Loading...
09-184(3)-066CHEMICAL STORAGE TOP VIEW UPPER RIGHT SHELF Y 7w I i• _ 1 1 r # 1 r i 1 r• # : i I 1 M # # • : Y �117�1 i �� it II • 1 JIL-LIBLIALEFT SHELF BOTTOM RIGit a A_. F 0 F 0 0 *25 MOO y%y L LJ SECONDARY CONTAINER VOLUME CALCULATIONS SECONDARY CONTAINER VOLUME CALCULATIONS .! .1• a• .O. # REQUIRED: 11 ./ PROVIDED -PROVIDED: AREA OF TRAY=Al AREA OF TRAY -Al Y 1 . is AREA OF ! y,' • S Y • .j UPPERi R r2011,25 .� # 0 POLYPROPYLENE) . • ' 0 RO T AREA OF TRAY=A1 IA. 265.9SQIN O _R CONTAINERS=A3 NET • • ! # .;.. ,1 f i * CHEMICALS r QUANTITIES TO BE USED IN LAB: ALIPHATIC/•# `:# (HISTO-CLEAR);#... CONTAINERS. REAGENT ALCOHOL,PRESERVATIVE ! 1NE (1) GALLON CONTAINERS. EOSIN1 # PINT CONTAINERS. #' PINT CONTAINERS. CARBONATE- LITHIUM i WATER, BLUING SOLUTION WATER)(SCOTTS TAP ONE GALLON. NO MORE THAN FOURCONTAINERS OF SPECIALLYCHEMICALS WILL BE STORED IN THE LAB AT ROOM TEMPERATURE IN DESIGNATED CABINET - SECONDARY CONTAINMENT TO BE PROVIDED BY POLYPROPYLENE TRAYS (SEE ABOVE). CHEMICAL STORAGE tB#V CONTAINERS INERS i3.0® fi.00 17.00 gg 2.75 L 7.:010 1H.75 5 GAL x GAL 4 PW NOTE: EQUIPMENTALL BE r PROVIDED rOD OWNER PLUMBING GENERAL NOTES 1. ALL WORK SHALL BE ACCORDING O rr # ORDNANCES AND VARIANCES. 2, PLUMBING C09MCTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION REQUIRED. 3. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS #: SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT. 4. COORl /•. WITH OTHER TRADES. 5. PLUMBING CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS 1 WORKMANSHIP FOR PERIOD OF ONE •# DATE OF ACCEPTANCE. # POTABLE 1 AND COLD"LEADFREE' LEAD CONTENT # EXCEEDING 0 PERCENT r FOR SOLDER r r & 8 PERCENT FOR PIPE FITTINGS, FIXTURES AND TRIM. CONTRACTOR SHALL VERIFY MANUFACTURER'S COMPLIANCE. 7. ALL POTABLE # AND COLD WATER SYSTEMS SHALL BE FLUSHED CLEAR, STERILIZED WITH AN APPROVED SOLUTION AND THROUGHLY FLUSHED OF ALL RESIDUAL SOLUTION AFTER FINAL PRESSURE TESTS AND WITH ALL TRIM AND CONNECTIONS INSTALLED. 8. DRAINAGE SYSTEMDESIGN IS BASED ON :FOOT MINIMUM FALL FOR PIPES 3' OR LARGER AND 1/4- PER FOOT MINIMUM FALL FOR PIPES 2* OR SMALLER, ANY DEVIATIONS SHALL BE APPROVED BY ARCH EY 9. ALL VENT THROUGH ROOF OPENINGS SHALL BE OFFSET TO A MINIMUM DISTANCE OF /i FROM PARRAPET WALL OR ROOF EDGE. DRAWINGS FOR ROOF FLASHING. LEAD FLASHING WILL NOT BE ACCEPTED. REOUIRED CAPACITIES AT • rr FIXTURE SUPPLY E OUTLIL-.Ti SO i , FIXTURELOW SUPPLY TE .. ICI FLOW RATE,. • . • • • :. • • BATHTUB ' BIDET COMBINATION FIXTURES DISHWASHERTEMP) DISHWASHERTEMP) 1.7 • DRINKING FOUNTAIN r, LAUNDRY • • 8 LAVATORY SHOWER I TEMPERATURE O, 0 SILLCOCK, HOSE BIBBIBB 5 i SINK, RESIDENTIAL 