Loading...
Res No 031-24-16136RESOLUTION NO. 031-24-16136 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND PROJECT WORK/PURCHASE ORDER WITH SRS ENGINEERING, INC. FOR ADDITIONAL ENGINEERING AND DESIGN SERVICES FOR THE 100% CONSTRUCTION DRAWINGS RELATING 'l'O THE PROPOSED DANTE FASCELL PARK COMMUNITY BUILDING PROJECT IN AN AMOUNT NOT TO EXCEED $31,897.20; PROVIDING FOR AUTHORIZATION; PROVIDING FOR IMPl.,EMENTATION, CORRECTIONS, AND AN EFFECTIVE DATE. WHEREAS, in accordance with Section 287 .055, Florida Statutes, also known as the "Consultants Competitive Negotiation Act (CCNA),'' the City Commission adopted Resolution No. 056-22-15809, selecting SRS Engineering, Inc. ("Consultant") ns one of val'ious tinns to provide as-needed professional engineel'ing services pursuant to RFQ No. PW2022-03: and WHEREAS, on A1,dl 4, 2023, the City Commission adopted Resolution No. 039-23- 15973, aulhol"izing tho City Manager to procure additional engineering and design sci-vices from the Consultant to prepare l 00% conlracl plnns, drawings f01· the conversion of the handball courts to pickleball courts, exhibits and assistance at a public community meeting (if necessary), and constntclion documents for Miumi-Dadc County DP.RM's review and pel'mitting; and WHEREAS, based on feedback from the City Commission, University of Miami School of Architecture, and City Staff: the City desires lo revise the l 00% construction drawings to include additional improvements relating to the proposed Danto Fascoll Park Community Building Project (tho "Additional Services"), all as set forth in greater dotnil in the Proposal attached hereto ns Exhibit "A 1 '; nnd WHEREAS, the City Commission desires to approve the Consultant's Proposal, altnchcd hereto as Exhibit nA," for tho Additional Services in an amount not lo exceed $3 J ,897.20, inclusive of nn additional $5,970 for add-on 3d Modeling Renderings, and authorize the City Manager lo issue and execute a Pmject Work/Purclmse Order with the Consultant for the Additional Services in subsluntinlly the form attached hereto as Exhibit "8"; and WHEREAS, lhe cost of tho Additional Services will be charged to the American Rescue Pinn Act (ARPA) Account No. 121-2000-572-6550, or such other funding somcc as dclcnnincd by the City Manager to be in tho best interest of the City; and WHEREAS, the City Commission finds that this Resolution is in the best interest and wclfurc of the City. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OJc' THE CITY OF SOUTH MIAMI, li'LORIDA: Pagel of2 Res. No.()31-24-1 (, 136 Section 1. Recitals. The above-slated rec itals arc tru e and correct and arc in corporated he rein by thi s reference. Section 2. Approving the Proposal an<l Project Worlc/Purchase Order with Consultant; Authol'izntion to City Mn11agc1·. The Proposal nttaehed hereto ns Ex hibit "A" nncl lh c Work/Purchase Ord e r in subst anlially lhe form allached hereto as Exhibil "0" arc here by ap proved. The City Manager is authorized to i~s ue and execut e a Project Work/Purchase Order with th e Co ns ultanl for lh e Additional Servi ces and ex p end a tolal amo unt nol to exceed $31,897.20, in clu s ive or an additional $5,97 0 for add-on 3d Modeling Renderings. The Iola! ex pe ndilure shall be cha rge d lo th e American Rescue Phm Act (AR PA) Acco unt No . l 21-2000- 572-6550, or such olher fondin g so urc e as dct ermin cd by the City Manager to be in th e best in I crest o f th e Cit y. Section 3. h11pleme11tatio11 . The Cit y Manager is hereby authori zed lo take an y and all action necessary to impl e ment th e Additional Services and the purp oses o f thi s Resolulion. Section 4. Corrections. Conti.>rmin g lan gua ge or tec hni cal scrivener-type co rrc cl io ns ma y be made by th e City Allorney for any co nfrmning ame ndm e nt s lo be in cor porat ed into lh e final resolution for s ign ature. Section 5. adop ti o n. Effective Date. This Resolution shall beco me effective immediately up on PA SSE O /\ND ADOPTED thi s 19th day of' March, 2024. ATTEST: READ AND APPROVED AS TO FO!Uv1, LANGUAGE, LEGA LI TY AND EXECUTION THEREOF: • ·•L FMAN CO LE ' .. CIT Y AT TORNEY APPROVED: M~ COMM IS SION VOTE: Mayor Fcrn.'.111clcz: Vice Mayor Bo nich: Commissioner Ca ll e: 5-0 Yea Yea YcH Co mmi ss ion er Liebman: Yea Commi ss io ner Corey: Yen J>agc 2 of 2 Agenda Item No:3. City Commission Agenda Item Report Meeting Date: March 19, 2024 Submitted by: Quentin Pough Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND PROJECT WORK/PURCHASE ORDER WITH SRS ENGINEERING, INC. FOR ADDITIONAL ENGINEERING AND DESIGN SERVICES FOR THE 100% CONSTRUCTION DRAWINGS RELATING TO THE PROPOSED DANTE FASCELL PARK COMMUNITY BUILDING PROJECT IN AN AMOUNT NOT TO EXCEED $31,897.20; PROVIDING FOR AUTHORIZATION; PROVIDING FOR IMPLEMENTATION, CORRECTIONS, AND AN EFFECTIVE DATE. 3/5 (CITY MANAGER-PARKS, RECREATION & CULTURAL DEPT.) Suggested Action: Attachments: Memo-DFP_Community_Building_Addtl._Services.docx Resolution Approving Proposal And Project Work Order - SRS Engineering - Dante Fascell Park Revised Additional Design Services.DOCX Exhibit A-Additional Services-DFP Community Building.pdf 48D9776-Project Work Purchase Order Agreement - SRS Engineering - Additional Revisions - Dante Dascell Park.DOCX DFP-Render Elevation & Colorboard 5-25-23.pdf DFP Building Screenshots 10-19-23.pdf Res No 039-23-15973.pdf Res No 056-22-15809.pdf 1 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor, Vice Mayor, and Members of the City Commission FROM:Genaro “Chip” Iglesias,City Manager DATE:March 19, 2024 SUBJECT:Proposal for additional design services #2 (exterior finishes) –Dante Fascell Park Community Building RECOMMENDATION:Approval of additional architectural, electrical, structural, and landscaping services regarding exterior finish improvements for the proposed community building project at Dante Fascell Park in the amount of $31,897.20. BACKGROUND:On April 4th, 2023, the Mayor and City Commission passed and adopted Resolution #039-23-15973, authorizing the City Manager to procure additional services from SRS Engineering, Inc.Said additional services were as follows: relocate the proposed community building near the existing office- restroom facility; and rotate the facility counter-clockwise and flip/mirror the interior layout; and prepare drawings for the conversion of the handball court to pickleball courts to be incorporated into the contract drawings; and prepare exhibits and assist at a public community meeting, if necessary; and improvements to the building’s exterior finishes; and repurpose the locker room and shower facilities; and prepare construction documents for Miami-Dade County DERM's review and permit. The initial service related to improvements to the building’s exterior finishes, in the amount of $6,560, was limited to two (2)finish schemes, revised elevations, selection of materials, and color board.In addition, the Consultant revised and provided 3D renderings and video fly by at no additional cost to City. Additional exterior finish improvements, beyond the initial services written above, have been requested based on feedback from members of the City Commission, University of Miami School of Architecture, and City staff.Said improvements include: raise the parapet to display the building’s name and City’s logo; and 2 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM extend concrete slab along the back (west side) of the building to establish an open terrace with commercial tables and umbrella elements; and provide additional lighting for the extended concrete slab along the back; and provide protective enclosure and landscape around the HVAC system (ground level); and provide porcelain tile along the back of the building exterior wall; and extend counter space at concession window; and provide window shades or tinted windows at concession and office windows; and add-on service ($5,970):updated 3D modeling renderings showing final revisions and video fly by. TIMELINE:The estimated timeframe to complete the revised contract plans and submit for permitting is six (6) weeks from the issuance of a purchase order to the consultant. VENDOR SRS Engineering, Inc. EXPENSE:Proposal/contract amount for base services ($25,927.20) and add-on service ($5,970) shall not exceed $31,897.20. FUND ACCOUNT:American Rescue Plan Act (ARPA) – account number 121-2000-572-6550, or other funding source as determined by the City Manager to be in the best interest of the City. ATTACHMENTS:Resolution Additional Services Proposal #2 - SRS Engineering, Inc. DFP-Render Elevation & Color board (5/25/23) DFP Building Screenshots (10/19/23) Resolution #039-23-15973 - Additional Services #1 Resolution #056-22-15809 - CCNA Professional Service Agreement 3 EXHIBIT A SRS ENGINEERING, INC. PROPOSAL FOR ADDITIONAL SERVICES #2 6 March 5, 2024 (Rev.) Mr. Quentin Pough, CPRP, CPSI Director, Parks & Recreation Department City of South Miami 6130 Sunset Drive South Miami, FL 33143 Re: City of South Miami Dante Fascell Park – Design of New Community Building Additional Services No. 2 Dear Mr. Pough, We appreciate this opportunity to prepare this Proposal for Additional Services for the referenced project. In accordance with our Agreement for General Engineering and Architectural Services, we are submitting this proposal for additional services for revisions to construction drawings as described below and attached check list as requested by the City. SCOPE OF WORK 1. Prepare revisions to the 100% construction drawings to including, but not limited, to the following: a) Provide general project management services, to include attending project coordination meetings, coordination with team consultants, and conduct QC/QA reviews. b) Raising the parapet along one side to install the building name and City logo. These changes will require revisions to the Architectural, Electrical and Structural drawings. c) Extending the concrete slab along the back (west side) of the building and provide commercial tables with umbrellas. These changes will require revisions to the site grading. d) Provide additional bollard lighting at the extended concrete slab. e) Provide protective enclosure and landscape around the ground level HVAC system. f) Provide porcelain tile along back of building exterior wall. g) Extend counter space at concession window. h) Provide “Café” sign on the side of concession window. i) Provide Window Shades or Tinted windows at concession and office windows. 7 March 5, 2024 Page 2 (Add-ons) 2. Provide 3D Modeling Renderings showing latest revisions. SUBCONSULTANTS The following are professionals contracted be SRS Engineering, Inc. to assist in the preparation of the work outline above. Please see attached consultant’s fee proposals for additional information.  Laura M. Perez and Associates, Inc. (Architect)  Botas Engineers, Inc. (Structural Engineers)  Basulto & Associates (Electrical Engineer) COMPENSATION Our Engineering Fees for the above-described Basic Services will be a lump sum amount of TWENTY-FIVE THOUSAND NINE-HUNDRED and TWENTY-SEVEN DOLLARS AND TWENTY CENTS ($25,927.20). Plus, additional Add-Ons of $5,970.00 if selected by the City. Please see attached fee breakdown. It does not include plan review or permitting fees. Payment will be based on monthly invoicing as a percentage of completion of work. We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Agreement with the City represent the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement indicated below and return to our office. Very truly yours, Ignacio Serralta, P.E. President I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this _______ day of______________, 2024 City of South Miami By: __________________________________ Title: _______________________________ 8 ENGINEERING COST BREAKDOWN City of South Miami DATE:3/5/2024 ACTIVITY PRINCIPAL SR. PROJ. MGR SR. ENGINEER ENGINEER CAD TECH CLERICAL TOTAL TOTAL BY SRS HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HOURS COST $210.00 $190.00 $140.00 $115.00 $75.00 $58.50 PROJECT MANAGEMENT & COORDINATION 2.0 $0.00 6.0 $0.00 $0.00 $0.00 $0.00 $0.00 8.0 $0.00 REVISIONS TO PGD DRAWINGS $0.00 4.0 $0.00 6.0 $0.00 16.0 $0.00 $0.00 $0.00 26.0 $0.00 TOTAL 2.0 $0.00 10.0 $0.00 6.0 $0.00 16.0 $0.00 0.0 $0.00 0.0 $0.00 34.0 $0.00 ACTIVITY DESCRIPTION (Basic Services)COST BY OTHERS Laura M. Perez and Associates, Inc. Basulto & Associates, Inc. Botas Engineers, Inc. TOTAL = SUMMARY ACTIVITIES BY SRS (Salaries) (Basic Services)X 1.00 ACTIVITIES BY OTHERS Estimated OUT OF POCKET EXPENSES including reproduction costs, etc. TOTAL THIS PROPOSAL (Basic Services) = ACTIVITY DESCRIPTION (Add-Ons)COST BY OTHERS Laura M. Perez and Associates, Inc. TOTAL =$5,970.00 Dante Fascell - New Community Building $16,970.00 Additional Services 3D Modeling $5,970.00 $25,927.20 $0 Architect (Basic Services) $0.00 $25,927.20 $0.00 $25,927.20 MEP Engineers $1,800.00 Structural Engineers $7,157.20 9 Dante Fascell: From Quentin, please move forward with the following exterior improvements. Last response: 01/11/2024 from Quentin 1. HVAC system at ground level w/ protective enclosure and landscape. OK 2.(ƄťôŘĖĺŘϙƲĺĺŘĖIJČϙ- èĺīĺŘôîϙŕĺŪŘôîϙèĺIJèŘôťôϙƱIJĖŜēϟϙOK 3. Exterior wall – porcelain tile on front and back of building. OK 4. No raised parapet. o As previously presented, there will be raised parapet ONLY on the front where the name and logo will appear, see attached picture. o ĺIJƱŘıôîϟϙ„īôÍŜôϙèēôèħϙťēôϙÍIJČīôϙĺċϙťēôϙŕÍŘÍŕôťϙÍŜϙŕŘôŜôIJťôîϙĖIJϙťēôϙ>ŘĺIJťϙ view, it appears slanted. Also, the trim should be the same color as the rest of the building. 5. Stairs and ramp to be lit. o See attached E-301 showing (2) light poles at the bottom of the stairs and at the middle of the ramp. o Sounds good. 6. Extend counter space at concession window. OK 7. Add “Café” above concession window. o It will be installed on the side – within the porcelain tile so that it can be visible from outside. o Approved. 8.“ĖIJťϙèĺIJèôŜŜĖĺIJϙÍIJîϙĺƯĖèôϙſĖIJîĺſŜϟϙ o Should it be at all windows? Yes. o May be a shade instead or the tinted windows need to be visible both sides? Yes. 9. Add City logo w/ lighting on rooftop. OK 10.Add City branding on back of the building. o Can you clarify? Should it be at the center? See picture of the back of the building. Disregard. 11.Extend concrete slab in the back of the building to active area (add commercial tables w/ umbrellas). o SRS: It is our understanding that we will not extend the roof, only the concrete slab. o That’s correct o Additional lighting will be required. o Yes. Add bollard lighting on corner of slab Or in-ground recessed lighting as an alternate to bollard lighting for the extended slab. 12.Change building name (TBD by City). Also – ŕīôÍŜôϙèĺIJƱŘıϙťôIJťÍťĖŽôϙťĖıôīĖIJôϡϙ February 16th: Finalize contract plans March - June: Submit application and coordinate building permit 10 2 4 0 1 N . W . 7th S T R E E T M I A M I , F L 3 3 1 2 5 P H : 3 0 5 - 6 4 2 - 9 4 9 4 F A X : 3 0 5 – 6 4 2 – 0 8 8 9 E- M A I L : l m p @ l m p t c . c o m L A U R A M. P E R E Z & A S S O C I A T E S, I N C. A R C H I T E C T S – P L A N N E R S – I N T E R I O R D E S I N G E R S L I C. A A – C 0 0 1 8 6 4 January 18, 2024 Mr. Ignacio Serralta SRS Engineering 7000 SW 97 Avenue #210 Miami, Florida 33173 Re: City Of South Miami (Dante Fascell Park) New Building (Re Design based on owner comments) Dear Ignacio, The firm of Laura M. Perez and Associates, Inc. (LMP) is pleased to submit this fee proposal to provide additional Architectural services for the referenced project. Based on numerous meetings and owner reviews we have been asked to re design and incorporate the changes as per the attached email. Attached is a fee proposal, along with the amount of time required to change each sheet of the set. Total Architectural Fee for Redesign $ 16,970 (see attached fee breakdown) Total Architectural Fee 3D Modeling $ $5,970 (see attached fee breakdown) If you have any questions or require additional information please do not hesitate to contract our office. Sincerely, Laura M. Perez and Associates, Inc. Laura Perez, President 11 LAURA M. PEREZ & ASSOCIATES, INC. FEE PROPOSAL FOR SOUTH MIAMI DANTE FASCELL PARK REDESIGN AS PER OWNER 1) 100% Construction Documents (45 days) Description Hours Rate Total Principal 2 $180.00 $360 Project Architect/Manager 20 $140.00 $2,800 Staff Architect 20 $110.00 $2,200 CADD 150 $75.00 $11,250 Estimator 0 $95.00 $0 Clerical 8 $45.00 $360 $16,970 2) Work done for board meetings Description Hours Rate Total Principal 3 $180.00 $540 Project Architect/Manager (Description below)12 $140.00 $1,680 Staff Architect 0 $110.00 $0 CADD (Color Board)50 $75.00 $3,750 Estimator 0 $95.00 $0 Clerical 0 $45.00 $0 $5,970 12 Coord. Drawing Changes COVER 0 3 Changes new rendering G-1.0 GENERAL NOTES 0 0 No Changes 1 A-1.1 OVERALL SITE PLAN 1 8 Changes topographical coordination of new conc pad A-1.2 PARTIAL SITE PLAN 1 4 Changes add concrete and a/c pad A-1.3 PICKLE BALL COURT 0 0 No Changes A-2.1 OVERALL LIFE SAFETY PLAN 1 4 Changes add concrete and a/c pad A-3.1 FLOOR PLAN 2 12 Changes add concrete and a/c pad new furniture and lights A-4.1 ROOF PLAN 1 4 Changes add parapet and logo A-4.2 ROOF DETAILS 0 0 No Changes A-4.3 ROOF AND MISCELANEOUS DETAILS 0 0 Changes new detail for parapet and logo A-5.1 REFLECTED CEILING PLAN 0 0 No Changes A-6.1 ELEVATIONS 2 8 Changes add concrete and a/c pad & enclosure, extend counter, parapet & logo A-6.2 ELEVATIONS 1 4 Changes add concrete a/c pad and enclosure A-7.1 SECTIONS 1 4 Changes add concrete pad, parapet and logo A-8.1 WALL SECTIONS 0 0 No Changes A-8.2 WALL SECTIONS 1 4 Changes new wall section for parapet and logo A-10.1 ENLARGED MULTIPURPOSE ROOM & INT ELEVATIONS 0 0 No Changes A-10.2 REPURPOSE INT ELEVATIONS 0 0 No Changes A-10.3 CONCESSIONS ENLARGED PLANS & INT ELEVATIONS 0 0 No Changes A-11.1 DOOR, WINDOW, SCREEN SHADES, & LOUVER SCHEDULE 1 4 Changes tint on windows and new tile on exterior A-12.1 DOOR AND LOUVER DETAILS 0 0 No Changes A-12.2 WINDOW DETAILS 1 4 Changes add tile on exterior A-12.3 DETAILS (Not used)0 0 No Changes A-12.4 SUN CONTROL ELEVATION AND DETAILS 1 8 Changes add ac enclosure detail A-13.1 STAIRS ENLARGED PLANS & SECTIONS (LIGHTING)1 8 Changes A-14.1 WALL TYPES 1 8 Changes add tile on exterior A-15.1 ROOM FINISH SCHEDULE & DETAILS 1 8 Changes add tile on finish schedule and in floor plan add concrete pad & ac pad, A-16.1 IDENTIFICATION DEVICES 1 8 Changes add logo and café signage Coord. and asemble Set 4 3 coord with engineers 6 2 meetings 5 Sign and seal drawings 2 2 3D Model Rendered and with Animation ( Flip Mirror )3 30 New Color Board 2 12 40 150 1 3D Modeling A. 3D Model Rendered and with Animation (Original Design )3 30 B. Changes to Modeling add unit on top and bottom/protect enclosure and interiors 3 16 C. Photos of Modeling for meeting 1 4 2 Meeting with city/board (4)8 01550 INDEX OF DRAWINGS New Items Requested by City in email from Quentin dated 12-11-23 ADDITIONAL COORDINATION WORK WORK PROVIDED FOR BOARD 13 14 BDTAS Engineering, Inc. STRUCTURAL ENGIN E ERS February 8, 2023 SRS Engineering, Inc. 5001 SW 74th Court, Suite 201 Miami, Florida 33155 Attn: Mr. Jea n-Cl a ude Fon tan ea u Project Name: Dante Fascell Park -Modifications to Structural Plans Supplemental Fee Proposal Subject: Dear Jean-Claude: As requested, we are submitting a supplemental fee to incorporate the new changes in the structural plans and revise the structural calculations accordingly. The revisions are as follow ... • Opening changes along Axis 3 and 4 . Sheets Impacted : o Foundation Sheet o Roof Sheet o Section 1/S-3, 3/S-3, and Schedule o Revise Cales . for beam along Axis 4. • Widening of the north corridor and the addition of steps. Sheets Impacted: o Foundation Sheet o Roof Sheet o New Section required . • Widening of west corridor. Sheet Impacted: o Foundation Sheet o Roof Sheet o New Section showing required retaining wall at the north edge of the west corridor. o Changes to section 4/S-4. • Dimish number of steps in all stairs at the east and west corridor. Sheets Impacted: o Foundation Sheet o Roof Sheet o Section 3/S-3 • Increase height of parapet. Sheets Impacted : o Roof Sheet o All Sections showing the parapet; sheet S-3 and S-4 ; design and details of the Roof Tie Beams; Schedule modificat ions. o Revise Parapet calculations due to new height . 8835 NW 35th Lane. Suite #202 • Doral. FL 33172 • Tel: 305-418-8111 • Fax: 305 -418 -8112 15 Our fee for the above -mentioned revisions is a lump sum of$ 7,157.20. Regards , BOTAS Engineering, Inc. ~~~~~ Patricia M. Botas, P.E. President Accepted Date 8935 NW 35th Lane . Suite #202 • Doral. FL 33172 • Tel: 305-418-9111 • Fax : 305-418-9112 Page 2 of2 February 6 , 2024 Dante F ascc ll 14160 Palmetto Frontage Rd, Suite 22 Page 1 of 2 Phone (305) 698-3988 Miami Lakes, Florida 33016 www.basulto.com Fax (305) 698-3989 February 7, 2024 Proposal # 2024010 Jean-Claude Fontaneau SRS Engineering, Inc. 5001 SW 74 Court, Suite 201 Miami, Florida 33155 Project: Dante Fascell Park Additional Services # 2 Location: 8600 Red Rd, South Miami, FL 33143 Dear Mr. Fontaneau, We are pleased to submit our proposal to provide Professional Engineering Services for the above-mentioned project. Services: Our scope of work will consist of additional services of expanded lighting design. Compensation: Our proposed fee shall be as follows: Services: $ 1,800.00 Payments as requested as follows: Per City of South Miami Payment Schedule Payment is according to the listed prices above. In accordance with Florida Statutes, Section 715.12, “Prompt Payment Law” we reserve the right to accrue interest at a rate of 12% APR, beginning 14 days after payment is due. Reimbursable: Reimbursable expenses including travel, lodging, printing, courier service, etc. shall be reimbursed at 1.1 times actual cost. Thank you for an opportunity to serve you. Should you have any questions, please do not hesitate to contact our office. Sincerely, René I. Basulto, PE, MSEM CGC, CFEI, CPE, CPD Principal 16 Proposal # 2024010 Page 2 of 2 LETTER OF AGREEMENT ACCEPTANCE I, the undersigned, having authority to execute this Agreement for and having read and understood this proposal and attachments, hereby agree to terms and conditions stated herein as well as to any terms and conditions attached hereto and made part of this Agreement. Please return one executed copy to BASULTO & ASSOCIATES, INC. and keep the other for your records. Signature Title ____________________________________ _____________________________ Printed Name Date Proposal shall remain open for acceptance for a period of 90 days from the original proposal date. Proposal is deemed invalid after 90 days from the original proposal date. _____________________________________________________________________________________________ 17 PROJECT WORK/PURCHASE ORDER Between C ITY OF SOUTH MIAMI, FLORIDA And S RS ENGINEERING, INC. Project Name : Dante Fasce ll Park -Additional Engineering and Design Services to Revise 100% Contract Plans for t he Proposed Community Bui lding Project Subject to th e provisions contained in the "Professional Services Agreement for Professio nal Ge neral Engineeri ng and Architectural SeNices" (hereinafter referred to as the "Professional Services Agreement") between the CITY OF SO UTH MIAMI, FLORIDA (hereinafter referred to as "City") and SRS ENGINEERI NG, INC., (hereinafter referred to as "Consultant") dated May 3, 2022, which Professional Services Agreement was competitively procured throug h Request For Qualifications {RFQ) No. PW2022- 03 in accorda nce wJ'!Jb 1pection 287.955, Florida Statutes. This Project Work/Purchase Order is made effective as of the --.:._r;__n __ day of 11"\6-r r I-\ , ~nd authorizes the Consultant to provide t he seNices as set forth below: ..)~'-j SECTION 1. SCOPE OF SERVICES 1. 1 Consultant shall provide professional engineering and design services , to revise the Cont ract Plans for the Proposed Commun ity Build ing Project at Dante Fascell Park and complete the tasks th at are identified and described in the project proposal , attached hereto as Exhibit "1 ," for the City (the "Services"). 1.2 The City may request c hanges that would increase, decrease, or otherwise modify t he scope of services outli ned under the Project Proposal attached hereto as Exhibit "1." Such changes must be contained in a written c hange order executed by the parties in accordance with the provisions of the Professional Services Agreement, prior to any deviation from th e t erm s of this Project Work/Purchase Order, including the initiation of any extra work . SECTI ON 2. DELIVERABLES 2.1 As part of the scope of services and project schedule, the Consultant shall provide the City w ith th e Deli verab les iden tified in the Project Proposal att ached hereto as Exhibit "1." SE CTION 3. TERM/TIME OF PERFORMANCE/DAMAGE 3.1 Te rm. This Project Work/Purcha se Order sha ll commence on the date th is instrument is fully executed by all parties and shall continue in full force and effect until terminated pursuant to Section 6 or other ap plicab le provisions of this Project Work/Purchase Order. The City Manager, in his sole discretion , may extend the term of this Project Wo rk/Purchase Order through written notification to the Consu ltant. S uch extension sha ll not exceed 90 days. No further extensions of this Agreement shall be effective unless authorized by the City Manager. 3.2 Commencement. Services provided by the Consultant under th is Proj ect Work/Purchase Order an d the time fra mes applicab le to t his Project shall commence upon the date provided in a w ritten I o f 4 Notice to Proceed ("Commencement Date") provided to t he Consultant by the C it y. The Consultant sha ll not incur any ex pens es or obl igat ions for payment to third part ies prior to th e issuance of t he Notice to Proceed. Consultant m ust receive writt en notice From th e City Manager prior to the beginning the performa nce of services . 3.3 Contract Ti me. Upon receipt of the Notice lo Proceed, the Consultant shall provide se rv ices to the Ci ty on the Com mencement Date, and shall continuously perform services to the City, withou t in terru pti on, in accordance with the time frames set forth in the Project Proposal attached and incorporated into t his Agreement as Exhibi t "1". Th e nu mber of ca lendar days from the Comme ncement Date, t hrou gh t he date set forth in the Project Sched ule for completi on or the Proj ect or the date of actual complet ion of the Project, whichever sha ll last occu r, shall constitute the Contract T ime . 3.4 A ll limitations of time set forth in th is Ag reement are of the essence. SEC TI ON 4. A MOUNT. BAS IS AND ME TH OD OF COMPENSATION 4.1 Compensation. Consultant shall be co mpensated for the provision of the Services in accordance with Exhibit "1" attached hereto. Co nsul tant sha ll receive a to tal lump sum fee of $31,897 .20, inclusive of a n addit iona l $5,970 for add-on 3d Modeling Renderings for this Project. 4.2 Rei m bursable Expenses. All reimbursable expenses are included in the total compe nsat io n listed in Section 4.1 above . SECTION 5. BILLING A ND PAYMENTS 5.1 Invoices 5.1.1 . Compensatio n and Reimb ursable Expenses. Consultant shall submit invoices wh ich are identi fied by the specific proj ect number on a monthly bas is in a t imely manner. These invoices shall identify the nature of the work performed, the phase of work, and t he estimated percent of work accomplished in accordance with the Payment Sched ule attached hereto as Exhibit •1•, att ached here to and made part of this Agreement. Invoices for each phase shall not exceed amou nts allocated to sa id phase plus reimb ursable expenses accrued dur in g each phase. The statement shall show a sum mary of fees with accrual of t he total and credits for port ion s paid previously. 5.1.2. Florida Prom pt Paym ent Ac t. The City shall pay the Contractor in accordance w ith the Florida Prompt Payment Act after ap prova l and acceptance of the Services by the City Manager. 5.2 Dispu ted Invoices . In the event tha t all or a portion of an invoice submitted to the City for payment to the Con sulta nt is d isputed, or additio nal backup documentation is requ ired, the City shall noti fy t he Cons ultant wi thin fi ft een (15) working days of receipt of the invoice of suc h objection, modification or add itiona l documentation reques t. T he Consu ltant sha ll provide the City within five (5) worki ng days of t he date of the Ci ty's notice. The City may req uest addit ional informa tio n, includ ing bu t not l imited to, all invoices, time reco rd s, expe nse records, accounting records, and payme nt records of the Consultant. The City, at it s sole discreti on, may pay to the Consu ltant the undisputed portion of the invoice . T he parti es shall e ndeavor to resolve the d isp ute in a mutu all y ag reeable fashion. 5.3 Suspe nsion of Payment. In the event that the City becomes credib ly informed that a ny represe ntati ons of th e Consulta nt , provided purs uant to Subparagrap h 5.1, a re w ho ll y or partially Inaccurate , or in the event th at the Consultan t is not In compliance wit h any term or condition of th is Project 2 of4 Ag reement, the City may withhold payment of sums then or in the fu t ure otherwise due to the Consultant until the in accuracy, or other breach o f Project Ag reement, and the cause thereof, is corrected to the Owner's reasonable satisfaction . 5.4 Omitted. 5.5 Final Payment. Submission to the Consultant's invoice for final payment and reimbu rse men t shall constitute the Consul tan t's representation to the City that , upon receipt from the City of th e amou nt in voiced, all ob ligatio ns of the Co ns ultan t to oth ers, includi ng its consultants, incur red in connectio n w ith the Project, shall be paid in full. The Consultant sha ll deliver to the City all documents req ues te d by th e City evidencing payments to any and all subcontractors, and all final specifications, p lans, or oth er documents as dictated in t he Scope of Services and De liverable. Acceptance of final payment shall constitute a wa iver of all claims against the City by the Consulta nt. SEC TI ON 6. TERM INAT ION/S USPENSION 6 .1 For Cause. This Project Work/Purchase Order may be terminated by either party upon fi ve (5) cale nda r days w ritten noti ce to the other should such other party fail substantially to perform in accordance w ith its material terms through no fault of the party initiating the term ination and fails to cu re t he fai lure to perform within such five (5) day period . In the event that Consultant abandons thi s Project Work/Purchase Order or causes it to be terminated by the City, the Consultant shall indemnify the City ag a inst any loss pertai ning to this termination. In the event that the Consultant is terminated by the City for cause and it is subsequentl y determined by a court by a court of competent jurisdiction that such term ination was without cause, such termination sha ll thereupon be deemed a termination for convenience under Sectio n 6.2 and the provision of Section 6.2 shall apply . 6.2 For Conven ience. Th is Project Work/Purchase Order may be terminated by the City for convenience upo n fourtee n (14) calendar days' written notice to t he Consul tant. In the event of such termi nati on a terminati on, t he Cons ulta nt shall incur no further obli gations in connectio ns with the P roject and shall , to the extent possible terminate any outstanding subconsultant obligation. The Cons u ltant shall be compensated for all services performed to the satisfaction of the City and reimbursable expenses incurred prior th e date of te rmin ation. In suc h event, th e Consultan t shall promptly submit to the C ity its inv oice fo r fin al payme nt and reimbu rsement wh ich invoice shall comply with the provisions of Section 5.1. Under no circ umstances shall the City make payment of profit to the Consultant for services which have no t been performed . 6.3 Ass ignment upon Termination. Upon termination of this Project Work/Purchase Order, a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) work in g days of receipt of written direction from t he City, transfer to either the City or its authorized desig nee, a copy of all work product in its possession, includ ing but not limited to designs, specifications, drawings, studies, reports and all other docu ments and data in the possession of the Consultant pertaining to th is Project Work/Purchase Order. Upon the City's request, the Consultant shall addit ionally ass ign its ri ghts, title and inte res t under any s ubcontractor's ag reements to the City . 6.4 Suspension for Convenience. The City shall have the right at any time to direct t he Consultant to suspend its performance , or any designated part thereof, for any reason what soever, or w it hou t reason, for a c umulative period of up to t hirty (30) calendar days. If any such suspension is directed by th e City, t he Consultant shall immediately comply with same. In th e event the City directs a suspension of performance as provided herein, through no fault of the Consultant, the City shall pay the Consultant as full compensation for such s uspe nsion t he Consultant's reasonable cost, actually incurred and pa id, of demobilization and remob ilization. Section 7 . Ameri c an Rescue Pl an Act Co nt ract Cond itions. 3 o f4 7.1 The Consu ltant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Loca l Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act ('ARPA"). Towards that end, the Consultant shall be requi red to comply with all laws, ru les, regu lations, po licies, and guidelines (including any subsequent amend ments to such laws , regula tions, polic ies, and guidelines) required by ARPA , as further detailed in the ARPA Add endum. If compliance with the ARPA Addend um is required, the City shall select thi s box : □. [REMA INDER OF PAGE LEFT IN TENTI ONALLY BLANK. SIGNATURE PAGE FO LLOWS.] 4 of4 IN WITN ESS WHEREOF, the parties hereto have caused this Work/Purchase Order executed as of the day and year as fi rst stated above CITY: AT TEST: A,a By: __ _ G , Date : ___ "?__,_2 ____ y-+---+----- APPROVED AS TO FORM AND LEGA L SU FF ICIENCY: Clf Y, A TT OR NEY / CONSULTANT : SRS ENG INEER ING, INC. By:-~~~-J-~~-- Name: --=lg.a.:.n=ac"""io=--=-Se=r ___ ra=-lt=a~, P~·=E~. ___ _ Tille: Pres ide nt Da te: _____ 3 ..... -2.....cS_-2_4 ________ _ WITNESSE S: Jean-Claude Fontaneau l of I EXHIBIT "1 11 PROJECT PROPOSAL (SCOPE OF SERVICES AND SCHEDULE AND PAYMENT SCHEDULE) S001 SW 7 4TH COU A T. S UIT E 20 1 , M IAMI. F"LCRIOA :l31 SS T£L: 305 ·662•88B7 F"AX: 30$·662·BBSB March 5, 2024 (Rev.) Mr. Quentin Pough, CPRP, CPSI Director, Parks & Recreation Department City of South Miami 6130 Sunset Drive South Miami , FL 33143 Re: City of Sout h Miam i Dante Fascell Park -Design of New Community Building Additional Services No. 2 Dear Mr. Pough, We apprec iate thi s opportunity to prepare th is Proposa l for Additional Services for the referenced project. In accordance with ou r Ag re ement for Ge neral Eng i neerin g and Architectu ra l Services, we are submitting this proposal for additional services for revisions to construction drawi ngs as described be low and attached check li st as req uested by the City. SCOPE OF WORK 1. Prepare revisions to the 100% constru ct ion drawings to including , but not limited, to the follow ing: a) Provide general project management services, to include attend in g project coordination meetin gs, coord ination wi th te am consu ltants , and conduct QC/QA reviews. b) Rai s ing the parapet alo ng one s ide to in sta ll the building name and City logo. These changes w ill req uire rev ision s to the Architectural , Electrica l and Structural drawings. c) Extending the concrete slab along the back (west side) of the bu il ding and provide commercia l tab les with umbrell as. These changes will require revisions to the s ite grad ing. d) Provide additional bollard li ghting at the ex tended concrete slab. e) Prov ide protective enclosure and land scape around the ground leve l HVAC system. f) Provide porcelain tile along back of bui ldin g exte ri or wa l l. g) Ex tend counter space at con cession window. h) Provide "Cafe" s ign on the side of concession window. i) Provide Wi ndow Shades or T in ted window s at concession and office windows. (Add-ons) 2. Provide 30 Modeling Renderings showing latest revisions. SUBCONSULTANTS March 5, 2024 Page 2 The following are professionals contracte d be SRS Eng ineering, Inc. to assist in the preparation of the wo rk outlin e above. Please see attached consu ltant's fee proposals for add it ional information. • Laura M. Perez and Ass ociates, Inc . (Architect ) • Batas Engineers, Inc. (Structural Engin ee rs) • Basulto & Associates (Electrical Engineer) COMPENSATION Our Engin eerin g Fees for the above-described Basic Services wi ll be a l ump sum amount of TWENTY-FIVE THOUSAND NINE-HUNDRED and TWENTY-SEVEN DOLLARS AND TWENTY CENTS ($25,927.20). Plus, add itional Add-Ons of $5,970 .00 if selected by the City. Please see attached fee breakdown . It does not include plan review or p ermitting fees. Payment will be based on monthly invoicing as a percentage of completion of work. We wo uld expect to commence our services pro mptly after receipt of your acceptance of t his proposa l and approva l of the purchase order. Thi s Proposal a nd our Agreement wit h the City represent the entire understanding between the City of South Miami and SRS Engineerin g, Inc. in respect to the Project and may on ly be mod ified in writin g when signed by both of us. If th e forego ing is agreeable to you, please execute the origin al of this Agreement indicated below and return to our office. Very trul y y c9 , ~AJV ~J~ Igna cio S rral ta, P.E . Preside t I have read th e foregoing Letter of Agreeme nt and agree to all terms and conditions stated therein . Accepted t his ___ day of ______ , 2024 City of South Miam i By:-------------- Tit le: ------------- ACTI VITY BYSRS PROJECT MANAGEMENT & COORDI NATION REVISIONS TO PGD DRAW INGS TOTAL ACTI VITY BY OTHER S Laura M. Perez and Associates. Inc. Basulto & Associates, In c. Bolas Ena ineers, Inc. ACTIVITIES BY SRS (Salaries) (Basic Services) ACTIVITIES BY OTHERS PRI NCIPAL HRS RATE $210.00 2.0 $0.00 $0.00 2.0 $0.00 ENGINEERING COST BREAK DOWN City of Sout h Miami Dant e F ascell -New Communit y Bui lding Additi o n a l Services SR. PROJ. MGR SR. E NGINEER ENGINEER HRS RATE HRS RATE HRS RATE $190.00 $140.00 $1 15 .00 6.0 $0.00 $0.00 $0.00 4.0 $0.00 6.0 $0.00 16.0 $0 .00 10.0 $0.00 6.0 $0.00 16.0 $0.00 D ESCRIPTION (Basi c Services) Architect (Basic Services) MEP Engineers Structural Engineers SUMMARY $0 X 1.00 Estimated OUT OF POCKET EXPENSES including reproduction cost s, etc. CAO TECH CLERICAL HRS RATE HRS RAT E $75.00 $58.50 $0.00 S0.00 S0.00 S0.00 0.0 $0.00 0.0 $0.00 TOT AL , DATE: 3/5/2024 TOTAL TOTAL HOURS COST 8.0 26.0 34.0 S0.00 $0.00 $0.00 CO ST $16,970.00 $1,800.00 $7,157.20 $25,927.20 $0.00 $25,927 .20 S0.00 T OTAL THIS PROPOSAL (Basic Servi ces) = $25 ,927.20 ----------- ACTIVITY DESCR IPTION (Add-Ons) COST B Y OTHERS Laura M. Perez and Associates, Inc. 30 Modeling $5,970.00 TOTAL = $5,970.00 Dante Fascell: From Quenti n, please move forward with t he fo llowing ex terior improvement s. Last response: 01/11/2024 from Qu011tin 1. HVAC system at grou n d l evel w/ protective enclosure and lan d scape. OK 2. Exteri o r f l oo ri ng -col ore d poured concr ete finis h. OK 3. Exte rior wal l-porcela in tile on front and back of bu il d ing. OK 4 . No raised parapet. o As previou sly presented, there will be raised p,11apet ONLY on the front where the name and logo will appern. see attached p i cture. ,, Confirmed. Plec1se check th e an gle of the paropet ;:is presented in the Fr ont view, It appears slanled . Also. tlV" trim should be the same color as the rest of tho bui l ding. 5. Sta irs and ramp to be l it. o See attached E-301 showin g (2) ilgl1t poles at the bottom of the stair s and al tt1 e middle of the ram p . o Sounds goo d. 6. Extend cou nte r space at concession window. OK 7. Add "Cafe" above co n cession window. It will be in s talle d on th e sIdr• -wIth1r1 the porcelain tile :-o th;:it it c;:in be visible from ou tsid e. o Approved. 