06-138-008HVAC NOTES
1.0
1.1 PROVIDE ( FURNISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR
FOR A COMPLETELY OPERATIONAL HEATING, VENTILATING AND AIR CONDITIONING
(HVAC) SYSTEM AS DEPICTED ON THESE CONTRACT DOCUMENTS.
1.2 INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, ASHRAE
SMACNA, NFPA AND LOCAL ORDINANCES.
1.3 SCOPE OF WORK :
PROVIDE THE FOLLOWING COMPLETE SYSTEMS
A. AIR CONDITIONING SUPPLY AND RETURN DUCT SYSTEM.
B. EXHAUST SYSTEM FOR TOILET ROOMS.
C. EXHAUST SYSTEMS FOR WAREHOUSE.
D. AIR CONDITIONING UNITS AND CONTROLS.
E. INDEPENDENT TEST AND BALANCE.
1.4 NOT USED
1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED
1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS AVAILABLE FOR THE INSTALLATION OF
MATERIALS AND EQUIPMENT PRIOR THE INSTALLATION OF EQUIPMENT AND FABRICATION
OF DUCTS AND PIPING SYSTEMS. COORDINATE SPACE REQUIREMENTS FOR SERVICE
AND MAINTENANCE AND COORDINATE INTERFERENCE WITH OTHER TRADES.
1.7 NATURE OF DESIGN DRAWINGS; DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND
TO SHOW EVERY FITTING, ELBOW, TRANSITION, ETC. THAT WILL BE NECESSARY FOR A
COMPLETE AND OPERATIONAL SYSTEMS REQUIRED BY THESE SPECIFICATIONS.
1.8 COORDINATION DRAWINGS; PREPARE 1/4" SCALE (MIN.) COORDINATION DRAWINGS SHOWING
DUCTWORK, PIPING AND ALL MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL BEFORE
PROCEEDING WITH THE INSTALLATION. IMPLEMENT ALL INFORMATION FROM 1.6 ABOVE.
1.9 SUBMIT SHOP DRAWINGS FOR A/E APPROVAL BEFORE PROCEEDING WITH THE
THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS.
ALL SHOP DRAWINGS MUST BE SUBMITTED IN A SINGLE BOUND AND INDEXED PACKAGE
NO LATER THAN 30 DAYS FROM THE ADJUDICATION OF THE PROJECT.
1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A
A PERIOD OF ONE YEAR FROM THE DATE OF PROJECT ACCEPTANCE.
2.0 MAER
2.1 DUCTWORK
2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE
DIMENSIONS.
2.1.2 DUCTWORK MATERIALS:
A: GENERAL OFFICE AREAS:
FIVE POUNDS DENSITY 1.5" THICK GLASS FIBER (R-6)
DESIGNED, CONSTRUCTED AND INSTALLED IN ACCORDANCE
WITH SMACNA'S FIBROUS GLASS DUCT CONSTRUCTION STANDARDS.
DUCT JOINTS SHALL BE SEALED AND TAPED.
B: TOILET ROOM EXHAUST AND FRESH AIR INTAKES:
GALVANIZED SHEET METAL, CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. (0.5" W.G.)
C: EXPOSED AIR CONDITIONING DUCTWORK
SPIRAL GALVANIZED SHEET METAL, CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. (0.5" W.G.)
2.1.3 PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS.
WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS VANES.
.1 ALTERNATE A: PROVIDE 3-PIECE ELBOWS IN LIEU
OF TURNING VANES FOR GLASS FIBER DUCTS ONLY.
.2 ALTERNATE A: PROVIDE FULL RADIOS ELBOWS IN LIEU
OF TURNING VANES.
2.1.4 PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY
OUTLET AND AT EACH DUCT BRANCH.
2.2 NOT USED.
2.3 NOT USED.
JENNA WHITE
RETAIL BUILDOUT
SUITE 120 FIRST FLOOR, PLAZA 57
7300 S.W. 157fH COURT
CITY OF YOUTH MIAMI
SOUTH MIAMI. FLORIDA 33143
2.4 AIR DISTRIBUTION PRODUCTS :
2.4.1 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS.
2.4.2 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED
ON THE DRAWINGS AND SCHEDULES.
2.4.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE
CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS.
2.4.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS
BEHIND ALL AIR SUPPLY OUTLETS.