2.5 8 SINK, SERVICE i 3 • URINAL, VALVE a • CLOSET, BLOW Ii WATER CLOSET, FLUSHOMETER TANK WATER CLOSET,i 1 1 WATER CLOSET,ONE PIECE NOTE:1 ALL FIXURES ARE 1. AS BUILT INFORMATION # OF DESIGN. CONTRACTOR SR4L VERIFYLOCATION,` AND CONDITION OF EXISTING PIPING BEFORE COMMENCING WORK. CONTRACTOR SHALL COORDINATE AND REROUTE PIPING AS REQUIRED BASED EXISTING CONDITIONS ACCURATE AS -BUILT RECORD SHALL BE MAINTAINED DURING CONSTRUCTION. 2. EXISTING CONDITION INFORMATION BASED ON PLANS PROVIDED BY ARCHITECT. SPECIFICATIONS1. THE AND DRAWINGS * rr TO SERVE JOINTLY AS A BASIS UPON WHICH THE CONTRACTOR SHALL SUBMIT A CONTRACT PRICE FOR DEMOLITION W!' OF PRESENT rr` PWMBING AS INDICATED ON PLANS. 2. THE CONTRACTOR SHALL COORDINATE HIS WORK OR ADJUST SAME TO LOCA- TION #! NOT OCCUR. 3. THE WORK UNDER THIS CONTRACT SHALL BE PERFORMED SIMULTANEOUSLY WITH WORK OF OTHER TRADES, SO AS NOT TO DELAY THE OVERALL PRO- GRESS OF THE DEMOLITION PROGRAM. 4. THE CONTRACTOR SHALL VISIT THE PREMISES COMPARE WITH THE r-. 1 r 7 HIMSELF OF CONDITIONS EXISTING AT THE BUILDING BEFORE DELIVERY OF HIS PROPOSAL NO ADDITIONAL ALLOWANCE1 O THE CON- TRACTOR DUE TO HIS NEGLECT it FAILURE TO COMPLY SPECIFIED REQUIREMENTS. 5. DEMOLITION OF EXISTING PLUMBING WORKBE PERFORMED # COMPLETED r a` THIS SECTIONOF # ` 6. DISCONNECT WASTE, VENT HOT AND COLD WATER CONNECTIONS .# FIXTURES. 7. REMOVE ALL EXISTING PLUMBING EQUIPMENT, FIXTURES, PIPING NOT REQUIRED, INCLUDING DRAINAGE,LEADERS, r SATISFY CODEREQUIREMENTS FO` PROHIBITED DEAD ENDS. 8.• EXISTING ! COW WATER, VENT r SOIL PIPING *! rl iINTERFERE CONSTRUCTION, BELOW FINISHED FLOOR, BEHIND FINISHED WALLS OR ABOVE HUNG 9. THE WORK SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, CUT- TINGS, EXTENSIONS, CONNECTIONS, REPAIRING, ADAPTING AND OTHER WORK INCIDENTALTHERETO, TOGETHER WITH SUCH TEMPORARY CONNECTIONS /, EXISTING FIXTURES, MATERIALS AND EQUIPMENT TO BE REMOVED SALVAGEDSHALL BE OR DISPOSED i# 1 OF DIRECTED BY THE O` 11. ANY WORK NOT! ON DRAWINGS OR SPECIFICALLY MENTIONED CONTRACTORIN THE SPECIFICATIONS BLIT CONSIDERED NECESSARY FOR THE COM- PLETION OF THE WORK IN PROPER MANNER SHALL BE PROVIDED BY THIS WITHOUT ADDITIONAL RELATED WORK IN ALL LOCATIONS WHERE REQUIRED, EXCEPT WHERE 12. CONTRACTOR SHALL DO HIS OWN CUTTING AND REMOVAL OF ALL HIS ! ! ! r AND/OR AS SPECIFIE 13. THIS CONTRACTOR SHALL BE RESPONSIBIEFOR ROUGH PATCHING AND REPAIRING. r,• PATCHING SHALL BE PERFORMED r !i1 BY GENERAL CONTRACTOR. PLUMBING LEGEND SYMBOL DESCRIPTION NEW SANITARY PIPING ___________ SANITARY VENT PIPING - - - - -- HOT WATER RETURN (RTRN) --- - ®-- HOT WATER PIPING (HW) - GOLD WATER PIPING (CW) G GAS PIPING _CD CONDENSATE DRAIN PIPING GW - GREASE WASTE PIPE --- GATE OR BALL VALVE GAS SHUT-OFF VAVLE "P" TRAP CO If- WALL CLEAN OUT FCO -Bt- FLUSH FLOOR CLEAN OUT FSO-0FLOOR SINKDRAIN --�- POINT OF CONNECTION MI NOT ALL SYMBOLS INDICATED MAY NOT BE USED ON DRAWINGS FIXTURE CONNECTION SCHED. ill r III �I�� u� I� • .... I III i1• r`• 1. 