Res No 057-25-16349RESOLUTION NO.057-25-16349 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA,APPROVING A PROPOSAL AND PROJECT AGREEMENT WITH STANTEC CONSULTING SERVICE INC.TO PROVIDE EXTENDED OWNER’S REPRESENTATIVE PROJECT MANAGEMENT SERVICES FOR THE SANITARY SEWER IMPROVEMENTS - SUBAREA K,PHASE I PROJECT,IN THE AMOUNT OF $66,940;PROVIDING FOR AUTHORIZATION; PROVIDING FOR IMPLEMENTATION,CORRECTIONS, AND AN EFFECTIVE DATE. WHEREAS,the City of South Miami (the “City”)is undertaking the Sanitary Sewer Improvements -Subarea K,Phase I Project (the “Project”)to enhance its sanitary sewer infrastructure;and WHEREAS,on May 3,2022,the City Commission adopted Resolution No.056-22- 15809,authorizing the City Manager to enter into a continuing professional services agreement (the “Agreement”)with Stantec Consulting Services,Inc.(“Consultant”)to provide general engineering services on as-needed basis;and WHEREAS,the City previously entered into a Project Agreement with the Consultant on February 24,2025 to provide owner’s representative services (the “Services”)for the Project in the amount of $88,613,including initial assessment and four months of construction management services;and WHEREAS,the Project has been under construction for approximately eleven months, with significant progress made recently,and the remaining work,particularly the sanitary sewer pump station,is now anticipated to reach substantial completion by October 31,2025;and WHEREAS,the City is in need of the Consultant’s continued Services for the Project through the Project's substantial completion;and WHEREAS,the City’s initial engagement of Stantec’s services was for $88,613 and was obtained under the City Manager’s purchasing authority for CIP funded projects (Ordinance No.01-25-251 4)and the combined total for Owner’s Representative Services upon approval of this extension is $155,553;and WHEREAS,the Consultant has submitted a proposal,attached hereto as Exhibit “A” (the “Proposal”),to provide the additional or extended Services for the Project through substantial completion in an amount not to exceed $66,940;and WHEREAS,the City Commission desires to approve the Proposal attached hereto as Exhibit “A”and authorize the City Manager to enter into the Project Agreement with the Page I of 3 Res.No.057-25-16349 Consultant,in substantially the form attached hereto to provide the additional Services for the Project in an amount not to exceed $66,940;and WHEREAS,the cost of the Services will be funded from Account No.301-1790-519- 6450,which has a current balance of $5,412,046.16,and/or such other funding source as determined by the City Manager to be in the best interest of the City;and WHEREAS,the City Commission finds that this Resolution is in the best interest and welfare of the City. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AS FOLLOWS: Section 1.Recitals.The above-stated recitals are true and correct and are incorporated herein by this reference. Section 2.Approval of Proposal and Project Agreement.The City Commission hereby approves the Proposal for the Services attached hereto as Exhibit “A,”and the Project Agreement,substantially in the form attached hereto as Exhibit “B.” Section 3.Authorization.The City Commission hereby authorizes the City Manager to execute a Project Agreement,in substantially the form attached hereto as Exhibit “B,”with the Consultant for the additional Services for the Project in an amount not to exceed $66,940,based on the Proposal attached hereto as Exhibit “A,”subject to the final approval of the City Attorney and City Manager as to form,content,and legal sufficiency.The cost of the Services shall be charged to Account No.301-1790-519-6450,which has a current balance of $5,412,046.16,or such other funding source(s)as determined by the City Manager to be in the best interest of the City. Section 4.Implementation.The City Manager is hereby authorized to take any and all necessary action to implement the purposes of this Resolution. Section 5.Corrections.Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 6.Effective Date.This Resolution shall become effective immediately upon adoption. PASSED AND ADOPTED this 29th day of July,2025. ATTEST:APPROVED: Page 2 of 3 Res.No.057-25-16349 READ AND APPROVED AS TO FORM, LANGUAGE,LEGALITY AND EXECUTION THEREOF WEISS SEROTA HELFMAN COLE COMMISSION VOTE:5-0 Mayor Javier Fernandez:Yea Vice Mayor Brian Corey:Yea Commissioner Lisa Bonich:Yea Commissioner Steve Calle:Yea Commissioner Daniel Rodriguez:Yea &BIERMAN,P.L. CITY ATTORNEY Page 3 of 3 Stantec Stantec Consulting Services,Inc. 901 Ponce de Leon,Ste.900,Coral Gables,FL 33134 May 21,2025 File:177312186 Attention:Mr.Genaro “Chip”Iglesias,City Manager City of South Miami 6130 Sunset Drive Miami,FL 33143 Dear Mr.Iglesias, Reference:Owners Representative for Septic-to-Sewer Conversion -South Miami Subarea K - Phase 1 We are pleased to present this proposal for continued professional engineering services on this project.The City of South Miami is currently engaged in the construction of the above referenced project.SRS Engineering,Inc.is the Engineer of Record,and ATC Engineering,Inc.is the project's contractor performing the construction work.The project has been under construction during the past nine months.Almost all of gravity sewer has been constructed,and contractor is in the process of street restoration and system testing. The remaining work beyond that involves the sanitary sewer pump station,which is expected to reach substantial completion in October 31,2025. SCOPE OF SERVICES The City proposes to extend services of Stantec in an Owner's Representative Project Manager to work with the Engineer and Contractor to coordinate and streamline construction activities through October 31,2025. In this role,Stantec’s scope of services will be to: Task 3-Extended Owners Representative CM services Organize and lead weekly meetings,preparation of meeting minutes Monitor contractor progress vs schedule and expected rates of production on a bi-weekly basis,and provide weekly report to the City. Lead the coordination with WASD for resolution of technical items and issues. Provide independent review of items or issues in dispute between the Engineer and the Contractor,and provide findings and recommendations to the City. Participate in RFI and Change Order review and resolution. Participate in Payment Requisition review. Exclusions: The following services are anticipated to be covered by either the Engineer of Record,and/or the City of South Miami: tv II'T.r d 6 May 21,2025 Mr.Genaro ‘Chip*Iglesias,City Manager Page 2 of 2 Reference:Owners Representative for Septic-to-Sewer Conversion •South Miami Subarea K -Phase 1 Attendance and participation in weekly construction progress meetings,(to be lead by Owner’s Rep). Construction inspection services,including daily inspection and reports,witness quality and performance testing,substantial completion punch list and final inspection. Construction Administration services,including Project Management Software update/upkeep,RFIs, submittal reviews,change orders,payment application reviews,record drawings and contract close-out. Public information/public involvement services,including coordination with affected property owners and residents. Terms and Conditions: All terms and conditions shall be per our Professional Service Agreement for Professional General Engineering and Architectural Services RFQ #PW2022-03.Our fees shall be as follows. Task 3 -Extended Owners Rep CM Services (Lump Sum)$66,940 ($16,735 per month for June and July,$12,718.60 per month for August and September and $8,032.80 for October) We will invoice monthly based percentage completion on services provided.We are ready to begin working on this assignment upon your authorization to proceed.If acceptable to you,we will accept a signed copy of this form as your written authorization to proceed. Thank you, STANTEC CONSULTING SERVICES INC. Ramon Castella,P.E,ENV SP,LEED AP Vice-President Phone:(305)445-2900 Mobile:786-493-8688 Ramon.castella@stantec.com City of South Miami Approved by: Date: 7 FEE ESTIMATE -City of South Miami Sewers -Subarea K -phase 1 4 Name Caeeta Ramer Vargos Fwnar«»Fana Lar<Ma Project Billing Rite (TAM)$210 00 $11000 $34 50 $160 00 $29 310 00 Total Units (TAM)20 00 60 00 GO CO 136 00 1 00 Foo (TAM)$4 200 00 $6 600 00 $5 070 00 $21 760 00 $29 310 00 Escalation (TAM)$0 00 $0 00 $0 00 $0 00 $0 00 Total Fee (TAM)$4 200 00 $6 600 00 $5 070 00 $21,760 00 $29 310 00 Protect Summary Hours Labour Espensc Subs Total Filed Fee Time A Material Total 0 001 •- $37,6X OO]I $37.6X 00| $0 00!