2.5 PROVIDE A MINIMUM 5 YEAR WARRANTY FOR ALL AIR CONDITIONING
COMPRESSORS STARTING FROM THE DATE OF PROJECT ACCEPTANCE.
2.6 CONTROLS:
2.6.1 GENERAL: PROVIDE THE NECESSARY AUTOMATIC CONTROLS FOR PROPER OPERATION
OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC STARTERS AND INTERLOCK
WIRING INDICATED FOR EACH PIECE OF EQUIPMENT.
2.6.2 OFFICE AREA DX EQUIPMENT:
PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOW VOLTAGE HEAT/COOL
THERMOSTATS WITH ON -OFF AUTO SUB -BASE SWITCH AS FURNISHED
BY THE EQUIPMENT MANUFACTURER.
2.7 STARTERS:
PROVIDE MAGNETIC STARTER FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION
AS DESCRIBED ON THE EQUIPMENT SCHEDULES. ALL STARTERS MUST HAVE
HAND -OFF -AUTO POSITION SWITCH ON THE COVER AND RED/GREEN PILOT LIGHTS.
PROVIDE THE NECESSARY AUXILIARY OPEN AND CLOSED CONTACTS
FOR THE INTENDED OPERATION AND INTERLOCKS.
2.8 NOT USED.
2.9 IDENTIFICATION:
2.9.1 LABEL ALL EQUIPMENT WITH ENGRAVED BLACK PLASTIC PLAQUES 12"x4" HIGH WITH
WITH 1.5" LETTERS. USE THE SAME NOMENCLATURE AS IN THESE DOCUMENTS.
2.10 REMRN AIR CEILING P EMS,
2.10.1 WHEN CEILING SPACES ARE USED AS "RETURN AIR CEILING PLENUMS"
ALL MATERIALS INSIDE THE R/A CEILING PLENUM SHALL HAVE
A MAXIMUM FLAME SPREAD INDEX OF 25 AND A MAXIMUM
SMOKE DEVELOPED INDEX OF 50 PER NFPA 90A.
"NO PVC PIPING IS ALLOWED INSIDE THE R/A PLENUM."
2.10.2 PROVIDE FREE PATH FOR R/A INSIDE CEILING SPACE.
SEE ARCHITECTURAL PLAN FOR COORDINATION
3.0 EXECURON
3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S MANUALS AND RECOMMENDATIONS, PAYING SPECIAL ATTENTION
TO REQUIRED CLEARANCES FOR INSTALLATION, OPERATION & SERVICE.
FOR INSTALLATION, OPERATION AND SERVICE.
3.2 NOT USED
3.3 THERMOSTAT LOCATION.
THERMOSTAT LOCATION IS CRITICAL TO PROPER EQUIPMENT OPERATION.
INSTALL THERMOSTAT AT LOCATIONS SHOWN ON PLANS.
RELOCATE ONLY WHEN APPROVED BY THE A/E IN WRITING.
3.4 RETURN AIR FOR INDIVIDUAL ROOMS IS BEING PROVIDED AS SHOWN ON PLANS
AND IS SIZED COUNTING ON A 1 " UNDERCUT FOR ALL DOORS IN ADDITION TO
THE REQUIRED RETURN OR TRANSFER SYSTEM.
3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION
REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND
TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A/E.
3.6 BALANCE ALL SYSTEMS TO PROVIDE AIR AND WATER QUANTITIES AND CAPACITIES
TO MATCH SPECIFIED FLOWS & CAPACITIES.
CALIBRATE FLOWS TO NEW EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
SUBMIT FINAL TEST AND BALANCE REPORT TO A/E FOR ACCEPTANCE.