71 MATERIAL SHALL BE NEW, UNUSED, BEST OF THEIR RESPECTIVE KINDS AND FREE FROM DEFECTS IN WORKMANSHIP; IN CONFORMANCE WITH THE LATEST PUBLICATIONS #' OF BIDDING. A. SANITARY SOIL AND YM PIPING: (ABOVE GROUND) CAST IRON AS rER ASTM Z74, ASTM A 888, CISPI PLASTICABS PIPE r PER ASTM 1 2661, 628, : :. B. SANITARYSOIL i.l VENT r r l (BELOW ji lr PVC TYPE DWV AS PER ASTM 1 2665,# 2949, ASTM r 3034. C. DOMESTIC WATER T•1Il SUPPLY PIPING r POLYVINYL CHLORIDE (PVC) PLASTIC PIPE AS PER ASTM ASTM 1 # i I. WATER DISTRIBUTION ♦. BRASS PIPE r r CHLORINAT11111 POLYVINYL CHLORIDE (CPVC) PLASTIC PIPE AND TUBING A'_5 r# ■• 111 N (PO) PLAKIC PIPE i AND UBINQ AS PER ASTM r //• • • I- CONDENSATE PIPING: AS HEREIN BEFORE SPECIFIED FOR SANITARY SOIL, WASTE 1 VENT PIPING. SECTION3..JOINTS AND METHODS OF CONNECTION SHALL COMPLY WITH FBC `#// 4. i LEDGES,IPE FITTINGS: SHALL BE APPROVED FOR INSTALLATION WITH THE PIPING MATERIAL INSTALLED AND SHALL CONFORM TO THE RESPECTIVE PIPE STANDARDS OR ONE OF THE STANDARDS LISTED IN TABLE P605.6. ALL PIPE FITTINGS UTILIZED IN WATER SUPPLY SYSTEMS SHALL ALSO CONFORM TO NSF 61. THE FITTINGS SHALL NOT HAVE f r OR REDUCTIONS CAPABLEOF RETARDINGOR OBSTRUCTING r . FLOW IN THE * • r 5. PIPE r INSULATION: A- ALL CONDENSATE r WITH 3/4- FIRE RETARDANT ARMAFLEX INSULATIONOF SPREAD AND SMOKE DEVELOPED B. ALL HOT WATER AND TEMPERED WATER LINES SHALL BE INSULATED WITH 1' RETARDANTFIRE INSULATIONOF SPREAD AND SMOKEDEVELOPED RESPECTIVELY. WATER-HAMMER6. WATER HAMMER THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER HAMMER. A ARRESTOR SRU BE INSTALLED WHERE QUICK -CLOSING VALVES ARE UTILIZED, UNLESS OTHERWISE APPROVED. THE ARRESTOR SHALL BE LOCATED EFFECTIVE RANGE OF QUICK -CLOSING WATER -HAMMER ARRESTORS SHALL CONFORM TO ASSE 1010. ACCESS SHALL BE PROVIDED TOARRESTORS. 7. ALL VALVES SHALL BE OF ••R! al TYPE AND COMPATIBLE r #... PIPING • INSTALLED IN THE SYSTEM. 8. LOCATION OF FULL -OPEN VALVES. FULL -OPEN VALVES SHALL BE INSTALLED IN THE FOLLOWING # LOCATIONS: 1. ON BUILDING WATER SERVICE PIPE FROM PUBLIC rr NEAR THE CURB. 2. ON THE WATER DISTRIBUTION SUPPLY PIPE AT THE ENTRANCE INTO THE 3. ON THE BASE OF a` PIPE. 4. ON SUPPLY I PIPE r TO EVERY WATER HEATER. SHUTOFF5. is ar IN ON SUPPLY PIPE EACH APPLIANCE i OR MECHANICAL EQUIPMENT. 