AND ALL F FIRE MAIN RISER DOWN
E FINAL DECISION ON THE TYPE AND QUALITY OF EQUIPMENT TO BE BUILDING CONSTRUCTION AND FINISHES DAMAGED OR MARRED BY SUCH r
SUPLUED. CONT CTOR S O AIN WRI EN PERMI ION OM REPLACEMENTS, AL TlONS OR REPAIRS SHALL BE RESTORED TO G G MAIN C.O. FLOOR CL OUT
E OWNER PRIOR PURCHASING SUBSTITUTING EQUIPMENT, PRIOR CONDITION AT NO ADDITIONAL CO TO OWNER.
v
CONT CTO SHALL MR THE COST OF ALL ENGINEERING WORK STORM DRAIN C.T.G. CLEAN OUT TO GRADE 3/¢" H / C3V �Fm
RELATED TO SUBST[TUDED EQUIPMENT. & V
19. PLUMBING CONTRACTOR SHALL INCLUDE IN HIS BID, PROVISION FOR GATE VALVE O.R.D. ROOF DRAJN
PRIOR TO COMMENCEMENT OF WORK, VERIFY MEASUREMENTS AT PROVIDING TEMPORARY WATER FOR USE DURING CONSTRUCTION AS I I A/C a
5. BUILDING SITE. SUBMIT DESC E CI AND DIFFERENCES TO
REQUIRED. CHECK VALVE V.T.R. VENT THU ROOF
ARCHITECT/ENGINEER FOR CONSIDERATION AND DECISION BEFORE I
PROC DING. . SUB-CONTRACTOR SHALL E RESPONSIBLE FOR DAMAGES TO THE WORK ~® OS do Y VALVE C.I. C IRON I
OF OTHER SUB-CONTRACTORS, OR TO THE BUILDING, OR TO ITS I
6. PROVIDE ACCURATE LAYOUT, GRADES AND ELEVATIONS, SET SLEEVES CONTENTS, PEOPLE® C.; CAUSED BY LEAKS IN ANY OF THE ROOF DRAIN D.F. DRINKING FOUNTAIN ;
D OPENINGS IN AMPLE TIME, TAKE PROPER PRECAUTIONS TO EQUIPMENT, O MATERIAL FAILURES, O DISCONNECTED PIPES, PRESSURE RELIEF F.U. FIXTURE UNITS
z as
PROTECT WORK AND EQUIPMENT FROM DAMAGE. FITTINGS O Y OVERFLOWS, D SHALL MAKE AT HIS OWN EXPENSE,
_ s _ _ _ _ _ _ _ _ _ _ 6 _ _ _ _ _ _ _
ALL REPAIRS TO ! AND EQUIPMENT SODAMAGED.
. � T. DO ALL TRENCHING,
CAVATlNG AND BACKFILLING NECESSARY TO
ACCOMODATE THE WORK UNDER THIS DIVISION. TRENCH WIDTHS TO 21. ALL WORK, EQUIPMENT AND MATERIALS SHALL BE PROTECTED AT ALL ° I
E ADEQUATE TO PERMIT INSTALLATION ALLOWING A MINIMUM OF TIMES TO PREVENT OBSTRUCTION, DAMAGE, OR BREAKAGE. ALL PIPE
CLEARANCE ON EACH SIDE OF PIPE® BOTTOM OF TRENCH TO BE OPENINGS SHALL BE CLOSED WITH CAPS OR PLUGS.