$oocjI$ooc| I $ooo||$29 310 001 $29 310 001 moj $66 940 00 $66 940 00* WBS Cod* 1m Task Code 3 1 1 Task Name Owners Rep CM services sun DM* 2025-06-01 2025-06-01 End Otto 2025-10-31 Units a oo T^kTyp. Time A Material Tim*A Moji 276 00 Labour A37.A3A.H sa A74 nn Eipense $0 00 in nn 5ube $29 310 00 <n on Total $€6 940 00 ia nr 3 2 3 3 Schedule update O*nc<s Report Independent review <ems/issues &WASO coord Partcpale •Change Order.RFl &Pay Req review 2025-06-01 ?01 2025-06-01 2O2S-1O-31 2025-10-31 400 400 400 24 00 16 00 24 00=^F=43 00 48 00 24 00 —Time A Material Time A Material Timo &Material tew co 84 00 44 00 $13.188 00 $11.632 00 $8 236 00 $0 00 $0 PC woo $29 310 00 $0 00 J0 00 $42 498 00 $11,632 00 $6,236 00 co COMPELING SOLUTIONS,INC. City of South Miami -Sub-Area K -Phase 1 Position: Rate: 3 Owners Rep CM services 3.1 Weekly meetings 3.2 Schedule update -Owners Report 3.3 Independent review items/issues &WASD coord Total Hours; Labor Fees Expenses -Mise field Total Fees Senior PM $190 60 32 60 152 $28,880.00 $430.00 $29,310.00 9 Daniela dmo PROJECT AGREEMENT Between CITY OF SOUTH MIAMI,FLORIDA And STANTEC CONSULTING SERVICES,INC. Project Name:Owners Representative for Septic-to-Sewer Conversion -South Miami Subarea K - Phase 1 loft 10 PROJECT AGREEMENT Between CITY OF SOUTH MIAMI,FLORIDA and STANTEC CONSULTING SERVICES,INC. Project Name:Owners Representative for Septic-to-Sewer Conversion -South Miami Subarea K - Phase 1 Subject to the provisions contained in the “Professional Services Agreement for Professional General Engineering and Architectural Services"(hereinafter referred to as the “Professional Services Agreement")between the CITY OF SOUTH MIAMI,FLORIDA (hereinafter referred to as “City")and STANTEC CONSULTING SERVICES,INC.(hereinafter referred to as "Consultant")dated May 3,2022, which Professional Services Agreement was competitively procured through Request For Qualifications (RFQ)No.PW2022-03 in accordance with Section made effective as of the <5^^day of f-f provide the services as set forth below: .955,Florida Statutes.This Project Agreement is £a/i 4 .2024,and authorizes the Consultant to SECTION 1.SCOPE OF SERVICES 1.1 Consultant shall provide professional general engineering services (the “Services")for the Project in accordance with the terms and conditions of the Agreement and shall complete the tasks that are identified and described in the Project Proposal attached hereto as Exhibit “1”(the “Proposal”)for the City. 1.2 The City may request changes that would increase,decrease,or otherwise modify the scope of services outlined under the Proposal attached hereto as Exhibit “1.”Such changes must be contained in a written change order executed by the parties in accordance with the provisions of the Agreement,prior to any deviation from the terms of this Project Agreement,including the initiation of any extra work. SECTION 2.DELIVERABLES 2.1 As part of the scope of Services and Project schedule,the Consultant shall provide the City with the Deliverables identified in the Proposal attached hereto as Exhibit “1." SECTION 3.TERM/TIME OF PERFORMANCE/DAMAGE 3.1 Term,This Project Agreement shall commence on the date this instrument is fullyexecutedbyallpartiesandshallcontinueinfullforceandeffectuntilterminatedpursuanttoSection6hereinoruntiltheServicesarecompletedinaccordancewithotherapplicableprovisionsoftheAgreement. The City Manager,in his sole discretion,may extend the term of this Project Agreement through writtennotificationtotheConsultant.Such extension shall not exceed 90 days.No further extensions of thisAgreementshallbeeffectiveunlessauthorizedbytheCityManager. 3.2 Commencement.Services provided by the Consultant under this Project Agreement andthetimeframesapplicabletothisProjectshallcommenceuponthedateprovidedinawrittenNoticetoProceed(“Commencement Date")provided to the Consultant by the City.The Consultant shall not incuranyexpensesorobligationsforpaymenttothirdpartiespriortotheissuanceoftheNoticetoProceed. 1 of 4 11 Consultant must receive written notice from the City Manager prior to the beginning the performance of services. 