OUTSIDE AIR CALCULATIONS %
(2) AHU-5 I
OFFICES 1510 SF x 30 VP /` 1000* _ 11 Pux 20 CFM/ P zz. 340 CFM 340 CFM / O/A
i I O/A PROVIDED I 340 CFM / O/A 1
A/C SPLIT SYSTEM SCHEDULE
DESIGNATION L---AHU- -- I --_ AC-1
--QUANTITY -----I EXISTING I ---
----------------------------- F-----------}----------
__AREA SERVED ___________________I SUITE 515_ I SUITE 120 _
MANUFACTURER __p_____ I RHEEM
_ TRANE -- ---
FAN COIL MODEL No j
----------------------------- Tl�EO-F 3 -- I -- RBHK_ll _
_CONDENSING UNIT MODEL No. _________�__2t�060 _i_�C-030JA
--- -----------
00�81 N ED_RATI GS
__TOTAL SENSIBLE CAPACITY _BTU/HR _____�___ 61000____�___29,000 _
GRAND TOTAL CAPACITY _ BTU/H R _ _ 1 45100 1 21,400
TOTAL_ HEATING_ _CAPACITY_ _ BTU HR 25,500 _ _ 11,000
----------- - ---
ENERGY EFFICIENCY RATIO SEER EER 12.0 13.15
---------------------
COE_FFICIENT OF PERFORMANCE COP_____ L________-
FAN _C 0 1 L_ U N IT ------------
TYPE _______________L__ VERTICAL _ L _ I-�IORIZONTAL_
--------------
TOTAL AIR SUPPLY _ CFM _ _ 1 2,000 1 1000
--t------- _ _ t----------
_-OUTSIDE AIR SUPPLY CFM -____i ___ 20 _- i ___ 340---
ENTERING ----------------------
-_ ENTERING AIR CONDITIONS _FDB/FWB___ --------------------
EVAPORATOR
COIL MIN. ROWS MAX. F.P.I. -L - I
/----------!---------
-----------------------------
__ EXTERNAL STATIC_ PRESSURE _ "H201 0.5 I 0.36
I----------+----------
__ FAN_MOTOR SPEED RPM HIGH SPEED
FAN
--H-P -----------------Ir -3/4 ------1/4 _ _ _ I 1/4
--------------------
_ _ ELECTRICAL SERVICE AVAILABLE _1 _ _ _ _ _ _I _ _ 208/1/60 I _ _ 206/1/60
__ RUNNING_LOAD AMPS ______________r 3.13 r
ELECTRIC RESISTANCE HEATER SIZE KW __1 ____1. 5 ___ 1 ____ 5
---------------------------
-- UNIIT WEIGHT-------------------t___--225---L---- 1113 ---
C O_N D E IDS I (� G_ U N_I_T --------
TYPE AIR_C_OOL_ED AIR C_O_OLED
-----------------------------1--- --L-- ---
LOCATION - - _ _ 1 ROOF I ROOF
-------------------------
--------- ---------
REFRIGERANT TYPE R-22 --L- R-22
-----------------------------L---------------
__AMBIENT AIR TEMPERATURE_ FDB i 95°F I 95°F
--------
NUIMBER OF COMPRESSORS ____ � _ I __--I---
-------C--------------� 1
NUMBER 0_F_R_EFRIGE_RA_N_T_CIR_CUITS___
CAPACITY REDUCTION STEPS % i 0-100 j 0-100
--------------------------------
__ ELECTRICAL SERVICE AVAILABLE f 208/I/60 I 208/1/60
RUINNING LOAD AMPS j ___ 24.0 ____1 13.5
----------------
___MINIIM_UM_CIR_C_UIT_ A_M_PS__________r____36. 0___r____11
MA)XIMUM FUSE SIZE AMPS I ___60.0___1 25
----------------------------- --
__ UNIIT WEIGHT ___________________L_____212 ___L____225 _
AC_CE S__S 0 _R_I_E S_ _
REFRIG_ERANT PIPING LENGHT__ ________ __ FT 60 r SEE PLANS _
LIQUID LINE TYPE O.D._____________ _________ I AS PER MANUF_
SUCTION LI -- ZE O.D___________ ______ LRECOU_4 5PEC1r_
TH E.
