09-184(3)-066CHEMICAL STORAGE
TOP VIEW
UPPER
RIGHT SHELF
Y
7w
I
i•
_ 1 1
r # 1
r i
1
r• # :
i I 1
M
# # • : Y �117�1 i �� it II • 1
JIL-LIBLIALEFT SHELF BOTTOM RIGit a A_.
F 0 F 0 0
*25
MOO
y%y
L LJ
SECONDARY CONTAINER VOLUME CALCULATIONS SECONDARY CONTAINER VOLUME CALCULATIONS
.! .1• a• .O. #
REQUIRED:
11 ./
PROVIDED -PROVIDED:
AREA OF TRAY=Al AREA OF TRAY -Al
Y 1 . is
AREA OF ! y,'
• S
Y • .j
UPPERi R
r2011,25 .�
# 0
POLYPROPYLENE)
. • '
0
RO T
AREA OF TRAY=A1
IA. 265.9SQIN
O _R
CONTAINERS=A3
NET
• • ! #
.;.. ,1
f i *
CHEMICALS r QUANTITIES TO BE USED IN LAB:
ALIPHATIC/•# `:#
(HISTO-CLEAR);#... CONTAINERS.
REAGENT ALCOHOL,PRESERVATIVE
!
1NE (1) GALLON CONTAINERS.
EOSIN1 # PINT CONTAINERS.
#' PINT CONTAINERS.
CARBONATE- LITHIUM i WATER, BLUING SOLUTION
WATER)(SCOTTS TAP ONE GALLON.
NO MORE THAN FOURCONTAINERS OF
SPECIALLYCHEMICALS WILL BE STORED IN THE LAB AT ROOM TEMPERATURE IN
DESIGNATED CABINET
- SECONDARY CONTAINMENT TO BE PROVIDED BY POLYPROPYLENE
TRAYS (SEE ABOVE).
CHEMICAL STORAGE tB#V
CONTAINERS
INERS
i3.0®
fi.00
17.00 gg 2.75
L 7.:010
1H.75
5 GAL x GAL 4 PW
NOTE:
EQUIPMENTALL BE
r
PROVIDED
rOD OWNER
PLUMBING GENERAL NOTES
1. ALL WORK SHALL
BE
ACCORDING O rr
# ORDNANCES AND VARIANCES.
2, PLUMBING C09MCTOR SHALL PAY ALL FEES, INSPECTION AND
CONNECTION REQUIRED.
3. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND
DIMENSIONS #: SITE PRIOR TO FABRICATION AND INSTALLATION
OF MATERIALS AND EQUIPMENT.
4. COORl /•. WITH OTHER
TRADES.
5. PLUMBING CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF DEFECTS
IN MATERIALS 1 WORKMANSHIP FOR
PERIOD OF ONE •#
DATE OF ACCEPTANCE.
# POTABLE 1 AND COLD"LEADFREE'
LEAD CONTENT
# EXCEEDING 0 PERCENT
r FOR SOLDER
r r
& 8 PERCENT FOR PIPE FITTINGS, FIXTURES AND TRIM. CONTRACTOR
SHALL VERIFY MANUFACTURER'S COMPLIANCE.
7. ALL POTABLE # AND COLD WATER SYSTEMS SHALL BE FLUSHED CLEAR,
STERILIZED WITH AN APPROVED SOLUTION AND THROUGHLY FLUSHED OF
ALL RESIDUAL SOLUTION AFTER FINAL PRESSURE TESTS AND WITH ALL
TRIM AND CONNECTIONS INSTALLED.
8. DRAINAGE SYSTEMDESIGN IS BASED ON :FOOT MINIMUM
FALL FOR PIPES 3' OR LARGER AND 1/4- PER FOOT MINIMUM FALL
FOR PIPES 2* OR SMALLER, ANY DEVIATIONS SHALL BE APPROVED BY
ARCH
EY
9. ALL VENT THROUGH ROOF OPENINGS SHALL BE OFFSET TO A MINIMUM
DISTANCE OF /i FROM PARRAPET WALL OR ROOF EDGE.
