07-316R-001GENERAL NOTES:
i. ALL WORK SHALL BE IN ACCORDANCE
WITH THE REQUIREMENTS OF THE FLORIDA
BUILDING CODE, 2004 EDITION, AND THE
ZONING REQUIREMENTS OF THE CITY OF
50UTH MIAMI AND OTHER APPLICABLE
MUNICIPAL REQUIREMENTS, AND THE BASE
BUILDING SPECIFICATIONS.
2. BEFORE PERFORMING ANY WORK OR
ORDERING ANY MATERIALS, THE
CONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND CONDITIONS OF ANY
EXISTING AND NEW WORK AND SHALL BE
RESPONSIBLE FOR THEIR ACCURACY. ANY
DIFFERENCES FOUND SHALL BE SUBMITTED
TO THE ARCHITECT OR ENGINEER FOR
VERIFICATION BEFORE PROCEEDNG WITH
WORK ANY DISCREPANCY IN DIMENSIONS
OR SPECIAL MODIFICATICN5 REQUIRED DUE
TO FIELD CONDITIONS SHALL BE
REPORTED IN WRITNG TO THE ARCHITECT
FOR CLARIFICATION, OR APPROVAL OR
MODIFICATION BEFORE COMMENCING WORK
THE RESPONSIBILITY FOR ANY CHANGES
MADE IN THE FIELD WITHOUT PRIOR
NOTIFICATIONS TO THE ARCHITECT SHALL
REST WITH THE CONTRACTOR OR ANY
OTHER PERSON APPROVING SUCH CHANGE.
3, THE ARCHITECT SHALL NOT BE
RESPONSIBLE FOR ANY DEVIATIONS FROM
THESE DRAWINGS AS DATED ON THIS SHEET.
4. THE AIA GENERAL CONDITIONS, THE
SUPPLEMENTARY GENERAL CONDITIONS,
AND GENERAL REQUIREMENTS SHALL BE
CCNSIDERED AN INCLUSIVE PART OF THESE
SPECIFICATIONS AND OR DRAWINGS. ALL
SUBCONTRACTORS, AS WELL AS THE
GENERAL CONTRACTOR, SHALL BE
"OVERNED BY ALL APPLICABLE SECTIONS
Cr- THESE DOCUMENTS WITH REFERENCE TO
THEIR RESPECTIVE AREAS OF WORK IT
SHALL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR TO ADVISE HIS
SUBCONTRACTORS AND SUPPLIERS OF
THESE REQUIREMENTS.
5. THE GENERAL CONTRACTOR SHALL BE
HELD TO HAVE EXAMINED THE SITE WITH
RESPECT TO ALL EXISTING FIELD
CONDITIONS AND TO HAVE FULLY
EXAMNED THE COMPLETE SET OF
ARCHITECTURAL DRAWINGS AS PREPARED
BY OTHERS, AND SHALL BE RESPONSIBLE
FOR THE COORDINATION AND INSERTION OF
THIS DRAWING SET, AS IS INCLUDED AS
PART OF THE ORIGINAL DRAWINGS
PACKAGE.
LOCATION PLAN -FOURTH FLOOR
1/20'=1'-0'
6.THE GENERAL CONTRACTOR SHALL
LOCATE ALL GENERAL REFERENCE POINTS
AND TAKE ORDINARY PRECAUTIONS TO
PREVENT THEIR DISRUPTION. EACH PRIME
SUBCCNTRACTOR SHALL BE RESPONSIBLE
FOR ALL LINES, ELEVATIONS,
MEASUREMENTS AND OTHERS AS MAY BE
REQUIRED OF AND FOR HIS WORK. HE
SHALL BE RESPONSIBLE FOR VERIFYING
ALL FIGURES AND DETAILS SHOWN ON THE
DRAWINGS, WHICH RELATE TO HIS WOW,
PRIOR TO LAYING OUT THE WORK HE SHALL
BE HELD RESPONSIBLE FOR ANY ERROR
RESULTING FROM HIS FAILURE TO TAKE
SUCH PRECAUTIONS.