M_0_S_TAT _ _ _ - __ _ _ _ _ _ _ _ HEAT/COOL I NEAP/COOL
_ FILTER SECTION_ AND_ FILTER TYPE _ _ _ _ _ _ 1L12' THROWAWAY L IL%' 7HROWAWA
-- - - ----
SMOKE DETECTOR ___ __IN SU_P_PL_Y__
-- ---- ---- -- -----------
V 18_IR A T 10_N_I _S -0- LA T O R_S___
FOR F&j-6-E L UNIT _______________i
-_ FOR CON_DEN_SIN_G_ UNIT
______________�_________�________
A U_T_ 0 A T I C C -0 -A T R O L S _ __--___ _______-
--TYPE --------- --------- -r-- - -,--
--TYPE --
-------------------F---------I---------
-- DESCRIPTION------------------------=----j---------
A J ON 0 (",NY'E
ViV "I".a a�' T'_
VE
s 4 cer,fic r tf
600122J00
s °a
i PrVV 7 Strcat Nlliini FL .3:31 i2
TFL : (, FAQ t� &; 3 27
oEs
i(C?ATE
01/16/06
"CO Nl hq€ F"ice" of
AIR DISTRIBUTION SCHEDULE
mawmw�qDESIGNATION rrrrrrrr�rrr 0 rrrJrrr�rrrrrrrrrrrrr
USE ---------------{ --SUPPLY------RETUI�I--j---------
USE
CONSTRUCTION_______ I _ _ ALUMINIUM_ IALUMINIUM _I
CAITY
PAC(C.F.M.) TSHOWN ON PLAN __'�
SIZE16HOWN ON PLAN51 I
T - --
TYPE 24 x_2_4_MOD UL-
R _____ ►r--_------
-----------------L- ---------G---------
COMMENTS i DIRECTIONAL. CEILING DIFFUSER
- - - - - - - - - - - - - - - - - --------J---------L--------
FINISH 1 ALL ALUMINIUM I ALL ALUMINIUM I
MOUNTING TYPE ------. T -EAR__---------L---------
NOISE CRITERIA ______ I 30 MAX I 30 MAX
----------I---------i---------
MANU FACTU R E R I METALAIRE I METALAIRE I
_ _ _ _ _ _
MODEL T-- -- --1-------r---------
- ------------ -3---------J---------L----------
�A C_C E-S S 0 R I E S_ __ __ _________ _________
7 OPPOSED -BLADE _ RE_GIST T OBD - '-
FIRE DAMPER
CONNECTION SIZEI SNOUJN ON FL_- ____I _-______
rrrrrrrrrrrrrrrrsi�rrrsrrrrsir®rrrrrrri�rrrra�rrr
NOTES
1. FINISHES AND TYPES OF MOUNTS SHALL BE COORDINATED WITH ARCHITECTURAL DRAWINGS.
2. PROVIDE SINGLE THICKNESS TURNING VANES AT ALL 900 RECTANGULAR ELBOWS AND DOUBLE
THICKNESS TURNING VANES AT ALL 900 SQUARE ELBOWS, OR 3 PIECE ELBOWS.
3. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH
SUPPLY OUTLETS MODEL - OBOC.
DUCT BRANCH TAKE -OFF MODEL - AIRTROL MOD. 102
4. PROVIDE O.B. DAMPER AT ALL SUPPLY OUTLETS.
5. DUCT WORK TYPE - - - - SEE A/C NOTES.
6. AIR PATTERN AND DIFFUSOR FACE SHOWN ON PLANS.
7. DIFFUSOR NECK SIZE SHOWN ON PLANS. (6x6, 9x9, 12x12, OR 15xi5)
HVAC DESIGN REQUIRES;
YES
NO
Remarks
DUCT SMOKE DETECTOR
-
I/
-
FIRE DAMPER($)
-
,r
_
SMOKE DAMPER(5)
-
-
FIRE RATED ENCLOSURE
-
-
-
FIRE RATED ROOF/FLOOR
CEILING ASSEMBLY
FIRE $TOPPING
_
-
-
SMOKE CONTROL
-
-
-
CHANDLER AND ASSOCIATES NO DATE NO. DATE
ARCIHIFJCTLIRK PA
AA 0003M
LA" F_ CHAMLEK AIA AIL NQ 16M ;
SOUTH NI AK FLOREDA 33143
TEL (°i0d) 669-7992
FAX G 669-7993
W W W.CHANDLERARCHITECTURE.COM
THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW. THEY ARE
NOT TO BE CONSTRUED AS FINAL CONSTRUCTION DOCUMENTS
UNTIL ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED AND
COMMENTS INCORPORATED INTO THESE DWGS. DUE TO THE
VARIATIONS IN INTERPRETATIONS OF THE CODE THAT OCCUR IN
DIFFERENT MUNICIPALITIES FINAL APPROVAL AND REVIEW IS NEEDED
TO ASSURE COMPLIANCE WITH THE APPLICABLE CODES AND
STANDARDS.
DRAWING TIT LE-
FEVkgON
v A n
R1AC.
NOTES and SCHEDULES
A A:11 %l r
:SUITE 120
SCALE:
DATE. SOY. C.D 12-08-05
PROJECT Na 2004.23
ti
f DRAWING NOr
M-2
..
2