3.3 Contract Time.Upon receipt of the Notice to Proceed,the Consultant shall provide the Services for the Project to the City on the Commencement Date,and shall continuously perform the Services for the Project to the City,without interruption,in accordance with the time frames set forth in the Proposal attached and incorporated into this Project Agreement as Exhibit “1".The number of calendar days from the Commencement Date,through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project,whichever shall last occur,shall constitute the Contract Time. 3.4 All limitations of time set forth in this Project Agreement are of the essence. SECTION 4,AMOUNT.BASIS AND METHOD OF COMPENSATION 4.1 Compensation,Consultant shall be compensated for the provision of the Services for the Project in accordance with Exhibit “1”attached hereto.Consultant shall receive a total lump sum fee for Task 1 in the amount of $21,673 and the amount of $66,940 for Task 2,for a total amount not to exceed $88,613 for the provision of the Services for the Project 4.2 Reimbursable Expenses.All reimbursable expenses are included in the total compensation listed in Section 4.1 above. SECTION 5.BILLING AND PAYMENTS 5.1 Invoices 5.1.1.Compensation and Reimbursable Expenses,Consultant shall submit invoices which are identified by the specific project number on a monthly basis in a timely manner.These invoices shall identify the nature of the work performed,the phase of work,and the estimated percent of work accomplished in accordance with the Payment Schedule attached hereto as Exhibit “1“and made part of this Project Agreement.Invoices for each phase shall not exceed amounts allocated to said phase plus reimbursable expenses accrued during each phase.The statement shall show a summary of fees with accrual of the total and credits for portions paid previously. 5.1.2.Florida Prompt Payment Act.The City shall pay the Contractor in accordance with the Florida Prompt Payment Act after approval and acceptance of the Services by the City Manager. 5.2 Disputed Invoices.In the event that all or a portion of an invoice submitted to the City for payment to the Consultant is disputed,or additional backup documentation is required,the City shall notify the Consultant within fifteen (15)working days of receipt of the invoice of such objection,modification or additional documentation request.The Consultant shall provide the City within five (5)working days of the date of the City’s notice.The City may request additional information,including but not limited to,all invoices,time records,expense records,accounting records,and payment records of the Consultant.The City,at its sole discretion,may pay to the Consultant the undisputed portion of the invoice.The parties shall endeavor to resolve the dispute in a mutually agreeable fashion. 5.3 Suspension of Payment In the event that the City becomes credibly informed that any representations of the Consultant,provided pursuant to Subparagraph 5.1,are wholly or partially inaccurate,or in the event that the Consultant is not in compliance with any term or condition of the Agreement or this Project Agreement the City may withhold payment of sums then or in the future otherwise 2 of 4 12 due to the Consultant until the inaccuracy,or other breach of Agreement or Project Agreement,and the cause thereof,is corrected to the City's reasonable satisfaction. 5.4 [INTENTIONALLY OMITTED] 5.5 Final Payment.Submission to the Consultant's invoice for final payment and reimbursement shall constitute the Consultant's representation to the City that upon receipt from the City of the amount invoiced,all obligations of the Consultant to others,including its consultants,incurred in connection with the Project,shall be paid in full.The Consultant shall deliver to the City all documents requested by the City evidencing payments to any and all subcontractors,and all final specifications,plans, or other documents as dictated in the Proposal,Scope of Services,and Deliverables.Acceptance of final payment shall constitute a waiver of all claims against the City by the Consultant. SECTION 6,TERMINATION/SUSPENSION 6.1 For Cause.This Project Agreement may be terminated by either party upon five (5) calendar days written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination and fails to cure the failure to perform within such five (5)day period.In the event that Consultant abandons this Project Agreement or causes it to be terminated by the City,the Consultant shall indemnify the City against any loss pertaining to this termination.In the event that the Consultant is terminated by the City for cause and it is subsequently determined by a court by a court of competent jurisdiction that such termination was without cause,such termination shall thereupon be deemed a termination for convenience under Section 6.2 and the provision of Section 6.2 shall apply. 