8. Tint concess ion and office w indows. r-Should It be at ;:ill windows? Yes . May be a shade insteacl or tho tinted wInclows nc~P.d to br-v1s1ble both sides? Yes . 9. Add C i ty logo w/ lighting on rooftop. OK 10 . Add City brand ing on back o f t he bu ild ing. n Ca n you clarify? Shou l d it be at the ce nt er ? Sec picture at tho bc1ck of the builclin g. Di s re gard. 11. Exten d concrete slab in t he back of the building to a ctive area (add commercia l ta b les w/ umb rellas). ·, S R S: It is our understanding that we will not extend the roof. o n ly the concre te s lab. That's correct Acld1tional lightin g will be re quIrccl. o \'es. Adel bo llard lighting on coII1EH ni slnh Or 111-grnuncl recessed lighting as an alternate lo bollard lIgl1t1n),( Ior the extencJecl sl"I). 1 2. C h a n ge b u ild ing n ame (TBD by C i ty). January 18, 2024 Mr. Ignacio Serra lta SRS Engineering 7000 SW 97 Avenue #210 Miami, Florida 33173 Re: City Of South Miami (Dante Fascell Park} New Building (Re Design based on owner comments} Dear Ignacio, The firm of Laura M. Perez and Associates, Inc. (LMP) is pleased to submit this fee proposal to provide additional Architectural serv ices for the referenced project. Based on num erous meetings and owner reviews we have been asked to re design and incorpora te the changes as per the attached email. Attached is a fee proposa l, alo ng with the amount of time required to change each sheet of the set. Total Architectural Fee for Redes ign Total Architectural Fee 3D Modeling $16,970 (see attached fee breakdown) $ $5,970 (see attached fee breakdown) If you have any que stions or req ui re add itional in formation please do not hesitate to contract our office. Sincerely, Laura M. Perez and Associates, Inc. Laura Perez, Pres iden t I I ~1---+---+----+---l--l--r--- 7111 S T R E E T M I A M I F L l J 1 2 ~ I' H 1 0 ., . ,, a 7 24 0 1 N .W 1 '1 i I ! j •--~,'--1-----,----1--+----t-- .. I 4 4 F A X J <, r t; ,t 2 0 S ~ 9 E M A I L I n, fl ,fJ, f n J, t c c o m LAURA M. PEREZ & ASSOCIATES, INC. FEE PROPOSAL FOR SOUTH MIAMI DANTE FASCELL PARK REDESIGN AS PER OWNER 1) 100% ConstrucUon Documents (45 days) Description Principal Projed Architect/Manager StaffArchited CADD Estimator Clerical 2) Work done for board meetings Description Principal Project Architect/Manager (Description below) Staff Architect CADD (Color Board) Estimator Clerical Hours 2 20 20 150 0 8 Hours 3 12 0 50 0 0 Rate $180.00 $140.00 $110.00 $75.00 $95.00 $45.00 Total $360 $2,800 $2,200 $11,250 $0 $360 $16,970 Rate Total $180.00 $540 $140.00 $1,680 $110.00 $0 $75.00 $3,750 $95.00 $0 $45.00 $0 --.$5~,11!!1!97~0~ INDEX OF DRAWINGS New Items Requ ested by City in email from Qu entin dat ed 12-11-23 COVER G-1.0 GENERAL NOTES A-1.1 OVERALL SITE PLAN A-1.2 PARTIAL SITE PLAN A-1 .3 PICKLE BALL COURT A-2.1 OVERALL LIFE SAFETY PLAN A-3.1 FLOOR PLAN A-4.1 ROOF P LAN A-4.2 ROOF DETAILS A-4.3 ROOF AND MISCELANEOUS DETAILS A-5.t REFLECTED CEILING PLAN A-6.1 ELEVATIONS A-6.2 ELEVATIONS A-7.1 SECTIONS A-8.1 WALL SECTIONS A-8.2 WALL SECT IONS A-10.1 ENLARGED MULTIPURPOSE ROOM & INT ELEVATIONS A-10.2 REPU RPOSE INT ELEVATIONS A-10.3 CONCESSIONS ENLARGED PLANS & IN T ELEVATIONS A-11.1 DOOR, WINDOW , SCREEN SHA DES, & LO UVER SC HEDULE A-12.1 DOOR AND LO UVER DETAILS A-t 2.2 WINDOW DETAILS A-12.3 DETA IL S (Nol used) A-12.4 SUN CONTROL ELEVA TION AND DETAILS A-t 3.1 STAIRS EN LARGED PLANS & S ECTIONS (LIGHTING) A-14.1 WALL TYPES A-15.1 ROOM FINISH SCHEDULE & DETAILS A-16.1 IDENTIFICATION DEVICES ADDI TIONAL COORDI NATION WORK Coord. and asemble Set coord wilh engineers 2 meetings Sign and seal d rav~ngs 3D Model Rendered and with Animation ( Flip Mirror ) New Col or Board WORK PROVIDED FO R BOARD t 30 Mode ling A. 3 0 Model Rendered and with Animati on (O rigina l Design ) B. Changes lo Modeling ad d unil on top a nd botto m/protect enclosure and interiors C. Photos o f Modeli ng for mealing 2 Meeting with city/board (4) Coord. Drawing Changes 0 3 Changes new rendering 0 0 N o Changes 1 8 C ha nges topographical coord ination of new cone pad 1 4 C hanges add conc rete a nd ale pad 0 0 N o Changes 1 4 Changes add concrete and ale pad 2 12 C hanges add concrete and ale pad new furniture and lights 1 4 Changes ad d para pet and logo 0 0 No Changes 0 0 Changes new detail for parapet and logo 0 0 No Changes 2 8 Changes add concrete and ale pad & enclosure, extend counter. parapet & logo 1 4 Changes add concrete ale pad and enclosure 1 4 Changes add concrete pad, parapet and logo 0 0 No Changes 1 4 Changes new wall section for parapet and logo 0 0 No Changes 0 0 No Changes 0 0 No Changes 1 4 C hanges ti nt on windows and new Ille on exterior 0 0 No Cha nges 1 4 Changes add llle on exterior 0 0 No Changes 1 8 Changes add ac enclosure delail 1 8 Changes 1 8 Changes add tile on exterior 8 Changes add tile on fi nish sched ule and In noo r pla n add concrete 1 pad & ac pad, 1 8 Changes add l ogo and cafe slgn age 4 3 6 5 2 2 3 30 2 12 40 150 3 30 3 16 1 4 8 0 BUT AS Engineering, Inc. s T r~ u C r u R A L F N Ii I N l I r~ ) Feb, uJry 8. 2023 SRS Engineering, Inc. 5001 SW 74 t h Court, Suite 201 Miami, Fl orida 33155 Attn: Mr. Jean-Claude f-ontan1 au Project Name: Dan le Fdsccll P<1rk -Mod1f1c llI011, lo ',t, uc t1II di Pl ,1 11 ', Supplenwntal I-ce P1 oµosal Subject: Dear Jean-Cl aude· As r eq u c!.led, we are subm itting ;1 '.:.lll)plc111cntc1I fee to rnrnrpor .11 r· tlw new chJnges. 111 the stru ctural plans a n d r evise the structurul colcul,1l1011 '.:. .iccord1nglv The revision, arc il S lollow • • • • Openinr, changes al ong /\x1~ 3 ,lna 11 Shrrts lmpr1rterl: Fuu11dat1011 Sh el'\ Roof Sheet Sec tion J/S-3, 3/S ~-dnd SchPcitrlc Revise (;1 lcs for beam illong /\x1·, ,! W i dening of the north r.o 111cl o1 ,1110 till' 1d i,t 11 11 nl •,tl'p ,. ~h1•Pt '> linpact ec . Foundation Sheet Roof Sheet New Sccuon r cquirPcl. Widening of we st rorrnio1 <:,iw0t lr1p;1rt<'<i · roundation S.hcr•t Roof Sheet New Sect i on showing 1L•qu11rd re l dI11In~ •.v 1II .. t Uw riortli edge of the wes.t corridor Changes Lo sec tion II/':, ,1 D 11rnsh number of step<, in cJII ~t.11,.., it the' l'rl~l ,11HI Wt",f rn111do1 SIH•1•t <; lrnpr1c tt•d· Foundc1 tio 11 Sh C'c l Roof Sheet Section 3/S-3 Increas e height of parapr.'l 5'1P l'l ~ lmr,lf t rd Roof Sheet /\II Sec tions showing the p,11ar rt : ·,l11·1·t <, ~.ind':> it, tk'..lf!ll ,11 1u dlldtb oi th e Roof 11l· Beams; Schedu le mot1drr,1t1u11~. , • Revi se Pc1rapet cr1lculat inn~ rlt1P t n ,ww llr •1r,ht Ou r fee for th!' c1h ovc-rnenl101wd ,,,vr•.rtrn ~ ,, .i lu,1 1p ,u111 of ~7,l_SJ .20. Regards. BOTAS En gi nee rin g, I nc . Patrici a M . Betas, P.E . Pres i de nt ., /\1 r <'J'I L'cf {),II I 11,11:, '111 ' I r1,r11.11, o lfl', 11 Hlh I ,,\.,:It B A s u LT 0 A S S 0 C A T [ S \ 0 '>,: C, II I 1 I N •• 11'.C.INIIR'> Feb ruary 7, 2024 Jean-Claude Fontaneau SRS Engin eerin g, Inc. 5001 SW 74 Court, Suite 20 1 Miami, Florida 33155 Proj ect: Dante Fascell Park Additional Services# 2 Location: 8 600 Re d Rd. South Miam i. FL 33143 Dear Mr. Fon tanea u, We are pleased to submit our pro posa l to provide Profess ional Engin eerin g Services for the above -mention ed project. Servi ces: Our scope of wo rk will co nsist of a dditional services of expanded l igh ting design. C o mpen sation: Ou r proposed f ee sh all be as fo ll ows: Se rv ices: $ 1 ,8 00.00 Payments a s requ e sted a s follows : Pe r Ci t y of So uth Miami Pa yment Schedule Payment is acco rding to the listed pri ces above. In acc ord ance wi th Florida Statutes , Section 715.12 , "Pro mpt Pay ment Law" we res erv e the right to acc rue inte res t at a rate or 12% APR, be ginning 14 days aft er pa ym en t is due. Reim burs able: Re imbu rs ab le exp en ses includin g travel , lodgi ng, printing , c our ier se rvice , etc. s ha ll b e r eimbursed at 1.1 time s actu al cost. Thank yo u fo r an op portunity to serve yo u. Should yo u have any questions, ple a se do n ot hesitate t o contact our offi ce. S in ce re ly , ~~ Rene I. Basu lto, PE, MSEM CGC , CFE I, CP E, CPD Prin cipal 1-l I /,1) Pa lm..:lto l ·ronlaµ,• Rd . '-i111il' .' .' i\,J i a1111 I ,1k.:,. Flornl.1 1_10 I <, l',I_'.!<' I 111 ' \\•\\ \', h,hllll ,t Cl)lll l'h,111,· I 11151 <,•)S-_,<)xx i·a, r .10:-J <,,>s -_1 0:-9 Proposal # 20240 I 0 LETTER OF A GREEMENT ACC E PTANCE I, the undersi g ned , hav in g authori ty to execute this Ag ree ment for and having read and und e rs tood th is pro posa l and attachm ents, he reby agree to terms and cond iti ons stated he rein as w ell as t o any te rm s and cond itions attached he reto and made part of this Agreement. Please return one executed copy to BAS ULTO & ASSOC IATES , INC. and keep the other for you r re co rd s. Signature Ti tle Printed Name Date Proposa l sh a ll r emain open for ac ceptance for a period of 90 days from the original proposal date. Proposa l is deemed in valid after 90 days from the origina l proposal date. I\ /\ ~ U L 1._ ') I\ ', ~ .., ' -. I \ I I .... 1 of 1 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Dante Fascell Park – Additional Engineering and Design Services to Revise 100% Contract Plans for the Proposed Community Building Project 18 1 of 4 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Dante Fascell Park – Additional Engineering and Design Services to Revise 100% Contract Plans for the Proposed Community Building Project Subject to the provisions contained in the “Professional Services Agreement for Professional General Engineering and Architectural Services” (hereinafter referred to as the “Professional Services Agreement”) between the CITY OF SOUTH MIAMI, FLORIDA (hereinafter referred to as “City”) and SRS ENGINEERING, INC.,(hereinafter referred to as “Consultant”) dated May 3, 2022, which Professional Services Agreement was competitively procured through Request For Qualifications (RFQ) No. PW2022- 03 in accordance with Section 287.955, Florida Statutes. This Project Work/Purchase Order is made effective as of the day of , 2023, and authorizes the Consultant to provide the services as set forth below: SECTION 1. SCOPE OF SERVICES 1.1 Consultant shall provide professional engineering and design services, to revise the Contract Plans for the Proposed Community Building Project at Dante Fascell Park and complete the tasks that are identified and described in the project proposal, attached hereto as Exhibit “1,” for the City (the “Services”). 1.2 The City may request changes that would increase, decrease, or otherwise modify the scope of services outlined under the Project Proposal attached hereto as Exhibit “1.” Such changes must be contained in a written change order executed by the parties in accordance with the provisions of the Professional Services Agreement, prior to any deviation from the terms of this Project Work/Purchase Order, including the initiation of any extra work. SECTION 2. DELIVERABLES 2.1 As part of the scope of services and project schedule, the Consultant shall provide the City with the Deliverables identified in the Project Proposal attached hereto as Exhibit “1.” SECTION 3. TERM/TIME OF PERFORMANCE/DAMAGE 3.1 Term. This Project Work/Purchase Order shall commence on the date this instrument is fully executed by all parties and shall continue in full force and effect until terminated pursuant to Section 6 or other applicable provisions of this ProjectWork/Purchase Order. The CityManager, in his sole discretion, may extend the term of this Project Work/Purchase Order through written notification to the Consultant. Such extension shall not exceed 90 days. No further extensions of this Agreement shall be effective unless authorized by the City Manager. 3.2 Commencement. Services provided by the Consultant under this Project Work/Purchase Order and the time frames applicable to this Project shall commence upon the date provided in a written 19 2 of 4 Notice to Proceed (“Commencement Date”) provided to the Consultant by the City. The Consultant shall not incur any expenses or obligations for payment to third parties prior to the issuance of the Notice to Proceed. Consultant must receive written notice from the City Manager prior to the beginning the performance of services. 3.3 Contract Time. Upon receipt of the Notice to Proceed, the Consultant shall provide services to the City on the Commencement Date, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the Project Proposal attached and incorporated into this Agreement as Exhibit “1”. The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, whichever shall last occur, shall constitute the Contract Time. 3.4 All limitations of time set forth in this Agreement are of the essence. SECTION 4. AMOUNT, BASIS AND METHOD OF COMPENSATION 4.1 Compensation. Consultant shall be compensated for the provision of the Services in accordance with Exhibit “1” attached hereto. Consultant shall receive a total lump sum fee of $31,897.20, inclusive of an additional $5,970 for add-on 3d Modeling Renderings for this Project. 4.2 Reimbursable Expenses. All reimbursable expenses are included in the total compensation listed in Section 4.1 above. SECTION 5. BILLING AND PAYMENTS 5.1 Invoices 5.1.1.Compensation and Reimbursable Expenses. Consultant shall submit invoices which are identified by the specific project number on a monthly basis in a timely manner. These invoices shall identify the nature of the work performed, the phase of work, and the estimated percent of work accomplished in accordance with the Payment Schedule attached hereto as Exhibit “1”, attached hereto and made part of this Agreement. Invoices for each phase shall not exceed amounts allocated to said phase plus reimbursable expenses accrued during each phase. The statement shall show a summary of fees with accrual of the total and credits for portions paid previously. 5.1.2.Florida Prompt Payment Act. The City shall pay the Contractor in accordance with the Florida Prompt Payment Act after approval and acceptance of the Services by the City Manager. 5.2 Disputed Invoices. In the event that all or a portion of an invoice submitted to the City for payment to the Consultant is disputed, or additional backup documentation is required, the City shall notify the Consultant within fifteen (15) working days of receipt of the invoice of such objection, modification or additional documentation request. The Consultant shall provide the City within five (5) working days of the date of the City’s notice. The City may request additional information, including but not limited to, all invoices, time records, expense records, accounting records, and payment records of the Consultant. The City, at its sole discretion, may pay to the Consultant the undisputed portion of the invoice. The parties shall endeavor to resolve the dispute in a mutually agreeable fashion. 5.3 Suspension of Payment. In the event that the City becomes credibly informed that any representations of the Consultant, provided pursuant to Subparagraph 5.1, are wholly or partially inaccurate, or in the event that the Consultant is not in compliance with any term or condition of this Project 20 3 of 4 Agreement, the City may withhold payment of sums then or in the future otherwise due to the Consultant until the inaccuracy, or other breach of Project Agreement, and the cause thereof, is corrected to the Owner’s reasonable satisfaction. 5.4 Omitted. 5.5 Final Payment. Submission to the Consultant’s invoice for final payment and reimbursement shall constitute the Consultant’s representation to the City that, upon receipt from the City of the amount invoiced, all obligations of the Consultant to others, including its consultants, incurred in connection with the Project, shall be paid in full. The Consultant shall deliver to the City all documents requested by the City evidencing payments to any and all subcontractors, and all final specifications, plans, or other documents as dictated in the Scope of Services and Deliverable. Acceptance of final payment shall constitute a waiver of all claims against the City by the Consultant. SECTION 6. TERMINATION/SUSPENSION 6.1 For Cause. This Project Work/Purchase Order may be terminated by either party upon five (5) calendar days written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination and fails to cure the failure to perform within such five (5) day period. In the event that Consultant abandons this Project Work/Purchase Order or causes it to be terminated by the City, the Consultant shall indemnify the City against any loss pertaining to this termination. In the event that the Consultant is terminated by the City for cause and it is subsequently determined by a court by a court of competent jurisdiction that such termination was without cause, such termination shall thereupon be deemed a termination for convenience under Section 6.2 and the provision of Section 6.2 shall apply. 6.2 For Convenience. This Project Work/Purchase Order may be terminated by the City for convenience upon fourteen (14) calendar days’ written notice to the Consultant. In the event of such termination a termination, the Consultant shall incur no further obligations in connections with the Project and shall, to the extent possible terminate any outstanding subconsultant obligation. The Consultant shall be compensated for all services performed to the satisfaction of the City and reimbursable expenses incurred prior the date of termination. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 5.1. Under no circumstances shall the City make payment of profit to the Consultant for services which have not been performed. 6.3 Assignment upon Termination. Upon termination of this Project Work/Purchase Order, a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) working days of receipt of written direction from the City, transfer to either the City or its authorized designee, a copy of all work product in its possession, including but not limited to designs, specifications, drawings, studies, reports and all other documents and data in the possession of the Consultant pertaining to this Project Work/Purchase Order. Upon the City’s request, the Consultant shall additionally assign its rights, title and interest under any subcontractor’s agreements to the City. 6.4 Suspension for Convenience. The City shall have the right at any time to direct the Consultant to suspend its performance, or any designated part thereof, for any reason whatsoever, or without reason, for a cumulative period of up to thirty (30) calendar days. If any such suspension is directed by the City, the Consultant shall immediately comply with same. In the event the City directs a suspension of performance as provided herein, through no fault of the Consultant, the City shall pay the Consultant as full compensation for such suspension the Consultant’s reasonable cost, actually incurred and paid, of demobilization and remobilization. Section 7. American Rescue Plan Act Contract Conditions. 21 4 of 4 7.1 The Consultant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Local Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act (“ARPA”). Towards that end, the Consultant shall be required to comply with all laws, rules, regulations, policies, and guidelines (including any subsequent amendments to such laws, regulations, policies, and guidelines) required by ARPA, as further detailed in the ARPA Addendum. If compliance with the ARPA Addendum is required, the City shall select this box: . [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.] 22 1 of 1 IN WITNESS WHEREOF, the parties hereto have caused this Work/Purchase Order executed as of the day and year as first stated above CITY: ATTEST:CITY OF SOUTH MIAMI, FLORIDA, a Florida Municipal Corporation By: CITY CLERK Genaro “Chip” Iglesias, City Manager Date: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: CITY ATTORNEY CONSULTANT: SRS ENGINEERING, INC. By: Name: Title: Date: WITNESSES: Print Name: Print Name: 23 EXHIBIT “1” PROJECT PROPOSAL (SCOPE OF SERVICES AND SCHEDULE AND PAYMENT SCHEDULE) 24 25 26 27 - • -• - • - - ' • ,,. • • • . .. ' ,. . .. .. - • 28 • • 1am Tl IF CITY or Pl.FASANT LIVJNG 29 30 • Iii iii 31 • • • 32 ... iii - ~ ~ • • • 33 .... ~ ...... -.. ,. -..... ~-"--' -' . . I • • I I I . ' J' ' ,l I L -• ~~ . --• -. ? -. ... •• I , ~ ·" • ~ - 34 • • -- , • • • --r ,,, --, ;;, • , )' , r , , ,, , -• ,, • / J ,I ,, ' - , • • , ,, '.17, ~( , • - , • • • • • I 111 __,,.,..,, _,,,,..,,.. II 11 I 111 I ('' 1,\\1 \ 111111 I I I • • 35 36 37 RESOLUTION NO. 039-23-15973 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND WORK/PURCHASE ORDER WITH SRS ENGINEERING, INC. FOR ADDITIONAL SERVICES RELATED TO THE DANTE FASCELL PARK COMMUNITY BUILDING PROJECT; PROVIDING FOR AUTHORIZATION; IMPLEMENTATION; CORRECTIONS; SEVERABILITY; AND AN EFFECTIVE DATE. WHEREAS, on October 5, 2021, the City Commission passed and adopted Resolution #119-21-15739, which authorized the City Manager to procure services from SRS Engineering, Inc. ("Consultant") to provide complete construction documents for a new rubber pathway and community building at Dante Fascell Park; and WHEREAS, in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act ("CCNA")", Consultant is one of various firms selected by the City Commission pursuant to RFQ No. PW2022-03, and approved in Resolution No. 056-22-15809, to provide professional engineering services, as needed, and resulting in the City entering into a continuing Professional Services Agreement with Consultant dated May 3, 2022 for such services; and ' WHEREAS, the contract plans are I 00% complete and. the Environmental Review and Preservation Board ("ERPB") approved the project by a 4-3 vote on December 6, 2022; and WHEREAS, the ERPB expressed concerns regarding the building's location, orientation, and limited input. Staff has met with a few residents who have expressed concerns about the building's location and orientation. In addition, staff has gathered feedback from the members of the City Commission; and WHEREAS, staff recommends contracting with "Consultant" for additional services to the 100% contract plans to include relocating the building near the existing office-restroom facility, rotating the facility counter-clockwise, and flipping the interior layout; prepare drawings for the conversion of the handball courts to pickleball courts to be incorporated into the contract drawings; prepare exhibits and assist at a public community meeting, if necessary; and, prepare construction documents for Miami-Dade County DERM's review and permit (the "Additional Services"); and WHEREAS, the aforementioned Additional Services require rev1s1ons to the civil, architectural, mechanical, electrical, structural, and landscaping drawings; and WHEREAS, the Consultant's Proposal for the Additional Services attached hereto as Exhibit "A" provides for a cost of $47,657.24. The cost shall be funded and charged to the Citywide Parks Improvement -Miscellaneous, account number 301-2000-572-6450, which has a current fund balance of$2,311,767; and WHEREAS, based on feedback gathered by the City Commission, two (2) add-on options pertaining to design services pertaining to new exterior finish improvements ($6,560) and the Page 1 of 3 38 Res. No. 039-23-15973 repurposing of the locker room and shower facilities ($5,840) (the "Add-On Items") were further considered by the City Commission; and WHEREAS, the City Commission desires to approve the Consultant's Proposal for the Additional Services attached hereto as Exhibit "A" related to the Dante Fascell Park Community Building, including the Add-On Items, and authorize the City Manager to issue and execute a Work/Purchase Order with the Consultant for the Additional Services (including the Add-On Items) in substantially the form attached hereto as Exhibit "B"; and WHEREAS, the City Commission finds that this Resolution is in the best interest and welfare of the City. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. Recitals Adopted. The above-stated recitals are true and correct and are incorporated herein by this reference. Section 2. Approving the Proposal and Work/Purchase Order with Consultant; Authorization to City Manager. The Proposal attached hereto as Exhibit "A" and the Work/Purchase Order in substantially the form attached hereto as Exhibit "B" are hereby approved. The City Manager is authorized to issue and execute a Work/Purchase Order with the Consultant for the Additional Services (including the Add-On Items) and expend a total amount not to exceed $60,057.24. The total expenditure shall be charged to the Citywide Parks Improvement -Miscellaneous, account number 301-2000-572-6450, which has a current fund balance of$2,311,767. Section 3. Implementation. The City Manager is hereby authorized to take any and all action necessary to implement the Additional Services and the purposes of this Resolution. Section 4. Corrections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 5. Severability. If any section, clause, sentence, or phrase of this Resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this Resolution. Section 6. Effective Date. This Resolution shall become effective immediately upon adoption. PASSED AND ADOPTED this 4th day of April, 2023. Page 2 of3 39 Res. o. 039-23-15973 ATTEST: CITYls):,ERK READ AND APPROVED AS TO FORM, LANGUAGE , LEGALITY AND EXECUTION THEREOF: & BIERMAN, P.L. CITY ATTORNEY • FMANCOLE APPROVED: Q<---- COMMISSION VOTE: Mayor Fernandez: Vice Mayor Bonich: Commissioner Calle: Commissioner Liebman: 4-0 Yea Yea Yea Absent Commissioner Corey: Yea Page 3 of 3 Agenda Item No:5. City Commission Agenda Item Report Meeting Date: April 4, 2023 Submitted by: Quentin Pough Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND WORK/PURCHASE ORDER WITH SRS ENGINEERING, INC. FOR ADDITIONAL SERVICES RELATED TO THE DANTE FASCELL PARK COMMUNITY BUILDING PROJECT; PROVIDING FOR AUTHORIZATION; IMPLEMENTATION; CORRECTIONS; SEVERABILITY; AND AN EFFECTIVE DATE. 3/5 (CITY MANAGER-PARKS & RECREATION DEPT.) Suggested Action: Attachments: Memo-DFP Community Building Addtl. Services.docx Reso_Approving_SRS_Eng_-_Dante_Fascell_Park_Additional_Services_Community_Buildiing_CAv3a.docx SRS Additional Services Proposal 3.19.23.pdf 4691537-Project Work Purchase Order - SRS Eng Dante Fascell Park - Design New Community Building Additional Services CAv1.DOCX Resolution #119-21-15739.pdf CCNA Professional Service Agreement-Res No 056-22-15809.pdf 140 41 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Dante Fascell Park -Design of New Community Building Additional Services to Relocate and Modify Interior I ofl 42 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Dante Fascell Park -Design of New Community Building Additional Services to Relocate and Modify Interior Subject to the provisions contained in the "Professional Services Agreement for Professional General Engineering and Architectural Services" (hereinafter referred to as the "Professional Services Agreemenr) between the CITY OF SOUTH MIAMI, FLORIDA (hereinafter referred to as "City") and SRS ENGINEERING, INC., (hereinafter referred to as "Consultant") dated May 3, 2022, which Professional Services Agreement was competitively procured through Request For Qualifications (RFQ) No. PW2022- 03 in accordance with Section 287.955, Florida Statutes. This Project Work/Purchase Order ls made effective as of the _____ day of _____ _. 2023, and authorizes the Consultant to provide the services as set forth below: SECTION 1. SCOPE OF SERVICES 1.1 Consultant shall provide professional engineering services, including for the DANTE FASCELL PARK-DESIGN OF NEW COMMUNITY BUILDING ADDITIONAL SERVICES TO RELOCATE AND MODIFY INTERIOR and complete the tasks that are identified and described in the project proposal, attached hereto as exhibit "1," for the City (the "Services"). 1.2 The City may request changes that would increase, decrease, or otherwise modify the scope of services outlined under the Project Proposal attached hereto as Exhibit "1." Such changes must be contained in a written change order executed by the parties in accordance with the provisions of the Professional Services Agreement, prior to any deviation from the terms of this Project Work/Purchase Order, including the initiation of any extra work. SECTION 2. DELIVERABLES 2.1 As part of the scope of services and project schedule, the Consultant shall provide the City with the Deliverables identified In the Project Proposal attached hereto as Exhibit •1.• SECTION 3. TERMrrtME OF PERFORMANCE/DAMAGE 3.1 Term. This Project Work/Purchase Order shall commence on the date this instrument is fully executed by all parties and shall continue in full force and effect until terminated pursuant to Section 6 or other applicable provisions of this Project Work/Purchase Order. The City Manager, in his sole discretion, may extend the term of this Project Work/Purchase Order through written notification to the Consultant. Such extension shall not exceed 90 days. No further extensions of this Agreement shall be effective unless authorized by the City Manager. I of4 43 3.2 Commencement. Services provided by the Consultant under this Project Work/Purchase Order and the time frames applicable to this Project shall commence upon the date provided in a written Notice to Proceed ("Commencement Date") provided to the Consultant by the City. The Consultant shall not incur any expenses or obligations for payment to third parties prior to the issuance of the Notice to Proceed. Consultant must receive written notice from the City Manager prior to the beginning the performance of services. 3.3 Contract Time. Upon receipt of the Notice to Proceed, the Consultant shall provide services to the City on the Commencement Date, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the Project Proposal attached and incorporated into this Agreement as Exhibit "1". The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, whichever shall last occur, shall constitute the Contract Time. 3.4 All limitations of time set forth in this Agreement are of the essence. SECTION 4. AMOUNT, BASIS AND METHOD OF COMPENSATION 4.1 Compensation. Consultant shall be compensated for the provision of the Services in accordance with Exhibit "1" attached hereto. Consultant shall receive a total lump sum fee of $47,657.24, plus an additional $6,560 for Add-on Exterior Finishes, for this Project. 4.2 Reimbursable Expenses. All reimbursable expenses are included in the . total compensation listed in Section 4.1 above. SECTION 5. BILLING AND PAYMENTS 5.1 Invoices 5.1.1. Compensation and Reimbursable Expenses. Consultant shall submit invoices which are identified by the specific project number on a monthly basis in a timely manner. These invoices shall identify the nature of the work performed, the phase of work, and the estimated percent of work accomplished in accordance with the Payment Schedule attached hereto as Exhibit T, attached hereto and made part of this Agreement. Invoices for each phase shall not exceed amounts allocated to said phase plus reimbursable expenses accrued during each phase. The statement shall show a summary of fees with accrual of the total and credits for portions paid previously. 5.1.2. Florida Prompt Payment Act. The City shall pay the Contractor in accordance with the Florida Prompt Payment Act after approval and acceptance of the Services by the City Manager. 5.2 Disputed Invoices. In the event that all or a portion of an invoice submitted to the City for payment to the Consultant Is disputed, or additional backup documentation is required, the City shall notify the Consultant within fifteen (15) working days of receipt of the invoice of such objection, modification or additional documentation request. The Consultant shall provide the City within five (5) working days of the date of the City's notice. The City may request additional information, including but not limited to, all invoices, time records, expense records, accounting records, and payment records of the Consultant. The City, at its sole discretion, may pay to the Consultant the undisputed portion of the invoice. The parties shall endeavor to resolve the dispute In a mutually agreeable fashion. 2of4 44 5.3 Suspension of Payment. In the event that the City becomes credibly informed that any representations of the Consultant, provided pursuant to Subparagraph 5.1, are wholly or partially inaccurate, or in the event that the Consultant is not in compliance with any term or condition of this Project Agreement, the City may withhold payment of sums then or in the future otherwise due to the Consultant until the inaccuracy, or other breach of Project Agreement, and the cause thereof, is corrected to the Owner's reasonable satisfaction. 5.4 Retainage. Tf:te City reserves the right ta withhelel retainage in the ameunt ef teR peraeRt (10%) of any payment due to the Consultant until the preje6H6-GGmpleteEI. Said-retamage may be-wilhf:lekl at U:1e sale discFetion of the City..and-a&-6ecurity for-the successful completion of the Consultant's duties and Fesponsibililies URder the Preject .A.gFeement. Intentionally Deleted. 5.5 Final Payment. Submission to the Consultant's invoice for final payment and reimbursement shall constitute the Consultant's representation to the City that, upon receipt from the City of the amount invoiced, all obligations of the Consultant to others, includlng its consultants, incurred in connection with the Project, shall be paid in full. The Consultant shall deliver to the City all documents requested by the City evidencing payments to any and all subcontractors, and all final specifications, plans, or other documents as dictated in the Scope of Services and Deliverable. Acceptance of final payment shall constitute a waiver of all claims against the City by the Consultant. SECTION 6. TERMINATION/SUSPENSION 6.1 For Cause. This Project Work/Purchase Order may be terminated by either party upon five (5) calendar days written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination and fails to cure the failure to perform within such five (5) day period. In the event that Consultant abandons this Project Work/Purchase Order or causes it to be terminated by the City, the Consultant shall indemnify the City against any loss pertaining to this termination. In the event that the Consultant is terminated by the City for cause and it is subsequently determined by a court by a court of competent jurisdiction that such termination was without cause, such termination shall thereupon be deemed a termination for convenience under Section 6.2 and the provision of Section 6.2 shall apply. 6.2 For Convenience. This Project Work/Purchase Order may be terminated by the City for convenience upon fourteen (14) calendar days' written notice to the Consultant. In the event of such termination a termination, the Consultant shall incur no further obligations in connections with the Project and shall, to the extent possible terminate any outstanding subconsultant obligation. The Consultant shall be compensated for all services performed to the satisfaction of the City and reimbursable expenses incurred prior the date of termination. