Loading...
BRB20-1291SP-3.0 IMPERVIOUS DIAGRAM CONTACT: JUAN PINHEIROS, M.S., P.E., S.I., STRUCT. PRINCIPAL/PRESIDENT L1 LANDSCAPE PLAN ENGINEER 3920 E CORONADO ST. STE 203 --- ANAHEIM, CA 92807 L2 TREE LOCATION & DISPOSITION PLAN • • TEL. 562.713.0056 L3 LANDSCAPE DETAILS & SPECIFICATIONS EMAIL - jp.pinheiros@visioneers-intl.com N i D-1.1 REMOVAL SECOND FLOOR PLAN • A • • _ D-1.2 REMOVAL CABANA PLANS • _. D-13 REMOVAL CABANA ELEVATIONS • D-2.0 REMOVAL FIRST FLOOR CEILING PLAN • D-2.1 REMOVAL SECOND FLOOR CEILING PLAN • D-3.0 REMOVAL ROOF PLAN • • D-4.0 REMOVAL ELEVATIONS • • • D-4.1 REMOVAL ELEVATIONS . • • i A-1.0 - PROPOSED FIRST FLOOR PLAN • • • A-1.1 PROPOSED SEC ONDFLOOR PLAN • • • A-1.2 PROPOSED CABANA PLANS • • A-1.3 PROPOSED CABANA ELEVATIONS & SECTIONS A-2.0 PROPOSED FIRST FLOOR CEILING PLAN • • A-2.1 PROPOSED SECOND FLOOR CEILING PLAN • • A-3.0 PROPOSED ROOF PLAN • • • " • A40 PROPOSED ELEVATIONS • • • • . • *.` • ° A-5.0 BUILDING SECTIONS • • A-5.1 BUILDING SECTIONS • • A-5.2 BUILDING SECTIONS • • A-5.3 BUILDING SECTIONS • • A-6.0 ENLARGED PLANS & INTERIOR . ELEVATIONS ° A-6.1 ENLARGED PLANS & INTERIOR ELEVATIONS ° A-7.0 WALL TYPES • A-7.1 WALL SECTIONS • A-7.2 WALL SECTIONS • A-7,3 WALL SECTIONS • A-7 4 WALL SECTIONS • • ... A-7.5 WALL SECTIONS • • GENERAL NOTES A-7.6 WALL SECTIONS . ° 1: THE CONTRACTOR AGREE THAT HE, HIS MANAGEMENT TEAM (ESTIMATOR, PROJECT MANAGER, PROJECT ENGINEERS, SUPERINTENDENTS, AND SUBCONTRACTO�SAND PRINCIPAL A-8.0 SCHEDULES • • SUPERVISORY PERSONNEL)AND CONDITIONS AND HAS VISITED THE SITE, EXAMINED THE SITE THE LOCATION OF THE PROPOSED WORK, AND EXISTING IMPROVEMENTS, - PHYSICAL CHARACTERISTICS OF THE JOB. THE CONTRACTOR(S) SHALL INCLUDE IN HIS BUDGET ALL COSTS ASSOCIATED WITH, AND PERTAINING TO, THE SATISFACTORY COMPLETION S-0.1 , GENERAL NOTES • OF THE PROJECT AND THE DIOMPLETE INSTALLATION OF ALL ASSOCIATED SYSTEMS, INCLUDING THE REMOVAL AND RELOCATION OF ANY AND ALL OBJECTS OR OBSTRUCTIONS THAT MAY BE ENCOUNTERED IN HE COMPLETION OF THE WORK THAT MAY NOT HAVE BEEN PREVIOUSLY DOCUMENTED BIN THE CONSTRUCTION DOCUMENTS. S-0.2 GENERAL NOTES • NINE iiiii::iii'� 2. THE WORK DESCRIBED HE EIN IS DESCRIBED IN THE SCOPE OF WORK, THIS SHEET. THE CONTRACTOR SHALL CORRELATE ALL WORK DESCRIBED ON THE DRAWING WITH THE 5 2021,10.06 AS APPROVED BY ERPB S-0.3 GENERAL NOTES • h ` ACTUAL CONDITIONS IN TH FIELD. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF ANY.SITUATION WHICH ENDANGERS THE INTEGRITY OF EXISTING BUILDING 4 2021,04.21 HRS COMMENTS - S 0.4 GENERAL NOTES • OR PREVENTS HIM FROM S CCESSFULLY ATTAINING THE DESIGN INTENT. 2 21 03. RCOMMENT 0 26 H S S 3. THE CONTRACTOR SHALL E E RESPONSIBLE FOR COMPLYING WITH ALL NOISE ORDINANCES OR OTHER ORDINANCES THAT MAY RESTRICT WORK ON THE SITE, S-0.5 GENERAL NOTES • 3 y. - t IL ' 1/1 4. THE CONTRACTOR SHALL E RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACTOR S REQUESTING AND COORDI ATING ALL INSPECTIONS AND APPROVALS OF ALL ASPECTS OF HIS WORK, THE CONTRACTOR SHALL OBTAIN ALL TEMPORARY AND FINAL CERTIFICATES OF OCCUPANCY. 