TAMPERED FIRM AND EVENLY GRADED TO PROVIDE SPECIFIED PITCH. I
SHEATH D BRACE TRENCHES AND EXCAVATIONS. AFTER TESTING 22. PLUMBING FIXTURES SHALL BE TESTED FOR PROPER OPERATION AND I
D INSPECTION, CILL WITH CL H. CKFILLIN D A FLUSH VALVES ADJUSTED. I °
REMOVAL OF ANY SHEATHING AND BRACING TO BE DONE WITHOUT
DISTURBING INSTALLED PIPING. 23. A CLEANOUT SHALL BE PROVIDED AT THE BASE OF EACH SOIL AND
WASTE PIPE. I
f ° f
' 6. EQUIPMENT SCHEDULES ON THE DRAWINGS WERE USED TO ARRIVE AT I
SPACE AND SERVICE REQUIREMENTS. 24. A MINIMUM PITCH OF ALL HORIZONTAL BRANCHES AND SEWER LINES [ 2W CTG
SHALL E 1/4" PER LINEAL FOOT FOR 2" AND SMALLER PIPE SIZES I
9. ANY SUBSTITUTE EQUIPMENT U EQUAL IN ALL RESPECTS AND AND 1/8- PER Fr. MIN. FOR 3" AND LARGER PIPE SIZES.
WILL BE ALLOWED ONLY UPON WRITTEN APPROVAL BY ENGINEER PRIOR I
TO SUBMISSION OF BIDS. 26. ALL UNDERGROUND PIPING SHALL BE COPPER TYPE L. ALL OTHER I I
10. SHOP DRAWINGS T BE SUBMITTED FOR THE FOLLOWING ITEMS:
WA PIPING SHALL B COPPER E M.
DRAINAGE SPECIALITIES, FIRE PROTECTION EQUIPMENT, PLUMBING
2 . IN GENE ALL WORK OF IS MU COMPLY W THE
FIXTURES, PRESSURE CONTROL MS, VALVES, VIBRATION
FLORIDA PLUMBING BUILDING CODE AND ALL OTHER CODES IN EFFECT. I
ISOLATION EQUIPMENT.
27. PROVIDE FOR AIR CONDITIONING UNIT CONDENSATE WITH
TRAP. I ,
11. WINGS, ARE APPROXIMATE ONLY AND ARE UNDERSTOOD TO BE a
SUBJECT TO SUCH REVISIONS Y PROVE NECESSARY OR 28. PROVIDE PAN DRAINS TO BUILDING EXTERIOR 6" ABOVE GRADE
DESIRABLE AT E TIME E WORK IS INSTALLED. EACH TURNED DOWN (EACH SEP DLY).
CONTRACTOR WILL BE REQUIRED TO INSTALL HIS WORK WITH
[ I
RELATION TO EXISTING BUILDING CONDITIONS AND WILL BE 29. ALL HOSE BI BSS E PROVIDED W VACUUM BREAKERS
ENTIRELY RESPONSIBLE FOR FINISH ELEVATIONS, C. EXTERIOR (WATTS 6A) AND SHUT OFF VALVE.
UTILITIES SHOWN ON DRAWINGS ARE DIAGRAMMATIC ONLY; THEIR ° a LINE RUNS ABOVE
CT LOCATIONS, EP AND INVERT ELEVATIONS ARE AS
REQUIRED FOR PROPER FLOW AND COORDI TIN WITH 0 ER ES 30. ALL OUTSIDE C OUTS BE BROUGHT TOG E WITH COVER. GROUND ATTACHED TO
(REFER TO CIVIL ENGINEER PLANS). 1. PROVIDE CL 0 Y 75 FE INSIDE BUILDING. I WALL. ,
m
12. DRAWING SHOW ARRANGEMENT OF PIPING AND EQUIPMENT. SHOD 32« WHERE M Y CODE IN APPROPRIATELY D CH D
LOCAL CONDITIONS NECESSITATE ANY R R NGMENT, OR IF THE E ° e SACK FLOW AI ENTO
PIPING CAN BE INSTALLED TO VANTAGE I A DIFFERENT APPROVED PRIOR TO SIGNING OF THIS SUBCONTRACT Y OWNER
PRC?VID A MAIN C?V
MANAGER, E CONTRACTOR SHALL BEFORE PROCEEDING WITH WORK® D ENGINEER, PVC PIPE, DWV PIPE AND FITTINGS ARE ACCE .
SUBMIT COPIES OFD WINGS O PROPOSED ARRANGEMENT FOR j IN PIPE RISE. �!
