Loading...
6387 SW 69 ST EB-09-051-006 2 3 5 6 7 Uppermost edge of roof — ------------------------------------------------------------------ mechanical loft mechanical loft hvac equipment; hvac equipment; see M-1 ----- see M-1 , B B 0 z v First floor 0° concrete foundation as noted on `�. structural drawings (note: size and 4" reinforced concrete 16' glazed overhead Grade �� position of all steel members to be slab, stained finish, on rolling door, bottom -6" determined by structural engineer) vapor barrier, 6" aligned with kitchen compacted gravel base counter ° and compacted soil a Z 1 Building Section, Scale: 1/4" = 1 '-0" o V C 1 0 0 o 0 0 *�- N °m c c o 4" insulated steel roof © .2 panels, 36" coverage ° (see A-02 for layout of photovoltaic panels) 0. Uppermost edge of roof W N 1-� 2 V 22'-3" i d Z © C1 4" insulated steel roof tiN panels, 36" coverage (see A-02 for layout of solar hot water panel) 3" insulated steel wall panels, 36" coverage i2 c > CO E Oz Ln te + ? r + Cn i : M W ~ V M Q iV t pervious paving at courtyard [ , C „ =s . 1. First floor c4-J nit ) Grad �.! e U- AWN �, 4-J _6�� — concrete foundation as noted on 4" reinforced concrete rn •-. c structural drawings (note: size and slab, stained finish, on 'a LO .M o position of all steel members to be vapor barrier, 6" grade grade 2 Building Section determined by structural engineer) compacted gravel base 4-J V) Scale: 1/4" = 1 '-0" t` :3 and compacted soil "_- Co o tU M tJ7 .:e U E E m Scale Sheet Scale Drawing No. A-05 of 1 2 3 5 6 7