5. THE CONTRACTOR SHALL AINTAIN A COPY OF ALL APPLICABLE CODES AND STANDARDS RELEVANT TO THIS PROJECT ON SITE AT ALL TIMES, AND SHALL COMPLY WITH ALL REQUIREMENTS OF THE CURRENT FLORIDA BUILDING N BU CODE, AND ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, STANDARDS, REGULATIONS, AND LAWS. 6. THE CONTRACTOR SHALL MAINTAIN A COMPLETE AN D CURRENT SET OF PERMIT DRAWINGS ON -SITE AT ALL TIMES ALONG WITH ALL REVISIONS TO THE PERMIT, INCLUDING PERMITTED SHOP DRAWINGS AND CALCULATIONS. SAID DRAWINGS ALONG WITH ALL INSPECTION LOGS, AND PERMITS SHOULD BE MAINTAINED IN AN EASILY ACCESSIBLE SPACE FOR THE OWNER, ARCHITECT, ENGINEERS, AND BUILDING OFFICIALS TO REVIEW. 7. THE CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS, PERMIT DOCUMENTS, DIMENSIONS,' JOB -SITE CONDITIONS, AND COORDINATE WITH FIELD DIMENSIONS, AND PROJECT4- SHOP DRAWINGS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL MAKE NOTE OF ANY AND ALL DISCREPANCIES THAT PREVENT THE INSTALLATION OF ANY ASPECT OF THE CONSTRUCTION TO ACHIEVE THE CHARACTER AND APPEARANCE DEFINED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL REPORT ANY AND ALL DISCREPANCIES REGARDLESS OF THEIR NATURE TO THE ARCHITECT IN WRITING PRIOR TO'PROCEEDING WITH THE WORK, ALLOWING SUFFICIENT TIME FOR THE ARCHITECT AND ENGINEERS TO REASONABLY ASSESS THE CONDITION AND DETERMINE AN APPROPRIATE SOLUTION. 8. ITEMS AFFECTING ALL TRADES ARE PLACED THROUGHOUT THE DRAWINGS. NO "CHANGE ORDERS" FOR MISSED ITEMS IN OTHER SECTIONS OF THE WORK WILL BE PERMITTED. THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ARCHITECT IN WRITING OF AMBIGUITY, INCONSISTENCY OR ERROR WHICH THEY DISCOVER UPON EXAMINATION OF THE CONTRACT DOCUMENTS, THE SITE, OR LOCAL CONDITIONS. . 9. THE CONTRACTOR SHALL PERFORM ALL WORK IN A FIRST CLASS WORKMANSHIP LIKE MANNER. 10, THE ARCHITECT AND OR ENGINEERS(S) SHALL NOT BE RESPONSIBLE FOR, NOR HAVE CONTROL OR CHARGE OVER THE CONSTRUCTION MEANS, METHODS, SEQUENCES, OR PROCEDURES OR FOR THE SAFETY PRECAUTION PROGRAMS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DAMAGES OR INJURIES DUE TO HIS ACT OR NEGLECT. 11. THE CONTRACTOR SHALL REMOVE FROM THE SITE AND LEGALLY DISCARD IN A TIMELY MANNER ALL`CONSTRUCTION DEBRIS THAT WILL NOT BE REUSED OR RELOCATED ELSEWHERE IN THE PROJECT. 12. THE CONTRACTOR IS RESPONSIBLE FOR ALL MATERIALS, EQUIPMENT, AND APPLIANCES THAT ARE TO BE USED. THE CONTRACTOR SHALL PROVIDE PROTECTION FROM VANDALISM, THEFT, WEATHER, DUST, NOISE, AND ANY OTHER SOURCE OF DAMAGE OR LOSS. 13. THE CONTRACTOR SHALL PREPARE AND MAINTAIN A HURRICANENVIND T R PREPAREDNESSP 5 O M LAN.. THE CONTRACTOR SHALL MAINTAIN SAID PLAN IN A LOCATION THAT IS READILY ACCESSIBLE FOR REVIEW BY THE OWNER AND OR ARCHITECT. A. THE HURRICANE PLAN SHALL INCLUDE A LIST OF CONTACTS IN THE EVENT THAT A HURRICANE WATCH IS POSTED AND WILL LL ALSO ADDRESS WHAT MEASURES ARE TO BE TAKEN TO SECURE THE CONSTRUCTION SITE IN THE EVENT NOTIFICATION BY THE NATIONAL WEATHER SERVICE OF AN IMPENDING HURRICANE OR WINDSTORM THAT MAY THREATEN THE JOB. - _ B. THE HURRICANE PLAN SHALL ADDRESS HOW THE CONTRACTOR WILL MOBILIZE THE PROJECT FOLLOWING A WIND OR HURRICANE EVENT AND DOCUMENTATION OF DAMAGES AND HOW REPAIRS WILL BE HANDLED IN THE EVENT OF A LOSS. 14. IN THE EVENT OF DAMAGES TO THE BUILDING WHICH REQUIRE