1. DIVISIONS OF THE WORK FOR
SUBCONTRACTING PURPOSES SHALL BE AS
PER THE GENERAL CONTRACTOR'S
DIRECTION.
B. IT SHALL BE THE RESPONSIBILITY OF ALL
THE SUBCONTRACTORS TO HAVE EXAMINED
AND REVIEWED THE COMPLETE SET OF
WORKING DRAWINGS AND/OR
SPECIFICATIONS AND TO PROVIDE ALL
LABOR AND MATERIAL FOR THEIR
RESPECTIVE AREA TO WORK FOR A
COMPLETE AND FINISHED INSTALLATION IN
COMPLIANCE WITH THE INTENT OF THE
DRAWING AND/OR SPECIFICATIONS,
WHETHER IT 15 INDICATED OR NOT. ALL
WORK WHETHER INDICATED OR NOT, SHALL
BE IN COMPLIANCE WITH ALL BUILDING
CODES AND ORDINANCES WHICH ARE
APPLICABLE TO THE PROJECT.
3 SUBCONTRACTORS SHALL COOPERATE
WITH EACH OTHER AND WITH THE GENERAL
CONTRACTOR 70 PROVIDE MATERIAL AND
LABOR THAT ARE NECESSARY IN EACH
OTHER'S WORK AT THE PROPER TIMES 50
THAT THE CONSTRUCTION SCHEDULE 15 NOT
AFFECTED. THIS INTERFACING SHALL BE THE
RESPONSIBILITY OF THE SUBCONTRACTORS
WHOSE WORK IS AFFECTED AS SUCH.
10. ALL WORK SHALL BE PERFORMED BY
QUALIFIED CONTRACTORS N STRICT
ACCORDANCE WITH MANUFACTURER'S
SPECIFICATIONS.
11. PRODUCT MANUFACTURERS INDICATED IN
SCHEDULE AND OR PLANS WERE SELECTED
BASED ON QUALITY, STYLE, SIZE, COLOR
ETC, AND ARE NOT INTENDED TO RESTRICT
COMPETITIVE BIDDING. PRODUCTS 'EQUAL
TO' INTENDED TO BE USED AS SUBSTITUTES
ARE SUBJECT TO THE ARCHITECT'S
APPROVAL N WRITING PRIOR TO PRODUCT
NSTALLATION.
12. THIS DRAWING PACKAGE iS BASED ON
DOCUMENTS, 5PECIFICATICN5 AND RELATED
INFORMATION PROVIDED BY OILNER/TENANT
AND/OR OWNER/TENANT'S AGENT.
13. THE DESIGN INIFOWATION INDICATED ON
PLANS 15 INTENDED TO BE A COMPLETE
AND WORKABLE SYSTEM IN ACCORDANCE
WITH ALL PRODUCT MANUFACTURER'S
SPECIFICATIONS, EXISTING AND/OR
PROPOSED, BUILDING DESIGN, FIELD
CONDITIONS, ETC. ALL MISCELLANEOUS
MATERIALS, PARTS, DESIGN DIMENSIONS,
WHETHER INDICATED ON PLANS OR NOT,
SHALL BE INCLUDED AS PART OF THIS
DRAWING PACKAGE.
14. ARCHITECT SHALL BE NOTIFIED PRIOR
TO STARTUP OF CONSTRUCTION, SHOULD
EXISTING FIELD CONDITIONS VARY FROM
DRAWINGS BY GREATER THAN 2'.
15, THE GENERAL CONTRACTOR OR
SUBCONTRACTOR SHALL BE HELD
RESPONSIBLE FOR THE REMOVAL AND
DISPOSAL OF ALL MATERIALS AND ITEMS
COMMONLY REFERRED TO A$ 'DEBRIS' OR
DETERMINED BY THE ARCHITECT AS
REFUSE
16. THE GENERAL CONTRACTOR SHALL
HAVE HAD MADE ALL REQUIRED
PROVISIONS FOR THE REMOVAL OF DEBRIS
FROM THE SITEt HAVING CHARGES, DUMPING
FEES, ETC, N HIS ORIGINAL BID
SUBMISSION.