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 5.1. Under no circumstances shall the City make payment of profit to the Consultant for services which have not been performed. 6.3 Assignment upon Termination. Upon termination of this Project Work/Purchase Order, a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) working days of receipt of written direction from the City, transfer to either the City or its authorized designee, a copy of all work product in its possession, including but not limited to designs, specifications, drawings, studies, reports and all other documents and data in the possession of the Consultant pertaining to this Project Work/Purchase Order. Upon the City's request, the Consultant shall additionally assign its rights, title and interest under any subcontractor's agreements to the City. 6.4 Suspension for Convenience. The City shall have the right at any lime to direct the Consultant to suspend its performance, or any designated part thereof, for any reason whatsoever, or without reason, for a cumulative period of up to thirty (30) calendar days. If any such suspension is directed 3 of4 45 by the City, the Consultant shall immediately comply with same. In the event the City directs a suspension of performance as provided herein, through no fault of the Consultant, the City shall pay the Consultant as full compensation for such suspension the Consultant's reasonable cost, actually incurred and paid, of demobilization and remobilization. Section 7. American Rescue Plan Act Contract Conditions. 7.1 The Consultant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Local Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act ("ARPA"). Towards that end, the Consultant shall be required to comply with all laws, rules, regulations, policies, and guidelines (including any subsequent amendments to such laws, regulations, policies, and guidelines) required by ARPA, as further detailed in the ARPA Addendum. If compliance with the ARPA Addendum is required, the City shall select this box: □. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.] 4of4 46 IN WITNESS WHEREOF, the parties hereto have caused this Work/Purchase Order executed as of the day and year as first slated above ATTEST: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: / /~ --r : ,, __ [' 4 . y(/4_,c~;y ' -CIT,Y ATTORNE WITNESSES: Ralph Pereda CITY: CITY OF SOUTH MIAMI, FLORIDA, a Florida Muni ipal Corporation " Ig lesias, City Ma Date: ___ .!,1£:....f-i_)..._I_')..._, _____ _ CONSULT ANT: SRS ENGINEERING, INC. By: cl.. fw.J!z, Name:~erralta, P.E . Title: President Date: ___ J_u_ne____:8,_2_02_3 _______ _ 1 of I 47 EXHIBIT "1" PROJECT PROPOSAL (SCOPE OF SERVICES AND SCHEDULE AND PAYMENT SCHEDULE) 48 sac 1 SW 74T.H COU.,RT, .SUITE 2 0 1 , "114MI. Fl.0RIDA 33 I 5,5 TE"LJ 305·662·666'7 FA)(: 305·662•88,SB WWW,SRS·CDRP.CD M EB·000073 17 March 19, 2023 (Rev. 2) Mr. Quentin Pough, CPRP, CPSI Director, Parks & Recreation Department City of South Miami 6130 Sunset Drive South Miami , FL 33143 Re: City of South Miami Dante Fascell Park -Design of New Community Building Additional Services to Relocate and Modify Interior Dear Mr. Pough, We appreciate this opportunity to prepare this Proposal for Additional Services for the referenced project. In accordance w ith our Agreement for General Engineering and Architectural Services, we are submitting this proposal for additional services for revisions to construction drawings to relocate the proposed new build in g to the existing Park Office Building location and for minor Interior modifications as requested by the City. SCOPE OF WORK (Basic Services) 1. Prepare revisions to the 100% drawings to include moving the building and rotating and mirroring the orientat ion . Th ese changes will require revisions to the Civil, Architectural, Mechanical and Electrical, Structural, and Landscaping drawings. This task shall include attending coordination meetings with City, conducting any additional site v isits, and additional project management. Please see attached Exhibits #1 thru #4 for additional information . 2. Prepare construction drawings to convert the existing racquet ball courts to pickle ball courts. 3. Preparation of exhibits to be presented at a Community Meeting to be scheduled and organized by the City. SRS shall attend and assist in the presentation, provide exhibits, and respond to questions. 4 . Prepare applicat ion and submit const ructio n documents to DERM for review and permit. This task shall include responding to comments and resubmissions. (Add-ons) 5. In addition, the City wou ld also like the following add-on options . a. Repurpose the locker room and shower facilities .. b. New options for exterior finishes 49 SUBCONSUL TANTS March 19, 2023 Page 2 The following are professionals contracted be SRS Engineering, Inc. to assist in the preparation of the work outline above . Please see attached consultant's fee proposals for additional information. ■ • ■ ■ Laura M. Perez and Associates, Inc. (Architect) Basulto & Associates, Inc. (MEP Engineers) Botas Engineers, Inc. (Structural Engineers) Curtis+ Roger Design Studio (Landscape Architecture) COMPENSATION Our Engineering Fees for the above -described Basic Services will be a lump sum amount of FORTY-SEVEN THOUSAND SIX-HUNDRED and FIFTY-SEVEN DOLLARS AND TWENTY- FOUR CENTS ($47,667.24). Plus additional Add-Ons of $12,400.00 if selected by the City. Please see attached fee breakdown . It does not Include plan revi ew or permitting fees . Payment will be based on monthly invoicing as a percentage of completion of work . We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement were indicated below and return to our office. Very truly y c9. J~ Ignacio S rralta, P.E. Preside t I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein . Accepted this ii:\-day of 0\A\.{ ~ City of South mi 8 ;me C. ½ Ww~ I 2023 D 50 ACTIVllY PRIN CIPAL BYSRS HRS RAT E $2 10.00 PRO JEC T MANAGEMENT & C OORDINATI ON 2 .0 $2 10.00 REVISIONS TO CIVIL DRAWIN GS $2 10.00 PREPARATION OF PICKLEBAL L COURTS ORAW,~GS $2 10.00 PREPARATION OF COMMU NITY M EE TIN G EXHl61TS $2 10.00 ATTEND COMMUNITY M EETING 2 .0 $210.00 SUBMIT TO OERM FOR RE VIEW AN D PE RMIT $210,00 PREPARE 100% DE SIGN PLAN SUB MITTAL 1.0 $2 \0.00 TOTAL 5,0 $210.00 ACTIVITY BY OTHERS Laut a M. Pere z ard Assoclalas, In c. Basullo & Associa los, Inc. Bolas Eoginae rs, Inc. Cutll s + Rego r Ooslnn Siuto ACTIVITIES BY SRS (S alalies) (Bas ic Service •) ACTIVITIES BY OTHER S ENGINEERING COST BREAKDOWN City of South Miami Dante Fascell -New Community Building Additional Servic es SR . PROJ , M GR SR. ENGIN EER ENGINEER CAD T ECH HRS RAT E HRS RATE HRS RATE HRS RA TE $190.00 $1 4 0.00 $11 5.00 $75,0 0 6.0 $190.00 $140.00 S115.00 $75.00 4.0 S1 90.00 16.0 S140.00 $115,00 6,0 S75.00 1.0 S1 90.00 6.0 $14 0.00 $\15,00 4,0 $75.00 1.0 $190.00 4.0 $140.00 $115.00 4.0 $7 5.00 2.0 $1 90.00 S140.00 S11 5.00 $75.00 4,0 $1 90.00 4.0 $140.00 B.O $115.00 2 .0 $75.00 2.0 $\90.00 2 .0 $140.0 0 $115.00 S75.00 20.0 $190 .00 32.0 $140.00 8 .0 $1 15.00 16,0 $75.00 DE SCRIPTION (B ao \c Sorvl co s) Arch~ecl !Basic S ervices) MEP EO(lnoe rs Slruc lural Erni ln eers Landscape Ar chlle cls SUMMARY $11,717 Eslima lo d OUT OF PO CKET EXPENS ES including reprnducllon cos ls, elc. CLERI CAL HRS RATE S~6.50 2,0 S56.50 $56.50 $58.50 $50.50 $58.50 $56.50 $50.5 0 2.0 $56.5 0 TOTAL• DAT E: 3/1912023 TOTAL TO TAL H OURS COST 10.0 28.0 11 .0 9.0 4.0 16.0 5.0 65.0 $1,6 77.00 S3 ,600.00 $1,330.00 $1 ,050.00 $000.00 $2,390.00 $0 70.00 $1 1,717.0 0 COST $14,300 .00 $10,39 0.24 $5 15 0.00 $5,900.00 $35,740.24 $1 1,7 17.00 $35,7 40.2 4 _$~00.00 TO TAL THIS PROPOSAL (Basic Services) = __ $4_7,_6_5_7._2_4_....; ACTIVITY DESCRIPTION (Adcl-On s) COST BY OTHERS LoU<a M. Pe1 oz and Assoclales, Inc. Archl1e cl (Repuiposing) (Add-Ons) $5,MO.OO Loura M. Perez end Associeles, Inc. A rchllocl (E x lorlor Finishes ) (Add-Ons) $6,560.00 ·TOTAL, $12,400.00 51 March 14, 2023 Mr. Ignacio Serralta • SRS Engineering 7000 SW 97 Avenue #21 0 Miami, Florida 33173 Re: City Of South Miami (Dante Fascell Park) New Bullding (Rotate and Mirror, Repurpose and Exterior Finishes) Dear Ignacio, The firm of Laura M. Perez and Associates, Inc. (LMP} Is pleased to submit this fee proposal to provide addlUonal Architectural seivices for the referenced project. Upon completion of our 100% drawing submittal we were advised that the owner preferred to move the building and rotate and mirror the orientation and add 2 renderings (30 days). Owner also wanted the Add-On options to Repurpose the shower locker room area (15 days) plus new options for exterior finishes ( 15 days) Attached Is a fee proposal, along with the amount of time required to change each sheet of the set. Total Architectural Fee for Basic Seivices Total Architectural Fee for Repurposing Total Architectural Fee for Exterior Finishes $14,300 (see attached fee breakdown) $ 5,840 (see attached fee breakdown) $ 6,560 (see attached fee breakdown) If you have any questions or require additional Information please do not hesitate to contract our office. Sincerely, Laura M. Perez and Associates, Inc. Laura Perez, President ..... 1 .......... 1 ........... .1. .......... 1 ............ 1 ......... \ ............ ! .......... 1 ........... 1 ........... ! ........... ! .......... ! ............ ! .......... ! ........... ! .......... \ ..... .. 2 4 O I N , W . 7th S T R E E T M I A M I , F L 3 3 1 2 5 P H : 3 0 5 • 6 4 2 • 9 4 9 4 F A X : 3 0 5 -6 4 2 -0 0 8 9 E• M A I L : I m p @ I m p I c . c o m 52 LAURA M. PEREZ & ASSOCIATES, INC. FEE PROPOSAL FOR SOUTH MIAMI DANTE FASCELL PARK BASIC SERVICES AND ADD-ONS ROTATE, MIRROW AND RENDERINGS 1) 100% Construction Documents (30 days) Description Principal Project ArchltecUManager Staff Architect CADD Estimator Clerical Renderings (2) Hours 5 30 0 80 0 0 32 REPURPOSE SHOWER AND LOCKER ROOM AREA 2) 100% Construction Documents -Repurpose (15 days) Description Hours Prlnclpal 2 Project ArchltecUManager 15 Slaff Architect 0 CADD 40 Estimator 4 Clerical 0 EXTERIOR FINISHES Rate $180.00 $140.00 $95.00 $75.00 $95.00 $45.00 $100.00 Rate $180.00 $140.00 $95.00 $75.00 $95.00 $45.00 3) 100% Construction Documents· EXTERIOR FINISHES (15 days) Description Hours Rate Principal 2 $180.00 Project ArchltecUManager (Description below: 40 $140.00 Staff Architect O $95.00 CADD (Color Board) 8 $75.00 Estimator O $95.00 Clerical O $45.00 2 new finishes schemes @ 20hr ea. Includes Rev Elevatlonss, Selection of materials & a new color board after selection of final scheme Total $900 $4,200 $0 $6,000 $0 $0 $3,200 $14,300 Total $360 $2,100 $0 $3,000 $380 $0 $5,840 Total $360 $5,600 $0 $600 $0 $0 $6,660 53 INDEX OF DRAWINGS Ccoltl. Drawing Changes Basis Services -Rotate, Mirror and Renderings I ~1.0 IGENERALNO11:<> I No changes. A-1.1 OVERALL SITE PLAN 1 7 Rolate 90'. mirror, notations, sltewotk (walkways, pickleball), stairs & ramp. A-1.2 PARTIAL SITE PLAN 1 6 R01alll 9D', mirror, notallons, sltowork (walkways, p!ckleball), stairs &ramp. A•2.1 OVERALL LIFE SAFETY PLAN 5 Milror, notat1011s, balll-s. stairs & ramps. A-3,1 FLOOR PLAN 4 11 Mlmlr, notations, IHlll!rooms, stairs & ramps. A-4.1 ROOF PLAN 1 4 Mlrr0r & nota11ons. A-4.2 ROOF DETAILS No changes. A-4.3 ROOF ANO MISCELANEOUS DETAILS No changes. M.1 REFLECTED CBLING PLAN 1 4 Mim,r. notations, 1:18111-s. f,,f;.1 ELEVATIONS 1 s Min"Dr, notations, stairs & ramps. A-6.2 ELEVATIONS 5 MIITOI', notations, stairs & ramps. A-7.1 SECTIONS 1 4 M!m,r, n01ations, llatlvoeFR6, stairs & ramps. A-8.1 WALL SECTIONS No changes. .... ,0.1 ENU\RGED MULTIPURPOSE ROOM & INT B.EVATIONS 5 Mlm:ir, notatiDIIS, .... 10.2 RESTROOM ENLARGED PLANS & INT ELEVATIONS 0 0 Entire sheet. CllaAgBB to batllra DIRC, .... 10.3 CONCESSIONS ENLARGED PLANS & INT ELEVATIONS 1 4 Mirror, notations. A-11.1 DOOR, WINDOW, SCREEN SHADES, & LOWER SCHEDULE 1 No changes. A-12.1 DOOR ANO LOUVER DETAILS No changes. .... ,2.2 WINDOW DETAILS No changes. .A-12.4 SUN CONTROL ELEVATION AND DETAILS 1 No changes. A-13,1 STAIRS ENLARGED PLANS & SECTIONS 2 B Entire sheet. Changes to stairs & ramp. A-14.1 WALL lYPES No changes. A-15.1 ROOM FINISH SCHEDULE & DETAILS 3 MIITDI', notations,-llatl!raami;. stairs & ramps. A-16.1 IDENTIFICATION DEVICES 3 Mim,r, nolalions, ball!IOORl8, stairs & ramps. CDOl'd. And asemble Set 6 4 coard wilh engineers 4 2meetings s Sign and seal drawings 2 0 Renderings (2) at 15 nrs each 2 30 32 110 54 INDEX OF DRAWINGS For Repurpose Locker Rooms/Shower Area Coord. Drawing Changes I G-1.0 GENERAL NOTES I No ehanges. A-1.1 OVERALL SITE PLAN No changes. A-1.2 PARTIAL SITE PLAN No changes. A-2.1 OVERALL LIFE. SAFETY PLAN 1 4 Repurpose A-3.1 FLOOR PLAN 4 10 Repurpose A-4.1 ROOF PLAN No changes. A-4.2 ROOF OE.TAILS No changes. A-4.3 ROOF AND MISCELANEOUS DE.TAILS No changes. A-S.1 REFLECTED CEJUNG PLAN 1 4 Repurposc Ml.1 ELEVATIONS No changes. A-6.2 ELEVATIONS No changes. A-7.1 SECTIONS , 2 ReplJ1!)0Se A-B.1 WALL SECTIONS 2 Repurpcse A-10.1 ENLARGED MULTIPURPOSE ROOM & INT ELEVATlONS No changes. A-10.2 RE.PURPOSE INT ELEVATlONS 1 4 Repurpose A-10.3 CONCESSIONS E.NLARGE.O PLANS & INT ELEVA TIO NS Nochanses. A-11.1 COOR. WINDOW, SCREEN SHADES, & LOUVER SCHEDULE 1 4 Coor schedule / Hardware Set-Spec ReplCJ)OSC A-12.1 COOR ANO LOUVER OE.TAILS No changes. A-12.2 WINDOW DETAILS No changes. A-12.4 SUN CONTROL ELEVATlON ANO OE.TAILS No changes. A-13.1 STAIRS ENLARGE.O PLANS & SECTIONS 1 4 Enlarged plans rapurpose A-14.1 WALL TYPES No changes. A-1S.1 ROOM FINISH SCHEDULE& DETAILS 4 Repurpose A-16.1 IOE.NTlFICATION DEVICE.$ 2 Repurpose Coon:I. and asemble Set Provided with Base Seivice coord with engineers 4 Repurpose 2meetings PJOVided with Base Service Sign and seal drawings 1 Repurpose 15 40 55 B A S t:Ur L T 0 A S S O C •. 1 1-A T E S February 17, 2023 Mr. Ignacio Serralta SRS Engineering CONSULTING 5001 Southwest 74th Court, Suite 200 Miami, Florida 33155 Re: Dante Fascell Community Building Revision Dear Ignacio, ENGINEERS We are pleased to submit our proposal to provide Professional Engineering Services for the above-mentioned project. Services: Our scope of work will consist of additional services for mechanical, electrical and plumbing design for revision of building siting and Interior changes. Compensation: Our proposed fee shall be as follows: Services: $10,390.24 Payment Is according lo the Dsled prices above. In accordance with Florida Statutes, Section 716.12, "Prompt Payment Law' we reserve lhe right to accrue Interest at a rate of 12% APR, beglMlng 14 days after payment Is due. Proposal shall remain open for acceptance for a period of 90 days from the original proposal date. prgposal is deemed invalid after 90 days from the original proposal date, Reimbursable: Reimbursable expenses including travel, lodging, printing, courier service, etc. shall be reimbursed at 1.1 times actual cost. Thank you for an opportunity to serve you. Should you have any questions, please do not hesitate to contact our office. Sincerely, ~~ Rene I. Basulto, PE, MSEM CGC, CFEI, CPE, CPD Principal 14160 Palmetto Frontage Rd, Suite 22 Miami Lakes, Flol'ida 33016 Page I of2 www.basulto.com Phone (305) 698-3988 Fax (305) 698-3989 56 LETTER OF AGREEMENT ACCEPTANCE I, the undersigned, having authority to execute this Agreement for and having read and understood this proposal and attachments, hereby agree to terms and conditions stated herein as well as to any terms and conditions attached hereto and made part of this Agreement. Please return one executed copy to BASULTO & ASSOCIATES, INC. and keep the other for your records. Signature Title Printed Name Date B A S 1U1 L T Q ASS O C·l ATES Page 2 of2 57 BASULTO &ASSOCIATES --Pn,paool-for ~Smlau,Lllllarmod~ FuceD....,l<Addlllonol---------.;;:. .......... ..... ----------. ................. -... pqao, ,.,IHI ..... ........,..,.,......, ""'--..... ... • ... I ... . ... . ... . ... • .. I ... . ... . -. . .. A .. ••• .. ..... .. ..... .. '"'"' ., .... ., ••• ., ..... ... .. .... oq .. "" --USULTO.l'.E. --1JII ....... • . ,... . -•.m S ...... .... . ...... s . • . • . s . ..... -· ...... _,.,YOST ------•Dnatcll uo ...... • . • . • . ~ • ... ... • . • . • . • . ..... ~TM • --·--... uo • ..... ..... -11.11 I ...... ...... ...... -• .. .... • . • . • . • . -· ...... • 1,.,.... U\'LEEN LDPl!Z -... • 17.00 • . . .... ff.IQ ..... ff.00 , ... • ..... • • . • . s . ..... Ii.II I MT.IO -----• STAG • . WIS ...... '9M 1-1,1M.CICI on • . • -• -• -• . -· ...,._.. . ........ • -• . • -• . • . • -• • . • -• . .... ..... ··-··-.... • . • -, ..... . ·-··· I 11.no.u IIMMMTOll'DMCTDPINIII, -·-----I I . I IS I I I I TOULCUICTIDl!NSDI S .....,..,_.~DNIGD fflC .. _ --I TlffAI. I I • . I I I TOJAL......,..~s . TOTAL-CCIIITll,IIIRICTANDAIIMIIUAIA9UI-AHDI.Cl.nE-AIID PIRMlffll<GII S ••~-------,,,,.., I I I I I I I ll&Sl&.'ID&ANOCIA1Zlr.lC. I I I I I I S 11.stet.H' I I I I I I I I I I I I I I I -I 58 n3.se BQTA~ Engineering, Inc. LI ·' STRUCTURAL ENGINEERS February 8, 2023 SRS Engineering, Inc. 5001 SW 74 th Court, Suite 201 Miami, Florida 33155 Attn: Mr. Jean-Claude f:ontaneau Project Name: Subject: Dante Facell Park -Modification to Plans (mirror image) Structural Fee Proposal Dear Jean-Cl,1ude: As requested, we are submitting a fee proposal to implement mirror imaging all the structural plans, add an additional ramp and provide new openings as shown in the new exhibits. After reviewing the 4 different exhibits that we received, we estimated that it will take approximately 11/2 weeks to implement the changes and generate supplemental structural calculations. Our fee for the above-mentioned tasks is a lump sum of ~150. Jean-Claude, if the scope and fee are acceptable, please sign a copy of this proposal and return It to us at your convenience. Thank you very much for considering us for this project. Regards, BOTAS Engineeri11g, Inc . .,/?~--=?-----~ ,,,,,-,,,.,.,.. ,:.--~- ¢...,.... Accepted Patricia M. Botas, P.E. President Date 8935 NW 35th Lmm. Suite fJ2U2 • Doral. FL 33172 • Tel: 305-~18-9111 • F11x: 305-418-9112 59 CURT I S + ROGERS DESIGN S TUD IO I NC. ln11dscap e Arch i t ec /11re 7 5 2 0 S. R E D ROAD SU ITE M SO UTH MI AM I FLOR I DA 3 3 I <1 3 T ELEPHONE 3 0 5-4 4 2-1 7 7 4 F ACSIM I LE 3 0 5-4 4 5 -9 '1 8 8 LLC. LC 00024 1 w.,vw.curtisrogers.c om February 15 , 2023 Mr. Jean-Claude Fontaneau SRS Engineering Re : Dante Fascell Community Center -Revisions Dear Jea n-Claud e: As per your request enclosed you will fin d our proposal for additional services to provide landscape architectural se rvices for the revi sions to the new community center building at Dante Fascell Park . Our scope of services will includ e preparing the necessary plans addressing existing plantings -remova ls, reloca tion s or reta inage, and new plantings in the immediate vicin ity of the new building. These plans will include all the ne ce ssary information to obta in a building permit and for construction. Our detailed scope of services is as follow: 1. 2. Schematic Design/ Design Development a. Site visit to evaluate existing condit ions . b. Rev iew applicab le code requirement s c. Preparation of schematic design d. Preparation design deve lopment drawings , addressing land scape intent and code comp li ance . e. Preparation of outline specifications f. Preparation of Statements of Probable Cost for la ndscape elements g. Coordination with Architect and applicable consultants . h. Attend a meeting/ presentation with the client if required . Construction Documents ( 50% and 100% Subm ittals) a. Review and incorporate comments received for previous submittal , and in terim submittals b. Prepare construction document s for tree disposition and planting. c. Prepare technica l specifications for tree disposition (relocation or protection of existing trees), planting and sodding. NO IRRIGATION SCOPE IS INCLUDED. d . Update Statement of Probable Cost for above items e. Address permitting comments as ne eded. f. Coordination with Architect and applicable consultants g. Attend a meeting/ presentation with the client if required . Note that Bidding Assistance and Construction Administration were inc luded in the original proposal scope of services . We propose to prov ide th e above services in accordance with the schedule established with the Client. We assume that we w ill rece iv e digital bases of site plan for our use, as well as a digital survey locating an d identifying all existing tr ees w ithin project li mits. Trees shall be classified by name , and size in calip er, height and spread. This information 60 Mr. Jean-Claude Fonteneau February 15, 2023 will be needed In order to submit to the City of South Miami -should tree removal permits be needed. We propose to provide the above services for a lump sum of $5,900, with the following breakdown by phase: 1. Schematic Design - 2. Design Development - 3. Construction Documents a. 50% Submission - b. 100% Submission - 4. Community Meeting (1 @ 2hrs) $ 950.00 $ 950.00 $1750.00 $1950.00 $ 300.00 Page2 Expenses such as printing for Internal coordination, postage, and couriers are Included In the above fees. If required, printing of multiple sets for submission will be billed at cost. Alternatively we will provide hard or digital copies of the documents, for reproduction. Please call me If you have questions regarding any aspect of this proposal. Sincerely, ~~ ~- Ralph J. Ferrer Principal 61 l i I Jl~~'llJlt~8lll'ld Cl>la: '"1,1 IVfvlrl =A'I HU9 MS 0099..,..~ DN!CJ11118 JJJHIW6'(00 M3N )11:lv'd 7730Sv'::l 31N\fG i;;IJAl41-n'i,r4 ll81HX3 IJ'UtlD-4 1 :I ,L:.------• I I I 1 ' 62 --~==-===:~(~_:: _.:~~-c, _"' _°" _=c.-.:-:::=-=.::~,:,_:;.:=.,:o;:;d.C.,::,-•-,p-::==::;------=-~-=--.,;:,-------------~"."~~~-------=-----~-7,..,!: __________ _ ___ ----- = " 0 (Z)f'IIXLmlU. cam EXIST. re.as axm !::: ID :E i'.ij 63 I \ I I n I ti \ I I : ;\ \ I I I I I I I , I I I I t I O I I I C, I I I I I I I 64 I,\\\~, I I I : I, : I I I I c, o ~ I l ' t ' ' I I I CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor, Vice Mayor, and Members of the City Commission FROM:Genaro “Chip” Iglesias,City Manager DATE:Tuesday, April 4, 2023 SUBJECT:A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND WORK/PURCHASE ORDER WITH SRS ENGINEERING, INC. FOR ADDITIONAL SERVICES RELATED TO THE DANTE FASCELL PARK COMMUNITY BUILDING PROJECT; PROVIDING FOR AUTHORIZATION; IMPLEMENTATION; CORRECTIONS; SEVERABILITY; AND AN EFFECTIVE DATE. RECOMMENDATION:Staff recommends the approval of the subject item. BACKGROUND:On October 5, 2021, the Mayor and City Commission passed and adopted Resolution #119-21-15739, which authorized the City Manager to procure services from SRS Engineering, Inc. to provide complete construction documents for a new rubber pathway and community building at Dante Fascell Park. The total contract amount was for $159,776.57. The contact plans are 100% complete. The proposed community building is one story, approximately 3,500 square feet. Building features entail a concession room with an adjacent covered terrace; staff business office, multipurpose room, men and women public restrooms, separate locker rooms with shower facilities, and a storage room. The Environmental Review and Preservation Board approved the project by a 4-3 vote on December 6, 2022. The Board expressed concerns regarding the building’s location, orientation, and limited input. Staff has met with a few residents who have also expressed concerns about the building’s location and orientation. In addition, staff has gathered feedback from members of the City Commission regarding the building’s location, orientation, and interior facilities. Staff recommends the following additional base services, which require revisions to the civil, architectural, mechanical, electrical, structural, and landscaping drawings: prepare all required revisions to the 100% contract plans to include relocating the building at or near the existing office-restroom facility, rotating the facility counter-clockwise, and flipping the interior layout. prepare drawings for the conversion of the handball courts to pickleball courts to be incorporated into the contract drawings. 265 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM prepare exhibits and assist at a public community meeting, if necessary. prepare application and submit construction documents for Miami- Dade County DERM’s review and permit. Building Layout Alternative I – Option B (RECOMMENDED) The recommended position of the building, Option B, does not extend beyond the south tennis court fence line and it does not impact any native hardwood tree species. Building Layout Alternative II – Option C In this scenario, the position of the building, Option C,willalter the familiar layout of the jogging path, extend beyond the south tennis court fence line, and it will impact at least one (1) mature Live Oak tree. 366 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The following add-on items are available due to expressed concerns shared by members of the City Commission: Improvements the building’s exterior finishes. Repurpose the locker room and shower facilities. For operational purposes, staff maintains and stores a utility vehicle and tennis-related supplies and materials at Dante Fascell Park that make up roughly 350 square feet (“SF”)of storage needs. Staff recommends using the proposed facility’s storage room (290 SF) and the men’s locker room (156 SF) for complete storage needs.This will eliminate the need for the isolated shed at the park. Staff also proposes that the remaining women’s locker room be repurposed to a dedicated office for the Tennis Operation Supervisor. The Supervisor currently shares a space in the main office where customer and business services are being conducted which makes it challenging to conduct high level administrative assignments when needed. This change would also free up additional space in the proposed main office (288 SF)to not only conduct business services but also establish a future pro shop should one be desired. 467 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM VENDOR &EXPENSE:SRS Engineering, Inc. Proposal/contract amount for base services shall not to exceed $47,657.24. ADD-ONS:If selected, design services related to new exterior finish improvements are $6,560. If selected, design services related to repurposing the locker room shower facilities are $5,840. FUND ACCOUNT:Citywide Parks Improvement - Miscellaneous, account number 301-2000-572- 6450, which has a current fund balance of $2,311,767. ATTACHMENTS:Resolution Additional Services Proposal - SRS Engineering, Inc. Resolution #119-21-15739 Resolution #056-22-15809 - CCNA Professional Service Agreement 568 March 19, 2023 (Rev. 2) Mr. Quentin Pough, CPRP, CPSI Director, Parks & Recreation Department City of South Miami 6130 Sunset Drive South Miami, FL 33143 Re: City of South Miami Dante Fascell Park – Design of New Community Building Additional Services to Relocate and Modify Interior Dear Mr. Pough, We appreciate this opportunity to prepare this Proposal for Additional Services for the referenced project. In accordance with our Agreement for General Engineering and Architectural Services, we are submitting this proposal for additional services for revisions to construction drawings to relocate the proposed new building to the existing Park Office Building location and for minor interior modifications as requested by the City. SCOPE OF WORK (Basic Services) 1. Prepare revisions to the 100% drawings to include moving the building and rotating and mirroring the orientation. These changes will require revisions to the Civil, Architectural, Mechanical and Electrical, Structural, and Landscaping drawings. This task shall include attending coordination meetings with City, conducting any additional site visits, and additional project management. Please see attached Exhibits #1 thru #4 for additional information. 2. Prepare construction drawings to convert the existing racquet ball courts to pickle ball courts. 3. Preparation of exhibits to be presented at a Community Meeting to be scheduled and organized by the City. SRS shall attend and assist in the presentation, provide exhibits, and respond to questions. 4. Prepare application and submit construction documents to DERM for review and permit. This task shall include responding to comments and resubmissions. (Add-ons) 5. In addition, the City would also like the following add-on options. a. Repurpose the locker room and shower facilities.. b. New options for exterior finishes 969 March 19, 2023 Page 2 SUBCONSULTANTS The following are professionals contracted be SRS Engineering, Inc. to assist in the preparation of the work outline above. Please see attached consultant’s fee proposals for additional information.  Laura M. Perez and Associates, Inc. (Architect)  Basulto & Associates, Inc. (MEP Engineers)  Botas Engineers, Inc. (Structural Engineers)  Curtis + Roger Design Studio (Landscape Architecture) COMPENSATION Our Engineering Fees for the above-described Basic Services will be a lump sum amount of FORTY-SEVEN THOUSAND SIX-HUNDRED and FIFTY-SEVEN DOLLARS AND TWENTY- FOUR CENTS ($47,657.24). Plus additional Add-Ons of $12,400.00 if selected by the City. Please see attached fee breakdown. It does not include plan review or permitting fees. Payment will be based on monthly invoicing as a percentage of completion of work. We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement were indicated below and return to our office. Very truly yours, Ignacio Serralta, P.E. President I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this _______ day of______________, 2023 City of South Miami By: __________________________________ Title: _______________________________ 1070 ENGINEERING COST BREAKDOWN City of South Miami DATE:3/19/2023 ACTIVITY PRINCIPAL SR. PROJ. MGR SR. ENGINEER ENGINEER CAD TECH CLERICAL TOTAL TOTAL BY SRS HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HOURS COST $210.00 $190.00 $140.00 $115.00 $75.00 $58.50 PROJECT MANAGEMENT & COORDINATION 2.0 $210.00 6.0 $190.00 $140.00 $115.00 $75.00 2.0 $58.50 10.0 $1,677.00 REVISIONS TO CIVIL DRAWINGS $210.00 4.0 $190.00 16.0 $140.00 $115.00 8.0 $75.00 $58.50 28.0 $3,600.00 PREPARATION OF PICKLEBALL COURTS DRAWINGS $210.00 1.0 $190.00 6.0 $140.00 $115.00 4.0 $75.00 $58.50 11.0 $1,330.00 PREPARATION OF COMMUNITY MEETING EXHIBITS $210.00 1.0 $190.00 4.0 $140.00 $115.00 4.0 $75.00 $58.50 9.0 $1,050.00 ATTEND COMMUNITY MEETING 2.0 $210.00 2.0 $190.00 $140.00 $115.00 $75.00 $58.50 4.0 $800.00 SUBMIT TO DERM FOR REVIEW AND PERMIT $210.00 4.0 $190.00 4.0 $140.00 8.0 $115.00 2.0 $75.00 $58.50 18.0 $2,390.00 PREPARE 100% DESIGN PLAN SUBMITTAL 1.0 $210.00 2.0 $190.00 2.0 $140.00 $115.00 $75.00 $58.50 5.0 $870.00 TOTAL 5.0 $210.00 20.0 $190.00 32.0 $140.00 8.0 $115.00 18.0 $75.00 2.0 $58.50 85.0 $11,717.00 ACTIVITY DESCRIPTION (Basic Services)COST BY OTHERS Laura M. Perez and Associates, Inc. Basulto & Associates, Inc. Botas Engineers, Inc. Curtis + Roger Design Studio TOTAL = SUMMARY ACTIVITIES BY SRS (Salaries) (Basic Services)X 1.00 ACTIVITIES BY OTHERS Estimated OUT OF POCKET EXPENSES including reproduction costs, etc. TOTAL THIS PROPOSAL (Basic Services) = ACTIVITY DESCRIPTION (Add-Ons)COST BY OTHERS Laura M. Perez and Associates, Inc. Laura M. Perez and Associates, Inc. TOTAL = $47,657.24 $11,717 Architect (Basic Services) Landscape Architects $5,900.00 $11,717.00 $35,740.24 $200.00 $35,740.24 MEP Engineers $10,390.24 Structural Engineers $5,150.00 Dante Fascell - New Community Building $14,300.00 Additional Services Architect (Repurposing) (Add-0ns)$5,840.00 Architect (Exterior Finishes) (Add-Ons)$6,560.00 $12,400.00 1171 1272 ................ ···········:············ ············:············-:·············;············:·············:············-:············ ········•··· ..... L A U R A M. P. E R E Z &. A S S O c· I A T . E S, N C. A R C H I T E C T S -P L A N N E R S -I N T E R O R D E I N G E S L I C. A A -C O 1 8 6 4 . . . . . ' . . . . ••.• '. •. •• • ••••.• • ' •.••• , .• ·~·· •• ' •• ' .• ' ,,;,' •• , •••. '·••}••·· .•••••• ••:•• •••••• •• .• . • . •••••••••• • •.•• ' ••••••••••••••••• •❖••··· ...... . .......... ' .. ' .• . . . . . . . . . . ' . . . ' . . . ' ' March 14, 2023 Mr. Ignacio Serralta SRS Engineering 7000 SW 97 Avenue #210 Miami , Florida 33173 Re: City Of South Miami (Dante Fascell Park) New Building (Rotate and Mirror, Repurpose and Exterior Finishes) Dear Ignacio, The firm of Laura M. Perez and Associates, Inc . (LMP) is pleased to submit this fee proposal to provide additional Architectural services for the referenced project. Upon completion of our 100% drawing submittal we were advised that the owner preferred to move the building and rotate and mirror the orientation and add 2 renderings (30 days). Owner also wanted the Add-On options to Repurpose the shower locker room area (15 days) plus new options for exterior finishes (15 days) Attached is a fee proposal , along with the amount of time required to change each sheet of the set. Total Architectural Fee for Basic Services Total Architectural Fee for Repurposing Total Architectural Fee for Exterior Finishes $ 14,300 (see attached fee breakdown) $ 5,840 (see attached fee breakdown) $ 6,560 (see attached fee breakdown) If you have any questions or require additional information please do not hesitate to contract our office. Sincerely, Laura M. Perez and Associates, Inc. Laura Perez, President .... ' ........ '. \· .......................... '....... . .. ''.' .. ' ....... ' ... i •.......... . ...... ' ... ·i· .......... · ':·........... .. ....... ' .......... --~.......... . . . . .. . . . . . . .. . . .. . . . ' ..... . 