3. INSULATE HOT COLD WATER CONNECTIONS AT WATER HEATERS
I
E
id
NGINEER TOR I D UP TO 6 FC. THEREAFTER WITH 1 IN. THICK SELF-SEALING
-
13. IF CONTRACTOR PROPOSED TO INSTALL EQUIPMENT, INCLUDING
TYPE INSUL�A71ON (R- .2 MIN.) f
PIPING REQUIRING SPACE CONDITIONS OTHER THAN THOSE SHOWN, OR 34. PLY A WATER PRESSURE TEST TO L PAR OF E WATER Ila
TOREARRANGE EQUIPMENTS, HE S ASSUME FULL RESPONSIBILITY SUPPLY AND DRAINAGE SYSTEMS BEFORE THE PIPING IS CONCEALED I a i n
FOR REARRANGEMENT OF SPACE ANDS L HAVE ARCHITECT REVIEW D BEFORE THE FI RES D EQUIPMENT ARE CONNEC
CHANGES BEFORE PROCEEDING W E WORK. REQUEST FOR SUCH HYDRO-STATIC E 3/4 H W/SOV V
CHANGES SHALL E ACCOMPNI D BY SHOP DRAWINGS OF SPACE IN FOR THE WATER EM USE A PRESSURE OF NOT S
AN 150 PIG OR 1.25 TIMES THE SYSTEM WORKING PRESSURE, j
QUESTION. APPLIED TO THE SYSTEM FOR A PERIOD OF 4 HOURS. THERE SHALL
E NO LEAKS AT ANY POINT IN THE SYSTEM AT THIS PRESSURE.
14, EACH CONTRACTOR IS RESPONSIBLE FOR THE PROPER LOCATION AND FOR THE DRAINAGE EM USE NOT SS TH 10 FT. OF
SIZE OF SLR HOLES OR OPENINGS O BUILDING E PR LOCATION L---------------------------------------------- __-------------__ __----------------------_- -------------------------v_---_�
HYDROSTATIC H L THE WATER !N E SYSTEM FOR NOT S r- ____________________________ _______-
PERTAINING TO SLOTS, WORK D FOR CORRECT LOCATION OF PIPE THAN 30 MINUTES, AFTER WHICH TIME NO LEAKS AT ANY POINT OR
SLEEVES. LOWERING OF THE WATER LEVEL AT THE OVERFLOW SHALL BE
, SEE SITE PLAN FPR
VISIBLE, CONCEALED WORK UNCOVERED UNTIL REQUIRE CONTINUATION
16, EACH CONTRACTOR SHALL SO HARMONIZE HIS WORK WITH T OF THE BEEN COMPLETED. K REPAIRS OF DEFECTS THAT ARE � ______-_____________________
SEVERAL OTHER TRADES SO T IT MAY BE {N LLED IN A MOST DISCOVERED WITH N MATERIALS. OF SCR
DIRECT AND WORKMANLIKE MANNER WITHOUT HINDERING OR CRACKS OR HOLES WILL NOT BE ACCEPTED. REPEAT TESTS S ER
HANDICAPPING OTHER TRADES. PIPING INTERFERENCES SHALL BE DEFECTS BEEN ELIMINATED.
HANDLED BY GIVING PRECEDENCE TO PIPELINES WHICH REQUIRE A
STATED GRADE FOR PROPER OPERATION. SEWER LINES SHALL TAKE 35. PROVIDE DIELECTRIC FITTINGS WHEN JOINING DISSIMILAR METALS.
PRECEDENCE OVER WATER LINES REQUIRING STATED GRADE FOR THEIR
PROPER OPERATIONS SHALL HAVE PRECEDENCE OVER ELECTRICAL
CONDUIT AND DUCTWORK.
HOMO PLUMB11"N' G FLOOR PLAIN'
® ccl e
m
I
. 'A ® m
�}} !
AW N" FO SITE ----�
m
CONT. (�
LAV°
l
OV gr. P3
for N
too
m�
o
« � a
_
1/2Pe ACK FLOW
PR ENTOR
MAIN SCV
/4®" H /SCV
V
SEE SITE PLAN FO CK= NO
i
CONTINUATION.
SANITARY RISER GU TAUT
P-1 US t { ec amic l / electrical cm
lt,i l ex•
fla, r.egistration # 3 4 9 2 3
-7410- sm, 48th. ST., miami, fl. 33155
ry
tet. . 305 ) 665 6
- 151 ,
c