DRAWINGS FOR ROOF FLASHING. LEAD FLASHING WILL NOT BE ACCEPTED.
REOUIRED CAPACITIES AT
• rr
FIXTURE SUPPLY E OUTLIL-.Ti SO
i ,
FIXTURELOW
SUPPLY TE
..
ICI FLOW
RATE,.
•
. • •
• :.
•
•
BATHTUB
'
BIDET
COMBINATION FIXTURES
DISHWASHERTEMP)
DISHWASHERTEMP)
1.7
•
DRINKING FOUNTAIN
r,
LAUNDRY • •
8
LAVATORY
SHOWER
I
TEMPERATURE O,
0
SILLCOCK, HOSE BIBBIBB
5
i
SINK, RESIDENTIAL
2.5
8
SINK, SERVICE
i
3
•
URINAL, VALVE
a • CLOSET, BLOW Ii
WATER CLOSET, FLUSHOMETER TANK
WATER CLOSET,i 1 1
WATER CLOSET,ONE PIECE
NOTE:1 ALL FIXURES ARE
1. AS BUILT INFORMATION # OF DESIGN.
CONTRACTOR SR4L VERIFYLOCATION,` AND CONDITION
OF EXISTING PIPING BEFORE COMMENCING WORK. CONTRACTOR SHALL
COORDINATE AND REROUTE PIPING AS REQUIRED BASED EXISTING
CONDITIONS ACCURATE AS -BUILT RECORD SHALL BE MAINTAINED
DURING CONSTRUCTION.
2. EXISTING CONDITION INFORMATION BASED ON PLANS PROVIDED
BY ARCHITECT.
SPECIFICATIONS1. THE AND DRAWINGS * rr TO SERVE JOINTLY
AS A BASIS UPON WHICH THE CONTRACTOR SHALL SUBMIT A CONTRACT
PRICE FOR DEMOLITION W!' OF PRESENT
rr` PWMBING
AS INDICATED ON PLANS.
2. THE CONTRACTOR SHALL COORDINATE HIS WORK OR ADJUST SAME TO
LOCA-
TION #! NOT OCCUR.
3. THE WORK UNDER THIS CONTRACT SHALL BE PERFORMED SIMULTANEOUSLY
WITH WORK OF OTHER TRADES, SO AS NOT TO DELAY THE OVERALL PRO-
GRESS OF THE DEMOLITION PROGRAM.
4. THE CONTRACTOR SHALL VISIT THE PREMISES
COMPARE WITH
THE r-. 1 r 7 HIMSELF OF
CONDITIONS EXISTING AT THE BUILDING BEFORE DELIVERY OF HIS
PROPOSAL NO ADDITIONAL ALLOWANCE1 O THE CON-
TRACTOR DUE TO HIS NEGLECT it FAILURE TO COMPLY
SPECIFIED REQUIREMENTS.
5. DEMOLITION OF EXISTING PLUMBING WORKBE PERFORMED #
COMPLETED r a` THIS SECTIONOF # `
6. DISCONNECT
WASTE, VENT HOT AND COLD WATER CONNECTIONS
.# FIXTURES.
7. REMOVE ALL EXISTING PLUMBING EQUIPMENT, FIXTURES, PIPING NOT
REQUIRED, INCLUDING DRAINAGE,LEADERS,
r SATISFY CODEREQUIREMENTS FO` PROHIBITED DEAD ENDS.