2 4 1 N. W. 7th S REE MI AM , FL 3 1 2 5 P0 H: 3 0 5 -6 4 2 -9 4 9 4 F A·x: 3 0 5 6 4 2 -8 8 9 E-0 M A IL Imp @ mp t c . com 1373 LAURA M. PEREZ & ASSOCIATES, INC. FEE PROPOSAL FOR SOUTH MIAMI DANTE FASCELL PARK BASIC SERVICES AND ADD-ONS ROTATE, MIRROW AND RENDERINGS 1) 100% Construction Documents (30 days) Description Principal Project Architect/Manager Staff Architect CADD Estimator Clerical Renderings (2) Hours 5 30 0 80 0 0 32 REPURPOSE SHOWER AND LOCKER ROOM AREA 2) 100% Construction Documents -Repurpose (15 days) Description Hours Principal 2 Project Architect/Manager 15 Staff Architect 0 CADD 40 Est imator 4 Clerical 0 EXTERIOR FINISHES Rate $180.00 $140 .00 $95 .00 $75 .00 $95 .00 $45 .00 $100 .00 Rate $180.00 $140.00 $95.00 $75 .00 $95.00 $45.00 3) 100% Construction Documents -EXTERIOR FINISHES (15 days) Description Hours Rate Principal 2 $180.00 Project Architect/Manager (Description below: 40 $140.00 Staff Architect 0 $95 .00 CADD (Color Board) 8 $75 .00 Estimator O $95.00 Clerical O $45 .00 2 new finishes schemes@ 20hr ea . Includes Rev El evationss , Selection of materials & a new color board aft er selection of fi nal scheme Total $900 $4 ,200 $0 $6,000 $0 $0 $3 ,200 $14,300 Total $360 $2 ,100 $0 $3 ,000 $380 $0 $5,840 Total $360 $5,600 $0 $600 $0 $0 $6,560 1474INDEX OF DRAWINGS Coard. Drawing Changes Basis Services -Rotate, Mirror and Renderings I G-1.D GENERAL NOTES No changes. A-1.1 OVERALL SITE PLAN Rotate 9D', mirror, notations, sitework (walkways, pickleball), 1 7 stairs & ramp. A-1.2 PARTIAL SITE PLAN Rotate 9D', mirror, notations, sitework (walkways, pickleball), 1 6 stairs & ramp. A-2.1 OVERALL LIFE SAFETY PLAN 5 Mirror, notations, salRFBBA'IS, stairs & ramps. A-3.1 FLOOR PLAN 4 11 Mirror, notations, ~s, stairs & ramps. A-4.1 ROOF PLAN 1 4 Mirror & notations. A-4.2 ROOF DETAILS No changes. A-4.3 ROOF AND MISCELANEOUS DETAILS No changes. A-5.1 REFLECTED CEILING PLAN 1 4 Mirror, notations, salRFBBA'IS. A-6.1 ELEVATIONS 1 5 Mirror, notations, stairs & ramps. A-6.2 ELEVATIONS 5 Mirror, notations, stairs & ramps. A-7.1 SECTIONS 1 4 Mirror, notations, salRFBBA'IS, stairs & ramps. A-8.1 WALL SECTIONS No changes. A-10.1 ENLARGED MULTIPURPOSE ROOM & INT ELEVATIONS 5 Mirror, notations. A-10.2 RESTROOM ENLARGED PLANS & INT ELEVATIONS D D Entire sheet. G RaR!lBS 19 salRFeeA'!s. A-10.3 CONCESSIONS ENLARGED PLANS & INT ELEVATIONS 1 4 Mirror, notations. A-11.1 DOOR, WINDOW, SCREEN SHADES, & LOUVER SCHEDULE 1 No changes. A-12.1 DOOR AND LOUVER DETAILS No changes. A-12.2 WINDOW DETAILS No changes. A-12.4 SUN CONTROL ELEVATION AND DETAILS 1 No changes. A-13.1 STAIRS ENLARGED PLANS & SECTIONS 2 8 Entire sheet. Changes to stairs & ramp. A-14.1 WALL TYPES No changes. A-15.1 ROOM FINISH SCHEDULE & DETAILS 3 Mirror, notations, l:>alRFGBA'IS, stairs & ramps. A-16.1 IDENTIFICATION DEVICES 3 Mirror, notations, l:>atRFeeA'!s, stairs & ramps. Coard. And asemble Set 6 4 coord with engineers 4 2 meetings 5 Sign and seal drawings 2 D Renderings (2) at 1 5 hrs each 2 3D 32 110 1575INDEX OF DRAWINGS For Repurpose Locker Rooms/Shower Area Coard. Drawing Changes G-1.D GENERAL NOTES No changes. A-1.1 OVERALL SITE PLAN No changes. A-1.2 PARTIAL SITE PLAN No changes. A-2.1 OVERALL LIFE SAFETY PLAN 1 4 Repurpose A-3.1 FLOOR PLAN 4 10 Repurpose A-4.1 ROOF PLAN No changes. A-4.2 ROOF DETAILS No changes. A-4.3 ROOF AND MISCELANEOUS DETAILS No changes. A-5.1 REFLECTED CEILING PLAN 1 4 Repurpose A-6.1 ELEVATIONS No changes. A-6.2 ELEVATIONS No changes. A-7.1 SECTIONS 1 2 Repurpose A-8.1 WALL SECTIONS 2 Re purpose A-10.1 ENLARGED MULTIPURPOSE ROOM & INT ELEVATIONS No changes. A-10.2 REPURPOSE INT ELEVATIONS 1 4 Repurpose A-10.3 CONCESSIONS ENLARGED PLANS & INT ELEVATIONS No changes. A-11.1 DOOR, WINDOW, SCREEN SHADES, & LOUVER SCHEDULE 1 4 Door schedule/ Hardware Set -Spec Repurpose A-12.1 DOOR AND LOUVER DETAILS No changes. A-12.2 WINDOW DETAILS No changes. A-12.4 SUN CONTROL ELEVATION AND DETAILS No changes. A-13.1 STAIRS ENLARGED PLANS & SECTIONS 1 4 Enlarged plans repurpose A-14.1 WALL TYPES No changes. A-15.1 ROOM FINISH SCHEDULE & DETAILS 4 Repurpose A-16.1 IDENTIFICATION DEVICES 2 Repurpose Coard. and asemble Set Provided with Base Service coord with engineers 4 Repurpose 2 meetings Provided with Base Service Sign and seal drawings 1 Repurpose 15 40 14160 Palmetto Frontage Rd, Suite 22 Page 1 of 2 Phone (305) 698-3988 Miami Lakes, Florida 33016 www.basulto.com Fax (305) 698-3989 February 17, 2023 Mr. Ignacio Serralta SRS Engineering 5001 Southwest 74th Court, Suite 200 Miami, Florida 33155 Re: Dante Fascell Community Building Revision Dear Ignacio, We are pleased to submit our proposal to provide Professional Engineering Services for the above-mentioned project. Services: Our scope of work will consist of additional services for mechanical, electrical and plumbing design for revision of building siting and interior changes. Compensation: Our proposed fee shall be as follows: Services: $10,390.24 Payment is according to the listed prices above. In accordance with Florida Statutes, Section 715.12, “Prompt Payment Law” we reserve the right to accrue interest at a rate of 12% APR, beginning 14 days after payment is due. Proposal shall remain open for acceptance for a period of 90 days from the original proposal date. Proposal is deemed invalid after 90 days from the original proposal date. Reimbursable: Reimbursable expenses including travel, lodging, printing, courier service, etc. shall be reimbursed at 1.1 times actual cost. Thank you for an opportunity to serve you. Should you have any questions, please do not hesitate to contact our office. Sincerely, René I. Basulto, PE, MSEM CGC, CFEI, CPE, CPD Principal _____________________________________________________________________________________________ 1676 Page 2 of 2 LETTER OF AGREEMENT ACCEPTANCE I, the undersigned, having authority to execute this Agreement for and having read and understood this proposal and attachments, hereby agree to terms and conditions stated herein as well as to any terms and conditions attached hereto and made part of this Agreement. Please return one executed copy to BASULTO & ASSOCIATES, INC. and keep the other for your records. Signature Title ____________________________________ _____________________________ Printed Name Date 1777 Hourly Rate TOTAL LABOR (Sum 3-9) RAW COSTS [10] X [2] MULTIPLIED COSTS [1] x [11] $Hrs $Hrs $Hrs $Hrs $Hrs $Hrs $Hrs $Hrs $Hours $$ [1][2][3][2] X [3][4][2] X [4][5][2] X [5][6][2] X [6][7][2] X [7][8][2] X [8][9][2] X [9][10][2] X [10][11][12][13] RENE BASULTO, P.E.Principal 1.00 130.00$ -$ 1.00 130.00$ 1.00 130.00$ 1.00 130.00$ -$ -$ -$ -$ 3.00 390.00$ 390.00$ CHARLES YOST Senior Engineer - Electrical 2.90 39.67$ -$ -$ -$ 8.00 317.36$ -$ -$ -$ -$ 8.00 317.36$ 920.34$ DORCAS TOLEDO Senior Cad 2.90 28.00$ 8.00 224.00$ 12.00 336.00$ 12.00 336.00$ 4.00 112.00$ -$ -$ -$ -$ 36.00 1,008.00$ 2,923.20$ KAYLEEN LOPEZ Clerical 2.90 17.00$ -$ 1.00 17.00$ 1.00 17.00$ 1.00 17.00$ -$ -$ -$ -$ 3.00 51.00$ 147.90$ SERGIO HERNANDEZ Sernior Engineer -Plumb Mech 2.90 37.00$ -$ 24.00 888.00$ 32.00 1,184.00$ 0.00 -$ -$ -$ -$ -$ 56.00 2,072.00$ 6,008.80$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8.00 86.00 46.00 14.00 0.00 -$ -$ 154.00 3,838.36$ 10,390.24$ TOTAL -$ -$ TOTAL -$ -$ 10,390.24$ TOTAL BASULTO & ASSOCIATES, INC.10,390.24$ Notes DESCRIPTION TYPE OF EXPENSE TOTAL DIRECT EXPENSES TYPE OF EXPENSE Revise Electrical DrawingsCONTRACT RAW HOURLY RATE CAP Revise Plumbing Drawings and Isometrics NAME CONTRACT CATEGORY Labor Multiplier DESCRIPTION - BASULTO & ASSOCIATES 14-Feb-23 QUANTITY QUANTITY Revise Backgrounds Revise Mechanical Drawings and Heat Load Calculations SUMMARY OF DIRECT EXPENSES SUMMARY OF REIMBURSABLE EXPENSES - Proposal Breakdown for Engineering Services, Labor and Expenses Fascell Park Additional Services COMPANY PROPOSAL SUMMARY TOTAL REIMBURSABLE EXPENSES TOTAL LABOR COSTS, DIRECT AND REIMBURSABLE EXPENSES AND I.G. FEE (DESIGN AND PERMITTING) DISCIPLINE 1878 1979 BDTAS Engineering, Inc. STRUCTURAL ENGINEERS February 8, 2023 SRS Engineering, Inc. 5001 SW 74th Court, Suite 201 Miami, Florida 33155 Attn: Mr. Jean -C laude Fontaneau Project Name: Subject: Dante Facell Park -Modification to Plans (mirro r image) Structural Fee Propos al Dear Jean-Claude: As requested, we are submitting a fee proposal to implement mirror imaging all the structural plan s, add an additional ramp and provide new openings as shown i n the new exhibits. Af ter reviewing the 4 different exh i bits that we received, we estimated that it will tak e approxima tely 11/2 we e ks to implement the changes and generate supplemental structural calculations. Our fee for the above-mentioned tasks is a lump sum of$ 5,150. Jean -Claude, if the scope and fee are acceptable, please sign a copy of this proposal and return it to us at your convenience. Thank you very much for considering us for this project. Regards, BOTAS Engineering, Inc . Patricia M. Botas, P.E. President Accepted Date 8935 NW 35th Lane Suite #202 • Doral. FL 33172 • Tel: 305-418 -9111 • Fax: 305-418-9112 February 15, 2023 Mr. Jean-Claude Fontaneau SRS Engineering Re: Dante Fascell Community Center - Revisions Dear Jean-Claude: As per your request enclosed you will find our proposal for additional services to provide landscape architectural services for the revisions to the new community center building at Dante Fascell Park. Our scope of services will include preparing the necessary plans addressing existing plantings – removals, relocations or retainage, and new plantings in the immediate vicinity of the new building. These plans will include all the necessary information to obtain a building permit and for construction. Our detailed scope of services is as follow: 1. Schematic Design/ Design Development a. Site visit to evaluate existing conditions. b. Review applicable code requirements c. Preparation of schematic design d. Preparation design development drawings, addressing landscape intent and code compliance. e. Preparation of outline specifications f. Preparation of Statements of Probable Cost for landscape elements g. Coordination with Architect and applicable consultants. h. Attend a meeting/ presentation with the client if required. 2. Construction Documents ( 50% and 100% Submittals) a. Review and incorporate comments received for previous submittal, and interim submittals b. Prepare construction documents for tree disposition and planting. c. Prepare technical specifications for tree disposition (relocation or protection of existing trees), planting and sodding. NO IRRIGATION SCOPE IS INCLUDED. d. Update Statement of Probable Cost for above items e. Address permitting comments as needed. f. Coordination with Architect and applicable consultants g. Attend a meeting/ presentation with the client if required. Note that Bidding Assistance and Construction Administration were included in the original proposal scope of services. We propose to provide the above services in accordance with the schedule established with the Client. We assume that we will receive digital bases of site plan for our use, as well as a digital survey locating and identifying all existing trees within project limits. Trees shall be classified by name, and size in caliper, height and spread. This information C U R T I S + R O G E R S D E S I G N S T U D I O I N C. L a n d s c a p e A r c h i t e c t u r e 7 5 2 0 S. R E D R O A D S U I T E M S O U T H M I A M I F L O R I D A 3 3 1 4 3 T E L E P H O N E 3 0 5-4 4 2-1 7 7 4 F A C S I M I L E 3 0 5-4 4 5-9 4 8 8 L L C. LC 000241 www.curtisrogers.com 2080 Mr. Jean-Claude Fontaneau February 15, 2023 Page 2 will be needed in order to submit to the City of South Miami – should tree removal permits be needed. We propose to provide the above services for a lump sum of $5,900, with the following breakdown by phase: 1. Schematic Design - $ 950.00 2. Design Development - $ 950.00 3. Construction Documents a. 50% Submission - $ 1750.00 b. 100% Submission - $ 1950.00 4. Community Meeting (1 @ 2hrs) $ 300.00 Expenses such as printing for internal coordination, postage, and couriers are included in the above fees. If required, printing of multiple sets for submission will be billed at cost. Alternatively we will provide hard or digital copies of the documents, for reproduction. Please call me if you have questions regarding any aspect of this proposal. Sincerely, Ralph J. Ferrer Principal 2181 X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X MHMH CON C- CON C-CHK- 1 0 3 5- 9 2 4 XX XXX5.50 5.505. 5 0 6.0 0 6.006.006.0 0 6. 5 0 6.50 6.507.00 7.00 7.007.50 7.50 7.508.00 8.008.008. 5 0 8.50 8.509.00 9.00 9.009.50 9.5010.0010.5011.00 5.50 6.00 6.50 5.00 5.50 1:12 MAX1:12 MAX5001 S.W. 74th COURT, SUITE 201 MIAMI, FLORIDA 33155 TEL. 305-662-8887 FAX 305-662-8858 WWW.SRS-CORP.COM CONSULTING ENGINEERS EB-00007317 2282 X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X MHMH CON C- CON C-CHK- 1 0 3 5- 9 2 4 XX XXX5.50 5.505. 5 0 6.0 0 6.006.006.0 0 6. 5 0 6.50 6.507.00 7.00 7.007.50 7.50 7.508.00 8.008.008. 5 0 8.50 8.509.00 9.00 9.009.50 9.5010.0010.5011.00 5.50 6.00 6.50 5.00 5.50 1:12 MAX1:12 MAX5001 S.W. 74th COURT, SUITE 201 MIAMI, FLORIDA 33155 TEL. 305-662-8887 FAX 305-662-8858 WWW.SRS-CORP.COM CONSULTING ENGINEERS EB-00007317 2383 X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X MHMH CON C- CON C-CHK- 1 0 3 5- 9 2 4 XX XXX5.50 5.505. 5 0 6.0 0 6.006.006.0 0 6. 5 0 6.50 6.507.00 7.00 7.007.50 7.50 7.508.00 8.008.008. 5 0 8.50 8.509.00 9.00 9.009.50 9.5010.0010.5011.00 5.50 6.00 6.50 5.00 5.50 1:12 MAX1:12 MAX5001 S.W. 74th COURT, SUITE 201 MIAMI, FLORIDA 33155 TEL. 305-662-8887 FAX 305-662-8858 WWW.SRS-CORP.COM CONSULTING ENGINEERS EB-00007317 2484 X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X MHMH CON C- CON C-CHK- 1 0 3 5- 9 2 4 XX XXX5.50 5.505. 5 0 6.0 0 6.006.006.0 0 6. 5 0 6.50 6.507.00 7.00 7.007.50 7.50 7.508.00 8.008.008. 5 0 8.50 8.509.00 9.00 9.009.50 9.5010.0010.5011.00 5.50 6.00 6.50 5.00 5.50 1:12 MAX1:12 MAX5001 S.W. 74th COURT, SUITE 201 MIAMI, FLORIDA 33155 TEL. 305-662-8887 FAX 305-662-8858 WWW.SRS-CORP.COM CONSULTING ENGINEERS EB-00007317 2585 1 of 1 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Dante Fascell Park - Design of New Community Building Additional Services to Relocate and Modify Interior 2686 1 of 4 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Dante Fascell Park - Design of New Community Building Additional Services to Relocate and Modify Interior Subject to the provisions contained in the “Professional Services Agreement for Professional General Engineering and Architectural Services” (hereinafter referred to as the “Professional Services Agreement”) between the CITY OF SOUTH MIAMI, FLORIDA (hereinafter referred to as “City”) and SRS ENGINEERING, INC.,(hereinafter referred to as “Consultant”) dated May 3, 2022, which Professional Services Agreement was competitively procured through Request For Qualifications (RFQ) No. PW2022- 03 in accordance with Section 287.955, Florida Statutes. This Project Work/Purchase Order is made effective as of the day of , 2023, and authorizes the Consultant to provide the services as set forth below: SECTION 1. SCOPE OF SERVICES 1.1 Consultant shall provide professional engineering services, including ____________________________________________________________________________________ for the DANTE FASCELL PARK – DESIGN OF NEW COMMUNITY BUILDING ADDITIONAL SERVICES TO RELOCATE AND MODIFY INTERIOR and complete the tasks that are identified and described in the project proposal, attached hereto as exhibit “1,” for the City (the “Services”). 1.2 The City may request changes that would increase, decrease, or otherwise modify the scope of services outlined under the Project Proposal attached hereto as Exhibit “1.” Such changes must be contained in a written change order executed by the parties in accordance with the provisions of the Professional Services Agreement, prior to any deviation from the terms of this Project Work/Purchase Order, including the initiation of any extra work. SECTION 2. DELIVERABLES 2.1 As part of the scope of services and project schedule, the Consultant shall provide the City with the Deliverables identified in the Project Proposal attached hereto as Exhibit “1.” SECTION 3. TERM/TIME OF PERFORMANCE/DAMAGE 3.1 Term. This Project Work/Purchase Order shall commence on the date this instrument is fully executed by all parties and shall continue in full force and effect until terminated pursuant to Section 6 or other applicable provisions of this ProjectWork/Purchase Order. The CityManager, in his sole discretion, may extend the term of this Project Work/Purchase Order through written notification to the Consultant. Such extension shall not exceed 90 days. No further extensions of this Agreement shall be effective unless authorized by the City Manager. 2787 2 of 4 3.2 Commencement. Services provided by the Consultant under this Project Work/Purchase Order and the time frames applicable to this Project shall commence upon the date provided in a written Notice to Proceed (“Commencement Date”) provided to the Consultant by the City. The Consultant shall not incur any expenses or obligations for payment to third parties prior to the issuance of the Notice to Proceed. Consultant must receive written notice from the City Manager prior to the beginning the performance of services. 3.3 Contract Time. Upon receipt of the Notice to Proceed, the Consultant shall provide services to the City on the Commencement Date, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the Project Proposal attached and incorporated into this Agreement as Exhibit “1”. The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, whichever shall last occur, shall constitute the Contract Time. 3.4 All limitations of time set forth in this Agreement are of the essence. SECTION 4. AMOUNT, BASIS AND METHOD OF COMPENSATION 4.1 Compensation. Consultant shall be compensated for the provision of the Services in accordance with Exhibit “1” attached hereto. Consultant shall receive a total lump sum fee of $47,657.24, plus an additional $6,560 for Add-on Exterior Finishes, for this Project. 4.2 Reimbursable Expenses. All reimbursable expenses are included in the total compensation listed in Section 4.1 above. SECTION 5. BILLING AND PAYMENTS 5.1 Invoices 5.1.1.Compensation and Reimbursable Expenses. Consultant shall submit invoices which are identified by the specific project number on a monthly basis in a timely manner. These invoices shall identify the nature of the work performed, the phase of work, and the estimated percent of work accomplished in accordance with the Payment Schedule attached hereto as Exhibit “1”, attached hereto and made part of this Agreement. Invoices for each phase shall not exceed amounts allocated to said phase plus reimbursable expenses accrued during each phase. The statement shall show a summary of fees with accrual of the total and credits for portions paid previously. 5.1.2.Florida Prompt Payment Act. The City shall pay the Contractor in accordance with the Florida Prompt Payment Act after approval and acceptance of the Services by the City Manager. 5.2 Disputed Invoices. In the event that all or a portion of an invoice submitted to the City for payment to the Consultant is disputed, or additional backup documentation is required, the City shall notify the Consultant within fifteen (15) working days of receipt of the invoice of such objection, modification or additional documentation request. The Consultant shall provide the City within five (5) working days of the date of the City’s notice. The City may request additional information, including but not limited to, all invoices, time records, expense records, accounting records, and payment records of the Consultant. The City, at its sole discretion, may pay to the Consultant the undisputed portion of the invoice. The parties shall endeavor to resolve the dispute in a mutually agreeable fashion. 2888 3 of 4 5.3 Suspension of Payment. In the event that the City becomes credibly informed that any representations of the Consultant, provided pursuant to Subparagraph 5.1, are wholly or partially inaccurate, or in the event that the Consultant is not in compliance with any term or condition of this Project Agreement, the City may withhold payment of sums then or in the future otherwise due to the Consultant until the inaccuracy, or other breach of Project Agreement, and the cause thereof, is corrected to the Owner’s reasonable satisfaction. 5.4 Retainage. The City reserves the right to withhold retainage in the amount of ten percent (10%) of any payment due to the Consultant until the project is completed. Said retainage may be withheld at the sole discretion of the City and as security for the successful completion of the Consultant’s duties and responsibilities under the Project Agreement. Intentionally Deleted. 5.5 Final Payment. Submission to the Consultant’s invoice for final payment and reimbursement shall constitute the Consultant’s representation to the City that, upon receipt from the City of the amount invoiced, all obligations of the Consultant to others, including its consultants, incurred in connection with the Project, shall be paid in full. The Consultant shall deliver to the City all documents requested by the City evidencing payments to any and all subcontractors, and all final specifications, plans, or other documents as dictated in the Scope of Services and Deliverable. Acceptance of final payment shall constitute a waiver of all claims against the City by the Consultant. SECTION 6. TERMINATION/SUSPENSION 6.1 For Cause. This Project Work/Purchase Order may be terminated by either party upon five (5) calendar days written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination and fails to cure the failure to perform within such five (5) day period. In the event that Consultant abandons this Project Work/Purchase Order or causes it to be terminated by the City, the Consultant shall indemnify the City against any loss pertaining to this termination. In the event that the Consultant is terminated by the City for cause and it is subsequently determined by a court by a court of competent jurisdiction that such termination was without cause, such termination shall thereupon be deemed a termination for convenience under Section 6.2 and the provision of Section 6.2 shall apply. 6.2 For Convenience. This Project Work/Purchase Order may be terminated by the City for convenience upon fourteen (14) calendar days’ written notice to the Consultant. In the event of such termination a termination, the Consultant shall incur no further obligations in connections with the Project and shall, to the extent possible terminate any outstanding subconsultant obligation. The Consultant shall be compensated for all services performed to the satisfaction of the City and reimbursable expenses incurred prior the date of termination. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 5.1. Under no circumstances shall the City make payment of profit to the Consultant for services which have not been performed. 6.3 Assignment upon Termination. Upon termination of this Project Work/Purchase Order, a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) working days of receipt of written direction from the City, transfer to either the City or its authorized designee, a copy of all work product in its possession, including but not limited to designs, specifications, drawings, studies, reports and all other documents and data in the possession of the Consultant pertaining to this Project Work/Purchase Order. Upon the City’s request, the Consultant shall additionally assign its rights, title and interest under any subcontractor’s agreements to the City. 6.4 Suspension for Convenience. The City shall have the right at any time to direct the Consultant to suspend its performance, or any designated part thereof, for any reason whatsoever, or without reason, for a cumulative period of up to thirty (30) calendar days. If any such suspension is directed 2989 4 of 4 by the City, the Consultant shall immediately comply with same. In the event the City directs a suspension of performance as provided herein, through no fault of the Consultant, the City shall pay the Consultant as full compensation for such suspension the Consultant’s reasonable cost, actually incurred and paid, of demobilization and remobilization. Section 7. American Rescue Plan Act Contract Conditions. 7.1 The Consultant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Local Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act (“ARPA”). Towards that end, the Consultant shall be required to comply with all laws, rules, regulations, policies, and guidelines (including any subsequent amendments to such laws, regulations, policies, and guidelines) required by ARPA, as further detailed in the ARPA Addendum. If compliance with the ARPA Addendum is required, the City shall select this box: . [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.] 3090 1 of 1 IN WITNESS WHEREOF, the parties hereto have caused this Work/Purchase Order executed as of the day and year as first stated above CITY: ATTEST:CITY OF SOUTH MIAMI, FLORIDA, a Florida Municipal Corporation By: CITY CLERK Genaro “Chip” Iglesias, City Manager Date: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: CITY ATTORNEY CONSULTANT: SRS ENGINEERING, INC. By: Name: Title: Date: WITNESSES: Print Name: Print Name: 3191 EXHIBIT “1” PROJECT PROPOSAL (SCOPE OF SERVICES AND SCHEDULE AND PAYMENT SCHEDULE) 3292 3393 RESOLUTION NO. .1. 19 ....21 .., 15 7 3 9 A Resolution authorizing the City Manager to procure professional services from SRS Engineering, Inc. for Phase II design of a new community building at Dante Fascell Park. WHEREAS, pursuant to the Professional Services Agreement provided by the City for professional general engineering and architectural services, and as the next firm listed in the City's rotation, City staff desires to engage SRS Engineering, Inc. ("SRS") for Phase II design of a new community building at Dante Fascell Park; and WHEREAS, the Mayor and City Commission passed and adopted Resolution #011-21- 15631 regarding initial data collection documents and concept plans for a new community building and additional tennis clay court improvements at Dante Fascell Park; and WHEREAS, the purpose for the initial process, Phase I, was to collect and analyze data, review concepts, and preliminary construction costs to determine the desired facilities and layout at the park. Furthermore, this initial process allowed staff to determine applicable professional A/E design fees for future services related to this project; and WHEREAS, initial data collection and concept plans-attached schemes A & 8-illustrate that additional tennis courts and parking infrastructure will not only reduce existing green space at the park, but will also dramatically alter the park's physical characteristics, landscape and programming, as well as adversely affect adjacent residents and businesses; and WHEREAS, after further review and consideration, City staff recommends proceeding with the design of a new community facility only; and WHEREAS, the proposal/contract amount shall not to exceed $159,776.57. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution upon adoption hereof. Section 2. The City Manager is hereby authorized to instruct and pay SRS Engineering, Inc. to provide complete construction documents for Phase II design of a new community building at Dante Fascell Park. The total expenditure for the work shall not exceed $159,776.57 and shall be charged to account number 301-2000-572-6450, which has a balance of $1,943,D_00 before this request was made. Page 1 of 2 3494 Res. No. 119-21 -15739 Section 3. Corrections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4 . Severability. If any section clause, sentence , or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding will not affect the validity of the remaining portions of this resolut ion . Section 5. Effective Date. This resolution will become effective immediately upon adoption. PASSED AND ADOPTED this 5t h day of October, 2021 . ATTEST : W¼~A 0 CITY U rnK "3'- READ AND APPROVED AS TO FORM, LA COMMISSION VOTE: Mayor Philips : Comm i ssioner Harris: 5-0 Yea Yea Commissioner Gil: Yea Commissioner Liebman: Yea Commissioner Corey: Yea Pag e 2 o f 2 3595 City Commission Agenda Item Report Meeting Date: October 5, 2021 Submitted by: Quentin Pough Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: Agenda Item No:3. A Resolution authorizing the City Manager to procure professional services from SRS Engineering, Inc. for Phase II design of a new community building at Dante Fascell Park. 3/5 (Commissioner Liebman) Suggested Action: Attachments: Memo-Facility Design-Phase 11.docx Reso-Facility_Design-Phase_ll CArev.docx Resolution #011-21-15631.pdf SRS Design Proposal-Phase 11.pdf Dante Fascell SCHEME A.pdf Dante Face II SCHEME B.pdf SRS Professional Service Agreement.pdf 1 3696 THE OTY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM To: The Honorable Mayor & Members of the City Commission FROM: Shari Kamali, City Manager Via: Quentin Pough, Director of Parks & Recreation DATE: October 5, 2021 SUBJECT: A Resolution authorizing the City Manager to procure professional services from SRS Engineering, Inc. for Phase II design of a new community building at Dante Fascell Park. BACKGROUND: Pursuant to the Professional Services Agreement provided by the City for professional general engineering and architectural services, and as the next firm listed in the City's rotation, City staff desires to engage SRS Engineering, Inc. ("SRS") for Phase II design of a new community building at Dante Fascell Park. The Mayor and City Commission passed and adopted Resolution #011-21- 15631 regarding initial data collection documents (i.e. field investigations, surveying and mapping, elevations, geotechnical engineering, tree survey reports and maps) and concept plans for a new community building and additional tennis clay court improvements at Dante Fascell Park. The purpose for the initial process, Phase I, was to collect and analyze data, review concepts, and preliminary construction costs to determine the desired facilities and layout at the park. Furthermore, this initial process allowed staff to determine applicable professional A/E design fees for future services related to this project. Initial data collection and concept plans-attached schemes A & 8- illustrate that additional tennis courts and parking infrastructure will not only reduce existing green space at the park, but will also dramatically alter the park's physical characteristics, landscape and programming, as well as adversely affect adjacent residents and businesses. After further review and consideration, City staff recommends proceeding with the design of a new community facility only. The existing aging building possess operational shortcomings and arguably no longer meets the community's needs. There is no indoor program space for youth tennis participants; very minimum shelter available for participants during inclement weather; and, there are no showers available for tennis guests. 2 3797 THE CITY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The proposed community building is one-story, approximately 3132 square feet. The facility features a multipurpose room, concession service area, public restroom facilities, shower and locker room facilities for tennis guests, storage facilities, and an office space. EXPENSE & ACCOUNT: The total expenditure in the amount of $159,776.57 shall be charged to account number 301-2000-572-6450, which has a balance of $1,943,000 before this request was made. ATTACHMENTS: Resolution Resolution #011-21-15631 Phase II Design Proposal-SRS Engineering, Inc. Initial Concept -Phase I -Scheme A Initial Concept -Phase I -Scheme B SRS Professional Service Agreement 3 3898 RESOLUTION NO.: 011-21-15631 A Resolution authorlzlns the aty Manager to procure professional services from SRS En1lneerl111, Inc. for Initial data collection and concept plans reprdln1 a new community building and additional tennis court Improvements at Dante Fascell Park. WHEREAS, pursuant to the Professional Services Agreement provided by the City for professional general engineering and architectural services, City staff desires to engage SRS Engineering, Inc. ("SRS") to provide initial data collection documents (I.e. field Investigations, surveying and mapping, elevations, geotechnlcal engineering, tree survey reports and maps} and concept plans for a new community building and additional tennis clay court improvements at Dante Fascell Park; and WHEREAS, the purpose for this initial process is to collect and analyze data, review multiple concepts and preliminary construction costs for each concept to determine the desired facilities and layout at the park; and WHEREAS, furthermore, this initial process allows staff to determine applicable professional a/e design fees for future services related to this project; and WHEREAS, upon completion of the initial design phase, staff will submit a final a/e design proposal for City Commission review pertaining to the development of complete construction documents; and WHEREAS, the proposal/contract amount shall not exceed $30,800. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is authorized to procure professional services from SRS Engineering, Inc. for initial data collection and concept plans regarding a new community building and additional tennis court improvements at Dante Fascell Park. The total expenditure shall not exceed $30,800 and charged to Parks & Recreation Capital Improvement, account number 301-2000-572-6450, which has a balance of $805,485 before this request was made. Section 3. Corrections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Page 1 of2 3999 Res. No. 011-21-15631 Section 4. Severability. If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section S. Effective Date. This resolution shall become effective immediately upon adoption by vote of the City Commission. PASSED AND ADOPTED this 19th day of January, 2021. ATTEST: c1TY ct'eRK MAYOR I READ AND APPROVED AS TO FORM: COMMISSION VOTE: 5-0 LANGUAGE, LEGALITY AND Mayor Philips: Vea ~~✓& ci& ATTORNEY Vice Mayor Welsh: Vea Commissioner Harris: Vea Commissioner Liebman: Yea Commissioner Gil: Yea Page 2 of2 7 40100 City Commission Agenda Item Report Meeting Date: January 19, 2021 Submitted by: Quentin Pough Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: Agenda Item No:5. A Resolution authorizing the City Manager to procure professional services from SRS Engineering, Inc. for initial data collection and concept plans regarding a new community building and additional tennis court improvements at Dante Fascell Park. 3/5 (Commissioner Liebman) Suggested Action: Attachments: Memo-Facility & Court Design.docx Resolution-Facility & Court Design.docx SRS Proposal.pdf SRS Professional Service Agreement.pdf 1 8 41101 ~ Soutt1'Miami TllE CrY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM To: The Honorable Mayor & Members of the City Commission FROM: Shari Kamali, City Manager Via: Quentin Pough, Director of Parks & Recreation DATE: January 19, 2021 SUBJECT: A Resolution authorizing the City Manager to procure professional services from SRS Engineering, Inc. for initial data collection and concept plans regarding a new community building and additional tennis court improvements at Dante Fascell Park. BACKGROUND: Pursuant to the Professional Services Agreement provided by the City for professional general engineering and architectural services, City staff desires to engage SRS Engineering, Inc. {"SRS") for initial data collection documents (i.e. field investigations, surveying and mapping, elevations, geotechnical engineering, tree survey reports and maps) and concept plans for a new community building and additional tennis clay court improvements at Dante Fascell Park. ExPENSE: ACCOUNT: ATTACHMENTS: The purpose for this initial process is to collect and analyze data, review multiple concepts and preliminary construction costs for each concept to determine the desired facilities and layout at the park. Furthermore, this initial process allows staff to determine applicable professional a/e design fees for future services related to this project. Upon completion of the initial phase, staff will submit a final a/e design proposal for City Commission review pertaining to the development complete construction documents. Amount not to exceed $30,800. The total expenditure shall be charged to account number 301-2000-572- 6450, which has a balance of $805,485 before this request was made. Resolution Proposal -SRS Engineering, Inc. SRS Professional Service Agreement 42102 5001 SW ?4'TB COUEi,T1 SUITE 201, Ml;AMI, F'LORIDA: 33 l 55 January 12, 2021 Mr. Quentin Pough , CPRP, CPSI Director, Parks & Recreation Department City of South Miami 6130 Sunset Drive South Miami, FL 33143 Re : City of South Miami Dante Fascell Park New Community Build ing and Clay Tennis Courts Dear Mr. Pough , We appreciate this opportunity to prepare this Proposal for Professional Services for the referenced project. In accordance with our Professional Services Agreement for General Engineering and Architecture Services, we are submitting our understanding of the Scope of Work and Fee Proposal to provide Engineering Services in connection with the referenced project. The Scope of Work as we understand it at the present time will consist of the preparation of schematic site plans and program for the constructio n of improvements to Dante Fascell Park located on Red Road and SW 87th Street. Proposed improvements include new community building and 2 to 4 additional ten nis courts. All work shall be in accordance with the accepted practices and des ign standards of the City of South Miami, Miami-Dade County and local regulatory agencies . This work will include the following: Program/Master Plan Package 1. Provide Project Administration services , including attending meetings and coordination with City Staff and Team Consultants (Architect, Landscape Architect, Geotechnical and Surveyor) to discuss proj ec t and City requirements 2. Conduct site visit and field investigations as needed for design . 3 . Research of existing ut ilit ie s records and "As-Built " drawings within the project area. 4. Prepare base plans from survey information and incorporating utility as-built information. 5. Assist the Project Architect with the preparat ion of 3 or 4 schematic site plans to present to City for approval. 6. Attend meet ing with City Staff to present schematic site plans for review and comments . 7. A fee proposal for preparation of construction documents shall be prepared once an ultimate site plan is selected and the program scope is determined. 43103 SUBCONSULTANTS January 12, 2021 Page 2 The following are professionals contracted be SRS Engineering , Inc. to assist in the preparation of the work outline above . Please see attached consultant's fee proposals for additional information. • Laura M. Perez and Associates, Inc. (Architect) • Curtis + Roger Design Studio (Landscape Architecture) • Suarez Surveying and Mapping (Surveying and Mapping) • NELCO Testing and Engineering Services, Inc. (Geotechnical Engineering) Architectural Services SRS shall contract and coordinate with Laura M. Perez and Associates, Inc. to provide Architectural services as needed for the preparation of the Program/Master Plan Package including : • Conduct site visits to observe exist ing conditions • Prepare program/master plan including 3 or 4 schemes for the building and site plan area. • LMP and team will review the site assessment and alternatives schemes with City representatives and proceed to develop Schematic Design . • Preliminary construction costs estimates shall also be provided for each of the schemes . Deliverables: Schematic and Master Plan Package. Landscape Architectural Services SRS shall contract and coordinate with Curt is + Roger Design Studio to provide Landscape Architectural services as needed for the design including : • Review site conditions and evaluate existing trees. Trees will be evaluated by an arborist for their condition -and recommendat ions to retain, remove or relocate will be made. An arbor ist report w ill be submitted. • Prepare up to 4 site accommodation studies -show ing the desired program on the site and documenting impacts, pros and cons of each study . • Attend meeting with City staff to review accommodation studies and receive input. Deliverables: Schematic and Master Plan Package/landscaping accommodation studies ; and Arborist Report . Topographic Site Survey SRS shall contract and coordinate with Suarez Surveying and Mapping (to prepare an updated topographic and tree survey as needed for the design including : • Update the Boundary Survey to a Boundary and Topographic Survey and add Trees to the Survey Deliverables : Topographical Survey F 11 44104 Geotechnical Investigations January 12, 2021 Page 3 SRS shall contract and coordina te with Nelco Testing and Engineering Services , Inc to conduct geotechnical explorations and analysis as required for the design Including: • 3 Standard Penetration Test Borings, (15 feet deep) • 3 Percolation Tests (SFWMD 15 feet deep) • Geotechnical Report with Foundation Recommendations . • Public Utility Location/Layout Coordination. • Drill Rig/Equipment /Personnel Mobil ization Deliverables : Geotechnical Report COMPENSATION Our Engineering Fees for the above-described Basic Services will be a lump sum amount of THIRTY-THOUSAND and EIGHT-HUNDRED DOLLARS ($30,800.00). Please see fee breakdown below. It does not include plan review or permitting fees . Payment will be based on monthly invoicing as a percentage of completion of work . Topographical Survey (Suarez Surveying and Mapping) ............................ $ 6,500 .00 Geotechnical Services (NELCO) ................................................................... $ 2,100.00 Architectural Services (Laura M. Perez and Associates, Inc.) .................... $ 7,590.00 Landscape Architectural Services (Curtis + Roger Design Studio) ............ $ 6,500.00 Civil Engineering and Project Management Services (SRS) ....................... $ 7,960.00 TOTAL ........................................................................................................... $ 30,800.00 We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us . If the foregoing is agreeable to you , please execute the or iginal of this Agreement where indicated below and return to our office. I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein . Accepted this ___ day of ______ , 2020 City of South Miami By: ____________ _ Title : _____________ _ 7 1? 45105 ,____.... : : : . ~ . . ~ ~ ; : ., ............ !L'"""ifit"A·~ii···P,i ...... ~ .. z' .. i.:··A·S·~·o··c:·i·i·T: ....... ~ .... N.·c·~·· .. . ;ARCH ITECTS PLANNERS • I NT ER IO R DES INGER 5 LI C. A A -C 0 1 8 G 4 ecember 21, 2020 r. Ignacio Serralta RS Eng ineeri ng 7 000 SW 97 Avenue #210 iami, Florida 33173 •:• ........ , .... .. . . e: City Of South Miami {Dante Fascell Park) Tennis Courts and building ear Ignacio, : : : : • ~ ........... : •• ...... • : ••••••• '!"" ...... ···:· .. . The firm of Laura M. Perez and Associates, Inc. (LMP) is pleased to submit this fee proposal to rovide Architectural services for t he referenced project. 3ased on our site meeting it is our understanding that that the owner would like to add two tennis :;ourt s and field house building . As discussed we are first to provide a program/ master plan ackage which will include 3 or 4 schemes for the build ing and site plan of the area . Ne will need a detailed survey of th e area as well as boring results in order to properly locate both he building and the tennis courts . T otal Architectural Fee $7,590. (see attached fee breakdown) he following services are not inc luded in our fee . Civil , MEP , Structural , Geotechnical and urveyor you have any questions or requ ire additional information please do not hesitate to contract our ffice. incerely, ... aura M. Perez and Associates, Inc. _aura Perez , President ··•·•••··••C• • •• • .; • • •••• • • • O ~ ~ .... .., -th S T R E E T ~.· I A ~.-r L. 3 3 • :-!: n .. C 5 4 : t .: ::' ~ f r> I 13 46106 LAURA M. PEREZ & ASSOCIATES, INC. FEE PROPOSAL FOR DANTE FASCELL PARK PROGRAM/ MASTER PLAN FOR TENNIS COURTS AND BUILDING 1) Program and preliminary design Description Hours Rate Total Principal 2 $180.00 $360 Project Architect/Manager Site Visit 4 $150.00 $600 Current condition photos/plan 4 $150.00 $600 Preliminary layout 12 $150.00 $1,800 Coordination with owner/ Engineers 4 $150.00 $600 Staff Architect 10 $90.00 $900 CADD / Photo plan 24 $75.00 $1,800 Estimator 6 $125.00 $750 Clerical 4 $45.00 $180 $7,590 9 47107 TE STI NG & ENG INEERIN G SERVICES . INC. Letter of Proposal December 23 rd , 2020 SRS Engineering, In c. 500 I SW 74,h Court., Suite 20 I Miami Florida 33155 Attention : Reference: Folio o . Igna c io Serralta , P.E. Dante Fascell Park Community Buildi ng and Te nni s Courts 8600 SW 57•h Avenue South M iami Flo rida 09-4036-000-0600 Thank you for requesting a proposa l for our serv ic es at the above referenced project. We hereby propose to perform the following: 3 Standard Penetration Test Borings ( 15 fee t deep) @ $150.00 each--------------------------S 4 50.00 Geotechnical Report with Foun dat ion Recommendations------------------------------S 350.00 3 Percolation Tests per SFWMD -15 feet deep) @$300.00 each --------------------S 900.00 Public U tility Locati on/Layout Coordin a ti o n---------·---·-------------------------------------S 200.00 Drill Rig/Equipment /Perso nnel Mob ili za tion------------------------·-----------------------S 200.00 (Standard fee ofS 200.00 per day /per trip ) NOTE: Total Amoun t--------·-------------------------------$2, l 00.00 Ple ase note sit e is 10 be accessible for en try & pcrfonnancc of work. i\ny clearing necessary is to be pcrfonncd by others . "lnis proposal is based on site being accessib le with tru ck-m ounted drilling eq uipment . ct Pay : 30 Duys Co11ducri11g 1/r e abo ve referc11 ced res/s i11vo /1 •es drM11g " heai 1• rr11ck-111 011111 ed drill rig or rlr e mobili=o tio11 of orher hem,• drilli ng equipment {i.e . tr i-pod) imo th e properly. mu/ drilli11g holes /,uo th e ground. We 11'//I 11or asrnme responsibility for damage to pril'a rely owned 1111dergro 1111d w iliries (s uch as sp rmklers , srreet lig/11i11g . elc.). sep ric ranks or orh er 1111dergro1111d stmcwres irlrich may result from drill ing actil'itics or mobili:arion of dr1/li 11g cquipmem if not idemijied prior ro mobi/i:at/011 10 th e site. /Ve will also 11 0 1 be responsible to damag e of law,, or sofi gror md whlc l, may result from th e us e or mo\'eme111 of th is eq uip111e111 on the pro pe rry. The information co11wi11ed ill th is doc11111 c111 is ime11ded 10 be used as a proposal of project specific fees as requested. based on informotion gfren and illte11ded for th e explicit use of rh e clrenL It shall remain confidemial -disclosure of any kind to Th ird ponies for any purpose Is srricrlyforbldden. elco Test ing and Engi neering Services, Inc. is pleased to assist you with this project. If you ha v e any questions or need further a ssis tance please call us at (305) 259-97 79. Respectfully Submitted, Nc lco Testing and Engineering Services, Inc. ~'1.,,:Z-23 Ll_ssesBatistaPresident ACCEPTANCE OF PROPOSAL Sig nature Dale 13370 W 131'1 Street, Suite 105 Mia mi , FL. 33 18 6 (30 5) 259-9779 Certified DB E. CBE, and SBE w ith Miam i-D ade . and MBE (State of Flo rida) \\ w\,. 'elc0Tes1in!.!.c om II Nclco I 0 1b llsou th.net 1? 15 48108 AC11VITY BYSRS Ge neral P· :iject Management Coor din auc n with Subconsultants Cond uct ility Search and Initi al sit e vi sit Prep ara ,,o of Base Plan Assis in P-eparatio n of Schemati c Site Plan s Pre pare C vi i/Site ConsL Cost Estimate Subm it a A!tend Meeting wi th City and Su'cCCln sultants Revisions to Program/Master Pla n and In r :,, TOTAL ACTIVITY BY OTHERS Suarez Survcvino NEL CO Tr"= and Enarneenng Se,v,ces. Inc. l un Perez and Assa .. Inc. CJt,•+Roa crs Oeslon St udio. Inc. ~ ~ BY SRS (Salano s) ACTIV ~ BY OTHE RS ENGINEERING COST BREAKDOWN City of South Miami Dante Fascell Park New Community Building and Tennis Courts -Program/Master Plan PRINCIPAL SR. PROJ. MGR SR. ENGINEER ENGINEER CAD TECH CLERICAL HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE S180,00 S1 50.00 S125.00 S90.00 $65.00 $45.00 2 S180.00 4 S150.00 $125.00 S90.00 S65.00 2 $45.00 S1 80.00 4 S150.00 2 5 125.00 S90.00 565.00 S45.00 S1 80 00 S150.00 3 $125.00 3 $90.00 SSS.00 $4 5.00 S18 0.00 S150.00 , S1 25.00 2 S90.00 4 SS S.00 $45.00 S180.00 2 $150.00 2 $12500 8 S90.00 4 565.00 $4 5.00 S1 80.00 S150.00 2 S1 25.00 4 S90.00 S65.00 $45.00 3 S180,00 4 .s,so.oo S125.00 S90.00 565.00 S<:5.00 2 S180 00 3 S150.00 4 S1 25 .00 S90 00 • $65,00 54 5.00 5 5 180.00 13 S150.00 14 5125.00 17 S90.00 12 565.00 0 $4 5.00 I DESCRIPTION To..,,,,rachK:al S16Ve-i Gco1cchnccal/Perc<>lat1on Tes:s /vchncctuial Des,pn Landscape lvch1tecture and /vborist TOTAL , SU MMARY $7 ,960 X Estimat!!d OUT OF POCKET EXPENSE S indud ing rep1oduct lon costs, elc. TOTAL THIS PROPOSA L D ATE: 1/6/2021 TOTAL TOTAL HOURS COST 8 s,.osooo 6 S850.00 6 5&<5.00 7 S56 5.00 16 S1 ,5 30.00 6 S6 10.00 7 S1.140.00 13 Sl ,57000 69 S7,960.00 COST S6500.00 52,100.00 S7.590.00 S6500.00 $22,690.00 S7 ,96000 522.GSOOO S150 00 $30,800.00 1:16 49109 Professional General Englneerlna & Architectural Services RFQ #PW201&-22 Wage Rates Summary Job Classlflcatlon City of South Miami Benchmark Hourly Rate Prfndaal $180.00 Sr. Project Manager $150.00 ProJect Manaaer $130.00 Senior Engineer $125.00 Senior Planner $125.00 Planner $85.00 Senior Traffic Engineer $125.00 Traffic Engineer $85.00 Senior Designer/Engineer $90.00 Designer $80.00 Englneer1na Intern $75.00 Senior CADD Technician $75.00 CADD Technician $65.00 GIS Technldan $80.00 Senior Construction Inspector $90.00 Construction Inspector $75.00 Senior landscape Architect $125.00 landscape Architect • $115.00 landscape Architect Intern $70.00 Arborlst $75.00 Utility Coordinator $90.00 Survevor / Manner $85.00 Survey Technician $60.00 2-Man Survev Crew $115.00 3-Man Survey Crew $125.00 4-Man Survey Crew $135.00 Fire Protection Engineer $90.00 Plumbing Engineer $90.00 Mechanical Engineer $90.00 Electrfcal Engineer $90.00 Geotechnical Engineer $120.00 Geologist $90.00 Environmental Scientist $85.00 Senior Administrative Assistant $65.00 Clerical $45.00 1.t 17 50110 IEXHIIIBT#6 BDR@!FESSBONAL SERVBCIS AGIIIEIEM!Sff ••profau!onaf Gan11rmll Snglneerlns m Afth~ l!arvlcet• RFQ #PW20B6-12 THIS AGREEMENT made and entered lnro chis~ day of '1NZtt: . 20.!L by and between the Oty of Soldh Miam~ a municipal corporadon (heranafter referred ro as Owner or CITY) by and dlrouafl hs City Manager (hereinafter referred co as CITY or Ciq Manager) and 5 RS c,.s, i)i,+e€su k\4 • l rl L who 11 aulhortzed 10 do business In die Seate of Florida. (hereinafwr referred to as die "CONSULTANT"). In c:onsldendfon of the premises and the mutual covenants comalned In this AGREEMENT, die pank1s agree co the follo'WUII ierms and condldons: 1.0 Genenl Proylstons 1.1 A Nodce to Proceed wllJ be Issued by the QJ Manager, or his deslgnea. following the slgnlns of chis AGREEMENT. Thia AGREEMENT does not confer on die CONSULTANT any exclusive rights u, perfonn work on behalf of the Owner other man the worit described In one or more Nodce to Proceed (hvelnaftea- ll'Ufamld to as the ''WORK"), nor does It obllpte the Owner in any manner to guaramee work Var the CONSULTANT. 1.2 The C1TY agrees dial It will furnish to the CONSULTANT avallable dala and documents In the CITY pouesslon penalnlng to Iha WORK m be perfonned under this AGREEMENT prompdy deer the Issuance of the N011ce to Proceed and upon wrtuen request of cha CONSULTANT. 2.P Smpe gf Serytces, The CQNSULTANT shall pedmm the wads as sag mnb lo dw Scape of Serytg;s as dewfbed '" ma Nodce 19 Proceed, 3.0 Ttme foe Campledqn 3.1 The ser.ric:es to be n!l'ldered by the CONSULTANT for any WORK shall be commenced upon receipt of a wriuen Notice co Proceed from the CITY subsequent to the mceanion of this AGREEMENT and shall be completed within the time set forth ln the Notice co Proceed or other document signed by die Cll)' Manager, or deslgnee. 3.2 A nuonable extension of dme wlll be granted In the event there Is a delay on die part af the CITY In fulfilling Its pan of the AGREEMENT, change of scope of work or shoutd any ocher evena beyond the control of che CONSULTANT render performance of his duties Impossible. 4.0 Basis gf CQmpemadqn; The fees for sentces of the CONSULTANT shall be dellermlned by one of the following methods or a combination thereof, as mutually agreed upon by 1he ClY and me CONSULTANT. 4.1 A fbced sum: The fee for a cask or a scope of work may be a fbced sum as mutually agreed upon by the CITY and the CONSULT ANT and lf such an agreement Is reached, It shall be In wridng signed by the CONSULTANT and the Ci1J Manager and auached hereat as ATTACHMENT' A: 4.2 Hourly ra1e fee: If there ii no ftxed sum or If additional work Is requesced without an agreement as co a fixed sum. the CITY aarees to pay. and che CONSULTANT agrees to accept, for the services rendered pursuant to this AGREEMENT, fees In ateordance with the hourly rates that shall lndude all PageSJ cfH 'lllomD P. Dt8po IGIIJIJOI& 135 11; 1R 51111 waaes, benefl&s. overhead and profit and chat shalB be In wrldnf, sJaned by the CONSULTANT and the 0iy Manaaer and auached beretD as ATTACHMENT A s.o PAJment pd Padid PIJrneop. 'Iba Cl1Y wiD make monthly paJlll8l11IS or panlal paJffl8lltS ID die CONSULTANT for all mnhortzed WORK parfarmed durfna die prevlous calendar month u set fonh In the schedule of paymeni as set fonh In ATTACHMENT A ar. If no schedule of paJ1111111t exhibit la auached m this AGREEMENT then pavmem WIii be made 30 days f'oUowq the receipt of CONSULTANrs lnvofca as die work progrene1 but oatly lor the work aaually performed and approved In wrllfnlby die Ctr Manqer. 6.0 Blahr, gf 'lrd!kna AO services lhaD be perfonned by the CONSULTANT ro dte salllfaaion of die CITY's represemallve. who shall cledde aU quasdons. cllfBadlles and dlspures of whailever llll1IINt whlc:h may arise under or by nman of dds AGREEMENT, the prmecudon and fulftllment of the senrlces, and die clmracllar, qua!IIJ, amount and value. 1he represemallve11 decisions upon all cll1ms. queslions, and dlsputm shall be ftnal. conduslve and binding upon dle pmrdes unlm such detennlnallon Is clearly arldtrary ar unrmsanalt!e. In die event dlat die CONSUL TANT does nat concur In lhe Judgment of the npnsentallve u ro anv decisions made by htm. CONSULTANT shaD pRllellC his wriUen obiecdcns ro die ctt, f1anqer and shall abide by the decision of the a,, Manaaar- 7.0 Qwnenhla of Dggnneg. All repons and reprodudble plans. and other da1a davetopecl by dle CONSULTANT far che purpose of dlis AGREEMENT shall llecome the propen, of tlae QTY wldlaut restrtcdon or lfmltadon. 8.0 Audit..._ lhe CITY ralll'Yel die right m audit the NCOl"ds of the CONSULTANT relm?d ID this AGREEMENT at any time dUJina the aecutlon of che WORK and for a period of one Jar _. final payment Is made. 1'1111 provision II appllcable only to proJects dtat are on a dme and cost basis. 9.0 Tnnlt:fn N•datlpns: If the contract amount exceeds the db eshold amount provided In L 287.017 far catiepry four, the CONSULTANT shall execute a trulh.fn.negotladon cierdftcate stating tllat Wlp rues and olher faclual unit com supponlna the compensallon are accuraut. comp!et&, and cumnt at Iha time of c:omracdn& In such event, the orf&lnal contnct price and any additions tlleretD shall be adJustad to exclude an, sfgnlffcam sums by which the a, determines the contract prlc:e was Increased due ID lnaccurallt. Incomplete. or noncurnnt wage rmes and other factual unit co• All such contract adjllltlnems must be made within one year following the end of the comnct. 10.0 S,"dettfz 1ba CONSULTANT shall not assign or nnsfer hi rf&hts under dds AGREEMENT without die cprea wrtaran consent of die CITY. The CITY wlD not unreasonably withhold and/or delay its consent to the aafpment of the CONSULT~• rights. The OTY may, In 11s sole dlsa'edon, allow 1he CONSULTANT to astJ&II Its dudes. oblfptlons and responllbtlldes provided the assignee meecs all of the CllY's requirements to the CITY's sole 1td6dtoP. lhe CONSULTANT shall not subcomract this AGRE&t1ENT or any of the services ca be provided by It without prtor wrlaen consent of the CITY. Any asst&nment or Mlbcontnctlng In vlolatlan hereof shall be void and unenforceable 11.0 UnamhpdJed ADem; The emploJment of unauthorized allenl I))' the CONSULTANT Is constdered a vtatadon of Federal Law. If the CONSUL TANT knowmal, employs unaudlortzed aliens, svch vloladon shall be cause for unilateral cancelJatlon of lhJs AGREEMENT. This applles 10 any sub-CONSULTANTs used by the CONSULTANT as welL The CITY reser¥eS the rl&ht ac la dlscredon. but does not assume the abltpdon. Pq&Dof6G 'IIGmaF.Pqie ICIIIJIION 138 52112 to require proof of valid cidzenlhtp or, In the allllrnadve. proof of a valkl .,_. card for each person emploJed In Iha performance of work or provld}na die goods and/or semces for or on behalf of Iha Cl1Y lncfucllng persons employed bJ an, Independent contraaDr. Br nsa.,,,. 1h11 ,.e.t. die C1ti' does not assume anr obhpdon or responsll,IDi, • enforce or ensure mmpllance wtch die appllcable l&wl and/or ....... 12.0WJuxtm\y.. The CONSULTANT warnnlS that It has not emploJed or retained any companr or penon. odler than a bona fide employee wortdna IOfely far dae CONSULTANT. co IORdc or secure dais comracc and that he has not paid or aa,eed ID ,a, an, companJ or penon other than a bona fide employee worlclna soret, fer tile CONSULTANT an, fee, commission, percen11p fee. gifts or any other mnsldendons condnpnt upon or nsuhlna from Iha award ar maldns of this comracc. For breach or vloladon of this warram,, the CITY shall have the rf&ht to annul dds contract wllhOUt ~-13.0iwndw dPPL It Is ... .., undenmod and ..-diat die CITY 1111J IIH'llllnalla dds AGREEEMENT for an, reason or no reason and without ll8fflll&, bJ ellher dedfnlng to ~ Notice to PNceed audlortzlngWORK. or, If a Nodce to Pnsceed Is Issued. Cl1Y may tarmlnala this AGREEMENT bl wrkllen notice to CONSULTANT, and In e1lher event the CTY's sate oltltpdon to die CONSULTANT shall be paJlll8Mfor che work prevloullJ audlorlmd and parfonned rn accan1ance w1m die prov111ons of this AGREEMENT. PaJment shall ~ dela mliial on Iha basis of the wvrk pertonned by the CONSULTANT up to the lime of wmlnadon. Upon wmlnallon. the CITY mall be endded IIO a nnnd of any monlel paid far any period of dme for which no work was pabmed. 14.0 Imm,, This AGREEMENT shall remain In forte undl die end of the term. which Includes aD authorized ranawalr. or unless alha wise '8fflllnDd bJ the CITY. The wm of thts ..,._ Is three (3) ,an from die Issuance of Iha Nodce co Proc:eed and one &Wo· ,ear t,-m renew. lhe option to nmaw Is II Iha dlsa"edon of me a, Manl.ger. The 1111f tannblBle die contract wldlout cause foUowln& 30 daJs advanced nodce • die CONSULTANT. Hawaver, In no event shall die mrm exceed flve (5) yean ~the luaanm of the Nodce tD Proceed. 15.0 IWauJt. In the event elcher pan, falls tD comply with die p1 ovlslons of chis AGREEMa.T. lhe aa,ieved parc, ma, cledare the odler panv In default and notify the defauldns ,an, In wrhlna-If CITY Is In default. die CONSULTANT will onlv be compe111118d for any completad profess1ona1 services and CONSULTANT shaO not be enddad m anr amsequendal or delay clamaps. rn the evem lhat pardal papnmt has been made for such professional services not completed. the CONSULTANT shall remm such 1111111 to the CITY within fl8II (10) clays after nodce lhat said sums are due. In the event of B.117Jillptlon be\wem lhe pudes arising ouc of or reladna In an, wa, to this AGREEMENT or a breach thereof. each party shall bear Ill own coses and legal fees. 16.0 lnpll'llllm ancl llylemnfflcallgn. The CONSULTANT qrees to comply with CITY's Insurance and lndemnlftcadon requirements dllt are set fonh In ATTA"OfMINT 8. ID dds AGR91ENT. 17.0 .--m Noc Em1111ye. Nodlln& In d1ls AGREEMENT shall pnwem the cm from empto,b,a Olher CONSULTANTS to perfonn the same or similar serllces. 18.0 Ca,las; 0nVnances and La,n. The CONSULTANT agNes to abide and be governed by all c1u1J promalpted and publlshed munlclpal, county, saw and federal codes, onlJnancar. ndes. reguladons and laws which have a dlr"a« bmrlng on the WORK involved on dtls pro)act. The CONSULTANT ii required to camplt118 and sip all afllclavlllr. indud1n& Public EndtJ Crimes Affldavlt fann (aaached) pursuant to PS 287.133(3) (a), as required by die CITY's sollchadan. If any. applicable co this PapDof'6 ,..... ...... IIIIIIJOIG 137 1., 20 53113 AGREEMENT. 19.0 Inn, CONSULTANT shall be responsible for payment of all federal, swe. and/or focal caxes reflllBd tD die Work. fndlllive of sales taJC If appllcable. 20.0 Dng F,:ee Werka!Rm CONSULTANT shal1 comply wl1fl CITY's Drug Free Worlcplace r::a which Is made a part of chis AGREEMENT by reference. . 21.0 ~ Cqmrag:pr,. CONSULTANT Is an Independent enthV under dlls AGREEMSfl' and no1Nng conm!ned herein shall be conSll'Ued 10 aeace a partnership. joint vemure. or: rela1tonshlp becween the panles. 22.0 Qutlel and 8,aon es. CONSULTANT agrees to provide ks semces during die term of this AGREEMENT In accordance with aD appllab!e Baws. rules, replatlons, and health and safea, sandarda of the federal, state. and CITY. YJhlch may be appftcab1e to 1he sentce being provided. 23.0 • krmm snd Cgj:lflc;aitgns. CONSULTANT shall secure all necessary business mid ~ Ocenses at Its sole expense prior to execudna the AGRE&tENT. 24.0 ~QM, Mpdfflgtlqn. and Nor §kt This AGREEMENT conlthutes the entire aa,eunent cf CM pzrdes. tncorparares an the underltandtngs of die pardes and supersedes any prior agrearnems, unclemandlnp. represemadon ar n~on. wrmmn or onL This AGREEMENT may not be modlfled or amended except In wrldng. signed by both pardel hereut. This AGREEMeNT mall be bfndlr,a upon and Inure ID the benefit of die Cit)' of Souda Hhunl and CONSULTANT and tD 1helr respective Qleln. successors and esstgns. No modfftcadcn ar amendment of any wms or provisions of dlls AGREEMENT shalB be wDd or blndtng un1as It compiles wllh this pngraph. 11t1s AGREEMENT, ln general, and dlls paragraph, in pardallar. shall not be modlfled or amended by aces or omlssfona of die parries. If chis AGREEMENT was approved by wrtaen raoludon of che City Commission. or If such approval Is required by ordlnanca or die Ch¥ Charter, no anndmeni to thls AGREEMENT shall be valld unless approved by wriaen resoludon of the Qi, Commission. 25.0 Ju0' Trial cnv and CONSULTANT fcnowuw,, lmwocably vofumardy and lntsmlonaJJy waive any rJ&ht efdler may have to a b'ial by turY in Sme cw Federal Court proceecfJqs in respect co any aaton. praceed)ng. lawsuit or coumerdalm arising out of this AGREEMENT or die performance of the Work thereunder. 26.0 YaJJ«flg gf faqtted 5:res. This AGREEMENT may l,e eteeuied In several ca.:::r..:;:; eadl of whf lhalJ be construed as an original 27.0 R~ar,tlqn: Throughout chis AGREEMENT the pronouns that are used may be subsclaned for male. female or nwter. whenever ;ppllcabla and die singular words subsduned for pturaJ and plural words subsdmted for singular wherever appDcable. 28.0 Sever;lbfllri. If any cerm m-pnmston of dus AGREB'-tENT or die appftcadon dtereof to any person or dn:umsmnce shall, to any extant. be bmdJd or unenforaable, the remainder of chis AGREEMENT, or the application of such uinn or provision to persons or drcumscances 01her than chose to which It Is held Invalid or unenforceable. shall not be atrecced thereby and each and every ocher term and provision of chis AGREEMENT shall be vahd and enfon:eabfe ID the fullest emnt pet mltted by law. 29.0 Cumulative Remedies: The ~ and obl'ipdons imposed by the contract documents. If any, and dte rlgha and remedies awffable hermmder. and, In pardc:ufar but wl1hout flmllatlan, cha warranties. parantees and obllgadans Imposed upon CONSULTANT by che Contract Documents, If any, and dtls AGREEMENT and the rJshts and remedies awllall!e tD the CfTY hereunder, shall be In adcfldon YD. and shall not be connrued In any way as a lbnhadan of, any rf&h1S and remedies available at law er In equity, by spedal gua.nmee or by other pnmslons of the Comract Documems, if any, or this AGREEMENT. In order a, emlde any party to exercise any remedy reserved to le In thls ,.3hf06 "nlamaP.Pepil ICIIJIZOl6 138 1P 21 54114 I ' ' I i i ' I l j J l AGREEMENT, or eclsdna In law or In equky, lt shaD noc be necessary ID p,e nodce. other 1111D such IIOllca as ma,-herein expressly required. No ~ Ollllferred upon or resaved 1D 1111)' pan, 11--. or edsdna at law or In eqult),, shall II& exduslva of any odlar avalfable remedy or remedies. but each and--, such remedy shall be cumufatlve and shall lte In addition co every odler remed,-pen under lhls AGREEMENT ar • hereafr.ar dlCISClng at law or In equllr. No delay or ondaton 1D exercise 1111)' rf&ht or power accrutns upon an, de6wlc shall Impair an, such right or power or lhall be mnsaved 1D be a waiver chereot but an, such rf&ht and power may be welled frmn dme • dme as oflan as ma, be deemed ezrpedlem. 30.0 Ngn-Wplyff. CITY anti CONSULTANT agree that no failure to _,.and no delay 11. wwwmm. an, rfaht. power or prlvlle&e under this AGREMENT on the pariof ehher panr shaD operate as a waiver of any tight. power, or prMlep under ddl AGREEMENT. No waiver of dds AGREEMENT. In whole or parr. lncludlna the provisions of this ,........ may be lmpllad lily-, act or omission and wlll only be valkl and aaforceable If In wrlclna and duly execufled a., each of die pardes ID dds AGREEMENT. An/ waiver of an, mrm. candltlan or provision of dds AGREEMENT wlll not consdlllle a waiver of any other wm. condJalon or provision herea( nor wlD a waiver of an, breach of any mrm. condition or provision connlanla a waiver of any subsequent or succeecllng brmdL The tdlura to enfora this AGREEMENT as ID Ill)' particular breach or default lhalJ not ace as a waiver of an, sublaquent breach or default. 31.0 Ng RkP lrgtmpden -ad Eqml rm_,,.,. No aa1on shall lte alcen br the CONSULTANT, nor wlD It pamdt Ill)' KIi or amJsslons which result In cll1crlmlnadon qdrllt any person, tndudlng emplo,ee or appllcant for emplo,maat on lhe 111111 of race, creed. color, edmicltJ. national artgln. rellglon, 1p. sex, famlllal atatut. marital status, edmlci&J, sexual orlelllallon or phJsical or memal dlnbllhr as prmatbed br law and thai tc wlD • afflrmallve acdon CD ensure a such cOscrlmlnadon does not cake place. The CONSULTANT shall Cllllllplv widl Iha Americans with Dlsabllldes Act. and It wm take aftlrmadva salon m ensure that such c8sa1mlnadon does not cake plaat. TIie Ctt, of South Miami's hfrlns pracdces strive ID comply wllh all appllc:able fedaral repladans reaanftnl employment eBab!lttr and emp!apaent pracdces In general. Thus. all lndlvlduala and emldes seeking• do work for the aTY are mcpeaed to comply with an appllcabJe laws. pernmenal requlremems and reguladons. Including die reguladons of lhe Unlflld Scal8s Depanment or Justice pena1n1na m emploJment elJdbllli, and emplOJffllftt pracdces. 8'/ sl&nlnl this AGREEMENT, the CONSULTANT hereby cerdftes under penallJ of perlul')', ID lhe CITY, elm CONSULTANT II In compllance with aD applicable reauf;dions and laws gcwemlng employment praalcm. 32.0 CiAY1mJo1 l,mn. This AGREEMENT and the perfonnance af servlcel hereunder wlll be governed by the laws of Iha Statll of Rorlda. wllh exduslva venue for lhe resohnlon of any dllpule belna a court af competent Jurisdiction In M1aml-Dade eoum,, Rorlda. 33.0 &give Data. 1111s AGREEMENT shall not become efealve and blndln, until It has been exealled by bo1:h parties herelD. and approved by cha O, Commission If such approval II required by 01:v'• Charter, and lhe effacdve data shall be the date of Its execution by the last: partJ so .execlldl\l lt or If 0, Commission approval is required by the Chi• Chanar, lhen che date of approval by CltJ Commission. whichever is later. 34.0 Dini Pargy llenafldarx, It Is spedftcally undenr.ood and qreed that no other penon or entifF shall be a chtrd-pany benefldarJ hereunder. and that none of provisions of this AGREEMENT shaD be for the benefit of or be enforceable by PaaaSSof66 n-F.Papo IGlll/2016 19 22 55115 an,one other chan the pardes herelD, and chat onlJ the panlas hereto shall have an, ,W. hereuncler. 35.0 funlr Amnns:r TIie pan1e1 hento ..-• exaane any and aD other and funller documents a mWit lie reaso:=aarr In order tD ratify. confirm. and eleauata the Intent and purposes of this ENT. 36.0 Drnts! Fr ra-Time la of the essence of this AGREEMENT. 37.0 ,,_.,,,,,,.... 11ds AGREEMENT shall nat be conmved men ••,at, sgalnlC either P8l'lr hereto. ...,._ of who was more l"IIPOIIIIWe for hi preparation. 38.0 Plrin tNrtm Naldler pa'lf heretlO shall be In deludt af hi faDure tD perform Ill obBptlonl Wider dda AGREEMENT If aused by ac11 of God, cMJ COIIIIIIOdon. sda. labor dlapua. or pvenunental demands or requlremena that COldd not be ~ ·anddpated and the afeccs avoided or mllfplad. lach panr shall nodfy the ocher of any such oa:urnnce. 39.0 Sullpnpedng If allowed bJ tlllsAGREEMENT, Ille CONSULTANT shall be at flan, l"llpCHlllble eo die CITYfor tlle aasand omllllonaofla lUIN:ontnaon/:lubc:omllllun:s ~ It II far die acts and ondlllonl of people dlracdJ emplo,ed by IL All •~fauns and dlab' aarearnws. If dowecl by dill AGREEMENT, must be appnnad bJ the CITY. llleCONSULTANT shall ~ each subconaaaur, who II approved lay the CITY, ID 181'11 In the subcamract co observe and be bound by aO aldlpdons and conditions of ddt AGREEMENT to which CONSULTANT la bound. 40.0 PubJlc B@cgrg CONSULTANT and all of ks avlscomracun n requlrecl ID ~ wldl the pubftc recanla law (a.I 19.G701) whUe provkflDg pods and/or servlas an of tlla CITY and Iha C0NSULTAN1, under such condldons. shall lncorporaca this ~ In alJ of Its sullcontraas for 1111s P,vJect. Under such candldon. CONSULTANT and Its aubtontrac:un are apeclftc:aJly requtred • (a) Kelp and malmafn publfc records nqutred by the publlc .-er to perform die service; (b) Upon raguac hm Iha pullllc aamc,'1 CllltDdJan of puldlc nconll. provide the public agency with a copy of the requestl8d records or allow Iha records tD be lnspeaed or copied within a nmonabla lime at a CIDIC that does not rmd the cost provided In dds chapter or at otherwise provided lay law: (c) Ensure dm pubic ncords that are mmpt or confldandal and 8RlfflPC hm ;ubllc reatrds dlsclmura requlnlmMls are noc cl1sdoired acepi at llllhortmd bJ law far the duration of the conuact 1111'111 and fallawlng campledon of the cvmncc If the comracmr does not 1l'mlnl' • nards co the puldlc aaenc,: and (d) Upon mmpledon of the conner. transfer, at 110 cost. ID Ille pulsllc aaanc, all pubUc records In poaealon of the co11uarmr or lceep and malmaln pubftc recori1s ~ the pubic agenq ID perlmm die serw:e. If the contrmDr translers all publlc CD die pablJc pc, upon compledon of the conner. die cmmaaor shall dellroy any duplcata publlc recCll'dl that ant mmmpt or conftdendal and exempt from public records dlsclosure ~11. If die comnccor keeps and malmalns pubDc reconls upon compledan of cha cxtmraa. the mllftCIIOI" shall meet aB applfcabfe requirements far l"8tllnlffl publlc reconls. All records •red elearonlcally m• be Plowled tD cha publlc apnq, upon requmhm the pubJlc agency's CUSIIDdJan of puldlc records, In a fonnat that Is compadble whh the lnfarmadon __,. .,.....ofthe=agenq· IF THEi RACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 189, P&.ORIDA ITATUTEI. TO THI CONTRACTOlrl DUTY TO PRO'YIDE PUBLIC RECORDS RELATING TC THIS CONTRACT. CONTACT TH& CUSTODIAN OF PUBLIC RECORDS AT 305-663-6340; E-malls mmen ......... •thndanllfl.p,,; 6130 lumet Drive, lautll Miami, FL :B:1141. 41.0 Ngms. Whenever nodce shall be required or permitted herein, It _shall be Plp56afM 140 2(' 23 56116 delivered by hand delivery, e-mall (or similar electronic transmission), facsimile transmission or certified mall, with return receipt requested and shall be deemed delivered on the date shown on the e-maU or delivery conflrmadon for-any facsimlle U'lftSfflission or, If by cerdfted mall, die date on the retum receipt or the dace shown as the date same was refused or unclaimed. If hand delivered to the CITY, a copy must be stamped with the official City receipt stamp showing the dace of deliver; otherwise the document shall not be considered to have been delivered. Nodces shall be delivered to the followln1 individuals or endties at the addresses (lndudlng e-mail) or facsimile transmission numbers set forlh below: ToaTY: w~ copies ro: To CONSUL TANT: City Manager. 6130 Sunset Dr. South Miami, FL 33143 Tel: (305) 668-2510 Fmc: (305) 663-6345 E-mail: salexander@southmlamifl.1ov City Attorney 6130 Sunset Dr. South Miami. A. 33143 Tel: (305) 667-2564 Fax: (305) 341-0584 E-rnalt t;pepe@southmiamjfl,goy 42.0 Co,:pprate Authority: The CONSULT ANT and lcs representative who signs this AGREB-IENT hereby cerdfies under penalty of perjury that the CONSULT ANT and lcs representative have. and have exercised, the required corporate power and that they have complied wkh all applicable legal requirements necessary to adopt. execute and deliver thls AGREEMENT and to assume the responslbilides and obligations created hereunder; and that this AGREEMENT Is duly executed and delivered by an aulhorized corporate officer. In accordance with such officer's powers to bind the CONSULT ANT hereunder, and constitutes a valid and binding obligation enforceable in accordance wllh its terms. conditions and provisions. IN WITNESS WHEREOF. this AGREEMENT was signed on or before die date first above written subJect co die terms and conditions set forth herein. ~F.Papa 10/13'20" Page57of66 r 21 ?.4 57117 Read and AppN,ved as to Ponn, Languaae. LeaaRt, and Execullan .,_ I,:-~~~ Tllomu F. Pipe. Esq. Cllr Aaas1w1 'lhmllllF.Pepo 11111111116 Papl8efM 14Z 2, 25 58118 ~iami na I IIUJI nrAS,\M 11\'Ni ADDENDUM TO PROFESSIONAL SERVICE AGREEMENT "Professlonal General Engineering and Architectural Services" RFQ #PW2016-22 The City and CONSULTANT agree that a separate rotational list will be dedicated for work performed under a continuing professional service contract, as specified in the Scope of Services, for "Certified Arborlsts Servlces,n and a separate rotational list will be established for all CCNA professional services. "Certlffed Arborists Services" ts defined as: e Celtlfled Arborlst Services: Consultant may be called upon to review all tree removal permit appllcatlons that are submitted to ensure compliance with the regulations outlined in Section 20-4.S.1 of the City's Land Development Code. The review Includes the Initial site Inspection followed up by the determination of mitigation and a final Inspection. When needed, assist City Departments with other Issues related to the maintenance, preservation, and protection of trees on both private and public property. The rotational list for "Certified Arborlsts Services'! will rotate every three (3) months among the CONSULTANTS. The City intends to retain a maximum of four (4) qualified firms under four (4) separate but similar Professional Services Agreements. ~ glneerfng, Inc. lgnado Serralta/Presldent (Name of Signatory) Read and Approved as to Form, Language, legality and Execution thereof: •••~::, _LL/', By: _ _,, :>,,~~7--r-~ Thomas F. Pepe, Oty Attorney ~ By: --""---------- .✓~teven Alexander, City Manager ~ 59119 1harnasP.Papa IDIIIIJ016 A T"i' A.CHMIENT A 11C@IMIPIENSATION" . PIMOPlESSKMAL 11:mcre AGRIEEM!Nr "PNfesilmnl G~ linsfnewlnll and Ardaltl!ctuND hnlam'' UQ#Pffleaa-:n P.lgeSVoft6 2.t ')7 60120 Professional General Engineering & Architectural Services RFQ IPW2016-22 Wage Rates Summarv Job Classlftcalion City of South Miami Benchmark Hourlv Rate Principal $180.00 Sr. Project Manager $150.00 Project Manager $130.00 Senior Engineer $125.00 Senior Planner $125.00 Planner $85.00 Senior Traffic Engineer $125.00 Traffic Engineer $85.00 Senior Designer/Engineer $90.00 Designer $80.00 Engineering Intern $75.00 Senior CADD Technician $75.00 CADD Technician $65.00 GIS Technician $80.00 Senior Construction Inspector $90.00 Construction Inspector $75.00 Senior landscape Architect $125.00 Landscape Architect • $115.00 Landscape Architect Intern $70.00 Arborist $75.00 Utility Coordinator $90.00 Surveyor/ Mapper $85.00 Survey Technician $60.00 2-Man Survey Crew $115.00 3-Man Survey Crew $125.00 4-Man Survey Crew $135.00 Fire Protection Engineer $90.00 Plumbing Engineer $90.00 Mechanical Engineer $90.00 Electrical Engineer $90.00 Geotechnical Engineer $120.00 Geologist $90.00 Environmental Scientist $85.00 Senior Administrative Assistant $65.00 Oerfcal $45.00 25 ?R 61121 A1JT ACHIM!ENT .B DNSUMNCE a UNDEMINlnRCATDON RE(QYB!i1EMENTS IFR~savlCEAGIU!!l!Mf!NT 1.010 lnsuqnca "PvofeGD!omll GQlftlard ~-~ lervlllll9'" lfQlWWHIM3 A. Whhout llmldng Its DabllhJ, die comraaor, consultant or consulting ftnn (hereinafter 1 eferred to as "FIRM'' with reprd to Insurance and Indemnification requlremenu) shall be required co procm'8 and malnialn at Its own mcpanse during the Ofe af dte Contract. Insurance of die types and In die mlnlmwn amoums sta1ed be!ow as will protect the FIRM, from daJms which may arbe ouc of or resuk from the comract or the ,erformance of me co:111 aa iJhh the Cit:'/ of South Miami, whether such claim Is aplnn the FIRM« any sub-connaor, or by anyone directly or tndirecd)' employed by any of them or by anyone for whose acts any of diem may be habie. B. No Insurance required by the CITY shall be Issued or wrtuen by a surplus Ones carrier unless audlorbed In wrldng by die cm and such authoriznion shall be at the CITY's sole and absolute discredon. The FIRM shall purchase Insurance from and shaD malnlaln the Insurance with a company or companies lawfully authomed u, seU Insurance fn the Sme of Rorida. on forms approved by die Sme of Aorida. as wlll prv11BC:t the FIRM. at a minimum, from all clahns as set fonh below which may arise out of or result from the FIRM's operadons under lhe Cancraa and far whlch lhe RRM may be legally liable. whether such opnllons be by the FIRM or by a Subcomractor or by an,one dlrecdy or lndlrecdy employed by any of chem, or by anyone for whose acts any of them may be ll2lble: (a) dalms under workenl' compensadon, disability benefit and other slmllar employee benefit acts which are appDeab!e to the Work to lbe performed; (b) clsJms for cfamaaes because of bodlSy Injury, occupational slckness or disease. or dead, of die FIRM's emplo)'ees; (c) dalms for damages bemuse of bodlly lnJury, sldcness or disease, or deadl of any person other than the ARM's employees: (cf) daln for damaps Insured by usual personal lnJury habllltJ coverqe: (e) claims for damages. other than to the Work hself, because of lnJury to or destruction of tangible property, lndudlng loss of use resuldfll there from: (i) dalms for damages because of bodily Injury, death of a person or prapeny damage arising out of ownership. maintenance or use of a motor vehlde; (g) dalms for boctny Injury or property damage artsfng out of comp!eled ope,adons; and (h) dalms lnvolvlng comrac:tual llablliq Insurance appflcable to the RRH's obhpdons under the Contract. 