11. REMOVE ANY OTHER 17EM OR
CONSTRUCTION AS REQUIRED TO
ACCOMPLISH ALL NEW WORK AND/OR
REVISION WORK TO EXISTING AREAS AS
SHOWN OR DESCRIBED EL5EWERE IN THE
CONTRACT DOCUMENTS.
16, THE GENERAL CONTRACTOR SHALL
PROVIDE AND INSTALL 51GNAGE,
BARRICADES, FENCING, LIGHTING, ETC. A$
REQUIRED FOR THE PREVENTION OF
PERSONAL INJURIES TO THE OWNERS, ITS
EMPLOYEES, REPRESENTATIVES, CLIENTELE,
OR OTHERS WITHIN THE AREAS OF
CONSTRUCTION.
19. PROTECTIVE DEVICES TO BE INSTALLED
SHALL COMPLY WITH THE REQUIREMENTS OF
ALL LOCAL, STATE AND NATIONAL
GOVERNING CODES, THE BUILDING OWNER
GUIDELINES, AND OTHER GOVERNNG FORMS
OF AUTHORITY. THE GENERAL CONTRACTOR
SHALL TAKE ORDINARY PRECAUTIONS TO
PREVENT THEIR DISRUPTION DURING THE
COURSE OF WORK
20. GENERAL CONTRACTOR SHALL TAKE
ORDINARY PRECAUTIONS TO SECURE AND
PROTECT MATERIALS TO BE RELOCATED
OR WAREHOUSED.
2L PRIOR TO THE START OF ANY WOK THE
CONTRACTOR SHALL SECURE ALL PERMITS,
LICENSES, UTILITY CONNECTION
CONFIRMATIONS, GOVERJMENTAL
APPROVALS, ETC., NECESSARY FOR FULL
COMPLETION OF THE PROJECT.
21. PANTING: SHERWIN WILLIAMS OR
APPROVED EQUAL. (1) EXTERiOR 1 COAT
MASONRY PRIMER, 2 COATS EXTERIOR
LATEX. (2) INTERIOR: (COLORS TO BE
SELECTED BY OWNER/ARCHITECT)
DRYWALL SURFACES- 1 COAT
PRIMER -SEALER, 2 COATS FINISH LATEX.
WOOD SURFACES: I COAT PRIMER, 2 COATS
ENAMEL OR STAINED AND SEALED, SEE
FINISH SCHEDULE.
23. GENERAL CONTRACTOR SHALL PROVIDE
ALL OF THE REQUIRED METAL FRAMING,
WOOD BLOCKING AND PLYWOOD BACKNG
NECESSARY BETWEEN CONCRETE SLABS,
ROOF TRUSSES, CONCRETE BLOCK OR
METAL PARTITIONS FOR THE SUPPORT OF
ALL EQUIPMENT, SUSPENDED LIGHT
FIXTURES, DEMISING WALLS, LIGHT TRACTS,
VALANCES, PLUMBING (FIXTURE5 AND
ACCESSORIES FOR EXACT LOCATION
COORDINATE WITH CURER ARCHITECT).
24. CAULKING AND SEALANTS: INSTALLED
SHALL BE GUARANTEED WATERTIGHT.
EXTERIOR METAL WORK INCLUDING
WINDOWS AND D00RFRAME6 AND ALL
JUNCTIONS BETWEEN MASONRY, CONCRETE
AND METAL SHALL BE SEALED WITH
NEOPRENE OR POLYURETHANE FILLER AND
APPROVED SEALANT COMPOUNDS. ALL
INSTALLATION TO CONlFORN1 WITH
MANUFACTURE'S SPECIFICATIONS AND
REQUIREMENTS. A. INTERIOR WORK:
SONNEBORN, INC. 'IKAULKIT' OR APPROVED
EQUAL. B. EXTERIOR WORK: F'�LYSULFIDE
BASE SEALANT (ONE PART) COMPOUND
THIOKOL CHEMICAL CORP' OR APPROVED
EQUAL.
