Loading...
06-138-008HVAC NOTES 1.0 1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SYSTEM AS DEPICTED ON THESE CONTRACT DOCUMENTS. 1.2 INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, ASHRAE SMACNA, NFPA AND LOCAL ORDINANCES. 1.3 SCOPE OF WORK : PROVIDE THE FOLLOWING COMPLETE SYSTEMS A. AIR CONDITIONING SUPPLY AND RETURN DUCT SYSTEM. B. EXHAUST SYSTEM FOR TOILET ROOMS. C. EXHAUST SYSTEMS FOR WAREHOUSE. D. AIR CONDITIONING UNITS AND CONTROLS. E. INDEPENDENT TEST AND BALANCE. 1.4 NOT USED 1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED 1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS AVAILABLE FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT PRIOR THE INSTALLATION OF EQUIPMENT AND FABRICATION OF DUCTS AND PIPING SYSTEMS. COORDINATE SPACE REQUIREMENTS FOR SERVICE AND MAINTENANCE AND COORDINATE INTERFERENCE WITH OTHER TRADES. 1.7 NATURE OF DESIGN DRAWINGS; DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND TO SHOW EVERY FITTING, ELBOW, TRANSITION, ETC. THAT WILL BE NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEMS REQUIRED BY THESE SPECIFICATIONS. 1.8 COORDINATION DRAWINGS; PREPARE 1/4" SCALE (MIN.) COORDINATION DRAWINGS SHOWING DUCTWORK, PIPING AND ALL MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL BEFORE PROCEEDING WITH THE INSTALLATION. IMPLEMENT ALL INFORMATION FROM 1.6 ABOVE. 1.9 SUBMIT SHOP DRAWINGS FOR A/E APPROVAL BEFORE PROCEEDING WITH THE THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. ALL SHOP DRAWINGS MUST BE SUBMITTED IN A SINGLE BOUND AND INDEXED PACKAGE NO LATER THAN 30 DAYS FROM THE ADJUDICATION OF THE PROJECT. 1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A A PERIOD OF ONE YEAR FROM THE DATE OF PROJECT ACCEPTANCE. 2.0 MAER 2.1 DUCTWORK 2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 2.1.2 DUCTWORK MATERIALS: A: GENERAL OFFICE AREAS: FIVE POUNDS DENSITY 1.5" THICK GLASS FIBER (R-6) DESIGNED, CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH SMACNA'S FIBROUS GLASS DUCT CONSTRUCTION STANDARDS. DUCT JOINTS SHALL BE SEALED AND TAPED. B: TOILET ROOM EXHAUST AND FRESH AIR INTAKES: GALVANIZED SHEET METAL, CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. (0.5" W.G.) C: EXPOSED AIR CONDITIONING DUCTWORK SPIRAL GALVANIZED SHEET METAL, CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. (0.5" W.G.) 2.1.3 PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS VANES. .1 ALTERNATE A: PROVIDE 3-PIECE ELBOWS IN LIEU OF TURNING VANES FOR GLASS FIBER DUCTS ONLY. .2 ALTERNATE A: PROVIDE FULL RADIOS ELBOWS IN LIEU OF TURNING VANES. 2.1.4 PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH. 2.2 NOT USED. 2.3 NOT USED. JENNA WHITE RETAIL BUILDOUT SUITE 120 FIRST FLOOR, PLAZA 57 7300 S.W. 157fH COURT CITY OF YOUTH MIAMI SOUTH MIAMI. FLORIDA 33143 2.4 AIR DISTRIBUTION PRODUCTS : 2.4.1 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS. 2.4.2 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED ON THE DRAWINGS AND SCHEDULES. 