9. IDENTIFICATION. SERVICE AND HOSE BIBB VALVES SHALL BE IDENTIFIED. ALL OTHER INSTALLED IN LOCATIONSNOT # TO THE FIXTURE OR APPLIANCE SHALL BE IDENTIFIED, INDICATING THE FIXTURE OR APPLIANCE SERVED. JOINTS10. )DINTS BETWEEN DIFFERENT MATERIALS DIFFERENT PIPINGMATERIALSBE MADE INSTALLEDMECHANICAL JOINT OF THE COMPRESSION OR MECHANICAL -SEALING TYPE, OR AS PERMITTED IN §P605.22.1 AND §P605.22.2. CONNECTORS OR ADAPTERS SHALL HAVE AN ELASTOMERIC SEAL CONFORMING TO ASTM D 1869 OR ASTM F 477. JOINTS SHALL BE IN ACCORDANCE INSTRUCTIONS. FLOORS11. ESCUTCHEONS: CHROME PLATED OR STAINLESS STEEL WITH SET SCREWS FOR HOLDING SECURELY IN PLACE USE ESCUTCHEONS ON PIPES PASSING THROUGH WALLS, r CEILINGS OF 1 13. HOT WATER SUPPLY TO FIXTURES. THE HOT WATER SUPPLY TO ANY FIXTURE REQUIRING HOT WATER SHALL BE INSTALLED ON THE LEFT SIDE OF THE FIXTURE ! • r !'r i• • r •• r !r r r I SCHEDULEPLUMBING FIXTURE 1. 71 MATERIAL SHALL BE NEW, UNUSED, BEST OF THEIR RESPECTIVE KINDS AND FREE FROM DEFECTS IN WORKMANSHIP; IN CONFORMANCE WITH THE LATEST PUBLICATIONS #' OF BIDDING. A. SANITARY SOIL AND YM PIPING: (ABOVE GROUND) CAST IRON AS rER ASTM Z74, ASTM A 888, CISPI PLASTICABS PIPE r PER ASTM 1 2661, 628, : :. B. SANITARYSOIL i.l VENT r r l (BELOW ji lr PVC TYPE DWV AS PER ASTM 1 2665,# 2949, ASTM r 3034. C. DOMESTIC WATER T•1Il SUPPLY PIPING r POLYVINYL CHLORIDE (PVC) PLASTIC PIPE AS PER ASTM ASTM 1 # i I. WATER DISTRIBUTION ♦. BRASS PIPE r r CHLORINAT11111 POLYVINYL CHLORIDE (CPVC) PLASTIC PIPE AND TUBING A'_5 r# ■• 111 N (PO) PLAKIC PIPE i AND UBINQ AS PER ASTM r //• • • I- CONDENSATE PIPING: AS HEREIN BEFORE SPECIFIED FOR SANITARY SOIL, WASTE 1 VENT PIPING. SECTION3..JOINTS AND METHODS OF CONNECTION SHALL COMPLY WITH FBC `#// 4. i LEDGES,IPE FITTINGS: SHALL BE APPROVED FOR INSTALLATION WITH THE PIPING MATERIAL INSTALLED AND SHALL CONFORM TO THE RESPECTIVE PIPE STANDARDS OR ONE OF THE STANDARDS LISTED IN TABLE P605.6. ALL PIPE FITTINGS UTILIZED IN WATER SUPPLY SYSTEMS SHALL ALSO CONFORM TO NSF 61. THE FITTINGS SHALL NOT HAVE f r OR REDUCTIONS CAPABLEOF RETARDINGOR OBSTRUCTING r . FLOW IN THE * • r 5. PIPE r INSULATION: A- ALL CONDENSATE r WITH 3/4- FIRE RETARDANT ARMAFLEX INSULATIONOF SPREAD AND SMOKE DEVELOPED B. ALL HOT WATER AND TEMPERED WATER LINES SHALL BE INSULATED WITH 1' RETARDANTFIRE INSULATIONOF SPREAD AND SMOKEDEVELOPED RESPECTIVELY. WATER-HAMMER6. WATER HAMMER THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER HAMMER. A ARRESTOR SRU BE INSTALLED WHERE QUICK -CLOSING VALVES ARE UTILIZED, UNLESS OTHERWISE APPROVED. THE ARRESTOR SHALL BE LOCATED EFFECTIVE RANGE OF QUICK -CLOSING WATER -HAMMER ARRESTORS SHALL CONFORM TO ASSE 1010. ACCESS SHALL BE PROVIDED TOARRESTORS. 