1.01 I Ban's losuraoca Generab, The FIRM shall provide and maimain In force and effect untll aft die Work to be perfonned under this Contract has been completed and accepied by CJTY (or far such duradon as Is otherwise specified hereinafter), the Insurance coverage written on Rortda approved forms and as set forth below: 1.012 Wprlu;rs' Compensation Insurance at die smutary amount as to all employees In compliance whh the 'Workers' Compensation Law° of the State of Florida indudlng Chapter 440, Florida Statutes. as presendy written or hereafcer amended, and aD applicable federal laws. TIIGfflallf.Popo Ull12n816 PaguGOofU 145 2F 29 62122 In addldan. the polkles nut Include: Employers' Uablllr, at die scaaawy coverage amoum. The FIRM shall funher Insure dlac aD of Its Submmncran maintain approprlale levels of Worker's Campenntlon Insurance. Q .013 Qammerclal Aanambwbm (jangral I.Jahllt\Y lnsunnce with broad fann endorsemem. as well as 8IIIOfflOWfe llablrit,, completed operations and produces Dablllty, contraaual llablhl)', severabflkr of llltllnlt with aw llablllty provision. and personal ln&ury and properc, damap llabl!hJ whh llml1s of $1,000.GOO combined slnafe llmlt par occurrence and $2.000.000 .....-.lndudlns o Personal ln)ury: $1.0CIO.GCJOt o Medial Insurance $5.000 per person: 0 Propera, Dafflaas $500.000 each occurrence: 1.014 Umlnpla Qanunmlal Cam..,.. Geoaral BJahJf"1 lnsuranca shall be wrfllen on a Rorlda approved form with the 11n1e c:ovenae • the primary lnsunince pollq but In lhe amaunc of SI.GOO.ODO per dalm and $2.000,0GO Annual,-.-Cown,ae must be afforded on a farm no more, ISIBfcdve lhan the Imm edldon af the Compnlllenslve General UabllllV pakJ, wllllout resaialve endorsements. • filed bJ the lnsuranc:a Sennc:es Ofllce, and must Include: (a) Pteml1es and Operation (b) lndependentComraaors (c) Produas andlar Complaad Oparadans Hmrd (d) Explosion, Collapse and Underground Haard Covenae (e) Braad Form Property Damage (f) Broad Form ConnClual Coverage appllc:able to d1ls spectflc Conner. Including any hold harmless and/or lndemnlftcadon 111reemem. (a) Personal Injury Covanga widl Employee and Contraccual Exclusions removed. with mlnfmum Rmlls of covenae equal to those required for Bodily lnJury Uablllty and ~ Damaav LiabiDlr- 1 .015 Be,.,,,, Aullllngblte U,NbJ wllh minimum llmlu of One MIiiion Dollars ($1,UOO.OOOJIO) plus an addldonal One Mllllon Dollar (Sl,GGD,000.CIO) umbrella per occurrence comlllned slewe Rmh: far BodHJ ln)ury Llablfkr and Prope"J Damage Uabl89. Umbrella coveraae ffl1IR be atrorded on a fonn·na mare resatcdve lhan the latest edJdan of the Business Autmnoblla IJabUity pollcy. without resaicdve endarsanems. as flied by with die state of Flortda. and must Include: (a) Owned Yehldas. (b) Hired and Non-0wnedVehldes (c) ElflplOJ8IS' Non-Ownenhlp 1.016 SUBCQNTRACD The RRM a,ees chat If any part of die Work under the Contract Is · suldar. cha subcamracc shaD contain the same lrmarance provision as required by of die Firm. other than the Fire and Extended Coveraae Insurance and subsdludng che word Subcontractor for the ward FIRM and aubsdaldna the word FIRM for CITY where appllcable. 1.011 Bm anc1 Eaaendml (!avan&e tnsunnm (lullders' Risk). If APPJ-ICAILE; C. In the event chat this contract Involves the construclfOn Df a sncc:ure. die RRN shall maintain, with an Insurance Company or Insurance Companies acaptable tlO die CITY, "Broad" form/AU Risk llllurance on butldlnp and 8lrllctUJ'9S. lnclud1118 Vandalism a Mallclous Mischief coveraae. while In the course of constrUcdon. lnclucfln& faundadons, additions. atradlments and all permanent fixtures belonglng to and constlanlnl a pan of ftap6lof'6 1'11amaF,Pepa IOIIIII016 141 27 30 63123 said bulfdlnas or ltnlauntl. Th• pollq or potldes shall also cover machlnerV, If che eost of maddnery II Included In Iha Connet. or If dae machinery Is locallld In a bulldlna dm Is being l"l!IICMtllll by reason of this mmraa. The BmDUnt of Insurance must. at all timer. be at least equal ID the replacement and actual cash value of lhe Insured propenr. The polk:yslaall be In the name of che CITY and the Ann. as 1he1r lnanst ma, appear, and shall also cover the 111111 em of all SubcmuraaDn performln& Work. D. AD of the provldons Mfonh In M1lallaneous sealon herein below shaD apply co this amnga unlea le would be dearty not appbcable. 1.018 MfnBmepu; F. If UJ nodce of cancallatlon of Insurance ar change In coverage Is Issued b)' che lnluranc:e CDlllpanJ or dmuld aa, lnsunnce have an mrplratlon dale thac wlU oc,cur during die perlad of lhJs contraa. Iha FIRM shall lie l'llpOftllbla far aacurina odaer a«epllllle 1nsunvtce prior 1G such canceDadon...,. or eacplra1lon so• tlD provide condnuoa CICM!l'ap aa lpldfted In dds sadlon and sou to maintain ~ durlna dae &re of dlls Conncc. G. NJ deduc:6hs must lte declanlcl bJ 1he FIRM and must be approved by die CITY. Al dae option of the arr. ellher die FIRM shall ellmlnat8 or reduce such deducdble or daa FIRM shall proan a Bond. In a Corm saddac:lm 'I to die CnY mver1n8 dla same. H. 1he polldes -U contain waiver of sullropdon ap1n1t CITY when appllable. shall apreaiJ ~ dlat lUCh pollq or pollcles IN primary W any olher coDecdble lnslnnce that CITY ma, have. The CITY ru11 VII dae rl&hc at an, dme ID request a COW of die reqund pallcles for review. All potlclel lhall COA111n a "severabllll:r of kll8r8st' or '"G"lm llabt1II:;' clause without obllp1lon for premium paJffl8llt of dae CITY as well as connctual habllhr provision covertna che FIRM'S due, ID lndemnlfJ Iha City u provided In ddsA:,eement. L !Ware smnlng die Work. dae FIRM shall dellver CD die CITY cenlftcaces of such Insurance, acceptallle tlO the CITY, as well as the lnlurance binder, If one Is lauecl. the lmurance poky, lncludlna the declaration pap and aD appbcable endanemems and provide Iha name. addrms and 18!ephone number of the Insurance l84!ftt or broker dlrou&h whom the pollqwaa olllalned. The Insurer shall be ratad A.VII or belrm-per AM. Best's Key Rating Gulde. fa11est edldon and audaorlled to Issue lnsuranca In the Stale of Rarida. AD fnaunnce poftdes nuat be wrtaen on f'onna approved 111 the State of flortda and lhey must remain In full form and effect for lhe duradan af the contract period wllh the CITY. The FIRM may be required by the CITY, at Its sole dJscre1lon. tD provide a "cerdftad capt/' of~ Polle, (as defined In Anlde I of dais documeni) which aW Include die declaradon 11119 and aD required endonemams. In addidan. die FIRM shall' deliver, at the time of d._, af the Insurance au liftale, die followlna endorsements: • (3) a pollq provision or an endoraemenc with subsaunlally slmllar provisions as 11-P...,. 1111112116 follows: • "The Cit;, of Souda Miami is an addidonal lnand. lhe 1naunr shall pa}' all 1111111 that the 0, of Scnnh Miami becomes lepl)' oNJpted to par as damages because af 'bodU, Injury', 'pn,,en:, damage' , or "personal and advenlslna ln)u,.,.. and It wlll provide a, the City all of the eoveraae chat ls tr,lcall)' provided under the standard Aorlda approved forms for eolVllla'clal pneral llabllhJ coverage A and C1DV11"81,11 B": Pap6lofeG 147 2fl 31 64124 (4) a pollcy provision or an endorsement wtdl subsmndally slmllar provisions as follows: "ThJs policy shall not be cancelled Ondudlng cance!Jadon for non-payment of premium). lermlnamd or mawtally modified whhout first gMn, die City of Soudl Miami ren (10) days advanced written nodce of the Intent to materially modify the poftcy or to cancel or terminate the poRcy for any reason. The nC1ifkadon shaU be dell!Jered to the City by cenlftecl malL with proof of delivery todleCily." J. If the FIRM Is provtdtng professlonal services, such as would be provided by an ardli&ect. engineer. aaamey, or accountant, to name a few, 1:hen In such event and In addldon to the above requlremencs. the FIRM shall also provide Professional Uablllty Insurance on a Flortda approved fonn In the amount of $1,000,000 wilh deducdhle per dalm If any, not to mteeed 5% of the nmtt of llablltty provldlng for all sums which ihe FIRM shall become legally obltpted to pay as danwges for claims arising out of the services or work performed by die FIRM Its agenu. represent.awes. Sub Contractors or assigns, or by any person employed or recalned by him In connecdon whh mis Agreement. "nils Insurance shall be malmalned for four years after compledon of the conSU'UCdon and acceptanee of any Project covered by dlls Agreement. Howaver. the FIRM mmy purchase Speclftc Pralect Professtonal Uablhty Insurance, In the amount and under the cerms spedfted above, which Is also accaptable. No Insurance shall be issued by a surplus bnes carrier unless authorizmd In writing by the dty at the dty's sole. absolua, and unfeaered dtscre1fon. 9aooi'lamnlflcmt5on Ra,i&Blrament G. The Rnn accepts and voluntarily Incurs all risks of any Injuries. damages, or harm which might arise during the work or event that Is occurring on the CITY's propen;, due to che neaftgence or odter fault of the Finn or anyone acting through or on behalf of die finn. H. The Finn shall Indemnify, defend, save and hold CITY. its officers, affll\ates. employees, successors and assigns. harmfess from any and aD damages. dalms. liability, losses. dalms, demands. sula. fines. ludgmencs or cost and expenses. lncfudlng reasonable auorneys fees. paralegal fees and Investigative costs lnddiantal there to and incurred prior to. during or following any lltlpdon, medladon. arbitradon and at all appellace levels. which may be suffered by. or accrued aplnst. charged to or recoverable from che City of Soudl Miami, la officers, affiliates. employees. successors and assigns. by reason of any causes of actlons or claim of any lclnd or nature, lncludlng dalms for inJury to. or deadl of any person or persons and for the loss or damage to any property arising out of a negflgent error, omission, misconduct, or any gross ne&flgence. imemional act or harmful conduct of che Firm. its contractor/subcontn.ctor or any of chelr officers, directors, agems. representatives, employees, or assigns. or anyone aafng through er on behalf of any of them, arising out of this Agreement. lnddent co It. or resuldng from the performance ar non-performance af the Firm's obbgadons under this AGREEMENT. I. The Firm shafl pay all daims. losses and upenses of any kind or nature whaaoever. In connection therewith, including the expense or loss of the CITY and/or Its affected Page~Jcf6& 148 2~ 32 65125 officers, afftlmes. employees. successon and assigns. inducfina their auomey's fees. In rhe defense of any acdon In law or equity broupt against diem and arlsln, from die negflgant error, omission, or act of the Firm, Its Sub-Connctor or any of chelr agents. representadves. employees. or assigns. and/or arising out of. or lnddent u,. this Agreemem, or lnddent to or resulting from die pmionnance or non-perfonnance of the Firm's obUgations under dtls AGREEMENT. J. The Firm agrees and recognlles that nelcher die QTY nor Its officers. afffflaleS. employees. successors and assigns shall be held Oabla or responslb!e for any dalms. including che coses and e,cpenses of defending such dalms which may result from or arise out of actions or omissions of die Rrm, Its conaractor/subcomractor or any of dNllr agents. representatives employees. or assigns. or anyone acdng dlroup or on behalf of die diem. and arts!ng out of or concerning die work or event dm ls occumng on the CITY's property. In nwtawlng, appnmng ar NJecdng any submiaslons or acts cf die Finn. CllY In no way assumes or shares responslblilty or llab!fltJ for che acts or omissions of the • Arm, its camractorfsubcomractcr or any of their agems. represenwtves, employees. or assJps. or anyone acdq throuah or on IJehalf of diem. K. The Finn has die duty u, pro,,tde a defense with_ an aaomay or law ftnn approved by die City of South i'1laml; which approval WID not be unreasonably wldlheld. L However, u to design professional ccntra.cts. and pursuant to Section 725.08 (I), Florida Staa11et. ~one of~ pro!Jlslons set fonh herein above that are ln conftlct wldi dlls subpanwaph shall apply and this subparqraph shall set fonh die sole rmpanslblllty of the design professional concerning lndemnlftcadon. Thus. dte design prcfesslonal's obllgadons as to die Oty and Its agencies, as well as to Its officers and employees. Is to Indemnify and hold diem hannless from llabllldes, ciamages. losses, and COSU. lndudin,, but not llmlted ID, reasonable momeys' fees. to Iha extent caused by the negbgence. reddeaness, or lmemionally wronptl conduct of the d~lgn profealanal and other persons employed er utillzed by the cbsip professional in the performance of die contract Thomlllf,O>Gp IOIIIIZOl6 THIS IS INCWOED IN THE GENERAL CONomoNS END OF SEC'BlON Paga68ofGG 3" 33 66126 S001 SW 74TH COU R T, S UITE 20 1 . M I AM I , FLOR IDA 331 SS TEL: 3 □S-662-BBB7 FAX: 3 □5-662-BBS B September 21 , 2021 (Revised) Mr. Quentin Pough , CPRP , CPS I Director, Parks & Recreatio n De partm ent City of South Miami 6130 Sunset Drive South Miami , FL 331 43 Re : City of South Miami Dante Fascell Park -Design of New Community Building Dear Mr. Pough , We appreciate this opportun ity to prepare this Proposal for Professional Services for the referenced project. In accordance with our Professional Services Agreement for General Enginee ri ng and Architect ure Services , we are submi tting our un derstanding of the Scope of Work and Fee Proposal to prov ide Enginee rin g Services in connection with the referenced project. SCOPE OF WORK To prov ide complete architectur al and engineering design and lim ited construction phase services as neede d for the construction of a new Community Bui ld ing at the Dante Fascell Park located on Red Road and SW 87th Street. Proposed improvements include new community bui lding as shown on the attached Alternative A sketches. All work shall be in accordance with th e accepted practice s and design st andards of the City of South Miami , Miami-Dade County and local regulatory agencies . This work will include th e following : PHASE I -SCHEMA TIC DESIGN 1. The AJE sha ll comp lete and transmit for review and approva l to the City , t he following : a. Phase I -Schemat ic Design documents . b . Phase I Estima te of Probable Construct ion Cost in CSI format ; 2. The City shall review the NE's Phase I Doc uments and furnish any and all comments to the AJE in writing ("Phase I Review"). The A/E shall in corporate the City's Phase I Review comments and re-submit Phase I Documents for the City's approval. a. The City shal l evalua te the AJE's Phase I Estimate of Probable Construction Cost and if the AJE's Estimate of Probable Construct ion Cost exceeds the Construction Budget , the City may , at its so le op ti on . b . direct the A/E to reduce th e Final Scope of Wo rk and/or Phase I Es timate of Probable Cons tructi on Cost to meet the Construction Budget through red esign by the A/E ; or c. increase the Constructi on Budget for the Project ; or d . disco ntinue the A/E's service s on the Project. 3. T he C ity sha ll eva lu ate t he AJE 's report of any im pact on the Project Schedule and 34 67127 September 21 , 2021 Page 2 documents substantiating any request by the NE to adjust the Project Schedule. 4. The City shall transmit to the NE in writin g the final decision by the City with respect to its Phase I Review. PHASE II -DESIGN DEVELOPMENT 1. The A/E shal l i nco rporate any remaining comments from the City's Phase I Review , if applicable , and, from the City -approved Phase I Documents , shall prepare Phase II plans and out line spec ification s to fix and illustrate the size and character of the entire Project in its essentials as to kinds of materials , type of structure , types of mechanical and electrical systems , and suc h other document development as may be required , in accordance with Design Standards an d applicable codes ("Phase II Documents"). The NE shall complete the Phase II Documents and transmit the Phase II Documents for review and approval to the City . As part of the Phase II submittal , the NE shall i nclude a Phase II Estimate of Probable Construct ion Cost in CSI format for the City's review . 2 . The City shall review the NE's Phase II Documents and furnish any and all comments to the NE in writ i ng ("Ph ase II Review"). The A/E shall inco rporate the City's Phase II Review comments and re-submit Phase II Documents for the PM 's approval. 3. The C ity shall evaluate the Phase II Estimate of Probable Construction Cost to determine the course of action to be take n by the A/E . If the NE's Phase II Estimate of Probable Construction Cost exceeds the City's current Construction Budget , the City shall , at its sole option and at no add itional cost to the City : a. d irect the N E to reduce the Final Scope of Work and/or Phase II Estimate of Probable Construction Cost as required t o meet the Construction Budget through redes ign ; or b. increase the Construct ion Budget; or c. d iscontin ue the NE's services on the Project. 4 . The C ity sha l l evaluate the A/E 's report of any impact on the Project Schedule and documents substantiat in g any reques t by the A/E to" adjust the Proj ect Schedule . 5. The C ity shall transmit to the NE, in wr it ing , the final decision by the City with respect to its Phase II Review. PHASE Ill -50% and 100% CONSTRUCTION DOCUMENTS 1 The A/E shall prepare (from the City -approved Phase II documents), construction drawings and specifications setting forth in detail and desc rib ing the Work to be done , and the materials , finishes , and equ ipment required , for the architectural , civil , structural , mechanical, electrical , service -re la ted equipment , and site work , and the necessary bidding information . 2 The A/E shall address and incorporate into Phase Ill Documents all Comments from the Phase II Review(s), if applicable . 35 68128 September 21 , 2021 Page 3 3 The A/E shall organize the Phase Ill Documents such that Construction phasing and sequencing will minimize the disruption of the opera tion of ex isting facilities and facilitate the safety of th e occu pant s. The A/E shall des ign all Phase Ill Documents so that Work related to all phasing and se quencing can be prepared and relea sed as required. 4 The A/E shall subm it copies of the fifty pe rcent (50%) complete Phase Ill Documents for the City 's review and comment. This re view may be a "stand-up" review and shall include the Prime Discip line of Record, architect, mechan ical , civil and structural Engineers of Record , and othe rs on the A/E's team as required to interface with the City's staff. 5 Th e A/E shall submit for review and approval , copies of the one hundred percent (100%) comp lete Phase Ill Doc uments to the Ci ty , loc al fire offic ial , and any other public/governmental agencies as necess ary pursuant to applicable law . 6 The A/E sha ll provide , conc urrently with the 100 % complete Phase Ill Construction Documents subm itta l t o the City , the following : a. Building Permit Application (prepared by the City); b. Phase Ill Estimate of Probable Construction Cost in CSI format; 7 The Ci ty shall evaluate the Phase Ill Estimate of Probable Construction Cost submitted by the A/E , and if the A/E 's Phase Ill Estimate of Probable Construction Cost exceeds the City 's Construct io n Budget, the City shall: a. direct the A/E t o reduce the Final Scope of Work and/or Phase Ill Estimate of Probable Construct ion Cost as required to meet the Construction Budget through redesign by the A/E; or b. increase the Constructi o n Budget ; or c. discon ti nue the A/E 's services on the Project. 8 The A/E shall , upon receipt of the Phase Ill City 's Revi ew(s), modify the Phase Ill Documents to meet requirements and do all things necessary to obtain the unconditional approval of the Phase 111 Documents by any and all authorities . 9 When a Pro ject is t o be awa rded to a Contractor by conventional bid , the City shall provide the A/E with "I nstructions to Bidders " and Gene ral Conditions of th e Contract for Construction for inclusion in t he A/E's Construction Documents . 10 The A/E shall incorporate any required modifications int o the Phase Ill Documents prior to release of the advertiseme nt for bids by the City , if applicable , or by the A/E issuing addenda to the Construction Documents prior to the opening of bids , at no additional cost to the City . BASIC SERVICES: PHASE IV-BIDDING AND AWARD OF CONSTRUCTION CONTRACT 1. T he A/E shal l assist the City in obtaining bids and awarding the Construction Contract , for all or portions of the Work, regardless of the delivery method chosen by the City . 2. The A/E shall di stribu te and maintain a log of the Construction Documents issued for bid purposes, and any subseq uent addenda . 36 69129 September 21 , 2021 Page 4 3. For Projects to be awarded by conventional bid , the NE sha ll conduct the pre-bid conference(s), receive and respond to inqu iries from bidders , prepare and issue addenda as approved by the City, assist the City in the analysis of bids and in determining the successfu l responsive and responsible bidder , and make written recommendations to the City on the award of the Construction Co ntract. CONSTRUCTION PHASE V -ADMINISTRATION OF THE CONSTRUCTION PROCESS GENERAL A/E DUTIES W ITH RESPECT TO CA 1. The NE sha ll prov ide CA of the Construction Contract as set forth in this Ag reement , the Construction Documents and the General Condit ions of the Contract for Construction . 2. The A/E shall assist the City to enforce the faithful performance of the Construction Contract and confirm that the Work has been or is being performed in a manner that is in accordance with the Construction Documen ts. The NE shall provide written notice to the City if it observes or becomes awa re of any defect or non-conformance with the Construction Documents. 3. The NE shall designate a fully -q ualified representat ive of the NE's firm , acceptable to the City , to act as the NE's construction project manager. The A/E shall also designate a fully- qualified rep resenta ti ve from each of its Sub-Cons ult ants , acceptable to the City , for each of th e professiona l discip lin es , to act as the Sub-Consultants ' construction project manager(s). 4 . The A/E shall have access to the Work at all times in order to meet its responsib ility and obligations under this Agreement. 5. The NE shall , when requested by the City , prov ide the City with recommendations regard ing matters concern ing performance of the Contractor under the requirements of the Construction Documents . The A/E's response to such request(s) shall be made with reasonable promptness and within any time li mits ag reed upon . 6. The A/E shall advise the City in wr iting when in the opin ion of the A/E , sufficient cause exists to terminate the Contractor in accordance w ith the General Cond itions of the Contract for Construction. 7. It is assumed the tota l project construction duration for this project to be 8 months . PROJECT MEETINGS AND SITE VISITS 8. PROJECT MEETINGS : As part of the A/E 's Basic Services Fee, the NE and the NE's Sub- Consultants (if needed) shall conduct Monthly Project Meeting s at the Project Site . The purpose of the Project Meeting, a review and up-date of the Construction Schedule , a review of the Con t ractor 's As-Built drawings , the Contractor 's Schedule of Values , coordination with the Contractor and its subcon tract ors and the City , and observation of the progress of the Work ("walk-thr u") in order to properly rev iew the Contractor's Requisition(s) for Payment. 37 70130 September 21 , 2021 Page 5 9. SITE VISITS: As a part of the A/E 's Basic Services Fee, the A/E shall conduct bi-monthly Site Visits to become gene rally familiar with the progress and quality of the Work completed , and to determine , in general , if the Work is being performed in accordance with the Contract Documents . The A/E shall submit to the City a Site Visit Report for each Site Visit conducted by the A/E and by the A/E 's Sub-Consultants . CONTRACTOR'S SUBM ITTALS 10. The A/E sha ll review , comment and approve , (or disapprove and requ ire modifications to), the Contractor's document submittal schedule. 11. The A/E shall review and eit he r return without exceptions, or with noted comments , reject, or take other appropriate action upon a Contractor's submittals (such as samples , sche du les , and shop draw ings , etc .) for conformance with the design intent expressed in the Const ruction Documents , applicable codes and ordinances , and th e Construction Documents . The A/E 's act ion sha ll be taken with such reasonable promptness so as to cause no delay to the progress of the Project , as cal led for in the Contractor's approved document submittal schedule , while all ow ing sufficient time in the A/E's professional judgment to perm it adequ ate review. If the A/E re j ects a submittal , the A/E shall state , in writing , the grounds for reject ion . 12 . The A/E shall review a submi ttal two (2) time s as part of Basic Services , and may be entitled to fees for additiona l servi ces if, due to materially incomplete or in correct submittals by the Contractor, the A/E is requ ired to review or address a submittal three (3) or more times . The A/E sha ll notify the PM within five (5) days of a second submittal rejection . Notwithstanding the forego ing, the A/E shall perform timely reviews of submitta ls . If the A/E is required to review a submitta l more than two (2) t imes due to inc omplete or incorrect submittals by the Contracto r, the A/E shal l recommend to the City in writ ing that a modification to the Construction Contract be approved (and the basis for the A/E 's recommendation) deducting a sum from th e Con tractor's contract bala nce due which is su fficient to compensate the City for any payments the Ci ty agrees to make to the A/E for add itional services made necessary by a Co nt racto r's repeate d incomplete or incorre ct submittals , such method being the A/E 's exclusive remedy for such additional expenses and services . SU BSTITUTIONS 13. The A/E shall rev iew and eval uate in a timely manner subst itutions proposed by the Contractor for conforma nce with the Construction Documents . The A/E shall recommend to the City acceptance of subst itutions only when it can be demonstrated by the Contractor that th e item specified , or its successor, is no longer avai lable for purchase or that the subs titution provides a clear benefit to the City in performance and/or price . The A/E will not be req uired to take any action on requests for substitutions from a Contractor that are not submitted within forty-five (45) days after execution of the Construction Contract , except for good cause shown , or un less requested by the City . 38 71131 RFls AND RFCs September 21 , 2021 Page 6 14. The A/E shall review and respond to or take other appropriate action upon a Contractor's submittal of a RFI , RFC , inquiry or similar correspondence . The A/E shall maintain a current log for all RFls and RFCs . CONSTRUCTION CONTRACT MODIFICATIONS 15. With such reasonable promptness so as to cause no delay to the progress of the Project , the A/E shall review cost and time estimate(s) for proposed changes in the Construction Contract and shall prepare all necessary contract modifications for the City's approval and execution in accordance with the Construction Documents . The A/E shall maintain a current log of all such contract modifications . QUALITY ASSURANCE 16. The A/E shall evaluate materials and/or workmanship for conformance with Construction Documents , evaluate quality control testing reports , advise the Contractor and the City immediately of any unacceptable materials and/or workmanship the A/E may discover and ensure that the Contractor takes appropriate action to remedy unacceptable conditions . 17 . The A/E shall have the duty to recommend to the City rejection of Work that does not conform to the Construction Documents. Whenever the A/E considers it necessary or advisable for implementation of the intent of the Construction Documents , the A/E shall have the duty to recommend to the City additional inspection or testing of the Work in accordance with the provisions of the Construction Documents , whether or not Work is fabricated , installed or completed . The A/E shall recommend that the City stop Work when , in the A/E's professional judgment, defects and deficiencies in the Work warrant that the Work be stopped. The City alone shall have the authority to stop and/or order recommencement of the Work . BUILDING CODE CONSULTANTS , INSPECTORS AND PLAN REVIEWERS 18 . The A/E shall cooperate with the City inspectors and plan reviewers in providing information and explanations as requested . The A/E shall also respond to any deficiencies noted by the City in the Construction Documents and during construction , by making the necessary changes in the plans , or taking the necessary action during construction. CERTIFICATES FOR PAYMENT 19 . All Requisitions for Payment received from the Contractor shall be processed and paid by the City in accordance with the Construction Documents . A/E shall assist the City in a limited capacity as needed. SUBSTANTIAL COMPLETION/OCCUPANCY INSPECTION 20 . Within seven (7) days of receiving the Contractor's request for a Substantial Completion Inspection (and when required , Occupancy Inspection), the Contractor's Punch List with all items completed or explained , a copy of the Contractor 's building permit reflecting all final 39 72132 September 21 , 2021 Page 7 inspections have successfully been concluded, all reviewed/approved shop drawings , all required operations and maintenance manuals, all safety systems certifications, the A/E shall determine if the Work is ready for a Substantial Comp letion Inspection and , if applicable , Occupancy Inspection , and notify the Contractor, in writing, as follows: a. If th e A/E determines that the cond itions for Substantial Completion have not been met , the A/E shall no t ify the Contractor, noting specifically those deficiencies that cause the Work to not meet Substantial Completion requirements; or b. If the A/E determines t hat the conditions for Subs tantia l Completion have been met, the A/E shall notify the City and schedule a Substantial Completion Inspection to be completed within fourteen (14) days of the A/E's receipt of the Contractor's request for a Substantial Comp le t ion Inspection , unless this time period is otherwise extended by the City in writing. The A/E shall be responsible for having the Work inspected by , at a minimum , the A/E, the A/E 's Sub -Consultants , other consultants , the Contractor , the subcon tra ctors , and t he sub -subcontractors. 21. Upon the concl usion of th e Substantial Completion Inspe cti on , the A/E sha ll determine the status of th e Work to be one of the follow ing: a . Subs tanti ally complete. If on the date the Substantial Completion Inspection is completed , the A/E determ ine s that the Work has achieved Substantial Completion , the A/E shall with in fifteen (15) days of the conclusion of the Substantial Completion Inspection , certify in writing to the Ci ty the date on which Substantial Completion was achieve d. The date on which the A/E determines tha t Substant ial Comp letion has been achieved is the da te on which liquidated damag es end pursuant to the General Conditions of the Contract for Construction ; or b. Not substantially complete. If the A/E determines that the Work has not achieved Substan tial Completion , the A/E shall notify the Contractor and the City, in writing , of its determination by no later than ten (10) days after the conclusion of the Substantial Completion Inspectio n, noting specifically those deficiencies that cause the Work to not meet Substantial Completion requirements . SUBSTANTIAL COMPLETION PUNCH LIST 22. When Substantia l Complet ion is achieved , the A/E shall prepare and provide to the Contractor a comprehensive Substantial Completion punch list in electro nic form which incorporates , by trade , all punch list items submitted to the A/E by participants in th e Substantial Completion Inspection. The A/E shall submit the Substantial Completion Punch Li st to the City and Contractor within fifteen (15) days of the Substantial Completion In spec tio n date . 23. During t he thirty (30) day period when the Contractor is completing the Substantial Completion punch list, the A/E shall monitor and keep the City informed of the Contractor 's progress . FINAL INSPECTIO N AND FINAL COMPLETION 24 . Upon completion of the Substantia l Co mpletion Punch List , the Contractor shall provide written notice to the A/E that the Work is ready for Final In spect io n and Acceptance . 40 73133 September 21 , 2021 Page 8 a. Within seven (7) days after 1) the expiration of the thirty (30) day Substantial Completion punch list period or Contractor 's wr itten notice that the Work is ready for final inspection and Acceptance , whichever occurs first , and 2) receipt of Contractor's final Requisition for Payment , the A/E shall schedule and conduct a Final Completion inspection with its Sub-Consultants (as appropriate), the City and Contractor to determine the status of the Work to be one of the following : Finally complete. If the A/E and its Sub-Consultants concur that there remain no incomplete or deficient items of Work , and that the Construction Documents have been fully complied with by the Contractor, the A/E shall inform the City within two (2) business days of the Final Completion Inspection , in writing , of its determination and recommendation for the Acceptance of the Work . If the City concurs with the A/E's determination that the Work has achieved Final Completion , the Project shall be "A ccepted" by the City , final payment to the Contractor shall be recommended by the A/E to the City in accordance with the Construction Documents and the A/E shall close out the Project ; or b. Not finally complete . If the A/E determines that the Work has not ach ieved Final Completion , the A/E shall notify the Contractor and the City within two (2) business days of the failed Final Completion Inspection , in writ in g , of its determination that the Project has not achieved Final Completion , noting specifically those deficiencies that cause the Work to not meet Final Completion requirements . The A/E shall provide to the City , in electronic form , a Final Completion Punch List identifying any and all open punch list items and estimates of the cost to properly complete/correct each item listed and provide the City with the A/E's recommendation as to how to proceed with the completion of the Final Completion Punch List and close out of the Project ; all in accordance with alternatives provided in the Construction Documents . In the event that the A/E determines that the Work has not achieved Final Completion , the City shall not be required to review the A/E's determination in this regard. 25 . The A/E shall complete the processing of any remaining Construction Contract modifications , evaluate the assessment of liquidated damages (if any), and shall evaluate Contractor 's final Requisition for Payment (including , without lim itation, all required Final Releases of Lien and/or Bond Righ ts) and submit its written recommendation as to payment to the City , on a line-item basis , within five days of it s subm itt al , and shall otherwise perform its duties with sufficient time for the City to make payment. 26 . During the subs tantial and final completion process , the A/E shall notify the City when , based upon the A/E's observation , the Project is sufficiently complete to allow occupancy by the City . Occupancy by the City at any time during the correction of Punch List item s shall not alter the schedule or responsibilities of the A/E regarding completion . A/E SERVICES CLOSEOUT 27 . The A/E shall subm it project close-out documentation . 