8.• EXISTING ! COW WATER, VENT r SOIL PIPING
*! rl iINTERFERE CONSTRUCTION,
BELOW FINISHED FLOOR, BEHIND FINISHED WALLS OR ABOVE HUNG
9. THE WORK SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, CUT-
TINGS, EXTENSIONS, CONNECTIONS, REPAIRING, ADAPTING AND
OTHER WORK INCIDENTALTHERETO, TOGETHER WITH SUCH TEMPORARY
CONNECTIONS
/, EXISTING FIXTURES, MATERIALS AND EQUIPMENT TO BE REMOVED
SALVAGEDSHALL BE OR DISPOSED
i# 1 OF DIRECTED BY THE O`
11. ANY WORK NOT! ON DRAWINGS OR SPECIFICALLY MENTIONED
CONTRACTORIN THE SPECIFICATIONS BLIT CONSIDERED NECESSARY FOR THE COM-
PLETION OF THE WORK IN PROPER MANNER SHALL BE PROVIDED BY
THIS WITHOUT ADDITIONAL
RELATED WORK IN ALL LOCATIONS WHERE REQUIRED, EXCEPT WHERE
12. CONTRACTOR SHALL DO HIS OWN CUTTING AND REMOVAL OF ALL HIS
! ! ! r AND/OR AS SPECIFIE
13. THIS CONTRACTOR SHALL BE RESPONSIBIEFOR ROUGH PATCHING AND
REPAIRING.
r,• PATCHING SHALL BE
PERFORMED
r !i1 BY
GENERAL
CONTRACTOR.
PLUMBING LEGEND
SYMBOL
DESCRIPTION
NEW SANITARY PIPING
___________
SANITARY VENT PIPING
- - - - --
HOT WATER RETURN (RTRN)
--- - ®--
HOT WATER PIPING (HW)
-
GOLD WATER PIPING (CW)
G
GAS PIPING
_CD
CONDENSATE DRAIN PIPING
GW -
GREASE WASTE PIPE
---
GATE OR BALL VALVE
GAS SHUT-OFF VAVLE
"P" TRAP
CO If-
WALL CLEAN OUT
FCO -Bt-
FLUSH FLOOR CLEAN OUT
FSO-0FLOOR
SINKDRAIN
--�-
POINT OF CONNECTION
MI
NOT ALL SYMBOLS INDICATED MAY NOT BE USED ON DRAWINGS
FIXTURE CONNECTION SCHED.
ill r III
�I�� u� I� • .... I III
i1• r`•
1. 71
MATERIAL SHALL BE NEW, UNUSED, BEST OF THEIR RESPECTIVE KINDS AND
FREE FROM DEFECTS IN WORKMANSHIP; IN CONFORMANCE WITH THE LATEST
PUBLICATIONS #' OF BIDDING.
A. SANITARY SOIL AND YM PIPING: (ABOVE GROUND)
CAST IRON AS rER ASTM Z74, ASTM A 888, CISPI
PLASTICABS PIPE
r PER ASTM
1 2661, 628, : :.
B. SANITARYSOIL i.l VENT r r l (BELOW ji lr
PVC TYPE DWV AS PER ASTM 1 2665,# 2949, ASTM r 3034.
C. DOMESTIC WATER T•1Il SUPPLY PIPING
r
POLYVINYL CHLORIDE (PVC) PLASTIC PIPE AS PER ASTM
ASTM 1 # i
I. WATER DISTRIBUTION ♦.
BRASS PIPE
r r
CHLORINAT11111 POLYVINYL CHLORIDE (CPVC) PLASTIC PIPE AND TUBING A'_5
r# ■• 111 N (PO)
PLAKIC PIPE
i AND UBINQ AS PER
ASTM
r //• • •
I- CONDENSATE PIPING: AS HEREIN BEFORE SPECIFIED FOR SANITARY SOIL,
WASTE 1 VENT
PIPING.
SECTION3..JOINTS AND METHODS OF CONNECTION SHALL COMPLY WITH FBC
`#//
4. i
LEDGES,IPE FITTINGS:
SHALL BE APPROVED FOR INSTALLATION WITH THE PIPING MATERIAL INSTALLED
AND SHALL CONFORM TO THE RESPECTIVE PIPE STANDARDS OR ONE OF THE
STANDARDS LISTED IN TABLE P605.6. ALL PIPE FITTINGS UTILIZED IN WATER
SUPPLY SYSTEMS SHALL ALSO CONFORM TO NSF 61. THE FITTINGS SHALL NOT
HAVE f r OR REDUCTIONS CAPABLEOF RETARDINGOR
OBSTRUCTING
r . FLOW IN THE
* •
r
5.