7. ALL VALVES SHALL BE OF ••R! al TYPE AND COMPATIBLE r #... PIPING • INSTALLED IN THE SYSTEM. 8. LOCATION OF FULL -OPEN VALVES. FULL -OPEN VALVES SHALL BE INSTALLED IN THE FOLLOWING # LOCATIONS: 1. ON BUILDING WATER SERVICE PIPE FROM PUBLIC rr NEAR THE CURB. 2. ON THE WATER DISTRIBUTION SUPPLY PIPE AT THE ENTRANCE INTO THE 3. ON THE BASE OF a` PIPE. 4. ON SUPPLY I PIPE r TO EVERY WATER HEATER. SHUTOFF5. is ar IN ON SUPPLY PIPE EACH APPLIANCE i OR MECHANICAL EQUIPMENT. 9. IDENTIFICATION. SERVICE AND HOSE BIBB VALVES SHALL BE IDENTIFIED. ALL OTHER INSTALLED IN LOCATIONSNOT # TO THE FIXTURE OR APPLIANCE SHALL BE IDENTIFIED, INDICATING THE FIXTURE OR APPLIANCE SERVED. JOINTS10. )DINTS BETWEEN DIFFERENT MATERIALS DIFFERENT PIPINGMATERIALSBE MADE INSTALLEDMECHANICAL JOINT OF THE COMPRESSION OR MECHANICAL -SEALING TYPE, OR AS PERMITTED IN §P605.22.1 AND §P605.22.2. CONNECTORS OR ADAPTERS SHALL HAVE AN ELASTOMERIC SEAL CONFORMING TO ASTM D 1869 OR ASTM F 477. JOINTS SHALL BE IN ACCORDANCE INSTRUCTIONS. FLOORS11. ESCUTCHEONS: CHROME PLATED OR STAINLESS STEEL WITH SET SCREWS FOR HOLDING SECURELY IN PLACE USE ESCUTCHEONS ON PIPES PASSING THROUGH WALLS, r CEILINGS OF 1 13. HOT WATER SUPPLY TO FIXTURES. THE HOT WATER SUPPLY TO ANY FIXTURE REQUIRING HOT WATER SHALL BE INSTALLED ON THE LEFT SIDE OF THE FIXTURE ! • r !'r i• • r •• r !r r r I SCHEDULEPLUMBING FIXTURE MADERA! WATER SENSE, MEETS EPACRITERIA. SELECTRONIC FLOWISETOILET WATER SENSE, MEETS *' CRITERIA EXAM ROOM AND �• !!SENECK TOUCHLESS DECK -MOUNT LAVATORY FAUCET FAUCET WITH TEMPERATURE MIXER. (0.5 GPM) I III III DII � �I p LAVATORY ��11� ��YI I� i /J • WORK AREA AND i TRITON BASE FAUCET K-7304 WITH LOW KITCHEN FAUCET FLOW AERATOR K-18016 (0.5 GPM) I KITCHEN�K #I i1r WO WORK AREA AND 13203.045 ., SINK # 1` • r r HeBJ Intomationall. c. 811 Ponce De Leon Blvd. � - A (mm .,_ ����`k 11C}i�e �a�NeS®t �� , TEL. (.305),441-1556'm m" FAX: (305) 445a23T4 hUp://www,s-garchitects.com AA 0002293 EB 0005176 Project Number 0723700 Consultants G/'a t�// P[� G.Y < IREZ STRUCTURAL ENGINEERS 7315 S.W. 87th AV MIAMI, FL 33173 TEL: 305-412-2200 Consultants DESIGN ONE CONSULTING ENGINEERS a 809 S.W. 8 STREET, No, 200 MIAMI, FL 33130 TEL: 305-860-0384 a OFFICE TENANT IMPROVEMENTFOR DR. IL.EANA R. PEREZ _ QUINTAIROS 6310 SUNSET DRIVE MIAMI, FLORIDA 33143 p F Revisions Date DE M COMMENTS O4.10,2009 DERM COMMENTS 05,06.2009 Seat: y . f DATE J F d 2. 2009 ARDO Se PEREZ-GALS' PAN d » FLORtDA REM W. 56754 , ' 6 PROFESSICR#AL Ef1QNEFR,%,"-- i- PLAN NORTH Checked By: d1ce Drawn By; d1ce Issue: 01-25-08 _ Date, 01-25-08 Sheet Index - PLUMBING NOTES SCHEDULES Sheet Number. P-1 •