25.GENERAL CONTRACTOR SHALL
PROTECT EXISTING FACILITIES, STRUCTURES
AND UTILITIES. THEY MUST BE VERIFIED AS
TO THEIR EXACT LOCATIONS SO THAT NO
INTERFERENCE BY DISRUPTION WILL BE
CAUSED. DAMAGED THAT MAY BE CAUSED
BY THE CONTRACTOR OR
5000NTRACTORS TO ANY OF THE ABOVE
MENTIONED SHALL BE REPAIRED BY HIM
AND LEFT N AS GOOD CONDITION AS THE
EXISTING PRIOR TO DAMAGING.
2b. GYPSUM WALLBOARD: SHALL CCNFORM
TO THE REQUIRED OR SPECIFIED
UNDERWRITERS LABORATORY (UL)
ASSEMBLY SEE PARTITION SCHEDULE ALL
GYPSUM WALLBOARD SHALL
MANUFACTURED BY UL APPROVED
COMPANIES. INSTALLATION SHALL MEET THE
FOLLOWING: A ? OR 5/3 INCH THICK BY 48
WIDE BY HEIGHT REQUIRED APPLIED
VERTICALLY ON FURRING STRIPS AT N51DE
OF EXTERIOR MASONRY WALLS AT CEILING
AS INDICATED. B. GYPSUM BOARD
PARTITIONS SHALL BE ERECTED AS SHOWN
ON THE PLANS OR CALLED FOR IN THE
WALL SCHEDULE. ALL JOINTS SHALL BE
LOCATED SO THAT THE PANELS OPPOSITE
ONE ANOTHER SHALL FALL ON ALTERNATE
STUDS. ALL JOINTS SHALL BE TAPED
SPACKLED AND FINISHED SMOOTH. C. ALL
GYPSUM BOARD CONSTRUCTION SHALL BE
ERECTED PLUMB, LEVEL, SQUARE, STRAIGHT
AND SECURELY INSTALLED WITH ALL SEAMS
TO BE VERTICAL. ALL JOINTS ON EXPOSED
SURFACES SHALL BE FLUSH, TIGHT, AND
NEATLY CUT AND CLOSELY FIT AT
OPENINGS FOR THE WORK OF OTHER
TRADES AT THE INTERSECTIONS OF GYPSUM
BOARD AND OTHER MATERIALS. D. METAL
CORNER BEAD SHALL BE USED AT ALL
EXPOSED CORNERS AND ENDS. E. ALL
RESTROOMS SHALL USE MOISTURE
RESISTANT BOARD 'GREEN BOARD' AT ALL
AREAS WITHIN V-0' OF ANY PLUMBING
FIXTURE. F. INSTALL PER MANUFACTURER'S
SPECIFICATIONS.
21. PROVIDE GALVANIC INSULATION
BETWEEN ALL D1551MILAR METALS.
26. THE GENERAL CONTRACTOR SHALL FILL
WITH CONCRETE ALL OF THE BROKEN
CONCRETE BLOCK CELLS AT ALL INTERIOR
AND EXTERIOR MASONRY WALLS CAUSED
BY ANY OF THE GENERAL CONTRACTOR'S
OR SUB CONTRACTOR'S UJORKERS DURING
THE INSTALLATION OF PLUMBING,
ELECTRICAL, AIR CONDITIONING OR
MECHANICAL PIPES SLEEVES, CONDUITS,
BOXES, EQUIPMENT AND/OR ACCESSORIES
DURING THE CONSTRUCTION OF T14I5
PROJECT.