PIPE
r INSULATION:
A- ALL CONDENSATE r WITH 3/4- FIRE RETARDANT
ARMAFLEX INSULATIONOF SPREAD AND SMOKE
DEVELOPED
B. ALL HOT WATER AND TEMPERED WATER LINES SHALL BE INSULATED WITH 1'
RETARDANTFIRE INSULATIONOF
SPREAD AND SMOKEDEVELOPED RESPECTIVELY.
WATER-HAMMER6. WATER HAMMER
THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM SHALL BE
CONTROLLED TO REDUCE THE POSSIBILITY OF WATER HAMMER. A
ARRESTOR SRU BE INSTALLED WHERE QUICK -CLOSING
VALVES ARE UTILIZED, UNLESS OTHERWISE APPROVED. THE ARRESTOR SHALL
BE LOCATED EFFECTIVE RANGE OF QUICK -CLOSING
WATER -HAMMER ARRESTORS SHALL CONFORM TO ASSE 1010. ACCESS SHALL
BE PROVIDED TOARRESTORS.
7. ALL VALVES SHALL BE OF ••R! al TYPE AND COMPATIBLE
r #... PIPING
• INSTALLED
IN THE SYSTEM.
8. LOCATION OF FULL -OPEN VALVES. FULL -OPEN VALVES SHALL BE INSTALLED
IN THE FOLLOWING # LOCATIONS:
1. ON
BUILDING WATER SERVICE PIPE FROM PUBLIC rr
NEAR THE CURB.
2. ON THE WATER DISTRIBUTION SUPPLY PIPE AT THE ENTRANCE INTO THE
3. ON THE BASE OF a` PIPE.
4. ON SUPPLY
I PIPE
r TO
EVERY WATER HEATER.
SHUTOFF5. is ar IN ON SUPPLY
PIPE
EACH APPLIANCE
i OR
MECHANICAL EQUIPMENT.
9. IDENTIFICATION.
SERVICE AND HOSE BIBB VALVES SHALL BE IDENTIFIED. ALL OTHER
INSTALLED IN LOCATIONSNOT # TO THE FIXTURE OR
APPLIANCE SHALL BE IDENTIFIED, INDICATING THE FIXTURE OR APPLIANCE
SERVED.
JOINTS10. )DINTS BETWEEN DIFFERENT MATERIALS
DIFFERENT PIPINGMATERIALSBE MADE
INSTALLEDMECHANICAL JOINT OF THE COMPRESSION OR MECHANICAL -SEALING TYPE, OR
AS PERMITTED IN §P605.22.1 AND §P605.22.2. CONNECTORS OR ADAPTERS
SHALL HAVE AN ELASTOMERIC SEAL CONFORMING TO ASTM D 1869 OR ASTM F
477. JOINTS SHALL BE IN ACCORDANCE
INSTRUCTIONS.
FLOORS11. ESCUTCHEONS:
CHROME PLATED OR STAINLESS STEEL WITH SET SCREWS FOR HOLDING
SECURELY IN PLACE USE ESCUTCHEONS ON PIPES PASSING THROUGH WALLS,
r CEILINGS OF 1
13. HOT WATER SUPPLY TO FIXTURES. THE HOT WATER SUPPLY TO ANY FIXTURE
REQUIRING HOT WATER SHALL BE INSTALLED ON THE LEFT SIDE OF THE FIXTURE
! • r !'r i• • r •• r !r r r
I
SCHEDULEPLUMBING FIXTURE
1. 71
MATERIAL SHALL BE NEW, UNUSED, BEST OF THEIR RESPECTIVE KINDS AND
FREE FROM DEFECTS IN WORKMANSHIP; IN CONFORMANCE WITH THE LATEST
PUBLICATIONS #' OF BIDDING.
