02-930-004WALKWAY OR HARDSCAPE AREA TOE NAIL BRACE TO BATTEN
SPACE PLANTS FROM EDGE S0
THAT MATURE PLANTS WILL NOT
OVERLAP ONTO SIDEWALK AREA ,
--VARIES WITH PLANT SPECIES
SEE PLANTING PLAN FOR SPACING 5 P.T. WOOD BATTENS
t> t, ft
@ 2 X4 X16 LOCATE GUY ABOVE FIRST
SPECIFIED GROUNDCOVER y
BRANCH
STEEL BAND I ADJUSTABLE SLIP KNOT
NOTE: ti
SECURE BATTENS WITH 2-3/4" SAFETY WHITE GUYING
EXCAVATE TO ROOT 3 BRACES @ 4" X 4" HI CARBON STEEL BANDS TO LINE FASTENED TO STAKE
BALL DEPTH PLUS 4 INCHES
3 SOIL SAUCER HOLD BATTENS IN PLACE I
3" MULCH DURING PLANTING PROCESS. 3„ Mu SPECIFIED PLANTING MIX
-111 -1 DO NOT NAIL BATTENS TO
III —II III -
SPECIFIED PLANTING MIX PALM, HEIGHT OF BATTENS
3 STAKES C� 2" X 4,f X 2 SHALL BE LOCATED IN RELATION
f�
2 MULCH
TO THE HEIGHT OF THE PALM
TOP OF STAKE 6" ABOVE GRADE FOR ADEQUATE BRACING,
-
SPECIFIED PLANTING MIX
2" X 4" STAKE PAD BURIED
3" BELOW GRADE
FOLD BACK TOP 1 /3 OF BURLAP
REMOVE AND RECYCLE POT
EXISTING SOIL OR APPROVED
— -
MOUND AND COMPACT SOIL
=1I
MOUND AND COMPACT SOIL
__ - LESS THAN 12"-
i.
BACKFILL
1=1II
=111=1
II — III-
NO LESS THAN 12"NO
ADJUST HEIGHT TO PLACE
III
�
—II
ADJUST HEIGHT TO PLACE
TOP OF MULCH SHALL BE
1 INCH BELOW PAVEMENTIl
l I li 1_-7 It 1=1 I I —
I-
H l=I I I=I I I I �I I I I
TOP OF ROOT BALL EVEN
WITH GRADE
WITH
—I
i I I
„TI
'- — I- TOP OF ROOT BALL EVEN
-III -I i I -I I�I i I I WITH GRADE
,111-111=111 111=111,
—III I
EXISTING SOIL OR APPROVED
T
EXISTING SOIL OR
NOTES:
BACKFILL
APPROVED BACKFILL
GROUND COVER PLANTING DETAIL
3 PALM PLANTING
AND STAKING DETAIL
(" 4 STREET TREE PLANTING DETAIL
1. ALL PLANTING MATERIAL SHALL BE GRADED FLORIDA NO. 1 OR BETTER IN COMPLIANCE WITH FLORIDA
L-4
L-3
NO SCALE
DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, DIVISION OF PLANT INDUSTRY, GAINSVILLE,
NO SCALE
NO SCALE
" AND "GRADES AND STANDARDS FOR
Ivu 3WHLL GRADES AND STANDARDS FOR NURSERY PLANTS, PART I ,
NURSERY PLANTS, PART II PALMS AND TREES."
SPECIAL ONE YEAR MAINTENANCE AND REPLACEMENT WARRANTY.
2: CONTRACTOR SHALL PROVIDE I�
REFER TO SPECIFICATIONS FOR PERFORMANCE REQUIREMENTS.
I
12" X 8" CONCRETE RESTRAINT
W/ 2 #5 CONT.
3, CONTRACTOR SHALL HAVE ALL PLANT MATERIAL SUBSTITUTIONS APPROVED BY THE LANDSCAPE
3 1 /S
" PERMEABLE CONCRETEPAVERS 4" REINFORCED CONCRETE SLAB ARCHITECT.
. INTEGRAL COLOR -TWO.
NATURAL GRAY (Eco-Stone or equal)
GRADED AGGREGATE FILLED VOID SPACE 1/2 ti PREMOLDED EXPANSION JOINT 4. ON ALL B&B PLANT MATERIALS, LOOSEN AND FOLD DOWN BURLAP FROM TOP 1 /2 OF ROOT BALL
NOTE: REFER TO CIVIL DRAWINGS FOR ALL
AFTER PLANT IS IN PLACE.