41 74134 SUBCONSULTANTS September 21 , 2021 Page 9 The following are professionals contracted be SRS Engineering , Inc . to assist in the preparation of the work outline above . Please see attached consultan t's fee proposals for additional information . • Laura M . Perez and Associates, Inc. (Architect) • Basulto & Associates, Inc. (MEP Engineers) • Botas Engineers, Inc. (MEP Engineers) • Curtis + Roger Design Studio (Landscape Architecture) COMPENSATION Our Engineering Fees for the above-described Basic Services will be a lump sum amount of ONE- HUNDRED FIFTY-NINE THOUSAND and SEVEN-HUNDRED SEVENTY-SIX DOLLARS AND FIFTY-SEVEN CENTS ($159,776.57). Please see fee breakdown below . It does not in clude plan review or permitting fees. Payment will be based on monthly invoicing as a percentage of completion of work . Phases SRS LMP Basulto Botas C+R Total Schematic $1 ,755 .00 $6 ,050 .00 $3 ,108 .96 $2,467.40 $750 .00 $14,131.36 Design Development: $1 ,205 .00 $6 ,980 .00 $1 ,554.48 $1 ,233 .70 $750 .00 $11 ,723.18 50 %CD $6 ,665 .00 $10 ,600 .00 $7 ,150 .60 $5 ,675 .02 $1 ,500 .00 $31 ,590.62 100 % CD $7 ,370 .00 $13 ,1 55 .00 $9 ,326 .87 $7,402 .20 $1 ,875.00 $39,129 .07 Bidd inci $2 ,160 .00 $2 ,350 .00 $1 ,554.48 $1 ,233 .70 $375 .00 $7,673.18 Constructi on $7 ,433 .00 $26 ,72 5.00 $6 ,839 .71 $5,428 .28 $2 ,000 .00 $48,425.99 Close out $1 105 .00 $2 960 .00 $1 554.48 $1 .233 .70 $250 .00 $7103.18 Total $27 ,693.00 $68,820.00 $31 ,089.57 $24,674.00 $7,500.00 $1 59 ,776.57 We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Agreement with the City represents th e entire understanding between the City of South Miami and SRS Engineering , Inc . in re spect to the Project and may only be modified in writing when signed by both of us . If the foregoing is agreeable to you , please execute the original of this Agreement were indicated below and return to our office . Very truly y c9-~~V'J~ Ignacio erralta , P.E. Presid t I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this ___ day of _______ , 2021 City of South Miami By:------------- Title : --------------- 42 75135 11sn1 SRS ENGINEERING, INC. -AE FEE PROPOSAL SPREASDSHEET ~ :::I "' ~ w Dante Fascel Park .2 ~ :::, !::! w > o> :c ffi w a: Design Schematic Design Design Development CD 50¾ Completed CD 100% Complete Bid/ Award CA -Substantial CA -Closeout .... "' ~~ :! =! g !::! 0~ Discipline/Firm ... "' ... i CIVIL Hourly Rate SRS Engineering, In c. Hrs $ Hrs $ Hrs $ Hrs $ Hrs $ Hrs s Hrs $ Hrs s Principal S180.00 2 $360 2 S360 3 $540 3 $540 3 $540 6 $1,080 2 S360 21 $3,780 ---Sr. Project Manager S150 .00 4 S600 2 $300 10 $1,500 12 $1,800 8 $1,200 32 $4 ,800 3 $450 71 $10,650 ---Sr. Civil Engineer $125 ,00 6 $750 4 $500 16 $2,000 16 $2,000 3 $375 12 $1,500 2 $250 59 $7,375 ,__ ~gn Enginee r ------$90 .00 0 so 0 $0 20 $1,800 24 $2,160 So $8 so 44 S3,968 f------------CAD Technician $65 .00 0 $0 0 so 12 S780 12 $780 $0 so so 24 S l ,560 - Clerica $45 .00 l $45 1 $45 1 $45 2 $90 1 $45 1 $45 1 S45 8 $360 TOTAL CIVIL 13 $1,755 9 I $1,205 62 $6,665 69 $7,3 70 15 I $2,160 51 $7,433 8 $1,105 227 $27,693 4 76136 . . . . . . . . . . ................ )L"A·,rR·i M.~ ... p:·E .. R .. fz ... &: .. is'i .. o .. c{i··A·T:E .. S~·· .. N .. C~ ..... )ARCH I TE CT S -PL A N NE RS -I NT ER O R D E I NG ER S LI C. A A -C 0 1 8 6 4 ' : : : : : : ••••.• ···········!·····•···•··!·············:·············?············:············· ············ ············!·············;············ •••••••••••••• , •• : : : : : : : May 11, 2021 July 9, 2021 (Revised) Mr. Ignacio Serralta SRS Engineering 7000 SW 97 Avenue #210 Miami , Florida 33173 Re: City Of South Miami (Dante Fascell Park) New Building Dear Ignacio , The firm of Laura M. Perez and Associates, Inc. (LMP) is pleased to submit this fee proposal to provide Architectural services for the referenced project. Based on the approved preliminary drawings it is our understanding that the owner would like to add a field house building next to the exist ing tennis courts. Total Architectura l Fee $68 ,820. (se~ attached fee breakdown ) The following services are not included in our fee . Civil, MEP , Structural , Geotechnical , surveyor and building material testing . Each consultant will have to provide there estimate for construction. If you have any questions or req uire additional information please do not hesitate to contract our office. Sincerely, Laura M. Perez and Associates, Inc. Laura Pere z, President ............ ; ........................................................ [ ....................... \ ........... ( ................. .. 4 1 r~ . W . 7th S R E E M I A M . F L 3 1 2 5 P H : 3 0 5 6 4 2 , 9 4 9 4 F A X : 3 0 5 6 4 2 - . . . . ············"'·········· ....................• ······ . . 889 E-'MAIL Imp% mptc con, 44 77137 LAURA M. PEREZ & ASSOCIATES, INC. FEE PROPOSAL FOR SOUTH MIAMI DANTE FASCELL PARK BASIC DESIGN AND CA SERVICES 1) Schmatic Design (30 days) Description Hours Rate Total Principal 1 $180.00 $180 Project ArchitecUManager Site Visit 4 $140.00 $560 Design 12 $140.00 $1,680 Staff Architect 8 $90.00 $720 CADD 30 $75.00 $2,250 Estimator 6 $95.00 $570 Clerical 2 $45.00 $90 $6,050 2) Design Development (30 days) Description Hours Rate Total Principal 1 $180.00 $180 Project ArchitecUManager Design 16 $140.00 $2,240 Staff Architect 10 $90.00 $900 CADD 40 $75.00 $3,000 Estimator 6 $95.00 $570 Clerical 2 $45.00 $90 $6,980 3) 50% Construction Documents (60 days) Description Hours Rate Total Principal 2 $180.00 $360 Project ArchitecVManager 20 $140.00 $2,800 Staff Architect 24 $95.00 $2,280 GADD 60 $75.00 $4,500 Estimator 6 $95.00 $570 Clerical 2 $45.00 $90 $10,600 4) 100% Construction Documents (60 days) Description Hours Rate Total Principal 2 $180.00 $360 Project ArchitecUManager 20 $140.00 $2,800 Staff Architect 24 $95.00 $2,280 GADD 60 $75.00 $4,500 Estimator 6 $95.00 $570 Clerical 2 $45.00 $90 $10,600 5) Permitting (review comments and resubmittal only) TBD Description Hours Rate Total Principal 1 $175.00 $175 Project Architect/Manager 8 $140.00 S1, 120 Staff Architect 6 $95.00 $570 CADD 8 $75.00 $600 Clerical 2 $45.00 $90 $2,555 45 78138 6) Bidding Description Principal Project Architect/Manager Staff Architect CADD Clerical 7) Construction administration (8 months) Hours 1 8 6 4 4 Description Hours Administration (SD, RFI, correspondences) ~~-4 PM/Architect (2 hrs per week) 70 Const. Manager ( 1 hrs per week) 35 Construction Meetings/minutes and site visit reports meetings and reports bi month (5 Hrs) ea 80 Pay app and schedule review (1 per month) 12 Punch list/ Closeout 16 aerical 16 Rate $180.00 $140.00 $95.00 $75.00 $45.00 Rate $180.00 $140.00 $95.00 $140.00 $140.00 $140.00 $45.00 Total $180 $1,120 $570 $300 $180 Total $720 $9,800 $3,325 $11,200 $1,680 $2,240 $720 $2,350 $29,685 $68,820.00 46 79139 B A A s N June 14, 2021 Re, iscd 06 1JQ /202 I Ig nacio Serralta SRS Engineering, Inc. 5001 SW 74 Court , Suite 201 Miami , Florida 33155 s u s u L 0 C J A T I Project: Dante Fascell Park Concession -Restroom Building Location: 8600 Red Rd , Sou th Miam i, FL 33143 Dear Mr. Serralta , T 0 T E s Proposal # 2021078 We are pleased to submit our proposal to provide Professional Engineering Services for the above -mentioned project. Basic Services: Our scope of work wi ll consist of: Preparation of mechanica l, electrical , plumb ing construction document level drawings shall be prepared i n accordance with local codes. Draw i ngs sha ll be subm itted at 30 %, 60 %, and 100% phased along with any required calculations for permit. Site visits during design to verify existing conditions shal l be considered part of basic serv ice s. A ssistance in obtain ing pe rmit in the form of responding to Building Department plan review comments , and cost estimates shall be considered part of Basic Services. Construction Adm in istrat ion sha l l include shop drawing review , response to RFl 's and monthly site visits during cons t ruction . Compensation: Our proposed fee shall be as fo ll ows : PROPOSED FEE: $31,089.57 Payments are requested as follows : As per City of Sou th Miami Payment Sched ule Please make checks payable to: "Basulto & Associates, Inc." Exclusions: • Processing or walking drawings through the bui ld ing department are not included . • Tec hnical specifications (book type) are not included. 14160 Palmetto Frontage Rd, Suite 21 Miami Lakes. Florida 330 I 6 Pagel of2 \\'\\'\\• .basulto.com Phone(305)698-3988 Fa:,; (305) 698 -3989 47 80140 Proposal # 2021078 Additional Services: • Modifications to drawings due to owner requested or value engineering changes shall be considered additional services and shall be billed accordingly. • In-House printing charged at $0.20 square feet. Compensation for Additional Services shall be hourly, per contract, at: Principal Hours: Engineering Hours: CAD Tech Hours: Clerical Hours: $180.00 $125.00 $ 65.00 $ 45.00 Thank you for an opportunity to serve you. We look forward to working with you on this project. Should you have any questions, please do not hesitate to contact our office. Sincerely, ~~ Rene I. Basulto, PE, MSEM CGC, CFEI I CPE, CPD Principal LETTER OF AGREEMENT ACCEPTANCE I, the undersigned, having authority to execute this Agreement for and having read and understood this proposal and attachments, hereby agree to terms and conditions stated herein as well as to any terms and conditions attached hereto and made part of this Agreement. Please return one executed copy to BASULTO & ASSOCIATES, INC. and keep the other for your records. Signature Title Printed Name Date B A S ,1{ L T 0 A SSO~-C.JA T [ S Page 2 of2 48 81141 BDTAS Engineer ing, Inc. STRUCTURAL E NG INEERS May 20 , 2921; rev. Jun e 16, 2021; rev . July 14, 2021 SRS Engineering, Inc. 5001 SW 74 th Court, Suite 201 Miami, Florid a 33155 Attn: Mr. Ignacio Serralta, PE Project Name: Subject: Dear Ignacio: Dante Facell Park -New Building Structural Fee Proposal As requested, we are submitting a revised fee proposal for the structural design of a new 1-story building. This proposal summarizes our fees for the above-mentioned project and our scope. Based on t h e information that we received, we understand that the proposed building will be approximately 3100 sf. The structural components of the 1-story building will consist of shallow foundation, r einfo rced masonry walls , concrete beams and columns, concrete slab roof for the cast an d west wing and a metal roof frame system for the raised roof along the entry hallway which connects the east wing to the west wing. Ignacio, based on the schematic/conceptual renderings that we rec eived for th is bui lding, p lease note that the support system for the hallway roof may require modifications due to stabi li ty. Botas Engineering scope for this project is as follows ..... • Schematic and Design Development Narrativ e • Submit 50% and 100% (signed and sea led) plans; includes specs ., cost estimate and calcs . • Implement any applicable review comments . • Bidd i ng and Award Support • Construction Adm i nistration Support (incl. shop drwgs. review, responses to RFl's and required inspections). • Develop structural as-bui lt plans Our fee for the above-mentioned tasks is a lump sum of$ 24,974 and the distribution of hours is as i ndicated under the attached "Fee Breakdown for Basic Design Pref. Serv ic es". 8935 NW 35 th Lane. Sui P. t/702 • IJnntl Fl :rnn • Tel 305 -111 8 ~Ill • Fa~ 305-418-9117 49 82142 Page 2 of:! May 20 . 202 1: re, 6/16/2021: re\ 7/14 /_Q'.!I Da me 1· accll Parl. If o u have any question(s) or need additional information to be included in this letter, please let us kno w at your ear l iest convenience. Th nk you very much for considering us for this project. Re ards, BO TAS Engineering, Inc. ✓-~- Patricia M. Batas, P.E. Accepted Pre sident Date 8935 NW 35th Lane . Suite #2 □2 • Dami. FL 33172 • Tel · 3 □5 -'118-9111 • Fax : 305-418-9112 50 83143 May 19 , 2021 Mr. Ignacio Serralta SRS Engineering Re: Dante Fascell Commun ity Center c u R T 1 5 Dear Ignacio: + As per your request enclosed you will find our proposal to provide landscape architectural R o G E R s services for the new community center build ing at Dante Fascell Park. DESIGN STUDIO IN C. Lan dscape A rchit ec tur e 7 5 2 0 S. R E D RO AD SU I TE M SOUTH MI AM I FLORIDA 3 3 l 4 3 TELEPHONE 3 0 5-4 4 2-l 7 7 4 FACSIMIL E 3 0 5.4 4 5.9 4 8 8 L L C. LC 0002 4 1 www.curtisrogers.com Our scope of services wil l include preparing the necessary plans addressing existing plant ings -removals , relocations or reta inage , and new plantings in the immediate vicinity of the new bu ilding. These plans will include all the necessary information to obtain a building permit and for construction. Our detailed scope of services is as follow: 1. 2. 3. 4. Schematic Design/ Des ign Development a. S ite visit to evaluate existing conditions. b. Review applicable code requirements c. Preparation of schematic design d. Preparation design development drawi ngs , addressing landscape intent and code compliance . e. Preparation of outline specificat ions f. Preparation of Sta t ements of Probable Cost for landscape elements g . Coo rdination with Archi tect and applicable consultan t s. h . Att end a mee ti ng/ presentation with th e cl ient if required . Construction Documents ( 50 % and 100 % Submittals) a . Rev iew and incorporate comments rece ived for previous submittal , and interim submittals b . Prepare const ruction documents for tree dispos ition and planting. c . Prepare technical spec ifications for t ree disposition (relocation or protection of existi ng trees), planting and sodd i ng. NO IRR IGATION SCOPE IS INCLUDED . d. Update Statement of Probable Cost for above items e. A ddress permitt i ng commen t s as needed . f. Coordina t ion w ith A rchitect and applicable consultants g. Attend a meeting/ presentation with the client if required . Bidd i ng Ass istance a. Ass istance during bidding including attendance to pre-bid conference if needed, b. Prepare addendums , respond to requ ests fo r information or issue cla r ificat ions , c . Assist Owner/ Archi t ec t in rev iew of bids Constructi on Administration a . Attend a preconstruction meet i ng (if requ i red ) b. Assist Architect in reviewing applicable shop drawings , response for info rmation , or clar ifications , c. Att endance t o a maximum of two(2 ) construction meetings , and perform two site o bserva t ions during construction , p repare the applicable site observa t ion reports , 51 84144 Mr. Ignacio Serralta May 19, 2021 Page2 d. Perform a substantial completion inspection and prepare a punchlist for outstanding items, e. Perform a final completion inspection and prepare a report outlining findings, f. Conform drawings utilizing "Contractor's As-builts" , to reflect actual as-built record drawings, • g. Review closeout packages and guarantees as they relate to landscape. We propose to provide the above services in accordance with the schedule established with the Client. We assume that we will receive digital bases of site plan for our use, as well as a digital survey locating and identifying all existing trees within project limits. Trees shall be classified by name, and size in caliper, height and spread. This information will be needed in order to submit to the City of South Miami -should tree removal permits be needed. We propose to provide the above services for a lump sum of $7,500, with the following breakdown by phase: 1. Schematic Design (10%)- 2. Design Development (10%) - 3 .. Construction Documents a. 50% Submission (20%)- b. 100% Submission (25%)- 4 .. Bidding Assistance (5%) - 5. Construction Administration (30%) - $ 750.00 $ 750.00 $1500.00 $ 1875.00 $ 375.00 $ 2250.00 Expenses such as printing for internal coordination, postage, and couriers are included in the above fees. If required, printing of multiple sets for submission will be billed at cost. Alternatively we will provide hard or digital copies of the documents, for reproduction. Please call me if you have questions regarding any aspect of this proposal. Sincerely, (}Jru..{~ Aida M. Curtis President 52 85145EX1Sf1.'IG BEACH VOLLEYBALL COURT N£.W COUR1' ., EXISllHQC01JRTS16) 0 (I) I. I~ I I! I--I I I r>nos ·ACTIVITY ON (XISTlllO COURTS WOULD NOT BC AFFCCT[O OV CONSTRUCTIOM .1,UtJIUUl.1IMPACl mJ XIS TING SPECIMEJ/ IREES • llO 11,IPACT Ori OTHER SPORTS FACILITIES ON SQUTU HALF OF PAHK • NFW nu11 nlNG/TERRACf ORIEIHATION IS /~ORTH-SOUTH -NEW PARKING DOES NOT DMOE PARI( rACILITIES • RCOUlRCS t.llNIMUt.1 CUT ANO FILL, (:IUSTIN{i TOPOGRAPHY R(.MAJNS • PROVIDES E)i:JltRITIOU COURT CONS • SOME EXISTING SCULPTURES MUST BE RELOCATED. • (MCRGDlCV ,\CCCSS TO DUILDltJUAVAllABLC O Y THROUGH GREEN AREAS FROM SW 58THAVE • SQUASH COURT GCTS ELLIMINATED 86146r . ., .# (@~~!~! .. Fl/TURE AMPHETHEATEA.~ .~ ... EXISTING RACKET BALL COURT TO BE REMOVED \--) t-EWCOURTS (2) ,(~) ..._ ... ,.,. ,6' ,tP , .. RELOCATED TI<IHUT J r.-~ '•, . .:': • X •: ,••. i~ .. \ .. •n ·~ ·~ ' ',i \. \I • .~ TERRACE .f I ·F -------------100 I ,., NEW BUILDING EXHIBITlON COURT l -----~8~F~ ----COVERED TERRACE --7~~-:::.~-\ \\((2, ..... _ ( c~ r(f/\) \ JJ~J (----EXISTING BLOO TO BE REMOVED ! EXISTING COURTS (6) I 1111 ~. 1' -~ «1-2 ~ -~:l A -:! : !j g5 ~!-;~ Ii -.. s ., ~"J ~i -~~ !2-:E ~J• ... i "'u • :JI:: :t-s f ·~ ~ ~ 0:: ii <( n. .., ::l .]! W 0~ u ~ij .. cn ~~u ~ ~,a w i;f I-~ z ;;; <( ~ 0 n sa<W::•l..uJtGCO S-A.1 ~ 87147·r l 11\l.ll--Nll'OSE 543 SO FT ~ COOS. <XP::ES$0tl S1tW,C1: 1eoson 106 so n l oma: Jl2 SO FT SPATIAL DIAGRAM SCALE: 3/32" = r-o· ENTRY ll£C. 120 SQ n IEIL 120 SO FT ~ ~ Sll:lw£R & LOCl<IR RII. 5!5 SQ FT Ef,/TRY PUIJJC ll!Sffi()OMS <166 SO FT l l l 20·-e· 1 41•-3• JOT.I!. 3132 SO Fl l---~ ! RESTROOM/LOCKER LAYOUT SCALE: 3132" = 1"-0" "' "' 88148NEW CO<JRT ., NEW COURT ., tE>Ota.rTlC»'J COURT) E)JSlJNO co1.,ns 1t1 G Pnos • ACTMTY ON [X!SrnlG COURTS \.'/OULO NOT 0[ AFFCCTCO BY CONSTRUCTION • MIH:MUM IMPACI OU E;)OSrtNG SPECl!.IEN TREf:.S • NO 1,._IPACT ON OT HEit SPORTS FACILITIES ON SOUTH HALF OF PARK • tlEW OUU OING'TERRACF ORIENTATION IS IIORTH·SOUTH • NEW PARK1"1G ooes NOT OMOE PARK FACILITIES • R(OUIRCS MINlf.lUM CLIT AtlO FILL. DOSTIOO TOPOGRAPHY REMAINS • PROV!O[S EXHIBIHON COURT cons , SOVE E)(ISmtG SCULPTURES MUST BE RELOCATED • CI.U:RG(NCY ACC£SS 10 OUILOING,WAll>\Dl[ Ot-.t.Y THROUGH GREEN AREAS fROM SW58TH AVE • SOUASHCOURT GETS ELLI AINATEO 89149 .. "'1--,· • ......... ~ ,.~ "· ? 'iw•~~~-------~ ----. -·,,___,.:_• __ . l·:•::.•1 ... < "-!. .-.......... :·F I -• • ";".-~ •" .l -~--..... ✓ ...,:..,.11...-. .• 00000 I J.:1:lrmld tt~U"1,j°,uqn11'1DS"-V1ill5MSOCU.9 UOR1PPV1Jad >l~IVd 773:)S'o':I 3lN'o'O '·, <. I,, -J . ., ~· ,•:•'·•rt-•:. ~; I • ,. . ··.,. ,✓l";.1· .. ··4 ... ( .... 4 (I) ------ ---~ 90150<O u> r Jl'-0" r 1' ID'-n· r 10'-6" 20·-o· l i HITRY El£C. IIEOL rue. l!!:CII 1 120 so n no son 1111.TI-PURPOSE :i4ll son t i i f---+ ~ SIIM!l!&I.CJCj(!J!l!IL l'OIIJCIIESlllOOIIS ·-r wson !M son ~ CONS. COH!nS!ON OfflCI: 5llRACE 100 son J12 son 1116 S0 fl EllTRY l T r r tHJ j, t ! l ! 9•--4• 16'-l" lt'-0" 20"-B" 1 ll'-0" 12'-o' 41'-B' TOT,._ 3132 SO IT SPATIAL DIAGRAM RESTROOM/LOCKER LAYOUT SCALE: 3/32" = 1'-0" SCALE: 3132" = 1 '·0" 91151 PRELIMINARY ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Dante Fascell Park New Building & Tennis Court City of South Miami Parks and Recreation 5001 s.w . 74 Court Suite 201 Mram1, Florida 33155 Tel: (305) 662-8887 Apnl 20 . 2021 Fax: (305) 662-8858 Conceptual Scheme "A " ITEM ITE" EST, UNIT UNIT TOTAL NO. DESC RIPTIO N an COST COST Site Prepar.,tion t-1 Mobihzahon (2% of Grand Total) 1 LS S26 .072 89 S26.07289 t-2 Maintenance of Traffic (2% of Grand Total) 1 LS S26 .072 89 S26.072 89 t-3 Cleanng and Grubbing (5% of Grand TotaQ 1 LS S65 . 182 24 S65 182 24 1-4 Removal of ~sting Cone Ssdewalk & Mu lch Walkway 324 SY S20 00 S5 .480 00 1-5 Removal of Existing CBS Bu dding 892 SF StO 00 S8 ,920 00 t-6 Removal of Raquel Ball I LS S7.500 00 S7 .500 00 1-7 Relocat,on of Tiki Hui 1 LS S1 ,000 00 St .COO 00 1-8 Eanh work I LS S15 ,000 00 S15,000 00 Sub .Total $15 6,228 .02 New Parlll n!I Lot 2-t Regular Excavat ,on 396 CY S3 .00 St . 188 00 2-2 Type '13 .. S!abillzatlon (12H th ick m,mmum LBR 40) 706 SY St.70 St ,20020 2-3 Ltmerock Base ca· Th ick Doub le Course) (Primed) (Roadway) 706 SY Stt 50 S8 . tt9 00 2-• AsphattlC Concrete Type SP-9 5 (1 s· thick) 59 TON S130.00 S7 .670 00 2-5 New Concrete ~dewalk (4" Th,ck. Including Pedestnan 65 SY 540 00 S2 .600 00 Ramp) 2-6 Rubber mulch wa lkway (41 145 SY S84 oo St2 180 00 2-7 Root Barrier 20 LF St0.00 S200 00 2-8 New Lighting with services 2 LS ) St5,000 00 S30.000 00 Sub-To1al $63,157.20 New Parklna Lot Pavement Marlllna 3.4 Sohd Traffic Stripe (4 N White) (ThermoplasI1c) 305 LF St .SO S457 50 3-10 Wheel Stop t9 EA StS0.00 S2 ,850 00 Sub-Total SJ,30 7.50 New Parlllna Lot Ora l naae Svstem 4-1 En.ltratton Ora m (18 .. PerloraIed Pipe) 75 LF Stt0.00 SB ,250 00 4.3 Inlets, Gutter, Ty~ S, <10' 2 EA 54 ,600 00 S9 .200 00 .... Baffle 2 EA S300 00 S600 00 Sub-Tota l $18,050.00 New Bulldlna & Associated Sidewalk 5-t New Bulldmg 1 LS S660,000 00 S660.000 00 5-1 Ne w Covered Terrace 1 LS S57.000.00 S57.000.00 5-3 New Concrete Sidewalk (4" Thick -lnctudmg Pedestrian 365 SY $40.00 S14.600 oo Ramp) 5-4 New Drainage Sy,em t LS St0.000.00 Sl0.000 00 Sub-Total $741 ,600 .00 New Tennis Court 6-t 2 New Clay Court w/ above ground Irnga11on and pe nmeter t LS S220.00000 S220.000 00 rence 6-2 New Tenn is L1gh11ng t LS Stt2.50000 S112.50000 6-3 New Trench Dram w/ Oramage system t LS S20,000 00 S20 .000 00 Sub-Tota l S352,500.00 New Landscaolno 7-1 Tree ProIect ion t LS 510,000 00 S10 ,000 oo 7-2 Tree Remova ls 12 EA S1 ,000 00 S12 .000 00 7.3 Tree Relocallons 10 EA S5 .000.00 S50.000 00 7,4 New Tree 12 EA St ,000 00 S12 .000 00 7.5 Shrubs I LS S7 ,500 00 S7 ,500 00 7-6 New Sod ReI0ra110n I LS St0,000 00 St0,000 00 Sub-Total s101 .soo.oo TO TAL $1,436,342.72 5-t 10% Overhead and Profit $143,634.2 7 5,2 2% Bond and Insurance $28 ,726.85 5.3 Conungency Fund (20% ol subtotal amount) due to $287,268.54 ProQamm lnQ Phase 5.4 Survey $3,500.00 5-5 As Bu in $1,500.00 TOTAL PROJECT COST: $1,90 0 ,972 .39 92152I I I I I I I I / ---1.;EW COURT ., 0 E'l(lSTINGCOURTS(&) NEW PAAKIN(l en I. I~ ~ 0 PROS· ·I\CTIV TYON EXISTING COURTS WOULD NOT BEArFEClEO 8Y C STRUCllO" • NEY/ Utl01NGITERRACEOH1ENTAT10H IS tlOIHH.SOUlll • EXIST NG RESTROOM BUILDING CAN REltMJ OURIHG CONSTRUCTIOtJ • PROV ES EXHIBITION COURT • PROV ES MORE PARKING & THAT CAN BE EXPANDED. • PROV DES SECURE OROP-OFFIPICK-UPAREA & LMl:lt E~ICV VEHICLE ACCESS TO BUILDING CONS • PARK! 0 DIVIDES EXISTING PI\RK FACILITIES • REOU RES NEW LIGHT POLES EXIST 1,Ki OEACil VOLLEYBALL COURT GETS ELL!Mll~ATEO • REOU RES SIGNIFICANT EARTHWORK TO ACCOl.10DA1E NFW CURTS • SOME SPECIMEN TREES WILL BE li-.'PACTEO 93153 .. rr=r,=;=,=;===rr========;;--,"";;;;;;;:;;:--;====i_=;=i=...,..==!=,__==l=...,;=l ,=_=i ==i;=_=:.,=. =i··._=_ .. -=.;=_=_ .. = .. ===,;======-==.=,o=a,=ou=.=====;;1====,•=,il ..... •• CUH....U"lll¥M DIIIMIIU ..... Ulll ,_.-,. •m· • £H££"1:f~WlOS"IIIAVt;llSI.\SOOlll "'•~w"Ml I ' \. / • ~'Cl'~•d &Qlf'tll:QGIRIIDUCl•ftDCIWN•&&:tUDlaY j , ii[' ·':iNl'S11.LVl:ICIBSVY2alllld"Wwtlmn •••••••• ,_ :11 J )l~Vd 713::JSV:l 31NVO ! I I I I I :--.- i: ~/ ,, ,,r ,•··i ' - - - -----~, ...... !, : • .f ,. 1, .......... ~1 r:-----1 I I I I I I I I I ~ I : :, ~ : I i1 I I !!! I ·I I . I I 1· .. .. \ •. ~ ~ ~ 't ~ I I • Sll3H0\'378· w ~ ~-----------... ---~ -Q- ·" 94154r JI'-<>" r r 10·--e· r 10·-6· l 20·--s· l r r ENTRY El.£C. 11£QL ru:c. ;, 120 son 120 SQ ff If.I.TI·-::: S48 SQ fl 'i' r r l;; +---+ ~ ~ SOOIIIER & l.llCll!R Pll. PU80C R£SlllQOIIS m SO FT m SO FT ' -~ OOHSc o:it«:tsSION oma: S1tRlllE 100 SO FT 312 SO ff \06 SO FT ENTRY 1 T r r ! '4 t j, t j l t g'--4• 16·-1· ir-o· 20'-e· ~ J1·--o· 12'-0' • ·-e· TOT.IL 3132 SO FT SPATIAL DIAGRAM RESTROOM/LOCKER LAYOUT SCALE: 3132" = 1'-0" SCALE: 3/32" = 1 '·0" 95155 PRELIMINARY ENG INE ER 'S OPI N I ON OF PROBABLE CONSTRUCTION COST Dante Fas cell Park New Building & T ennis Court City of Sou th Miami Parks and Recrea tion 500 1 5. W . 74 Court Suite 201 Miami, Flonda 33155 Tel: (305 ) 662-8887 Apnl 20 , 2021 Fax : (305) 662-8858 Conceptual Scheme "B" ITEM ITEM EST . UNIT UNIT TOTAL NO . DESCRIPfto~ Ol'Y COST co:n Site Praoaratlon 1-1 Mob~i:zat1on {2 % or Grand Total) 1 LS S2B,774 05 S28 ,77 4 05 1-2 Mainten ance of Trafllc (2% of Grand Total} 1 LS S2B ,774 05 S28 ,77 4 05 1-3 C!eanng and Grubbfng (5%1 of Grand ToIal} I LS S71 ,93514 S71 ,935 14 1-4 Remo val of Ex1slmg Cone. Side walk & Mulch Walkway 324 SY S20 .00 S6 ,4B0 00 1-5 Removal of Ex 1sIma CBS 8u1ldtng B92 SF 510.00 SB .920 00 1-6 Earth won< 1 LS S25 ,000 00 S2 5.000 00 Sub-Total $169 ,883.24 New Parklna Lot 2-1 Reaular Excavatton 1,030 CY SJ .DO S3,090 00 2-2 Type "B" s Iab1h2.aI10n (12" thfck minimum LBR 40) 1,B36 SY S1 70 S3.121 20 2-3 L1mero ck Base (SN Th ick Double Course) {Pnmed} 1.B36 SY S1 I.SO S21 , 11• 00 Roadwav\ 2-4 Asphaltic Concrete Type SP-9 5 (l s· 1h11:11 ) 153 TON S130 00 S19 ,B90 00 2-5 New Concrete Sidewalk (4~ Thick . lndudmg Pedestnan 65 SY S40.00 S2 .600 00 Ramal 2-6 Rub ber mul ch walk.way (4~) 527 SY S84 .00 S44 ,26B 00 2-7 Ro ot Barrie r 40 LF S10 .00 S400 .00 2-8 New LJghtmg w,th service s J LS S15 ,000 00 545 ,000 00 Su b-Tola l S 139 ,483.20 I New Parldno Lot Pavement Marklna 3.4 Sohd Traffic Stnpe (4~ White) (ihermoplas t1c) 793 LF SI.SO S1 ,1B950 3-10 Wh eel St op 32 EA S150 .00 S4 .800 .00 Sub-Tota l S5 ,989.50 New Parkloo Lot Oralnaae Svstem 4 -1 Exfiltra lion Dram (1 6~ Perfora ted Pipe) 100 LF I S110 00 S11 .00000 4-3 Inlets, Guttl'r, Type, S, <10' 2 EA S4 .6 00 00 S9 ,200 00 4.4 Baffle 2 EA S300 .00 S600 00 Sub-Tota l $20 ,800 ,00 New BulldlnR & Associated Sldewalk 5-1 New Building 1 LS S660 ,000 00 S660 ,000 00 5-1 New Covered Terrace 1 LS S57 ,000.00 S57 ,000 00 5-3 New Concre te S ldewalk (4-Th ick -lndudmg Pede stnan 365 SY S40 .00 S14 ,600 .00 Ramal 5-4 New Drainage Sylem 1 LS S 10 ,000.00 S 10,000 .00 Sub-Total $741,600.00 New Tennis Court 6-1 2 New Clay Coun w/ above ground ,mgahon and penrneter 1 LS S220 ,000 00 S220 .000 00 fence 6-2 New T enms lighting , LS S11 2,500 00 $112 ,500 00 6 -J New T rench Dra in w l Drainage $yS IOm 1 LS S20 ,000.00 S2 0 ,000 00 Sub-Tota l SJ52 ,500.00 New Landscaotno 7-1 Tre e Prolechon 1 LS S10 ,000 00 S10,000 DO 7-2 Tree Remo vals 12 EA 51 ,00000 SI2 ,000 .00 7-3 Tree Re!oca110 ns 15 EA 55 ,000 .00 575 ,000 00 7-4 New T ree 10 EA s 1,00000 S10 ,000 00 7-5 Shrubs I LS S7 ,500 .00 57,500.00 7-6 Paver ror drop off 3,600 SF SB 00 S28 ,800 00 7-7 New Sod Retora11on I LS S10 ,000 00 510 ,000 .00 Sub-Tota l S 153 ,300,00 TOTAL $1,583,555.94 5-1 1 0% Overtlead and Profrt I S158,355.59 5-2 2% Bond and In surance S31 ,671.12 5.3 Contingen cy Fund (20% or subtotal amouni) due to S316,711 .19 Prooamm1no Phase 5-4 Survey $3 ,500 .00 5.5 As Built S1 ,500 .00 TOTAL PROJECT COST: $2,0 95 ,293 .84 96156 IEXHOIIIT#/16 PR@FESSBONAL SERVOCE AGREIEMENT "Prafasalonal Gmara!I !Einafneerln1 a Ardal8.eml8"8111 lervlces" RFQ #PW20D6o22 THIS AGREEMENT made and entered Into dtls ~ day of '4e£Mt: • 20 '1 by and beiween the City of South Miami, a municipal corporation (hereinafter referred to as Owner or CITY) by and through hs Clty Manager (herelnafller referred to as CITY or Otr Manager) and SR,$ C!::Ha,\tr+EF.e.u\4 c l,i L who Is auchorlzed to do business In che State of Rortda. (hereinafter referred to u che ncoNSULTANT'). In consldemlon of che premises and the mutual covenants contained In this AGREEMENT, che pardes agree to the following terms and condklons: t .o General Prpyislons 1.1 A Nodce·to Proceed wlD be Issued by die 0, Manager, or his deslgnee, foUowtng the slplng of this AGREEMENT. This AGREEMENT does not confer on the CONSULT ANT any emusive rights to perform work on behalf of die Owner odter dlan the work desaibed In one or more Notice to Proceed (herelnafteo- O'elerred ta as che .. WORK"), nor does It obllpte the Owner in any manner ta guaraneee work for the CONSULTANT. 1.2 The CITY agrees that it will furnish to the CONSULTANT ava1lable dala and documems in 1he CITY possession penalnlng to the WORK to be performed under this AGREEMENT prompdy after die Issuance of the Notice ta Proceed and upon wr1uen request of the CONSULTANT. 2.0 Scoge gf Ser,lces, Do CONSULTANT shaJI perfpnn tb@ wad< as sag mah 1n lb@ Scqpe of SmJces as dem:Jbed In the Notice m Proceed, 3.0 Dma for Compledon 3.1 The services to be rendered by the CONSULTANT for any WORK shall be commenced upon receipt of a written No1ice to Proceed from the CITY subsequent to die exeamon of dtls AGREEMENT and shall be completed wlchln the dme set fonh In the Notice to Proceed or other document signed by the City Manager, or deslgnee. 3.2 A reasonable extension of dme will be granted In the event there Is a delay on dte part af the CITY In fulfilling Its part of the AGREEMENT, change of scope of work or should any other events beyond the comrol of the CONSULTANT render performance of his duties Impossible. 4.0 Basis pf Compensation; The fees for services of d1e CONSULTANT shall be deiennlned by one of the foDowlng methods or a_ combination thereof, u mutually agreed upon by the CITY and d\e CONSULTANT. 4.1 A flxecl sung The fee for a ask or a scope of work may be a fixed sum as mutually agreed upon b)' the CITY and the CONSULT ANT and If such an agreement is reached, it shall be In writing, signed by d'le CONSULTANT and che Cle, Manager and attached hereto as ATI'ACHMENT A: 4.2 Hourly rate fee: If there Is no 6xed sum or If additional work Is requesced without an agreement as to a fixed sum, the CITY agrees to pay, and the CONSULTANT agrees to accept, for che services rendered pursuant to this AGREEMENT, fees In accordance wlch die hourly rates chat shall lndude all Page51 of66 TiiamaP.G'epe ICIIIJ/2016 135 64 97157 wages, beneflu, overhead and profit and that shal9 be in writing, signed by die CONSULT ANT and die City Manager and attached hereto as ATTACHM!ENT A. S.0 P;mnent and Partial Payments. The CITY will make monthly payments or partial payments to the CONSULTANT for all authorized WORK performed during the previous calendar month as set forth In the schedule of payment as set forth In ATTACHMENT A or, If no schedule of payment mchibit is attached to this AGREEMENT then payment will be made 30 days following the receipt of CONSULTANTs invoice as the work progresses but 001ly for the work actually performed and approved In wrldng by the City Manager. 6.0 Right gf Dec;lslgns. All services shaD be performed by the CONSULT ANT to the satisfaction of the CITY's representative, who shall decide all questions, dlfflculdes and disputes of whatever nature which may arise under or by reason of thls AGREEMENT, die prosecution and fulflllment of the services, and the character, qualhJ, amount and value. The representative's dadsions upon all dalms, questions, and disputes shall be final. conclusive and binding upon the parties unless such determination is clearly arbitrary or unreasonable. In the event that the CONSULTANT does not concur in the judgment of the representative as to any decisions made by him, CONSULTANT shall present his written oblections to the Oty Manager and shall abide by the decision of the Oa,Manager. 7.0 Ownershjp of Documents. All reports and reproducible plans, and other data developed by the CONSULT ANT for the purpose of this AGREEMENT shall become the property of ihe arv without restriction or limitation. 8.0 AudJt Rights. The CITY raerves the right to audit the records of the CONSUL TANT related to this AGREEMENT at any time during the execution of the WORK and for a period of one year after final payment Is made. This provision Is applkable only to projects that are on a time and cost basis. 9.0 Truth-in Negotiations: If the contract amount exceeds the threshold amount provided ins. 287.017 for category four, the CONSULTANT shall ececute a truth-In-negotiation certiftcate Siating that wage rates and other factuai unit costs supporting the compensation are accurate. complete, and current at th4!1 time of conncting. In such event, the ori&fnal contract price and any additions thereto shaU be adjusted to exdude any slgnlflcam: sums by which the City determines the contract price was Increased due to inaccurate, lncompl• or noncurrent wage rates and other factual unit costs. All such contract adjustments must be made within one year following the end of the contract. I 0.0 Subletting, _The CONSULT ANT shaU not assign or transfer Its rights under d\ls AGREEMENT without me express written consent of the CITY. The CITY will not unreasonably withhold and/or delay its consent to the assignment of the CONSULTANrs rights. The CITY may, in Its sole discretion, allow the CONSULTANT to assign Its duties, obligations and responsibilities provided the assignee meets all of the CITY's requirements to the CITY's sole satisfaction. The CONSULTANT shall not subcontract this AGREEMENT or any of the services to be provided by It without prior written consent of the CITY. Any assignment or subconcracdng in viotadon hereof shall be void and unenforceable 11.0 Unauthomed AOens; The employment of unauthorized aliens by the CONSULT ANT is considered a violation of Federal Law. If the CONSUL TANT knowingly employs unauthorized aliens, such vloladon shall be cause for unliateraJ cancellation of lhis AGREEMENT. This applies to any sut,.CONSULTANTs used by the CONSULTANT as well. The CITY reserves dle right at Its dlscredon, but does not assume the obligation, Page5lofH Ttlonm F. Pepe 10/1312016 138 65 98158 co require proof of valkll cidzenshlp or, In the alr.ernatlve, proof of a valid green card for each person employed In die performance of work or provkllns che goods and/or services for or on behalf of die CITY lndudlna persons emplo,ad by any Independent contractor. By reserving this light, the CITY does not assume any obllpdon or responslbUlty to enforce or ensure compliance with the applicable laws and/or regulations. 12.0 WaJ,;unx. The CONSULTANT warnnts that It has not employed or retained any company or person. other chan a bona fide employee working solely for die CONSULTANT. to solldt or secure dlls contract and chat he has not paid or agreed ID pay any company or person other dm a bona ftde employee working solely far the CONSULTANT any fee, commission. percemage fee. sifts or any other considerations contingent upon or resulting from the award or malcin& of this contract. For breach or violation of chis warranty, the CITY shaU have the right to annul this comract without Dablllty. 13.0Termlnatldn. It Is expessly understood and agreed dm die CITY may 1ermlnate dus- AGREEEMENT for any reason or no reason and without permla;y by eh:her decbnlng to Issue Nodce ID Procead authorizing WORK. or, If a Nodce io Proceed Is iaued. CITY may terminate dais AGREB1ENT by wr1tU!n nodce co CONSULTANT, and In elcher evem the Cl'TY's sole obligation to die CONSULTANT shall be P11ffi4!11t for che work previously authorized and perfonned In accordance wkh die provisions of dtls AGREEMENT. Pqment shaU be deiemdned on the basis of die work perfonnecl by the CONSULTANT up to the time of termlmmon. Upon termlnadon, die CITY shall be endtled ID a refund of any monies paid for any period of drpe for which no work was performed. 14.0 Imm This AGREEMENT shall remain In force umll the end of the term. which Includes aD authorized renewals. or lDlless olherwlse terminated by die CITY. The term of this agreement Is three (3) years from the Issuance of the Notice to Proceed and one two- year opdon-co renew. The option to renew Is at die dlscredon of the City Manager. The CITY mm}' wmtmne die comract wkhouc cause following 3~ days advanced nodce ID the CONSULTANT. However, tn no event shall die term exceed five (5) years followlng the lssaance of the Notice ID Proc:aed. lS.0 Defiwlt. In the event either party falls co ~ply with the provisions of dds AGREEMENT. die aafieved party may declare the other parq In default and notify the defauhing party In wrhlng. If QTY ls In default. the CONSULTANT will only be compensated for any completed professional services and CONSULT ANT shall not be emtded to any consequential or delay damaies. In die event that partial payment has been made for such professional services not completed, the CONSULT ANT shall reaam such sums to the CITY widaln ten (10) days after notice that said sums are due. In the event of any lidpdon between the parties arlslns out of or reladng In any way ID this AGREEMENT or a breach thereof, aach party shall bear la own coses and legal fees. 16.0 Insurance and lndamnlflcadon. The CONSULTANT agrees to comply with CITY's Insurance and lndernnlftcadon requirements that are set forth In ATTACHMENT 1. to chi.I AGREEMENT. 17.0 ~ Not Exduslye. Noddng In this AGREEMENT shall prevent 1he CITY from employing other CONSULTANTS to perform the same or slmllar services. 18.0 Codes. Ordjnances and Laws. The CONSULTANT agrees to abide and be governed by all duly promulpted and published munldpal, county, state and federal mdes, ordinances, rules. reguladons and laws which have a direct bearing on the WORK involved on this project. The CONSULTANT Is required t.o complete and sign all affidavits. including Public Ent11¥ Crimes Affldavlt form (attached) punuant to FS '1lfl. I 33(3) (a), as required by the CITY's sohdtation, If any, apphcable to this Page5Jof66 Ylloma9'.Pepe IGIIJl1016 137 66 99159 AGREEMENT. 19.0 Im!. CONSULTANT shall be responsible for payment of all federal, state, and/or local axes related to the Work. induslve of sales taX if appJlcable. 20.0 POii Free Wprkgtace. CONSULTANT shall comply with CITY's Drug Free Workplace pollcy whJch Is made a part of this AGREEMENT by reference. 21.0 lrulegendent CoQtl'ilClPr. CONSULTANT Is an Independent endty under this AGREEMENT and nothing contained herein shall be construed to create a partnership. Joint venture, or agency reladonshlp between the parties. 22.0 Duties and 8MponslbHides. CONSULTANT agrees to provide Its semces during the term of this AGREEMENT In accordance with all applicab!e laws, rules, regumions, and health and safety standards of the federal, state, and CITY, which may be applicable to the senfce being provided. 23.0 Ugmses and Cerdftc;aJtons. CONSULTANT shall secure all necessary business and ~onal licenses at Its sole expense prior to executing the AGREEMENT. 