A. SANITARY SOIL AND YM PIPING: (ABOVE GROUND)
CAST IRON AS rER ASTM Z74, ASTM A 888, CISPI
PLASTICABS PIPE
r PER ASTM
1 2661, 628, : :.
B. SANITARYSOIL i.l VENT r r l (BELOW ji lr
PVC TYPE DWV AS PER ASTM 1 2665,# 2949, ASTM r 3034.
C. DOMESTIC WATER T•1Il SUPPLY PIPING
r
POLYVINYL CHLORIDE (PVC) PLASTIC PIPE AS PER ASTM
ASTM 1 # i
I. WATER DISTRIBUTION ♦.
BRASS PIPE
r r
CHLORINAT11111 POLYVINYL CHLORIDE (CPVC) PLASTIC PIPE AND TUBING A'_5
r# ■• 111 N (PO)
PLAKIC PIPE
i AND UBINQ AS PER
ASTM
r //• • •
I- CONDENSATE PIPING: AS HEREIN BEFORE SPECIFIED FOR SANITARY SOIL,
WASTE 1 VENT
PIPING.
SECTION3..JOINTS AND METHODS OF CONNECTION SHALL COMPLY WITH FBC
`#//
4. i
LEDGES,IPE FITTINGS:
SHALL BE APPROVED FOR INSTALLATION WITH THE PIPING MATERIAL INSTALLED
AND SHALL CONFORM TO THE RESPECTIVE PIPE STANDARDS OR ONE OF THE
STANDARDS LISTED IN TABLE P605.6. ALL PIPE FITTINGS UTILIZED IN WATER
SUPPLY SYSTEMS SHALL ALSO CONFORM TO NSF 61. THE FITTINGS SHALL NOT
HAVE f r OR REDUCTIONS CAPABLEOF RETARDINGOR
OBSTRUCTING
r . FLOW IN THE
* •
r
5.
PIPE
r INSULATION:
A- ALL CONDENSATE r WITH 3/4- FIRE RETARDANT
ARMAFLEX INSULATIONOF SPREAD AND SMOKE
DEVELOPED
B. ALL HOT WATER AND TEMPERED WATER LINES SHALL BE INSULATED WITH 1'
RETARDANTFIRE INSULATIONOF
SPREAD AND SMOKEDEVELOPED RESPECTIVELY.
WATER-HAMMER6. WATER HAMMER
THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM SHALL BE
CONTROLLED TO REDUCE THE POSSIBILITY OF WATER HAMMER. A
ARRESTOR SRU BE INSTALLED WHERE QUICK -CLOSING
VALVES ARE UTILIZED, UNLESS OTHERWISE APPROVED. THE ARRESTOR SHALL
BE LOCATED EFFECTIVE RANGE OF QUICK -CLOSING
WATER -HAMMER ARRESTORS SHALL CONFORM TO ASSE 1010. ACCESS SHALL
BE PROVIDED TOARRESTORS.
7. ALL VALVES SHALL BE OF ••R! al TYPE AND COMPATIBLE
r #... PIPING
• INSTALLED
IN THE SYSTEM.
8. LOCATION OF FULL -OPEN VALVES. FULL -OPEN VALVES SHALL BE INSTALLED
IN THE FOLLOWING # LOCATIONS:
1. ON
BUILDING WATER SERVICE PIPE FROM PUBLIC rr
NEAR THE CURB.
2. ON THE WATER DISTRIBUTION SUPPLY PIPE AT THE ENTRANCE INTO THE
3. ON THE BASE OF a` PIPE.
4. ON SUPPLY
I PIPE
r TO
EVERY WATER HEATER.
