Loading...
02-930-0061 � h LOT iNFOf�I IATICN ZONING: 5-fib (SEEGIAL RETAIL) °HCMETCLJN FLAN" [)i5TFICT N ieklT (TC TOF CF ROOF): 5(o'-O" ALLCUJ �): 5rololl TOTAL ACREAGE..�3 ACFES (4O 52c3 SOFT) ALLOJJA5LE FAA. = 1:G (40,�2e X 1.ro - 64,84ro) BUILDINe FOOT FRINT:122'= IO" X 28_2'=g� _ 3 �21 SQ1-T. LOT CCARAG : R io (34,121 / 40,529) TOTAL Cf N �'AFD SFAC = 22�3 5OFT F 5% (202b % OF 5UiLT LOT Fl;z�CNTAC3: 9(o% Rir_�HT-OF-LUA"'S KITH QUIRT 30'_011 13�� STREET RlekT=CF—UJA�': 301_011 14TIA STS LT fZGiHIT-CF-UJA'' 2 _C ALLEI fRIGHT=CIS-WA�: 101-01I 5U L�) Ne USES: OF DLZLLiNe UNITS: O TOTAL RETAIL 5FACE: 1 2139 5OFT. (GFOUND FLOOR F.A.R.) 15,213c�l3 DC = 5C.9 FAFKiNCi 5FACE5 R OU I SED TOTAL OFFICE SFACE : 413,445 5OFT. F.AARJ2�0=1?ll.?� F,4R<1NG 5FACES REOUIRED (FOURTH FLCCF: 18,35ro 5OFT. �.A.FJ (FIFTH FLOC1,: 31 Oae 5OFT. FAR) TOTAL P.4R. , 144 307. 24(51 E QUiF1) FARKING SFACES FARKiNGi: OFF STREET FAFKf Ne- 11 5FACES GiROUN[) FLCOR. 13 5FACE5 N ACCES�15LE SFACE, l VAN ACC S15LF S ACL 11 REGULAR 5FACES) S�CCND FLOO7: ac3 SPACES (3 ACCESSIBLF SPACES, a(o SEr_iULAF SEACF-S) TNIFI) LEVEL: 91 SFACF5 (2 ACCESSIDLL SPACES r5'� FEGULAS SFAC 5) FOURTH LEVEL: 44 SPACES (44 1RFGULAS SPACES) TOTAL FARKiNG; 5FACE5 OVI� 254 SFACFS GENERAL NOTES I.All work shall be in accordance with the requirements of the South Florida Building Code, zoning requirements and other applicable municipal requirements. 2_ 5efore performing any work or ordering any materials, the contractor shall verify all dimensions and conditions of any existing and new work and shall be responsible For their accuracy. Any differences found shall be submitted to the architect or engineer and Owner for verification before proceeding with work 3. The architect shall not be responsible for any deviations from these drawings as dated on this sheet. 4. The AiA General Conditions, the Supplementary General Conditions, and General Requirements shall be considered an inclusive part of these speciFications and or drawings. All subcontractors, as well as the general contractor, shall be governed by all applicable sections of these documents with reference to their respective areas of work it shall be the responsibility of the general contractor to advise his subcontractors and suppliers of these requirements. 5. The general contractor shall be held to have examined the site with respect to all existing Field conditions and to have fully examined the complete set of architectural drawings as prepared by others, and shall be responsible for the coordination and insertion of this drawing set, as is included as part of the original drawings package. (o.The general contractor shall locate all general reference Points and take ordinary precautions to prevent their disruption. Each prime subcontractor shall be responsible For all lines, elevations, measurements and others as may be required of and for his work He shall be responsible For verifying all Figures and details shown on the drawings which relate to his work, prior to laying out the work He shall be held responsible for any error resulting from his failure to take such precautions. T Divisions of the work for subcontracting purposes shall be as per the general contractor's direction. LOCATION PLAN- S.W. 57TH COURT BETWEEN S.W. 73RD AND 74TH STREES CITY OF SOUTH MIAMI, FLORIDA N.T.S. LEGAL DESCRIPTION LOT 70. LESS THE WEST 5.00 FEET, AND LOTS 71, 72, 73, AND 74, LESS THE WEST 5.00 FEET, "W.A. LARKIN'S SUB -DIVISION, ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT BOOK 3 AT PAGE 198, OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA. SECTION 36, TOWNSHIP 54 SOUTH, RANGE 40 EAST & It shall be the responsiblity of all the subcontractors to have examined and reviewed the complete set of working drawings and/or specifications and to provide all labor and material for their respective area to work for a complete and finished installation in compliance with the intent of the draining and/or specifications, whether it is indicated or not. ,411 work whether indicated or not, shall be in compliance with all building codes and ordinances which are applicable to the project. 