6.2 For Convenience.This Project Agreement may be terminated by the City for convenience upon fourteen (14)calendar days’written notice to the Consultant.In the event of such termination,the Consultant shall incur no further obligations in connection with the Project and shall,to the extent possible terminate any outstanding subconsultant obligation(s).The Consultant shall be compensated for all Services performed to the satisfaction of the City and reimbursable expenses incurred prior the date of termination.In such event,the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 5.1.Under no circumstances shall the City make payment of profit to the Consultant for services which have not been performed. 6.3 Assignment upon Termination.Upon termination of this Project Agreement,a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10)working days of receipt of written direction from the City,transfer to either the City or its authorized designee,a copy of all work product in its possession,including but not limited to designs,specifications, drawings,studies,reports and all other documents and data in the possession of the Consultant pertaining to this Project Agreement.Upon the City's request,the Consultant shall additionally assign its rights,titleandinterestunderanysubcontractor’s agreements to the City. 6.4 Suspension for Convenience.The City shall have the right at any time to direct theConsultanttosuspenditsperformance,or any designated part thereof,for any reason whatsoever,orwithoutreason,for a cumulative period of up to thirty (30)calendar days.If any such suspension is directedbytheCity,the Consultant shall immediately comply with same.In the event the City directs a suspensionofperformanceasprovidedherein,through no fault of the Consultant,the City shall pay the Consultant asfullcompensationforsuchsuspensiontheConsultant’s reasonable cost,actually incurred and paid,ofdemobilizationandremobilization. 3 of 4 13 Section 7.American Rescue Plan Act Contract Conditions. 7.1 The Consultant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Local Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act (“ARPA”).Towards that end,the Consultant shall be required to comply with all laws,rules,regulations,policies,and guidelines (including any subsequent amendments to such laws,regulations,policies,and guidelines)required by ARPA,as further detailed in the ARPA Addendum. If compliance with the ARPA Addendum is required,the City shall select this box: [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.] 4 of 4 14 IN WITNESS WHEREOF,the parties hereto have caused this Project Agreement executed as of the day and year as first stated above. CITY: ATTEST:CITY OF SOUTH MIAMI,FLORIDA,a APPROVED AS TO FORM AND LEGAL SUFFICIENCY: CITY ATTORNEY CONSULTANT: WITNESSES: Print Name: Print Name:M t>A STANTEC CONSULTING SERVICES,INC. Name:Ramon Castella Title:Vice President Date:2/21/2025 1 of 1 15 EXHIBIT “1” PROJECT PROPOSAL 16 Stantec Stantec Consulting Services,Inc. 901 Ponce de Leon,Ste.900,Coral Gables,FL 33134 January 23,2025 File:177399000 Attention:Mr.Genaro “Chip”Iglesias,City Manager City of South Miami 6130 Sunset Drive Miami,FL 33143 Dear Mr.Iglesias, Reference:Owners Representative for Septic-to-Sewer Conversion -South Miami Subarea K - Phase 1 We are pleased to present this proposal for professional engineering services.The City of South Miami is currently engaged in the construction of the above referenced project.SRS Engineering,Inc.is the Engineer of Record,and ATC Engineering,Inc.is the project's contractor performing the construction work.The project has been under construction during the past four months,and progress has been slower than expected,with the deepest part of the sewer being built first,under challenging conditions.Approximately 750 linear feet of gravity sewer has been completed,as well as the force main.There are roughly 1850 linear feet of gravity sewer left to construct,as well as the sanitary sewer pump station. SCOPE OF