29. ALL OF THE ITEMS BELOW SHALL HAVE
PRODUCT CONTROL APPROVAL AND/OR
SEPARATE BUILDING PERMIT FOR EACH
ITEM (WHEN APPLICABLE) N COMPLIANCE
WITH THE FLORIDA BUILDING CODE. ALL
MANUFACTURERS AND/OR SUPPLIERS SHALL
SUBMIT SHOP DRAWINGS TO THE ARCHITECT
FOR REVIEW PRIOR TO FABRICATION.
I. ANCHORS 21. DOORS
2. AWNINGS/SUN SHADES 22. STEEL JOISTS
3. 23. WOOD CONNECTORS
4. CANOPIES 24. PREFABRICATED
FENCES
5. COOLERS AND FREEZERS 25.
ROOFING, VENTILATORS, TURBINE5,VENT5
6.
1. GARAGE DOORS
B. GLASS BLOCKS 2b. SCREEN
ENCLOSURES
9. INSULATION (NON -ROOFING) 21. SCREEN
ROOM AND WIND BREAKERS
10. METAL AND SANDWICH PANELS 26.
SHEDS 4 MANUFACTURED BUILDINGS
II. METAL ROOF SYSTEMS 29. SHUTTERS
12. NAIL 4 WOOD FASTENERS 30.
SKYLIGHTS SUCH
13. PASS T44RCUGW DEVICES 31. SOLAR
HEATERS
14. PASSAGE DOORS 32. SOLAR
PHOTOVOLTAIC ARRAYS
15. PLASTICS 33. SPAS (EXTERIOR)
I6. PLASTIC PLUMBING FIXTURES 34.
TRUSS PLATES
11. PLUMBING MATERIAL 35. VENEERED
LUMBER
APPLIANCES, POOL CHLORINATORS, 36.
VINYL SIDING AND SOFFIT
GLASS 4 ELECTRICAL POOL HEATERS 31.
WINDOWS
Ie. PREFABRICATED BEAMS 35, WOOD
TRUSSES
19. PREFABRICATED POOLS 39. SIGNS
20. PREFABRICATED RAILINGS
(STAIRS 4 BALCONIES)
FIRE DEPARTMENT NOTES:
PROVIDE ONE (1) 5 POUND, 2AI0BC, UL.
RATED, A55 TYPE FIRE EXTINGUISHER PER
2,500 SF. LOCATION AND QUANTITY TO BE
APPROVED BY FIRE DEPARTMENT FIELD
INSPECTOR.
NEW AND EXISTING DOORS SHALL COMPLY
WITH NFPA 1012003 SECTION 1 2J5.1 AND
FLORIDA ACCESSIBILITY CODE (CUR�NT
EDITION AS MANDATED BY THE
MUNICIPALITY)
IF THE PROJECT HAS FIRE SPRINKLERS, THE
CONTRACTOR SHALL BE RESPONSIBLE TO
PULL SEPARATE PERMIT FOR THE FULLY
AUTOMATED FIRE SPRINKLER SYSTEM.
CONTRACTOR SHALL PROVIDE FIRE
SPRINKLER SHOR DRAWINGS SIGNED AND
SEALED BY A FLORIDA STATE REGISTERED
ENGINEER FOR A O1NER'5 APPROVAL.
WORK SHALL CONFORM TO THE FLORIDA
BUILDING CODE 2004 CHAPTER 9 AND
NEFA 1012003 STANDARDS. REQUIRED ONE
HOUR RATED GLASS WALLS SHALL
CONFORRI1 NFPA 101 (2003 EDITION),
SECTION 5.1.
ALL FINISHES SHALL COMPLY WITH FLORIDA
FIRE PREVENTION CODE EFFECTIVE EDITION
JANUARY 1, 2005
SECTION 10) INTERIOR FINISHES.
ALL FNISHES SHALL COMPLY WITH NFPA 101
2003
tjJ_p1,�dG GHALL
Lt: L COD.