- GEOTEXTILF FABRIC TURNED UP AT EDGE 6" X B" CONCRETE RESTRAINT STRUCTURAL INFORMATION RELATED
W/ 1 #5 CONT. INTEGRAL COLOR ONE TO SUBBASE AND CONCRETE WORK 5. ALL STAKES AND BRACES SHALL BE SOUND NEW PRESSURE TREATED SOFTWOOD. ALL VISIBLE PARTS
6„ x 6" x 2 3/ 8„ PRECAST CONCRETE SHALL BE PAINTED WHITE.
I
UNIT PAVERS (Color selected by owner)
CRUSHED LIMEROCK SUB -BASE
6. ALL STAKING AND GUYING SHALL BE REMOVED BY CONTRACTOR AT END OF ONE YEAR MAINTENANCE "
SAND FILLED JOINTS W/ SEALER
4" REINFORCED CONCRETE SLAB
PERIOD.
o
GEOTEXTILE FABRIC TURNED UP AT EDGE (OPTIONAL)
INTEGRAL COLOR TWO
:,,�
•• • • - •• �• • • •- •' �• • ••
•• • • '- • •• •
7. ALL EARTHEN TREE SAUCERS SHALL BE REMOVED BY THE CONTRACTOR AT END OF ONE YEAR
a .,,.�..
.:.,kl.11 :.• t �.
.,.,:.,.�.� �.•,+.�
EXPANSION JOINT
MAINTENANCE PERIOD.
•• ,, •
I I I I I
I I ( I I
• •
t
• • •. -•... • • • , • • ; • , •. ••• • • •
' /41
.. • • .. • • • t R
8. ALL FLEXIBLE GUYING MATERIAL SHALL BE SAFETY WHITE POLYPROPYLENE SUCH AS ARBORTIE BY
. ..•
r t •• • t r
. ..
• • • • •- • • •
• •
Q
»' : .
„•• • r r r • • rr , _ • • •. + • '• + i r•
•
,,.:..
• • ••
.
• • • • • •
�.
.4
-
DEEP ROOT OR APPROVED EQUAL.
• • •
• •• .. ..•
...
III
I I
• ,. ..•,.:.••.
' • • • op.
4'. ' -
I
I
I
I
I
I
—
—
•
to
•: ,.,.:
, ', .' ... , r.
A • ' ...
. ;
•'
D INTEGRAL VERTICAL ROOT DEFLECTING MOLDED
9, ALL ROOT GUARDS SHALL BE POLYETHYLENE WITH M L E
-I
• • :
.• .: •:
•' •
•
—
III f I I I I i III—�
_ —
:
R
••
-. A. :.
• • ••• .0. • : • . •
•
RIBS AND DOUBLE TOP EDGESUCH AS -2 UNIVERSAL BARRIER BY DEEP ROOT OR APPROVED
, UB 24
IEd-
••r �'
_--•---
• • t• • • •.• • ••Rrrr
• k r► R tr R
EQUAL.
III
IiI
III
II
I
III
I I
II
I
III
I
I I
I
II
I
I I
I
III
I I
I
111
I
I I I I
III
I II
I
I
II
I I—
III-11I
I I—_ I F-El
III—III=III=III—III=IIII
I I—) I— I —I I IEHI
10. ALL TREES WITH PRUNED CENTRAL LEADERS SHALL BE REJECTED.
1" SAND SETTING BED
REINFORCED CONCRETE CURB & GUTTER
11. FOR ALL PLANT: MATERIALS, IMMEDIATELY AFTER PLANTING, .WATER. THOROUGHLY AND `REMOVE AIR
CRUSHED LIMEROCK BASE
COMPACTED BASE
POCKETS.,..'
,
1 SAND SETTING BED
EXISTING SUBGRADE OR APPROVED
12. TOPSOIL SHALL BE EVERGLADES PEAT.
COMPACTED FILL
CRUSHED LIMEROCK BASE
13. SAND SHALL BE CLEANED, WASHED, AND FREE OF SILT, SLUDGE AND TOXIC MATERIALS.
EXISTING SUBGRADE OR APPROVED COMPACTED BACKFILL
i
14. FERTILIZER SHALL BE ORGANIC FERTILIZER CONTAINING NITROGEN, PHOSPHORIC ACID AND POTASH
IN EQUAL PERCENTAGES OF PLANT FOOD BY WEIGHT, IN THE FOLLOWING FORMS:
-CONTAINERIZED (POTTED) MATERIAL SHALL RECEIVE A GRANULAR SUCH AS "TRI-NITE", OR
APPROVED EQUAL.
r5_'VERMEABLE
CONCRETE
UNIT PAVING('T�PRECAST
C
CONCRETEI
UNIT PAVING%
I
I VTEG RAL
COLOR
CONCRETE PAVING �
-SPECIMENS SHALL RECEIVE TIME -RELEASED FERTILIZER, SUCH AS OSM000TE, OR 5
11_0"
APPROVED EQUAL.
