Loading...
09-184(3)-043FINISH SCHEDULE ROOM. N0. ROOM NAME /AREA FLOOR MATERIAL BASE MATERIAL. WALL. FINISH CEILING MATERIAL REMARKS NORTH EAST SOUTH WEST 100 MAIN ENTRY GL 24X24 GL B WC WC WC WC AS SHOWN 101 LOBBY / WAITING AREA GL 24X24 GL B WC WC WC WC ASC -102 RECEPTION AREA GL 24X24 GL B WC WC AP WC DW 103 NOT USED J 104 A1C. #2 CLOSET CPT VN B PT PT PT PT DW 105 CLOSET CPT VN B PT PT PT PT DW 106 MULTI -PURPOSE RM. CPT VN B PT PT PT PT ASC 107 I.T. CLOSET VN VN B PT PT PT PT DW 108 DR. OFFICE NOA CPT VN B PT PT PT PT ASC 109 OFFICE MANAGER CPT VN B PT PT PT PT ASC 110 HALLWAY GL 24X24 GL B WC WC WC WC DW 111 EXAM -10Ill VN VN B WC/MO WC WC WC ASC 112 EXAM - 9112 VN VN B WC1M0 WC WC WC ASC 11 VN VN B WC WC WC/MO WC ASC 114 DR. OFFICE N0 2 V, CPT VN B PT PT PT PT ASC 115 DR. OFFICE NO.3 CPT VN B PT PT PT PT ASC 116 VN VN B PT PT PT PT ASC 117 V.I.P. WAITING VN VN B PT/MO PT PT PT ASC 118 WORK AREA GL 24X24 GL B WC WC WC WC ASC 119 EXIST. TOILET GL 24X24 GL B PT PT MO PT DW 120 EXIST. TOILET GL 24X24 GL B M0 PT PT PT DW 121 HALLWAY GL 24X24 GL B WC WC WC WC ASC 122 FACIAL VN VN B WC1M0 WC WC WC ASC 123 FACIAL VN VN B WC WC WC/MO WC ASC 124 NOT USED 125 NOT USED 126 CONSULTATION GL 24X24/MO GL B PT PT PT PT DW 127 DR. ASSISTANTS CPT VN B PT PT PT PT ASC 128 HALLWAY GL 24X24 GL B WC WC WC WC DW 129 CLO. GL 24X24 GL B PT PT PT PT DW 130 HALLWAY GL 24X24 GL B WC WC WC WC ASC 131 EXAM-2 j VN VN B WC WC/MO WC WC ASC 132 -3 VN VN B WC/MO WC WC WC ASC 133 REMOLDELED MEN'S RESTROOM GL 24X24 GL_B PT PT MO PT DW 134 ! REMOLDELED WOMEN'S RESTROOM GL 24X24 GL B MO PT PT PT DW 135 LAB VN VN B PT PT PT/MO PT DW 136 PROCEDURE ROOM VN VN B PT PT PT/MO PT ASC 137 A/C. #1 CLO. GL 24X24 GL B PT PT PT PT DW 138 CLO. ! GL 24X24 GL B PT PT PT PT DW 139 EXAM-4 VN VN B WC WC WC WC1M0 ASC 140 -5 VN VN B WC WC/MO WC WC ASC 141 WAITING AREA GL 24X24 GL B WC WC WC WC ASC 142 PHOTO ROOM VN VN B PT PT PT PT ASC 143 EXAM-1 VN VN B WC WC/MO WC WC ASC 144 W.H. / W+D. CLO. y GL 24X24 GL B PT PT PT PT DW * ALL FURNISHED FINISHES SHALL BE CLASS W (REFER TO I.D. VENDER PACKAGE). - - - - - - - - - ®. - - - A - A - - - A A - A 48 0A tP k C i °1 i k !t tp k t IA 0.i Y 1 tt •n•IMIJIJA I llefMlr • A� • r 1 •;jAd!AV 11113*z • ► , r VIRLA1111191,f. r 1 • r • • • r f•` TYPICAL METALPARTITION TYPICAL METAL STUD PARTITION MTED Tn OO d.Y 11 it 9 #YI 1 , i 1ti ..fit. •tk •. TYPICAL METAL PARTITION INTERIORFINISH LEGEND ALL FINISHES SHALL MEET THE FOLLOWING REQUIREMENTS: 1. ALL WALLS AND CEILING FINISHES TO BE CLASS: A 2. ALL INTERIOR FINISHES IN CORRIDORS SHOULD BE CLASS: A 3. ALL GYPSUM :a -. CEILINGS s SOFFITS 4. FOR CEILING HEIGHTS, REFER TO REFLECTED CEILING PLANS (SHEETS r # # 5. ALL GYPSUM BOARD CEILINGS SHALL BE PAINTED (TYP.). 