FIRE SPRINKLER NOTES:
IF EXISTING SPRINKLERS ARE LOCATED
WITHIN THE BUILDING. THE SPRINKLER
CONTRACTOR IS TO CONFIRM ALL EXISTING
CONDITIONS AND PROVIDE SPRINKLER
PROTECTION TO ALL RENOVATED AREAS
INDICATED ON THIS PLAN.
FIRE SPRINKLER SYSTEM SHALL CONFORRI
TO NF.P.A, STANDARDS
THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING SIGNED AND SEALED
DRAWINGS BY A LICENSED SPRINKLER
ENGINEER FOR PERMIT. FIRE SPRINKLER
PLANS MUST BE APPROVED BY FIRE
MARSHALL PRIOR TO ISSUE OF BUILDING
PER1'IIT.
THE SPRINKLER SYSTEM SHALL BE
SUPERVISED AS REQUIRED.
SPRINKLER CONTRACTOR SHALL NOTIFY
FIRE DEPARTMENT OR AUTHORIZED
AGENCY PRIOR TO WORKING ON THE
BUILDING SPRINKLER SYSTEM.
ALL SPRINKLER HEAD LOCATIONS SHALL
BE COORDINATED WITH ALL OTHER CEILING
ITEMS SUCH AS LIGHTING, HVAZ, GRILLES,
ARCHITECTURAL MEMBERS, ETC. PIPING
SHALL BE COORDINATED WITH HVAC
DUCTS, LIGHTS, ETC. AND WHERE REQUIRED
5HAL,- BE RELOCATED TO ACCOMMODATE
SAME.
BUILDING LOCATION
FINISH NOTES:
FINISH WORK SHALL BE SMOOTH, FREE
FROM ABRASION, TOOL MAWS, RAISED
GRAIN, ETC. ON EXP05ED SURFACE.
ALL FASTENNGS AND ATTACHMENTS SHALL
BE FULLY CONCEALED FROM VIEW.
USE MATERIALS THAT ARE IDENTICAL TO
EXISTING MATERIALS. IF IDENTICAL
MATERIALS ARE NOT AVAILABLE OR
CANNOT BE USED WHERE EXPOSED
5UW-ACES ARE INVOLVED, USE MATERIAL
THAT MATCH EX15TNG ADJACENT SURFACES
TO THE FULLEST EXTENT P0551BLE WITH
REGARD TO VISUAL EFFECT, USE MATERIALS
WHOSE INSTALLED PERFORMANCE WILL
EQUAL OR SURPASS THAT OF EXISTING
MATERIALS.
PRIOR TO ORDERING FINISH MATERIALS,
CONTRACTOR SHALL SUBMIT CURRENT
PRODUCTION B'XB' MNIMUM SAMPLE OF
EACH FINISH MATERIAL, AND A SAMPLE
FOR EACH COLOR OR FINISH, SPECIFIED,
INCLUDING BUT NOT LIMITED TO PANT
(IB'XIB'), WALL COVERING, CARPET, MARBLE,
TILE, VCT, ETC., TO ARCHITECT / OWNER FOR
APPROVAL.
GYPSUM WALL BOARD DESIGNATED TO
RECEIVE WALL COVERINGS SHOULD BE
PREPARED WITH ONE COAT OF ULTRA -HIDE
PVA PRIMER SEALER, COLOR TO BEND
WALL COVERING COLOR
ALL SURFACES DESIGNED TO BE PANTED
SHALL BE PERFECTLY DRY AND SMOOTH
BEFORE APPLICATIONS OF COVERINGS.
WALL MARKINGS MUST BE SUFFICIENTLY
SEALED BEFORE APPLICATION OF FINISH
MATERIAL 50 AS TO PREVENT BLEED -
THROZA
PANTED SURFACES SHALL RECEIVE ONE
PRIMER COAT, TINTED TO BE SHADE OFF
THE COLOR OF THE FINISH COAT, AND
SUFFICIENT FINISH COATS TO PROPERLY
COVER SURFACE PRIME ALL SURFACES
ACCORDING TO MANUFACTURER'S
SPECIFICATIONS PRIOR TO APPLICATION OF
PANT.
