02-930-165.....................................................................................................................- ........................................................................... ................................................_................................................---.............................................................
1'E_C_ W/PULLWIRE TO
ELECTRICALIALi�OM
(TYPICAL)
ROOF
I
i
NORTH ELECTRICAL ROOM I
I
4'xa'x3/4" I
I SOUTH ELECTRICAL ROOM
,
T.TB.
I
I
I
12' x 12' x 4' PULLBOX (TYPICAL)
SEE FLOOR PLAN FOR NUMBER
OF BOXEa REQUIRED At ELEVATOR COMTROLLER
I
qp
I
I
2-2' EPVC I
I
I 2-2' EPVC
i
I
I
I
,
1=11"TH LEVEL
NORTH ELECTRICAL ROOM
SOUTH ELECTRICAL ROOM
r ,G
I r
t
t
I
4'xa'x3/4' I
T.T.B.
I
t
I
4'xa'x3/4'
T.TB.
I
BEE PNL SCHEDULE
FOR CKT. NIM55R
FOURTH LEVEL
au TER CALCLXATKM
RETAIL SPACES 7,806 SO. FT A 12 W./SO. Fr.
94
KW.
RESTAURAUNT 57828 SO. FT % 20 W./SO. FT.
117
KW.
FUTURE LOAD
150
KW.
a-4' EPYC
TOTAL LOAD
361
KW.
•208/3 PHASE 1002 AMPS
THIRD LEVEL
GUTTER WILL BE SIZED AT 1200 AMPS W/ (3) 3-1/2ff
C. EA. W/ 4 # 600 MCM
G
PAWING
1 6 Cu (G)
l 6 CU (G)
10 BLOC. ACCESS P!JL
(VERITY EXACT LOCATION)
MAIN ELECTRICAL ROOM
SECOND LEVE
F.P.t L. TX. VAULT I
�
I
4
f 4'xa'x3/4'
t T.TB.
G
I
I
G
l AP C
FIRST LEVEL
* / L-4
34 "�.+ � -- ! O G.E.G.
To GEC.
= PARKING- TELEF HONE RISER DIAGRAM
2-4' E.PYC W/ PULLWIRE
N.T.S. TO PROPERTY L NE TEL CamPOINT 0;= .
(VERIFY EXACT LOCATION
BEFORE COMMENCING WORK)
ROOF