SHUTOFF5. is ar IN ON SUPPLY
PIPE
EACH APPLIANCE
i OR
MECHANICAL EQUIPMENT.
9. IDENTIFICATION.
SERVICE AND HOSE BIBB VALVES SHALL BE IDENTIFIED. ALL OTHER
INSTALLED IN LOCATIONSNOT # TO THE FIXTURE OR
APPLIANCE SHALL BE IDENTIFIED, INDICATING THE FIXTURE OR APPLIANCE
SERVED.
JOINTS10. )DINTS BETWEEN DIFFERENT MATERIALS
DIFFERENT PIPINGMATERIALSBE MADE
INSTALLEDMECHANICAL JOINT OF THE COMPRESSION OR MECHANICAL -SEALING TYPE, OR
AS PERMITTED IN §P605.22.1 AND §P605.22.2. CONNECTORS OR ADAPTERS
SHALL HAVE AN ELASTOMERIC SEAL CONFORMING TO ASTM D 1869 OR ASTM F
477. JOINTS SHALL BE IN ACCORDANCE
INSTRUCTIONS.
FLOORS11. ESCUTCHEONS:
CHROME PLATED OR STAINLESS STEEL WITH SET SCREWS FOR HOLDING
SECURELY IN PLACE USE ESCUTCHEONS ON PIPES PASSING THROUGH WALLS,
r CEILINGS OF 1
13. HOT WATER SUPPLY TO FIXTURES. THE HOT WATER SUPPLY TO ANY FIXTURE
REQUIRING HOT WATER SHALL BE INSTALLED ON THE LEFT SIDE OF THE FIXTURE
! • r !'r i• • r •• r !r r r
I
SCHEDULEPLUMBING FIXTURE
MADERA!
WATER SENSE, MEETS EPACRITERIA.
SELECTRONIC FLOWISETOILET
WATER SENSE, MEETS *' CRITERIA
EXAM ROOM AND
�•
!!SENECK TOUCHLESS DECK -MOUNT
LAVATORY FAUCET
FAUCET WITH TEMPERATURE MIXER. (0.5 GPM)
I III III DII � �I p
LAVATORY
��11� ��YI I�
i /J •
WORK AREA AND
i
TRITON BASE FAUCET K-7304 WITH LOW
KITCHEN FAUCET
FLOW AERATOR K-18016 (0.5 GPM)
I KITCHEN�K
#I i1r
WO
WORK AREA AND
13203.045
., SINK
# 1`
• r r
HeBJ Intomationall. c.
811 Ponce De Leon Blvd.
� - A
(mm
.,_
����`k 11C}i�e �a�NeS®t
�� ,
TEL. (.305),441-1556'm
m"
FAX: (305) 445a23T4
hUp://www,s-garchitects.com
AA 0002293
EB 0005176
Project Number
0723700
Consultants
G/'a t�// P[�
G.Y < IREZ
STRUCTURAL ENGINEERS
7315 S.W. 87th AV
MIAMI, FL 33173
TEL: 305-412-2200
Consultants
DESIGN ONE
CONSULTING ENGINEERS
a
809 S.W. 8 STREET, No, 200
MIAMI, FL 33130
TEL: 305-860-0384
a
OFFICE TENANT
IMPROVEMENTFOR
DR. IL.EANA R.
PEREZ _ QUINTAIROS
6310 SUNSET DRIVE
MIAMI, FLORIDA 33143
p
F
Revisions Date
DE M COMMENTS O4.10,2009
DERM COMMENTS 05,06.2009
Seat:
y .
f
DATE J F d
2. 2009
ARDO Se PEREZ-GALS' PAN d »
FLORtDA REM W. 56754 , '
6
PROFESSICR#AL Ef1QNEFR,%,"--
i-
PLAN NORTH
Checked By:
d1ce
Drawn By;
d1ce
Issue:
01-25-08
_
Date,
01-25-08
Sheet Index -
PLUMBING
NOTES
SCHEDULES
Sheet Number.
P-1
•