9. Subcontractors shall cooperate with each other and with the general contractor to provide material and labor that are necessary in each other's work at the proper times so that the construction schedule is not affected. This interfacing shall be the responsiblity of the subcontractors whose work is affected as such. 10.411 work shall be performed by stag licensed (sub) contractors if applicable or qualified (sub')conctractors in strict acccordance with manufacturer's specifiactians. II. Froduct manufacturers indicated in schedule and or plans were selected based on duality, style, size, color,etc..,and are not intended to restrict competitive bidding. Products "equal to" intended to be used as substitutes are subject to the architect's approval in writting prior to product installation. 12. This drawing package is based on documents, specifications and related information provided by owner/tenant and/or owner/tenant's agent. 13. The design information indicated on plans is intended to be a complete and workable system in accordance with all product manufacturer's specifications, existing and/or proposed, building design, field conditions, etc. All miscellaneous materials , parts, design dimensions, whether indicated on plans or not, shall be included as part of this drawing package. 14. Architect shall be notified prior to startup of construction , should existing field conditions vary from drawings by greater than 2". 15. The general contractor or subcontractor shall be held responsible for the removal and disposa I of all materials and items commonly refered to as "debris" or determined by the architect as refuse. 1&. The penera I contractor shall have had made all required provisions for the removal of debris from the site± having charges, dumping fees, etc.., in his original bid submission. 17. remove any other item or construction as required to accomplish all new work and/or revision work to existing areas as shown or described' elsewhere in the contract documents. Ia. The general contractor shall provide and 'install signage, barricades, fencing, lighting, etc. as required for the prevention of personal injuries to the owners, its employees, representatives, clientele, or others within the areas of construction. 1g. Frotective devices to be installed shall comply with the requirements of all local, state and national governing codes, the build- n owner guidelines, and other governin forms of aut✓'iority. The general contractor sha IIT take oridinary precautions to prevent their disruption during the course of work 20. General contractor shall take ordinary precautions to secure and protect materials to be relocated or warehoused. 21. Prior to the start of any work, the contractor shall secure all permits, lisenses, utility connection confirmations, governmental approvals, etc., necessary for full completion of the project. N❑TE! SEE 'TR❑DUCT SPEU❑CATI❑N B❑❑K" ❑❑R ADDITI❑NAU SPC❑EICATI❑NS M THESE DRAWING ARE NOT CMPUETE WITH❑❑T IT'S "PR❑DUCT SPEC-EICATI❑N B❑❑K" DRAWING TITLE: OWNER/DEVELOPER CHADLER AND ASSOCIATES NO. DATE REVISION NO. DATE REVISION THEARC RE, P.A. LOCATION !'-LAZA 9050i-26-0 RAMP/ RESTROOM REVISIONS �ocF�,�a-3�anaon taoo)07 JASON )L_ C1� b• x1`' f AR NO. 16055 2 11-4-02 WIND PRESSURES PLAN COMPANY _ ,„'•, C,,. � ., A SUITE 400 7300 S.W. 57TH COURT 59 WES'1c'� 1tD ST1tEEr 0 6-19-03 CLIENT REVISIONS SCALE: N.T.S. 4960 S.W. 72 AVENUE CITY OF SOUTH MIAMI,-F `IRIDA 33143 DATE APRIL 16, 2001 100% C,D. N�� J 3 O� PROJECT NO: 9902.2 DRAWING NO: TEL OR9" 669-*2 MIAMI, FLORIDA 33155 SOUTH MIAMI, FLORIDA 33143 ^ ��� . A 100 305.662.1421s••» `' - ODTYN6HT _ -7D(I(