2.4.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS. 2.4.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS BEHIND ALL AIR SUPPLY OUTLETS. 2.5 PROVIDE A MINIMUM 5 YEAR WARRANTY FOR ALL AIR CONDITIONING COMPRESSORS STARTING FROM THE DATE OF PROJECT ACCEPTANCE. 2.6 CONTROLS: 2.6.1 GENERAL: PROVIDE THE NECESSARY AUTOMATIC CONTROLS FOR PROPER OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC STARTERS AND INTERLOCK WIRING INDICATED FOR EACH PIECE OF EQUIPMENT. 2.6.2 OFFICE AREA DX EQUIPMENT: PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOW VOLTAGE HEAT/COOL THERMOSTATS WITH ON -OFF AUTO SUB -BASE SWITCH AS FURNISHED BY THE EQUIPMENT MANUFACTURER. 2.7 STARTERS: PROVIDE MAGNETIC STARTER FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION AS DESCRIBED ON THE EQUIPMENT SCHEDULES. ALL STARTERS MUST HAVE HAND -OFF -AUTO POSITION SWITCH ON THE COVER AND RED/GREEN PILOT LIGHTS. PROVIDE THE NECESSARY AUXILIARY OPEN AND CLOSED CONTACTS FOR THE INTENDED OPERATION AND INTERLOCKS. 2.8 NOT USED. 2.9 IDENTIFICATION: 2.9.1 LABEL ALL EQUIPMENT WITH ENGRAVED BLACK PLASTIC PLAQUES 12"x4" HIGH WITH WITH 1.5" LETTERS. USE THE SAME NOMENCLATURE AS IN THESE DOCUMENTS. 2.10 REMRN AIR CEILING P EMS, 2.10.1 WHEN CEILING SPACES ARE USED AS "RETURN AIR CEILING PLENUMS" ALL MATERIALS INSIDE THE R/A CEILING PLENUM SHALL HAVE A MAXIMUM FLAME SPREAD INDEX OF 25 AND A MAXIMUM SMOKE DEVELOPED INDEX OF 50 PER NFPA 90A. "NO PVC PIPING IS ALLOWED INSIDE THE R/A PLENUM." 2.10.2 PROVIDE FREE PATH FOR R/A INSIDE CEILING SPACE. SEE ARCHITECTURAL PLAN FOR COORDINATION 3.0 EXECURON 3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS, PAYING SPECIAL ATTENTION TO REQUIRED CLEARANCES FOR INSTALLATION, OPERATION & SERVICE. FOR INSTALLATION, OPERATION AND SERVICE. 3.2 NOT USED 3.3 THERMOSTAT LOCATION. THERMOSTAT LOCATION IS CRITICAL TO PROPER EQUIPMENT OPERATION. INSTALL THERMOSTAT AT LOCATIONS SHOWN ON PLANS. RELOCATE ONLY WHEN APPROVED BY THE A/E IN WRITING. 3.4 RETURN AIR FOR INDIVIDUAL ROOMS IS BEING PROVIDED AS SHOWN ON PLANS AND IS SIZED COUNTING ON A 1 " UNDERCUT FOR ALL DOORS IN ADDITION TO THE REQUIRED RETURN OR TRANSFER SYSTEM. 3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A/E. 3.6 BALANCE ALL SYSTEMS TO PROVIDE AIR AND WATER QUANTITIES AND CAPACITIES TO MATCH SPECIFIED FLOWS & CAPACITIES. CALIBRATE FLOWS TO NEW EQUIPMENT PER MANUFACTURER'S REQUIREMENTS. SUBMIT FINAL TEST AND BALANCE REPORT TO A/E FOR ACCEPTANCE. OUTSIDE AIR CALCULATIONS % (2) AHU-5 I OFFICES 1510 SF x 30 VP /` 1000* _ 11 Pux 20 CFM/ P zz. 340 CFM 340 CFM / O/A i I O/A PROVIDED I 340 CFM / O/A 1 A/C SPLIT SYSTEM SCHEDULE DESIGNATION L---AHU- -- I --_ AC-1 --QUANTITY -----I EXISTING I --- ----------------------------- F-----------}---------- __AREA SERVED ___________________I SUITE 515_ I SUITE 120 _ MANUFACTURER __p_____ I RHEEM _ TRANE -- --- FAN COIL MODEL No j ----------------------------- Tl�EO-F 3 -- I -- RBHK_ll _ _CONDENSING UNIT MODEL No. _________�__2t�060 _i_�C-030JA --- ----------- 00�81 N ED_RATI GS __TOTAL SENSIBLE CAPACITY _BTU/HR _____�___ 61000____�___29,000 _ GRAND TOTAL CAPACITY _ BTU/H R _ _ 1 45100 1 21,400 TOTAL_ HEATING_ _CAPACITY_ _ BTU HR 25,500 _ _ 11,000 ----------- - --- ENERGY EFFICIENCY RATIO SEER EER 12.0 13.15 --------------------- COE_FFICIENT OF PERFORMANCE COP_____ L________- FAN _C 0 1 L_ U N IT ------------ TYPE _______________L__ VERTICAL _ L _ I-�IORIZONTAL_ -------------- TOTAL AIR SUPPLY _ CFM _ _ 1 2,000 1 1000 --t------- _ _ t---------- _-OUTSIDE AIR SUPPLY CFM -____i ___ 20 _- i ___ 340--- ENTERING ---------------------- -_ ENTERING AIR CONDITIONS _FDB/FWB___ -------------------- EVAPORATOR COIL MIN. ROWS MAX. F.P.I. -L - I /----------!--------- ----------------------------- __ EXTERNAL STATIC_ PRESSURE _ "H201 0.5 I 0.36 I----------+---------- __ FAN_MOTOR SPEED RPM HIGH SPEED FAN --H-P -----------------Ir -3/4 ------1/4 _ _ _ I 1/4 -------------------- _ _ ELECTRICAL SERVICE AVAILABLE _1 _ _ _ _ _ _I _ _ 208/1/60 I _ _ 206/1/60 __ RUNNING_LOAD AMPS ______________r 3.13 r ELECTRIC RESISTANCE HEATER SIZE KW __1 ____1. 5 ___ 1 ____ 5 --------------------------- -- UNIIT WEIGHT-------------------t___--225---L---- 1113 --- C O_N D E IDS I (� G_ U N_I_T -------- TYPE AIR_C_OOL_ED AIR C_O_OLED -----------------------------1--- --L-- --- LOCATION - - _ _ 1 ROOF I ROOF ------------------------- --------- --------- REFRIGERANT TYPE R-22 --L- R-22 -----------------------------L--------------- __AMBIENT AIR TEMPERATURE_ FDB i 95°F I 95°F -------- NUIMBER OF COMPRESSORS ____ � _ I __--I--- -------C--------------� 1 NUMBER 0_F_R_EFRIGE_RA_N_T_CIR_CUITS___ CAPACITY REDUCTION STEPS % i 0-100 j 0-100 -------------------------------- __ ELECTRICAL SERVICE AVAILABLE f 208/I/60 I 208/1/60 RUINNING LOAD AMPS j ___ 24.0 ____1 13.5 ---------------- ___MINIIM_UM_CIR_C_UIT_ A_M_PS__________r____36. 0___r____11 MA)XIMUM FUSE SIZE AMPS I ___60.0___1 25 ----------------------------- -- __ UNIIT WEIGHT ___________________L_____212 ___L____225 _ AC_CE S__S 0 _R_I_E S_ _ REFRIG_ERANT PIPING LENGHT__ ________ __ FT 60 r SEE PLANS _ LIQUID LINE TYPE O.D._____________ _________ I AS PER MANUF_ SUCTION LI -- ZE O.D___________ ______ LRECOU_4 5PEC1r_ TH E. M_0_S_TAT _ _ _ - __ _ _ _ _ _ _ _ HEAT/COOL I NEAP/COOL _ FILTER SECTION_ AND_ FILTER TYPE _ _ _ _ _ _ 1L12' THROWAWAY L IL%' 7HROWAWA -- - - ---- SMOKE DETECTOR ___ __IN SU_P_PL_Y__ -- ---- ---- -- ----------- V 18_IR A T 10_N_I _S -0- LA T O R_S___ FOR F&j-6-E L UNIT _______________i -_ FOR CON_DEN_SIN_G_ UNIT ______________�_________�________ A U_T_ 