6. ABBREVIATIONS: GL 24X24 = GLASS TILES BASEBOARDS WALLCOVERING BASEBOARDSCPT = CARPET VN = VINYL TILES VN B = VINYL PT = PAINT = MOSAIC GLASS ASC = ACCUSTICAL CEILING # DRYWALL CHANGE IN ARCH • LAN FOLLOWS: GENERAL NOTES FOR WALL TYPES 1. STUDS GAUGES SHALL BE AS STUDSA. ALL •i i OR LESS 25GA. STUDSB. ALL r ii i • �n D. 18GA. METAL STUD FRAMING@ ALL WALLS SUPPORTING CABINETRY. E ALL r r, WALLS WHERE CABINETS ARE TO BE AFFIXED MUST BE 18GA. OR EDGES,2. TILE BACKER BOARD IS TO BE USED AT ALL HORIZONTAL BATHROOM SURFACES, SUCH AS TUB DECKS, SHOWER SEAT, NICHES AND SILLS FOR STONE, CERAMIC OR MARBLE APPLICATION. ADHERENCE TO RECOMMENDATIONS CONCERNING SEALING EXPOSED # # FOR SATISFACTORY PERFORMANCE MOISTURE3. BOARD IS TO BE USED AT ALL AREAS EXPOSED,# MOISTURE AND ALL PIPE PENETRATIONS. 4TILE BACKER :i••1 SHALL BE USED AT STONE APPLICATIONS. 5. FIRE RATED BOARD SHALL BE USED AT ALL FIRE RATED LOCATIONS1 SHALL BE CONTINUOSTO UNDERSIDE OF SLAB. STUDSPENETRATIONS SHALL HAVE PROPER UL RATED FIRE SAFING PER ASTM E814 AND UL1479 TEST CRITERIA. 6. USE 6' METAL O.C. AND PLUMBING COORDINATE7. REQUIRED BRACING FOR STUDS SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR INSTALLING THEM. 8. # 1 BLOCKING #• ALL ' B BARS AT HANDICAP ADAPTABLE BATHROOMS. PROJECT9. FOR VERTICAL AND HORIZONTAL REINFORCEMENT OF CONCRETE MASONRY WALL (S) REFER TO STRUCTURAL DRAWINGS AND # i ALL CMU. BLOCK TO BE RATED ' 11. INSULA11ON TYPES (REFER TO ENERGY CALCULATIONS FOR REQUIRED R-VALUES. A. R-1 I MINIMUM •t ALL EXTERIOR C. Y• 1 D POLYISOCY ANURATE AT ROOF LEVEL FURRED CONCRETE APPROVED BY UPOGMISIT 61-r,G. PERMIT TENSION criziTl r FMAz now trJ .zw rI F®F Heery Intemationa lnc.� . ', 811 Ponce De Leon Blvd. W F . 3A - _ Cora. Gables, FL :331 TEL: (305, 441-1556 FAX. • (305) 445-2374 L http://www.s-garchitects.com AA 0002293 ;5 EB 0005176 a z Project Number 0723701 2 PA N Consultants G.V. PIREZ STRUCTURAL ENGINEERS 7315 S.W. 87th AV MIAMI,FL 33173 8 TEL: 305-412-2200 9 s e3 s Consultants 5 DESIGN ONE � CONSULTING ENGINEERS a 809 S.W. 8 STREET, No. 200 MIAMI, FL 33130 % TEL: 305-860-0384 _ Q W OFFICE TENANT = IMPROVEMENT FOR z _ 0 DR. ILEANA R. u PEREZ - QUINTAIROS 0 6310 SUNSET DRIVE MIAMI, FLORIDA 33143 R/�evisions Date /� \ DERM ! FIRE COMMENTS 04-14-09 0 O Ev z m R • tS r- W ' . {i 4q'* ROBERTO SEQUEIRA o REGISTRATION NO. AR-0009035 p PLAN NORTH aXK W W a a G W Checked By: E.G. Drawn By: v A.A. ax Issue: E 03-04-09 Date: 01-12-09 Sheet Index: P WALL TYPES AND FINISH SCHEDULE F ppW,, i!! W 12 O Sheet Number:. A-6.2