-B&B MATERIAL SHALL RECEIVE TIME -RELEASED FERTILIZER IN THE FORM OF PACKETS OR
BRIQUETTES, SUCH AS "WOODACE", OR APPROVED EQUAL.
-PALMS SHALL RECEIVE A PALM -SPECIAL MIX CONTAINING MAGNESIUM, MANGANESE,
ff ff
�_
CHELATED IRON, AND OTHER MINOR ELEMENTS, SUCH AS THAT PRODUCED BY GRACE OR
12 X 8 CONCRETE RESTRAINT
6 X 8 CONCRETE RESTRAINT
NATURAL GRAY
W/ 1 #5 CONT. INTEGRAL COLOR ONE
ATLANTIC FERTILIZER COMPANIES, MIAMI; FLORIDA
15, LIME SHALL BE NATURAL DOLOMITIC LIMESTONE.
{
16. PEAT HUMUS SHALL BE FS O-P-166.
17, PERLITE SHALL MEET NATIONAL BUREAU OF STANDARDS PS23.
18. SAWDUST SHALL BE ROTTED SAWDUST WITH 7.5 POUNDS OF NITROGEN.
19. MULCH SHALL BE SHREDDED CYPRESS MULCH MOISTENED AT THE TIME OF APPLICATION. ALL PLANT
MATERIALS SHALL RECIEVE THE SPECIFIED DEPTH OF MULCH IMMEDIATELY AFTER PLANTING. MULCH
SHALL BE REPLACED BY CONTRACTOR AFTER REMOVAL OF SOIL SAUCER,
i
i
20, PLANTING SOIL FOR ALL PLANTINGS SHALL CONSIST OF 33% TOPSOIL, 33% _ NUMBER 70 SILICA
SAND, 23% SAWDUST AND 10% HUMUS BY VOLUME, UNLESS OTHERWISE NOTED. THE PLANTING SOIL
MIXTURE SHALL BE MIXED WITH EXISTING SOIL AT A RATIO OF 3:1 PRIOR TO PLANTING. ALL PLANTING
SOIL AND BACKFILL SHALL BE FREE OF DEBRIS, ROOTS, CLAY, STONES, AND OTHER FOREIGN MATERIAL.
21. THE QUANTITIES LISTED ARE FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. THE CONTRACTOR ., ; °t : ••
IS RESPONSIBLE FOR SUFFICIENT PLANT MATERIAL TO COVER THE AREA AS SPECIFIED. ,` �" `` ....
.MEABLE CONCRETE PAVERS 633x 6 x 2 3 8 PRECAST CONCRETE
.+ ,y
NATURAL GRAY (Eco-Stone or equal) UNIT PAVERS (Color selected by owner) 22. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. `M
23. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION: =
(*'_9 PAVING PATTERN 2
V C
L_4 1 „_ 1 t-Of,
DRAWING TITLE -
NO.
DATE RE'V SION NO. DATE REVISION
m O NER/DEVELOPER= KELLER ALVAREZ ASSOC. INC, CHANDLER AND ASSOCIATES
DETAILS,
ARCHITECTURE, P.A. 9-27-03 STREETSCAPE CHANGES PER
LANDSCAPE ARCHITECT �1
„nz THE57 NOTES &SCHEDULE
AA 000�050 7�rd 3TRE� tiUIDELIT+IE'.!
hiomi)-surmon LA 0000926 JASON R. CHANDLER, A.I.A. Alt.. NO. 16055
COMPANY SCALE- SCALE AS NOTED
1E5 FOX TRACE 5940 SOUTH WEST 73RD STREET DATE- APRIL 10, 2001 100% C.D.
SUITE 400 7300 S.W. 57TH COURT ATHENS, GCORGIA 30606 SOUTH MIAMI, FLORMA 33143 PRO.MOT NOv 8902.2
DRAWING Na
49BQ S.W. 72 AVENUE CITY OF SOUTH MIAMI
MIAMI, FLORIDA 33155 SOUTH MIAMI, FLORIDA 33143 TEL (76) 54: 9895 FAX (305) 66 7593 L-
305.662.1421 cornao[rr 2001 I
1
I