ASSESSMENT FOR AN INSURANCE CLAIM, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE OWNER OF THE CIRCUMSTANCES SURROUNDING THE LOSS, DOCUMENT DAMAGES, DETERMINE AND PRICE REPAIRS, DETERMINE IMPACT TO THE PROJECT SCHEDULE, SUBMIT ALL INFORMATION TO THE OWNER WITHIN 72 HOURS OF A LOSS. 15. CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES AT THE TIME THE WORK IS PERFORMED. NO ADDITIONAL PAYMENTS SHALL BE MADE FOR THE CONTRACTOR'S FAILURE TO CORRECT CONFLICTING FIELD CONDITIONS AFTER THE WORK HAS BEEN COMPLETED.-- 16. THE CONTRACTOR SHALL WORK AND RETAIN COOPERATION WITH THE OWNER AND TENANTS IN SCHEDULING THEIR WORK IN ORDER TO CAUSE THE LEAST INCONVENIENCE TO PERSONNEL AND PROPERTY. 17. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED TESTS. PAYMENT OF ALL TEST SHALL BE AS INDICATED IN THE AGREEMENT BETWEEN .THE OWNER/CONCTRACTOR OR GENERAL CONDITIONS. IF NOT SPECIFICALLY DEFINED, THESE COSTS SHALL BE BORNE BY THE CONTRACTOR. 18. THE ARCHITECT AND ENGINEERS WILL NOT PROVIDE TO THE CONTRACTOR OR HIS SUBCONTRACTORS ANY DISKS OR ELECTRONIC MEDIA PREVIOUSLYICURRENTLY USED IN THE PREPARATION OF THE CONSTRUCTION DRAWINGS. DO NOT REPRODUCE THE DRAWINGS FOR USE AS SHOP DRAWINGS. 19, DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE. 20. CONTRACTOR SHALL RESOLVE QUESTIONS REGARDING APPLICABILITY OF TYPICAL DETAILS WITH THE ARCHITECT/ENGINEER. DETAILS LABELED AS 'TYPICAL DETAILS, OR TYP.) ON THE DRAWINGS APPLY TO ALL SITUATIONS THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED OR EXISTING AT THE SITE. SUCH DETAILS APPLY WHETHER OR NOT THEY ARE KEYED IN AT EACH LOCATION. S-1.0 FOUNDATION AND GROUND FLOOR PLAN • 2021.02.25 HRS COMMENTS S-1.1 i 51 PROPOSED SECOND FLOOR • QI DA 4L, - -' • '° oQl • DEZ x �. / , v '- � � / quo `• Q. �O �EGIS1 AMILCAR R. MELENDEZ FLORIDA REGISTRATION AR93063, S-1.2 ROOF FRAMING PLAN • S-1.3 . CABANA PLANS •; S-20 . SCHEDULES • r- S-5.0 SECTIONS • SECTIONS • S-5.2 SECTIONS • S-5.3 TYPICAL DETAILS • S-5.4 TYPICAL DETAILS • S-5.5 TYPICAL DETAILS • S-5.6 TYPICAL DETAILS • S-5.7 TYPICAL DETAILS" • , 'u ijo arch I t O C , P.A. S-7.0 WIND PRESSURE OF ELEVATIONS • S-7.1 WIND PRESSURE OF ELEVATIONS • E-1.0 FIRST FLOOR POWER PLAN 1 • E-1.1 SECOND FLOOR POWER PLAN • • E-2.0 FIRST FLOOR LIGHTING PLAN • 1001 SW 67 AVE, STE 102, Miami, FL 33144 TEL.: +1 786 360 5718 FAX.: +1 786 347 7692 INFO a�RM-ARCHITECT.COM FLORIDA LICENSE NO, AA26001833 E-2.1 SECOND FLOOR LIGHTING PLAN • • _ E3.0 CABANA POWER &LIGHTING PLAN • COSTA GONZALEZ RESIDENCE project name. E-4.0 ; ELECTRICAL NOTES, SCHEDULES & DETAILS M-1.0 MECHANICAL FIRST FLOOR PLAN • 6944 SW 63 AVE SOUTH M IAM I,L 33143 FOLIO#: 09-4025-022-0390 project address. p M-1.1 MECHANICAL SECOND FLOOR PLAN M-2.0 MECHANICAL NOTES, SCHEDULES & DETAILS -� P-1.0 FIRST FLOOR WATER DISATRIBUTION PLAN e GENERAL INFORMATION drawing title. P1 1 SECOND FLOOR WATER DISTRIBUTION- PLAN • P-2.0 FIRST FLOOR SANITARY PLAN • P-2.1 SECOND FLOOR SANITARY PLAN • P-3.0 CABANA PLUMBING PLANS • drawn by.- ARM 20042 12.02,2020 •0 drawing no. P-4,0 PLUMBING NOTES, SCHEDULES &G-1 DETAILS • • project no. date. P-5.0 PROPOSED PLUMBING SITE PLAN e • • 2020 ARM ARCHITECT, P.A.