24.0 ~nt. Modfflq,don, and Wn1 Effect This AGREEMENT constitutes the entire agreement of the parties, Incorporates all the understandings of the parties and supersedes any prior agreemems, understandings, represmmtlon or-n~an. written or oral. This AG~ENT may not be modified or amended scept in wridng, signed by both pardes hereto. This AGREEMENT sOmll be binding upon and inure to the benaflt of the Chy of South Miami and CONSULT ANT and to their respective heirs, successors and assigns. No modification or amendment of any terms or provisions of this AGREEMENT shalH be valid or binding unless le comphes with this paragraph. This AGREEMENT, In general, and this paragraph, in particular, shall not be modified or amended by acts or omissions of the pardes. If this AGREEMENT was approved by wrlaen resolution of the City Commission, or If such approwl is required by ordJnance or the Ch¥ Charter, no amendment to this AGREEMENT shall be valid unless approved by written resolution of die City Commission. 2S.O Jyr:y Triat. CITY and CONSULTANT knowingly. Irrevocably voluntarily and intentionally waive any right either may have to a trial by jury In State or Federal Court proceedlnp in respect to any action, proceeding, lawsuit or counterelaim arising out of this AGREEMENT or me performance of the Work thereunder. 26.0 YalldllV of &ecuted Coples. This AGREEMENT may be executed In several counterparts. each of which shall be constn.1ed as an original. 27.0 Rules of Interpretation; Throughout this AGREEMENT the pronouns that are used may be substituted for male, female or neuter, whenever appllcabls and the singular words substituted for plural and plural words subsdtuted for singular wherever appficable. 28.0 Severablht)'. If any term or provision of this AGREEMENT or the appllcadon chereof to any person or drcumstance shall, to any eJrtent, be Invalid or unenforceable, the remainder of this AGREEMENT, or the application of such term or provision to persons or drcumstances other than those to which It is held Invalid or unenforceable. shall not be affected thereby and each and every other term and provision of this AGREEMENT shall be valld and enforceable to the fuDest extent permitted by law. 29.0 Cumulative Remedies: The duties and oblipdons imposed by the contract documents, If any. and the rights and remedies available hereunder, and. In particular but whhout limitation, the warranties, guarantees and obllpttons Imposed upon CONSULT ANT by the Contract Documents, If any. and this AGREEMENT and the rights and remedies avallable to the CITY hereunder, shall be In addldon to, and shall not be constrUed in any way as a limitation of, any rights and remedies available at law or in equity, by special guarantee or by other provisions of the Contract Documents, if any, or this AGREEMENT. In order to endde any party to e>terdse any remedy reserved to It in this Page34cf46 TllomaP.Pepe IGIIJ/2016 138 67 100160 i 1 l I l l l l l l AGREEMENT, or eJCisdng In law or In equity, It shaO not be necessary to give nodce. other lhan such nodca as ma~ herein expressly required. No remedy conferred upon or reserved to any pan, hereto. or existing at law or In equity, shaO be exclusive of any other available remedy or remedies, but each and every such remedy shall be cumulative and shall be In addition io every other remedy. given under this AGREEMENT or hereafter existing at law or In equity. No delay or omission to exercise any rf&ht or power accruing upon any default shall Impair any such right or power or shall be consrrued to be a waiver thereof, but any such right and power may ba exercised from dme to dme as often as may be deemed expedlent. 30.0 Non-Walyer. CITY and CONSULTANT aaree that no failure io exercise and no delay In exercising any right. power or privilege under this AGREEMENT on lhe pan of either party shall open.ta as a waiver of any rlghr. power, or prlvllege 11nder chis AGREEMENT. No waiver of dlls AGR&IENT. In whole or pan. indudJi,a the provisions of this paragraph. may be bnpUed by any act or omission and will only be valld andl enforceable If In wrklng and duly executed by each of the parties to this AGREEMENT. Ally waiver of any mnn. conclldon or provision of lhls AGREEMENT wUI not consdane a waiver of any other term. condition or provision hereof, nor wm a waiver of any breach of any term. condldon or provision ccnsdulte a waiver of any subsequent or succeeding breadt. The failure to enforce this AGREEMENT as to any pardcular breach or default lhalJ not act as a waiver of any subsequent breach or default. 31 .o No Dlsqlmlnatlon and Equal Emplo.,anam; No acdon shall be taken by the CONSULTANT, nor wlD it pennlt any acts or omissions which result In discrimination against any person, Including employee or apphcant for employment on the basis of race, creed. color, ethnicity, national orfaln. relfglon. age. sex. famlllal status. mariCal stacus, ethnicity, sexual orlentadon or physical or mental disability as proscribed by law and dm It wlD lake afflnnadve acdon CD ensure dm such dJscrlmlnadon does not take place. The CONSULTANT shall cmnply with the Americans with Dlsabllldes Act and It wiO take afllnnadve action to ensure chat such discrimination does not cake place. The City of Solllh Miami's hiring praalces strive to comply with all applicable federal regulations reprdlng employment eBglblltty and employment practices in general. Thus. all Individuals and emides seeking to do work for the CITY are expeaed to comply with all appDcable laws. aovemmental requirements and regula1lons. indudlng the reguladons of the Unltad States Deparanent of Justice penalnlng to employment eligiblllty and employment pracdces. By signing this AGREEMENT. the CONSULTANT hereby cerdftes under penalty of perjury, to the CITY, Chat CONSULT ANT Is In compliance with all applicable regulations and laws governing employment prracdces. 32.0 Ggyerning Laws. This AGREB'IENT and dte performance of services hereunder wlll be governed by the laws of dte State of Florida. with exduslve venue for the resoludon of any dispute being a court of competent }urlsdlcdon In Miami-Dade County, Rorlda. 33.0 Etrective Date. This AGREEMENT shall not become effecdve and binding undl it has been executed by both parties hereto, and approved by the Oty Commission If such approval is required by City's Charter, and the effective date shall be the date of its execution by the last pany so .execudffl It or If Otv Commission approval is required by the City's Charter, then the date of approval by Of¥ Commission. whichever Is later. 34.0 Third Pan;x Beoefici;u:y. It is specifically understood and 31reed that no other person or entity shafl be a third-party beneficiary hereunder. and that none of provisions of this AGREEMENT shaD be for the benefit of or be enforceable by VhamaF.Pcpe IGll:l/2016 Paga55of66 139 68 101161 anyone other than the parties hereto, and that only the parties hereto shall have any rights hereunder. 3S.0 Further Assurances. The parties hereto agree to execute any and all odter and further documents as might be reasonably necessary In order to ratify, colrilrm, and effectuate the Intent and purposes of this AGREEMENT. 36.0 Tune of Essence. Time Is of the essence of this AGREEMENT. 37.0 lnteqn'D11tign. This AGREEMENT shaH not be constrUed more strongly against either party hereto. regardless of who was more responsible for Its preparation. 38.0 Fgrce M;JJeure. Neither party hereto shall be In default of Its f&llure to perfonn tu obllptions under dals AGREEMENT If caused by acu of God, cMI commotion, strikes, labor disputes, or governmental demands or requirements that could not be reasonab!r • mnddpared and the effects avoided or mitigated. Each party shall notify the od\er of any such occurrence. 39.0 Subc;qnfflledng If allowed by this AGREEMENT, the CONSULT ANT shall be as fully responsible to tha CITY for the acts and omlaslons of Its subcontractors/subconsultants ~ ft Is for the acts and omissions of people directly employed by tt. All subcontractors/subconsultants and their agreanents, If zllowed by this AGREEMENT, must be approved by die CITY. The CONSUL TANT shmll requtre each subcomractor, who Is approved by i:he CllY, to agree In the subcontract to observe and be bound by aD obflpdons and condldons of dus AGREEMENT to which CONSULTANT ls bound. 40.0 Public Records: CONSULT ANT and all of Its subconnc:torS are required io comply with the public records law (s.119.0701) while providing goods and/or services on behalf of the CITY and the CONSULTAN1, under such conditions, shall Incorporate this paragraph In ail of Its subcontracts for this Project. Under such condition. CONSULT ANT and Its subcontractors are speclflcally required to: (a) Keep and mainlain publ!c records required by the pubfic agency to perform the service; (b) Upon request from the public agency's custodian of public records, provide the pad,Jlc agency with a copy of the requested records or allow the records to be lnspecced or copied within a reasonable dme at a cost chat does not mcceed the cost provided In dtls chapter or as otherwise provided by law; (c) Ensure dmt pubbc records dlat are exempt or confldential and eJtempt from public records dlsdosure requirements are not dlsdosed except as authorized by law for die duradon of the contract term and following compiedon of the contract If the contractor does not transfer the records to the public agency. and (d) Upon completion of the contract. transfer, at no cost. to the public agency all public records In possession of die contractor or keep and maintain public n!tords required by the public agency to perform the service. If the connctor transfers all public records to the public agency upon completion of the contract, the contract0r shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requlreme~ts. If the contractor keeps and maintains IPUbftc records upon compledon of dte contraet. the conuaaor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the publlc agency's custodian of public records, In a format that Is compatible wkh the lnformadon technology systemS of the pubflc agency. BF THE CONTRACTOR HA$ QUES1U)INII REGAfll!DIN@ YH!E APPLICATION CF CHAPTER D Of, IPILORIDA STATUTESP TO THE CONTRACTOR'S DUTY TO PR@VBDIE PUiiUC RECORDS REB.ATUNG TC THIS CONTRACT0 CONTACT THI! CUSTODIAN OF PUBLIC RECORD$ AT 305-663-6340; E-ma!I: mum,nendn@southmlamlft.gov; , B 30 Sunset Drive, South Miami, FL Jll I l@l. 41.0 Notjru. Whenever notice shall be required or permitted herein, It shall be PageH of66 Yhomas F.-Pape 10/1312016 140 69 102162 delivered by hand delivery, e-mail (or similar electronic transmission), facsimile transmission or certified mail, with return receipt requested and shall be deemed delivered on the date shown on the e-mail or delivery confirmation for any facsimile transmission or, If by certified mall, the date on the return receipt or the date shown as the date same was refused or unclaimed. If hand delivered to the CITY, a copy must be stamped with the official City receipt stamp showing the date of deliver; otherwise the document shall not be considered to have been delivered. Notices shall be delivered to the following individuals or entities at the addresses {Including e-mail) or facsimile transmission numbers set forth below: To CITY: With copies to: To CONSULTANT: City Manager, 6130 Sunset Dr. • South Miami, FL 33143 Tel: (305) 668-2510 Fax: (305) 663-6345 E-mail: salexander@southmlamifl.gov City Attorney 6130 Sunset Dr. South Miami, FL 33143 Tel: (305) 667-2564 Fax: (305) 341-0584 E-mail: tpepe@southmiamifl,gQY 42.0 Corporate Authority. The CONSULT ANT and its representative who signs this AGREEMENT hereby certifies under penalty of perjury that the CONSULT ANT and its representative have, and have exercised, the required corporate power and that they have complied with all applicable legal requirements necessary to adopt, execute and deliver this AGREEMENT and to assume the responsibilities and obligations created hereunder; and that this AGREEMENT is duly executed and delivered by an authorized corporate officer, In accordance with such officer's powers to bind the CONSULT ANT hereunder, and constitutes a valid and binding obligation enforceable in accordance with Its terms, conditions and provisions. RN WITNESS WHIERIEOF, this AGREEMENT was signed on or before the date first above written subject to the terms and condldons set forth herein. ~ ~a,o S£t2'2At:rA- A~ . . ·,' .·, By. •. ~.-~,_~,;i. -aria M. Menendez, C ;} City Clerk (/ ~e) City ~ By.__,~~,:;__, __________ _ ~ / Steven Alexander _/ City Manager Page 57 of 66 Thomas F. Pepe 10/13/2016 l 70 103163 kead and Approved as to form, language, Legalli'/ and E>secudon thereof. -~;~ By.-------------Thomas F. Pepe. Esq. City Auamey T'ilOlllllll F. Pepfl SCI/IWI~ Pag&Hof46 142 71 104164 ADIDENlOUM TO PROFESSIONAL SERVICE AGREEMENT "Professional General Engineering and Architectural Services'' RFQ #PW2016-22 The Oty and CONSULTANT agree that a separate rotational list will be dedicated for work performed under a continuing professional service contract, as specified in the Scope of Services, for "Certified Arborlsts Services," and a separate rotational list will be established for all CCNA professional services. "Certified Arborists Services" is defined as: e Certified Arborlst Services: Consultant may be called upon to review all tree removal permit appllcatlons that are submitted to ensure compliance with the regulations outlined in Section 20-4.5.1 of the Oty's Land Development Code. The review includes the Initial slte Inspection followed up by the determination of mitigation and a final inspection. When needed, assist City Departments with other Issues related to the maintenance, preservation, and protection of trees on both private and public property. The rotational list for "Certified Arborists Services'~ will rotate every three (3) months among the CONSULTANTS. The City intends to retain a maximum of four (4) qualified firms under four (4) separate but simllar Professional Services Agreements. ~ nglneerlng, Inc. Ignacio Serralta/Presldent (Name of Signatory) Read and Approved as to Form, Language, Legality and Execution thereof: -·•7i?':-:., _L,,_/) By: _..-/ :>-,,-.,.-,,,;,-~7"~~ Thomas F. Pepe, Oty Attorney ~ ,- By:----------- /teven Alexander, City Manager 72 105165 n-nasP.Papa IOIIJl2016 ATTACHMENT A "C@MPEINlSATUOINI'' PR@IFESSIONAL SERVBCE A@RIEEMIEINJT "ProfeulGlnzl Gdmlli"aB EnglneGtrrlns mnd ~ Senlcee'' RFQ#PW2816-ll Page59of'6 1,43 73 106166 Professional General Engineering & Architectural Services RFQ #PW2016-22 Wage Rates Summary Job Classification City of South Miami Benchmark Hourly Rate Principal $180.00 Sr. Project Manager $150.00 Project Manager $130.00 Senior Engineer $125.00 Senior Planner $125.00 Planner $85.00 Senior Traffic Engineer $125.00 Traffic Engineer $85.00 Senior Designer/Engineer $90.00 Designer $80.00 Engineering Intern $75.00 Senior CADD Technician $75.00 CADD Technician $65.00 GIS Technician $80.00 Senior Construction Inspector $90.00 Construction Inspector $75.00 Senior landscape Architect $125.00 Landscape Architect • $115.00 Landscape Architect Intern $70.00 Arborist $75.00 Utility Coordinator $90.00 Surveyor/ Mapper $85.00 Survey Technician $60.00 2-Man Survey Crew $115.00 3-Man Survey Crew $125.00 4-Man Survey Crew $135.00 Fire Protection Engineer $90.00 Plumbing Engineer $90.00 Mechanical Engineer $90.00 Electrical Engineer $90.00 Geotechnical Engineer $120.00 Geologist $90.00 Environmental Scientist $85.00 Senior Administrative Assistant $65.00 Clerical $45.00 74 107167 A TI .A~lrfllMl!f:NT. Ii DINJIYRAINICE & DNIDEMINIDFHCAYOON RIEQIYO~!EMENlT$ IJIIRC!!=HSBO~ SEU&VICE AGU!M!l:N'il" "fvofesl11lolllollff &Mrml IEnsfneerlng mnt9 AmtlblaurmB !Semcee» lmFQ M'Wlll 6-22 1.010 Insurance A Wimout llmJtlng la Uablllty, the conncter, consulrant or consulting firm (hereinafter referred u, as "FfRM" with regard to Insurance and lndemnificadon requirements) shall be required to proaare and maintain at its own mcpense during the life of the Contract, Insurance of the types and In the minimum amoums mted below as wlll protect the FIRM, from dalrns which may arise out of or resuk from the conll!'aCt or the ll)el'formance of the comraa with the City of Soudl Miami, whether such clzlm Is apinst the FIRM or any sub-contractor, or by anyone directly or Indirectly employed by any of diem or by anyone for whose aas any of diem may be llabie. B. No insurance requlrad by the CITY shall be lssuec!I or written by a surplus lines carrier unless authorized In writing by the CITY and such authorization shall be at the CITY's sole and absolute discretion. The FIRM shall purchase Insurance from and shaU maintain the Insurance with a company or companies lawfully authorized to seU Insurance fn the State of Aorida, on forms approved by die State of Florida. as wlll protect the FIRM, at a minimum, from all claims as set forth below which may arise out of or result from the FIRM's operadons under the Conn.a and for which the FIRM may be legally liable. whether such operations be by the FIRM or by a Subccnnctor or by anyone dlrecdy or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: (a) dalms under workers' compensatfon, dlsablllty benefit and odler similar employee benefit acts which are apphcable u, the Work to be performed: (b) claims for damages because of bodily injury, occupational sickness or disease. or death of die FIRM's employees: (c) dalms for damages because of bodily injury, sickness or disease, or death of any person other than the FIRM's employees; (d) claims for damages Insured by usual personal Injury llablllty coverage; (e) claims for damages, other than to the Work Itself, because of injury to or destruction of tangible property, lnduding loss of use resulting there from; (f) claims for damages because of bodily injury. death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; (g) dalms for bodily Injury or property damage arising out of completed operations; and (h) claims Involving connctuaJ liability Insurance appflcable to the ARM's obflgations under the Contract. 1.01 I Rem's losurancg Generali)', The FIRM shall provide and maintain In force and effect until all the Work to be performed under this Contract has been completed and accepted by CITY (or for such duration as Is otherwise specffied hereinafter), the Insurance coverage written on Rorida approved forms and as set forth below: 1.0 I 2 Warkers' Compensation Insurance at the statutory amount as to all employees in compliance with the 'Workers' Compensation Lawa of the State of Florida indudlng Chapter 440, Florida Statutes, _as presendy written or hereafter amended, and an applicable federal laws. Page GO of66 Tllomms f. Pope IOIIJ/2G16 145 75 108168 In addldon, che policies must lndude: Employers' UabUlty at the SWtatory coverage amount. The FIRM shall funher Insure dlat all of Its Subcontracton maintain appropriate levcels of Worker's Compensation Insurance. D .013 Commerdal Comprehensiye General Yabfll\Y insurance widl broad form endorsemeu1t. as well as automobile liablffty, compfetecB operations and products hablllq,, contracwal ltabillt)', severabtfttr of ln1:erest with cross llabllliy provision, and personal lnlur,, and property damage ltablllty with limits of $1,000,000 combined slngle llmJt per occurrence and $2,000,000 aggregate. Including: 0 Personal Injury: $1,000.000; 0 Medical Insurance: $5,000 per person: 0 Property Damage: $500.000 each occurrence; 1.014 Umbmfla Commercfal Comprehegwye General liabl)it)' insurance shall be written on a Florida approved form with the same coverage as the primary Insurance policy but In the amount of $1,000,000 per dalm and $2,000,000 Annual Afirepte. Cov~ must be afforded on a form no more restrictive man the latest edition of the Comprehensive General Uabllh:y policy, without restricttve endorsements. as filed by the Insurance Services Office. and must indude: (a) Premises and Operation (b) Independent Concractors (c} Products and/or Completed Operadons Huard (cl) E:cpfoslon. Collapse and Underground Hazard Coverage (e) Broad Form Property Damage (f) Broad Form Comractual Coverage applicable to dtls specific: Contract. Including any hold harmless and/Oi" indemnlflcadon agreement. (g) Personal Injury Coverage with Employee and ContractUal bclusions removed, with minJmum llmlu of coverage equal to those required for Bodily Injury Liability and Property Damage Uabitrty. 1.015 Bustness Aummoblle UabHIJ¥ with minimum hmla of One MIiiion Dollars ($1,000.000.00) plus an addldonal One Mllhon Dollar ($1,000,000.00) umbrella per occurrence combined slngle limit for Bodily ln)ury Uablnty and Property Damage Uablhi¥. Umbrella coverage must be afforded on a form·no more restrictive than the latest edition of 1he Business Automobile Uablfity pollcy, without restrictive endorsements, as flied by with the state of Florlda. and must include: (a) Owned Vehldes, (b) Hired and Non-Owned Vehldes (c) Employers' Non-Ownership 1.016 SUBCONTRACTS; The FIRM agrees that If any pan of the Work under the Contract Is · sublet, che subcontract shall contain the same Insurance provision as required by of the Firm, other than the Rre and Extended Coverage Insurance and substituting the word Subcontractor for dte word FIRM and substituting the word FIRM for CITY where appDcable. 1.017 Bee and ExJeoded Coveow; Insurance (BuHders' Risk), IE APPUCABLE; C. In the event that dtis contract involves the construcdon of a structure, the FIRM shall maintain, with an Insurance Company or Insurance Companies acceptable to dte CITY, •aroad 11 form/All Risk Insurance on buildings and strUCtUres. Including Vandalism & Malidous Mischief coverage, while In the course of constrUcdon, lncludlng foundations. additions. attachments and aD permanent fixtures belonging to and consdtutlng a part of PapGI of66 lbomm F. Pepe IOIIJIJOH 148 76 109169 said buildings or structUres. The pohcy or poUcies shall also cover machlnesy. If die cost of machinery Is Included In the Convact. or If the machinery Is located in a bulldlng that Is being renovated by reason of dlls contract. The amount of lnsunnce must, at all times, be at least equal to the replacement and aaual cash value of the Insured propenr. The poDcy shall be In die name of che CITY and the Firm. as dteir lnuirest may appear. and shall also cover the interests of all Subcontractors performing Work. D. All of the provisions set forth In MlscefJaneous secdon herein below shaD apply to this coverage unless It would be dearly not applicable. 1.018 Mlscellanaous; F. If any notice of cancellation of lnsunnce or change In covenge Is Issued by the Insurance company or should any lnsunnce have an expiration date that wlll occur during the period of mis contraet, the ARM shall be responsible for securing o1her auepmble lnsunnce prior to such cancelladon. c:hanp. or mcplmlon so as to provide continuous cownge as specffled In dlls section and so as to maintain coverage durins die life of lhls Contract. G. AD deduc:61es must 1be dac:lared by the FIRM and must be approved by the CITY. At che opdon of the CITY, either die FIRM shall ellmlnate or reduce such deductible or the FIRM shall procure a Bond, In a form smdsfactory to the CITY covering die same. H. The pohdes shall contain waiver of subrogadon against CITY where applicable. shall mq:,ressly provt~ chat such pollcy or polldes are primary over any other coDectlble Insurance 1hat CITY may have. The CITY reserves die right at any time u, request a copy of the required policies fer review. All poDdes shall comaln a "severablllty of lrarest" or 11cross llablllty'• clause without obliP1fon for premium payment of die CITY as weD as contractUal 1Jabilh¥ provision covering the FIRM'S duty to indemnify die City as provided In this Agreement. I. Befora starting die Work. lhe FIRM shall deliver to the CITY certificates of such Insurance, acceptablle to die CITY, as well as the ~nsurance binder, If one Is Issued, the Insurance pollcy. Including the declaration page and all applicable endorsemena and provide the name. address and telephone number of the Insurance a,ent or broker through whom die poltq, was oblalned. The Insurer shall be rated AVII or better per AM. Best's Key Rating Gulde, latest edition and auchorized to issue Insurance In the State of Florida. All Insurance pobcles must be written on forms approved by the State of Florida and they must remain In full force and effect for the dura11on of die contract period with the CITY. The FIRM may be required by che CITY, at its sole dlscredon. to provide a "certified copy'' of ~e Policy (as defined In Ardde I of this document) which shall lndude the declaration page and all required endorsements. In addidan, the FIRM shall. deliver. at the time of del"ivery of the Insurance certificate, die following endorsements: • (3) a policy provision or an endorsement with subnamlall)' similar provisions as follows: Thomall F. Pepe IG/fJIJOl6 "The Cit¥ of South Miami is an additional Insured. The Insurer shall pay all sums that the Ciq of South Miami becomes legally obftgated to pay as damages because of 'bodily Injury•, 'property damage' , or '"personal and advertising Injury'' and It will provide to the City all of die coverage chat Is qp!cally provided under the standard Florida approved forms for commercial general liability coverage A and coverage B": Page61of66 147 77 110170 (4) a policy provision or an endorsement with substantially similar provisions as follows: "This policy shall not be cancelled ~ndudlng c:ancelladon for non-payment of premium). terminated or materially modified without first giving the City of South Mlaml ten (10) days advanced written nodce of the Intent to materially modify the policy or to cancel or terminate the poficy for any reason. The noiificatlon shalll be delivered to the City by cerdfled mal~ with proof of delivery to the City." J. If the FIRM ls providing professional semces, such as would be provided by an ardtitect. engineer, aaomey, or accountant, to name a few, then In such event and In addition to the above requirements. the RRM shall also provide Professional UabHlty Insurance on a Aorlda approved fonn In the amount of $1,000,000 with deductible per claim if any, not to aceed 5% of the llmlt of llabUlty providing for all sums which ¢he ARM shall become lep!Jy obligated to pay as damages for dalms arising out of the services or work perfonnad by die FIRM Its agents. representatives. Sub Contractors or assigns. or by any person employed or retained by him tn c:onnecdoo wtch this Agreement. This Insurance shall be maintained for four years after completion of the constrUcdon and acceptanee of any Project covered by chis Agreement. However, the FIRM may purchan Specific Prolect Professional Liability Insurance. In the amount and under the terms specified above. whldti Is also acceptable. No insurance shall be issued by a surplus Ones carrier unless authorized In wridng by the city at the dty's sole. absolute and unfettered discretion. G. The Finn accepts and voluntarily Incurs an risks of any Injuries. damages, or harm which might arise during the work or event that Is occurring on the CITY's property due to the neallgence or other fault of the Arm or anyone acting through or on behalf of the Arm. H. The Firm shall indemnify, defend, save and hold CITY, Its officers, affillaw, employees, successors and assigns, harmless from any and aD damages, dalms, llablllty, losses, claims. demands. suks. floes. ludgments or cost and mq,enses. Including reasonable attorney's fees, paraJegaJ fees and Investigative costs Incidental there to and incurred prior to, during or following any lltipdon, mediation. arbitration and at all appellate levels, which may be suffered by, or accrued against charged to or recoverable from the City of South Miami, Its officers, affiliates, employees, successors and assigns, by reason of any causes of actions or claim of any kind or nature. including dalms for injury to, or death of any person or persons and for the loss or damage to any property arising out of a negllgent error, omission, misconduct, or any grass negligence, intentional act or harmful conduct of the Firm, Its contractor/subcontraetor or any of their officers, directors, agents, representatives, employees, or assigns. or anyone acting through or on behalf of any of them. arising out of this Agreement. lnddent to It, or resuldng from the performance or non-performance of the Firm's obligations under this AGREEMENT. I. The Ann shall pay all dalms. losses and expenses of any kind or nature whatsoever, In connection therewith, including the expense or loss of the CITY and/or its affected Page4>3 ofM Thomml F. Pepe IOll31JOl6 148 78 111171 officers. afflliales. employees. successors and asstans. lndudlna their aaomey's fees. In the defense of any acdon In law or equity brought aplnst them and arising from che neglgant en-or, omission, or act of the Firm. hs Sub-Contractor or any of chair apnt.s, representadves, employees. or assigns. and/or arising out of. or lnddent to, chis Agreement. or lnddent to or resulting from die perfonnance or non-performance of the Firm's obUgatlons under chis AGREEMENT. J. The Finn agrees and recoplzes chat nelcher the CITY nor Its officers. afflllates. employees. successors and asslp shall be held Uable or responsible for any dalms, lndudl1t1 the costs and expenses of defending such dalms which may result from or arise out of actions or omissions of Iha Firm, Its co,1tractor/subcomractar or any of their agents, representatives, employees. or assigns, or anyone acting through or on behalf of the them, and arising out of or concernJn& lhe work or event lhat Is occurring on the CITY's property. In reviewing. approving or reJecdng any submissions or acts of die Firm, CllY In no way assumes or shares responslblhty or llabll!CJ for the acts or omissions of die • Firm. Its contraaor/subcontractor or any of their agems. represenlatives, employees. or anlps. or anyone acting chrouah or on behalf of them. K. The Finn has die duty to provide a defense with_ an auomey or law flnn approved by the CIIJ of South Miami; which approval wlU not be unreasonably withheld. L However. u to design professional contracts. and pursuant to Secdon 725.08 (I), Florida Scmnes. none of che provisions set fonh herein above that are In confl1ct w11h chis subpar11r3ph shall apply and this subparagraph shall set forth che sole responslblJJty of die design professional concerning Indemnification. Thus. die design professlonars obllpdons as to che City and la qendes, as well as to its officers and employees. Is to Indemnify and hold them hannless from llabUhles. damages. losses, and coses. lncludllll, but not limited to, reasonable auomeys' fees. to die extent caused by the negbgence, recklessness, or lnll!lltlonaJly wrongful conduct of the design professional and ocher persons employed or utilized by the design professional In the performance of the contract. TllomalF.Pepe IO/IIIJOl6 THIS IS INCWDED IN THE GENERAL CONDITIONS END OF SECTION Page64of66 149 79 112172 RESOLUTION NO.: 056-22-15809 A Resolution authorizing the City Manager negotiate and execute a Professional Service Agreement provided under Florida Statute 287.055 Consultant's Competitive Negotiation Act "CCNA", with SRS Engineering, Inc., EXP U.S. Services Inc., Stantec Consulting Services Inc., Calvin, Giordano & Associates, Inc., M&J Engineering P.C., and Kimley-Horn and Associates, Inc., for general engineering services on an as needed basis. WHEREAS, the City Mayor and Commission wish to negotiate and execute for general engineering and architectural services on an as needed basis and on a rotation basis ; and WHEREAS, in accordance with Florida Statute 287 .055, "Consultants Competitive Negotiation Act." (CCNA), the City issued a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services, on a rotational and as needed basis; and WHEREAS, a Selection Committee comprised of City staff, rev iewed the proposals received and is recommending, based on the final scores and ranking, six (6) firms for the Contract Negotiations phase o f the process required by the CCNA; and WHEREAS, it was noted that two Respondents tied in ranking order, EXP U.S. Services Inc., and Stantec Consulting Services Inc., at 2.33; and WHEREAS, due to the number of proposals received (21), the Selection Committee is recommending six (6) Respondents for Contract Negotiations phase of the CCNA process and execution of professional service agreement; and WHEREAS, the Mayor and City Comm iss ion wish to authorize the City Manager to negotiate and execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and providing the City Manager with sole discretion to renew the agreement for one (1) two (2) year renewal. The maximum term of any one contract, if the City Manager decides to renew it, will be five (5) consecutive years. The expenditures related this contract will be charged to the Capital Improvements Program Accounts on an as needed basis. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is hereby authorized to negotiate and execute a non-exclusive multi- year contract with the firms selected for professional surveying , studies, engineering, and architectural services for construction projects in accordance with Section 287.055 , "Consultants Competitive Negotiation Act" on a rotational and as needed basis . The term of each contract will be three (3) years and the City Manager will have an option to renew each contract for one (1) two (2) year term . A copy of Page 1 of 2 113173 Res. No. 056-22-15809 a draft of the contract is attached. The contract may be amended in the event that the City Attorney finds that it is in the best i nterest of the City and that it complies with the CCNA process. The expenditures rela t ed these contracts will be charged to the Capital Improvements Program Accounts. Section 3. Corrections. Conforming language or technical scrivener -type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4: Severability. If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 5: Effective Date: This resolution shall become effective immediately upon adoption. PASSED AND ADOPTED this 3rd day of May, 2022. READ AND APPROV ED AS TO FORM, LANGUAGE, LEGALITY, AND EXECUTION THEREOF ~o z ~ Page 2 of 2 APPROVED: COMMISSION VOTE: Mayor Philips: Commissioner Harris: Commissioner Gil: Commissioner Liebman: Comm i ssioner Corey: 5-0 Yea Yea Yea Yea Yea 174 RESOLUTION NO.: 056-22-15809 A Resolution authorizing the City Manager negotiate and execute a Professional Service Agreement provided under Florida Statute 287.055 Consultant's Competitive Negotiation Act "CCNA", with SRS Engineering, Inc., EXP U.S. Services Inc., Stantec Consulting Services Inc., Calvin, Giordano & Associates, Inc., M&J Engineering P.C., and Kimley-Horn and Associates, Inc., for general engineering services on an as needed basis. WHEREAS, the City Mayor and Commission wish to negotiate and execute for general engineering and architectural services on an as needed basis and on a rotation basis ; and WHEREAS, in accordance with Florida Statute 287 .055, "Consultants Competitive Negotiation Act." (CCNA), the City issued a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services, on a rotational and as needed basis; and WHEREAS, a Selection Committee comprised of City staff, rev iewed the proposals received and is recommending, based on the final scores and ranking, six (6) firms for the Contract Negotiations phase of the process required by the CCNA; and WHEREAS, it was noted that two Respondents tied in ranking order, EXP U.S. Services Inc., and Stantec Consulting Services Inc., at 2.33; and WHEREAS, due to the number of proposals received (21}, the Selection Committee is recommending six (6) Respondents for Contract Negotiations phase of the CCNA process and execution of professional service agreement; and WHEREAS, the Mayor and City Comm ission wish to authorize the City Manager to negotiate and execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and providing the City Manager with sole discretion to renew the agreement for one (1) two (2) year renewal. The maximum term of any one contract, if the City Manager decides to renew it, will be five (5) consecutive years. The expenditures related this contract will be charged to the Capital Improvements Program Accounts on an as needed basis. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is hereby authorized to negotiate and execute a non-exclusive multi- year contract with the firms selected for professional surveying, studies, engineering, and architectural services for construction projects in accordance with Section 287 .055, "Consultants Competitive Negotiation Act" on a rotational and as needed basis . The term of each contract will be three (3) years and the City Manager will have an option to renew each contract for one (1) two (2) year term . A copy of Page 1 of 2 175 Res. No. 056-22-15809 a draft of the contract is attached. The contract may be amended in the event that the City Attorney finds that it is in the best i nterest of the City and that it comp lies with the CCNA process. The expenditures rela t ed these contracts will be charged to the Capital Improvements Program Accounts. Section 3. Corrections. Conforming language or technical scrivener -type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4: Severability . If any section, clause, sentence, or phrase of this resolution is for any reason he ld invalid or unconstitutional by a court of competent jurisdiction , the holding shall not affect the validity of the remaining portions of this resolution. Section 5: Effective Date: This resolution shal l become effective immediately upon adoption. PASSED AND ADOPTED this 3rd day of May, 2022. READ AND APPROV ED AS TO FORM, LANGUAGE, LEGALITY, AND EXECUTION Page 2 of 2 APPROVED: COMMISSION VOTE: Mayor Philips: 5-0 Yea Commissioner Harris: Yea Commissioner Gil: Yea Commissioner Liebman : Yea Commiss i oner Corey: Yea