WHERE REMOVAL OF WALLS OR PARTITIONS
EXTENDS ONE FINISHED AREA INTO
ANOTHER, PATCH AND REPAIR FLOOR AND
WALL SURFACE OF UNIFORM COLOR AND
APPEARANCE. REMOVE EXISTING FLOOR
AND WALL COVERINGS AND REPLACE WITH
NEW MATERIALS, IF NECESSARY TO ACHIEVE
UNIFORM COLOR AND APPEARANCE.
PROPERLY PREPARE SURFACES
ACCORDING TO MANUFACTURER'S
RECOMMENDED APPLICATION OF SPECIFIED
FINISHES AND IN ACCORDANCE WITH BEST
TRADE PRACTICE.
CONTRACTOR TO CAULK ALL WINDOWS AND
STOREFRONTS PRIOR TO PANTING
FLOORS SHALL BE INSPECTED FOR
DAMAGE, WARPAGE OR OTHER NOTICEABLE
DEVIATIONS, PATCHED AND LEVELED.
FLOORS SHALL BE SMOOTH AND CLEAN
PRIOR TO INSTALLATION OF NEW FLOOR
FINISHES
ALL CONTIGUOUS CARPET, WALL
COVERINGS, AND FABRICS OF THE SAME
SPECIFICATION MUST BE FROM ONE DYE
LOT AND MUST MEET INDUSTRY STANDARD
TOLERANCE FOR SIDE MATCH
DOOR SURFACES FACING THE PUBLIC
CORRIDOR TO BE FINISHED TO MATCH
BUILDING STANDARD CORRIDOR DOORS,
FINISH METAL DOOR FRAMES ON TENANT
AND CORRIDOR SIDES TO MATCH BUILDING
STANDARD
DA T
LIST OF DRAWINGS ^ ^ ^ ^ ^ ^
A100 LOCATION PLAN AND GENERAL -NOTES = _
A101 FLOOR PLAN AND
A102
A103.A
A103.B
A104
E-1
FP-1
M-1
M-2
P-1
REFLECTED PLAN
FLOORING PLANLING AND SCHEDULES FIRST
WALL TYPES AND DETAILS PAGE
DETAILS
INTERIOR ELEVATIONS
ELECTRICAL PLAN
FIRE PROTECTION PLAN
MECHANICAL PLAN
MECHANICAL PLAN
PLUMBING PLAN
R E D
LOCATION PLAN-
S.W. 57TH COURT BETWEEN
S.W. 73RD AND 74TH STREES
CITY OF SOUTH MIAMI, FLORIDA
N.T.S.
LEGAL DESCRIPTION
Z
m
m
R
0
A
D
S.
T.
LOT 70. LESS THE WEST 5.00 FEET, AND LOTS 71, 72, 73, AND 74, LESS THE WEST 5.00 FEET,
'W.A. LARKIN'S SUB -DIVISION', ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT
BOOK 3 AT PAGE 198, OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA.
SECTION 36, TOWNSHIP 54 SOUTH, RANGE 40 EAST
DICKERSONp.A.
W. DATE %-VMN
N0. DATE %-Vom
DRAVANG TTTLE:
LOCATION PLAN
-� "'
AND NOTES
OFFICE CONDO BUILDOUT
R�:,a�
SUITE 400 FOURTH FLOOR PLAZA 57
sov n 'i143
SCALE- SM %EET
DATES 02-15-07 100Y. cde
7301 S.W. 57TH COURT
.
�.,,
�,
PROJECT NO 2007.2
DMWM NO
CITY OF SOUTH MIAMI
SOUTH MIAMI, FLORIDA 33143
`•. ''
NVWW. .COIN
A 100
: • • • • .
,
-�.-=4.