0 A T I C C -0 -A T R O L S _ __--___ _______- --TYPE --------- --------- -r-- - -,-- --TYPE -- -------------------F---------I--------- -- DESCRIPTION------------------------=----j--------- A J ON 0 (",NY'E ViV "I".a a�' T'_ VE s 4 cer,fic r tf 600122J00 s °a i PrVV 7 Strcat Nlliini FL .3:31 i2 TFL : (, FAQ t� &; 3 27 oEs i(C?ATE 01/16/06 "CO Nl hq€ F"ice" of AIR DISTRIBUTION SCHEDULE mawmw�qDESIGNATION rrrrrrrr�rrr 0 rrrJrrr�rrrrrrrrrrrrr USE ---------------{ --SUPPLY------RETUI�I--j--------- USE CONSTRUCTION_______ I _ _ ALUMINIUM_ IALUMINIUM _I CAITY PAC(C.F.M.) TSHOWN ON PLAN __'� SIZE16HOWN ON PLAN51 I T - -- TYPE 24 x_2_4_MOD UL- R _____ ►r--_------ -----------------L- ---------G--------- COMMENTS i DIRECTIONAL. CEILING DIFFUSER - - - - - - - - - - - - - - - - - --------J---------L-------- FINISH 1 ALL ALUMINIUM I ALL ALUMINIUM I MOUNTING TYPE ------. T -EAR__---------L--------- NOISE CRITERIA ______ I 30 MAX I 30 MAX ----------I---------i--------- MANU FACTU R E R I METALAIRE I METALAIRE I _ _ _ _ _ _ MODEL T-- -- --1-------r--------- - ------------ -3---------J---------L---------- �A C_C E-S S 0 R I E S_ __ __ _________ _________ 7 OPPOSED -BLADE _ RE_GIST T OBD - '- FIRE DAMPER CONNECTION SIZEI SNOUJN ON FL_- ____I _-______ rrrrrrrrrrrrrrrrsi�rrrsrrrrsir®rrrrrrri�rrrra�rrr NOTES 1. FINISHES AND TYPES OF MOUNTS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS. 2. PROVIDE SINGLE THICKNESS TURNING VANES AT ALL 900 RECTANGULAR ELBOWS AND DOUBLE THICKNESS TURNING VANES AT ALL 900 SQUARE ELBOWS, OR 3 PIECE ELBOWS. 3. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH SUPPLY OUTLETS MODEL - OBOC. DUCT BRANCH TAKE -OFF MODEL - AIRTROL MOD. 102 4. PROVIDE O.B. DAMPER AT ALL SUPPLY OUTLETS. 5. DUCT WORK TYPE - - - - SEE A/C NOTES. 6. AIR PATTERN AND DIFFUSOR FACE SHOWN ON PLANS. 7. DIFFUSOR NECK SIZE SHOWN ON PLANS. (6x6, 9x9, 12x12, OR 15xi5) HVAC DESIGN REQUIRES; YES NO Remarks DUCT SMOKE DETECTOR - I/ - FIRE DAMPER($) - ,r _ SMOKE DAMPER(5) - - FIRE RATED ENCLOSURE - - - FIRE RATED ROOF/FLOOR CEILING ASSEMBLY FIRE $TOPPING _ - - SMOKE CONTROL - - - CHANDLER AND ASSOCIATES NO DATE NO. DATE ARCIHIFJCTLIRK PA AA 0003M LA" F_ CHAMLEK AIA AIL NQ 16M ; SOUTH NI AK FLOREDA 33143 TEL (°i0d) 669-7992 FAX G 669-7993 W W W.CHANDLERARCHITECTURE.COM THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW. THEY ARE NOT TO BE CONSTRUED AS FINAL CONSTRUCTION DOCUMENTS UNTIL ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED AND COMMENTS INCORPORATED INTO THESE DWGS. DUE TO THE VARIATIONS IN INTERPRETATIONS OF THE CODE THAT OCCUR IN DIFFERENT MUNICIPALITIES FINAL APPROVAL AND REVIEW IS NEEDED TO ASSURE COMPLIANCE WITH THE APPLICABLE CODES AND STANDARDS. DRAWING TIT LE- FEVkgON v A n R1AC. NOTES and SCHEDULES A A:11 %l r :SUITE 120 SCALE: DATE. SOY. C.D 12-08-05 PROJECT Na 2004.23 ti f DRAWING NOr M-2 .. 2