SERVICES The City proposes to retain Stantec in an Owner’s Representative Project Manager to work with the Engineer and Contractor to coordinate and streamline construction activities.In this role,Stantec's scope of services will be to: Task 1 -Initial Assessment Perform an initial assessment of the project technical design,and suggest any modifications that could be proposed to simplify or accelerate construction.We will provide an initial assessment of the construction schedule and construction progress.Based on this assessment and expected production rates going forward,a look-ahead schedule will be prepared against which future contractor progress can be monitored and measured.Perform a general assessment of project activities to date,project staging areas,tree trimming required for construction,restoration of rights-of-way and affected private properties. Task 2-Owners Representative CM services Organize and lead weekly meetings,preparation of meeting minutes Monitor contractor progress vs schedule and expected rates of production on a bi-weekly basis,and provide bi-weekly report to the City. Lead the coordination with WASD for resolution of technical items and issues. Provide independent review of items or issues in dispute between the Engineer and the Contractor,and provide findings and recommendations to the City. it I"fin'tv in TiTd 17 January 23,2025 Mr.Genaro "Chip"Iglesias,City Manager Page 2 of 2 Reference:Owners Representative for Septic-to-Sewer Conversion •South Miami Subarea K -Phase 1 Participate in RFI and Change Order review and resolution. Participate in Payment Requisition review. Exclusions: The following services are anticipated to be covered by either the Engineer of Record,and/or the City of South Miami: Attendance and participation in weekly construction progress meetings,(to be lead by Owner's Rep). Construction inspection services,including daily inspection and reports,witness quality and performance testing,substantial completion punch list and final inspection. Construction Administration services,including Project Management Software update/upkeep,RFIs, submittal reviews,change orders,payment application reviews,record drawings and contract close-out. Public information/public involvement services,including coordination with affected property owners and residents. Terms and Conditions: All terms and conditions shall be per our Professional Service Agreement for Professional General Engineering and Architectural Services RFQ #PW2022-03.Our fees shall be as follows. Task 1 -Initial Assessment (Lump Sum)$21,673 Task 2 -Owners Rep CM Services (Lump Sum)$66,940 ($16,735 per month for 4 month construction period starting at authorization to proceed) We will invoice monthly based percentage completion on services provided.We are ready to begin working on this assignment upon your authorization to proceed.If acceptable to you,we will accept a signed copy of this form as your written authorization to proceed. Thank you, STANTEC CONSULTING SERVICES INC. Ramon Castella,P.E,ENV SP,LEED AP Vice-President Phone:(305)445-2900 Mobile:786-493-8688 Ramon.castella@stantec.com City of South Miami Approved by: Date: 18 FEE ESTIMATE -City of South Miami Sewers -Subarea K -phase 1 Name Catfetta Ramon Verges Fernando Perez HeO Faria Larissa Project Summary Hours Labour Expense Subs Total Project Billing Rato (TAM) Total Units (TAM) Feo (TAM) $210 00 no $11000 iru (Yi $54 50 aq nn $160 00 t qr nn $32,932 96 i nn Fiaed Feo TlmA »MalArial 0 00 $0 00 $0 00 so ooi $0 00 $32.932 97|$88.613 47 $32,932 97|$88,613 47$5 040 00 •U*uu $11 440 00 03 UU $7 520 50 1i»o uu $31,680 00 1 uu $32 932 96 lime a iwaicriai Total 415 00 -A/i vw $55 680 501 $0 00 Escalation (TAM)$0 00 $0 00 $0 00 $0 00 $0 00 Total Feo (TAM)$5 040 00 $11 440 00 $7 520 50 $31.660 00 $32 932 96 WB5 Code Task Code Task Nam# Perform Initial att r urnanto SUH Dato 202S-O1-O6 End Date 202SO1 *31 Units -■-■-*|Task Typr Tarv«n A Malarial Hour.Labour Eiponw I H n—Schedule Revww ~202501-31 ?n?5 m .st ?nn tR nn 1 00 a rm 800 «•nn nil Tena A Material 900 •IQ,WOO 3V $1 364 50 <c tw;nr IV vu $000 J.VkX VJ $0 00 >4I.Qf J.1J $1.364 50 13 I 1 3 Tectwcal &Ccnstrucbcn acts t«s assessmerc 2025-01-06 2025 01*31 *uw 200 IO UU 24 00 o w 400 •o uu 1800 U II lone a Material Time A Material ♦a uu 48 00 >□/jo uu $6 278 00 >0 uo $0 00 *3 6ZZ 53 $0 co >9 35c 63 $6.278 00 Owner's Report 2025-01*31 400 1600 1600 Tern A Material 38 00 $4 672 00 $0 00 $0 00 $4 672 00 2 hi 2 _Owners Rep CM services 2025-01-13 a vs v va •• 202505-12 2025 05 12 6 00 1200 12 00 1600 Timo A Material Time A Material 276 00 48 00 $37,630 00 $6 574 00 $0 00 $0 00 $29,310.34 $0 00 $66 940 34 $6,574 00 |2 2 24 2 3 independent review terra issues &WASD coord Particpate -Change Order,RF1 &Pay Req review 2025-01-13 2025 05*12 202505-12 2025-05-12 4 00 4 00 400 24 00 16 00 800 24 00 1600 800 48 00 48 00 24 00 0 69 Time A Material Timo A Matenal Time A Material 100 00 84 CC 44 00 $13.188 00 $11.632 00 $6.236 00 $0 00 $0 00 $0 00 $29 310 34 sooc $0 00 $42 498 34 $11.632 00 $6 236 00 COMPELING SOLUTIONS,INC. City of South Miami -Sub-Area K -Phase 1 Position:Senior PM Rate:$190 1 Perform Initial Assessments 1.1 1.2 1.3 1.4 Schedule Review Production Estimate &Look-ahead Technical &Construction activities assessment Owner's Report 6 6 4 3 2 Owners Rep CM services 2.1 Weekly meetings 60 2.2 Schedule update -Owners Report 32 2.3 Independent review items/issues &WASD coord 60 Total Hours :171 Labor Fees $32,490.00 Expenses -Mise field $442.96 Total Fees $32,932.96 20 Agenda Item No.7. CITY COMMISSION Agenda Item Report Meeting Date:July 29,2025 Submitted By:Nkenga Payne Submitted Department:Public Works &Engineering Item Type:Resolution Agenda Section:RESOLUTION(S) Subject: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,APPROVING A PROPOSAL AND PROJECT AGREEMENT WITH STANTEC CONSULTING SERVICE INC.TO PROVIDE EXTENDED OWNERS€™S REPRESENTATIVE PROJECT MANAGEMENT SERVICES FOR THE SANITARY SEWER IMPROVEMENTS a€“SUBAREA K,PHASE I PROJECT,IN THE AMOUNT OF $66,940;PROVIDING FOR AUTHORIZATION;PROVIDING FOR IMPLEMENTATION, CORRECTIONS,AND AN EFFECTIVE DATE.3/5 (CITY MANAGER-PUBLIC WORKS &ENGINEERING) Suggested Action: Attachments: Memo-Stantec Extension of Agreement.docx Reso-Stantec Extended Services.docx Exhibit A -Stantec Proposal Exhibit B-Project Agreement South Miami -Stantec Consulting Services Septic to Sewer.pdf 1 South 'Miami THE CITY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM To:The Honorable Mayor,Vice Mayor,and Members of the City Commission From:Genaro "Chip"Iglesias,City Manager /<//.£/ Date:July 29th,2025 Subject:Extension of Owners Representative Services for Septic-to-Sewer Conversion - South Miami Subarea K -Phase 1for $66,940. Recommendation:Approve the extension of professional engineering services with Stantec Consulting Services Inc.(Stantec)to continue serving as the Owners Representative Project Manager for the Septic-to-Sewer Conversion Project in South Miami Subarea K -Phase 1for $66,940. Background:Stantec services as Owners'Representative,were initially retained in March of 2025 to provide needed additional oversight and coordination for this vital infrastructure project.The initial scope covered an assessment phase and four months of Owner's Representative Construction Management (CM)services. The project,which involves SRS Engineering,Inc.as the Engineer of Record and ATC Engineering,Inc.as the contractor,has been under construction for the past nine months.While significant progress has been made since the addition of Stantec,with almost all gravity sewer constructed,the project is still ongoing.System testing and restoration are on-going,and the critical sanitary sewer pump station is expected to be installed and connected and tested by the end of August. To ensure continued effective coordination,problem resolution,and oversight through the project's completion,it is essential to extend Stantec's services.The initial engagement of Stantec's services was for $88,613 and was obtained under the City Manager's purchasing authority for CIP funded projects (Ordinance No.01-25-2514)The combined total for Owner's Representative Services upon approval of this extension is $155,553.Their continued presence will help us maintain momentum,streamline activities,and address any unforeseen issues promptly as we near the final stages of construction,particularly with the pump station and final restoration. Funding:The cost for the extension will not exceed $66,940 and will be charged to account 301.1790.519.6450 which has a current balance of $5,412,046.16 before the request is made. Attachments:Proposal 2