Loading...
Res No 018-24-16123RESOLUTION NO. 018-24-16123 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING ADDITIONAL ARCHITECTURE AND ENGINEERING SERVICES FOR THE PROPOSED RESTROOM-CONCESSION BUILDING AT SOUTH MIAMI PARK; AUTHORIZING THE CITY MANAGER TO ISSUE A PURCHASE ORDER TO EAC CONSULTING, INC. IN THE AMOUNT OF $43,602.36 FOR SUCH SERVICES; PROVIDING FOR IMPLEMENTATION, CORRECTIONS, AND AN EFFECTIVE DATE. WHEREAS, on June 4•h, 2019, the Mayor and City Commission passed and adopted Resolution No. 71-19-15343, which authorized the City Manager to execute a professional service work order to EAC Consulting, Inc. (the "Consultant") for the completion of construction documents for a proposed restroom-concession facility at South Miami Park in the amoun of $99,519.20; and WHEREAS, on August 16, 2022, the Mayor and City Commission passed and adopted Resolution No. 099-22-15852 authorizing additional services in the amount of$91,971.19 related to project delays and conditions for approval from Miami-Dade Water and Sewer Department's ("W ASD") permitting process; and WHEREAS, the proposal before you, additional services #2, provides additional architecture and engineering services as follows • Surveying, geotechnical services, and engineering design for a proposed 8-inch watennain extem1ion along SW 59th Avenue, as required by W ASD. • Grease interceptors/traps to allow for separation of solids and grease in the concession area, as required by W ASD. • Re-permitting and approval coordination, as required by W ASD. • Updated 3D renderings of building interior (2); add city logo branding on exterior building, and incorporation of Thor Guard Lighting Prediction System. (collectively, the "Additional Services"); and WHEREAS, the City desires to approve the Additional Services as described in the Consultant's proposal attached hereto as Exhibit "A" (the "Proposal") and authorize the City Manager to issue a purchase order to the Consultant to provide the Additional Services in an amount not to exceed $43,602.36 WHEREAS, the cost of the Additional Services will be funded from the American Rescue Plan Act (ARP A) -Account No. 121-2000-572-6550, or such other funding source as detennined by the City Manager to be in the best interest of the City; and Page 1 of2 Res. No. 018-24-16123 WHEREAS, the City Commission find s that this Resolution is in the best interes t and welfare of the City. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. Recitals Adopted. The foregoing recitals are hereby ratified and confirmed as being tme and correct and are hereby made a specific part of this resolution upon adoption hereoC Section 2. Approval of Proposal. The Proposal for Additional Services attached hereto as Exhibit "A" is hereby approved. Section 3. Authorization. The City Manager is hereby authorized to issue a purchase order to EAC Cousulting, Inc. in the amount of $43,602.36 for Additional Services. The City Manager is hereby authoiized to charge th e costs of the Additional Services to American Rescue Plan Act (ARPA) -account number 121-2000-572-6550, or s uch other funding source as determined by the City Manager to be in the best interest of the City. Section 4. Implementation. The City Manager is here by authorized to take any and all necessary action to implement the purposes of this Resolution. Section 5. Corrections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 6. Effective Date. This Resolution shall become effective immediately upon a doption. PASSED AND ADOPTED this 20'11 day of February, 2024. ATTEST: CITY~ R EAD AND APPROVED AS TO FORM, LANGUAGE, LEGALITY AND EXECUTION THEREOF WEISS SEROTA HELFMAN COLE & BIERMAN, P.L. C ITY ATTORNEY APPROVED: M~ COMMISSION VOTE: Mayor Fernandez: Vice Mayor Bonich: Commissioner Ca lle: Commissioner Liebman: Commissioner Co rey: Page 2 of 2 5-0 Yea Yea Yea Yea Yea EXHIBIT A EAC CONSULTING, INC. ADDITIONAL SERVICES PROPOSAL #2 February 13, 2024 Quentin Pough, CPRP Director of Parks and Recreation City of So ut h Miami 5800 SW 66th St reet South M iami, FL 33 143 A, A -.... EAC Consulting, Inc. Re: Professional General Engine ering and Architectural Services Agreement RFQ PW2016-22 So uth Miami Park Restrooms and Concessio n Building Project Amendment No . 2 -Additional Architecture and Engin ee ring Services Dear Mr. Pough: Pursuant t o you r request for addi tiona l professional se rvi ces, EAC i s respectfully submit s our fee proposa l for the re fe renced project. Background: The City has requested the following scope i tems to be includ ed in the project. 1. Upda ted 3D Rend erings of building interior 2. 8-in ch Watermain Extension as shown in Exhibit C 3. Implementation of Thor Lighting Prediction Sys tem 4. Building Sign/Logo 5. Updated j u risdictiona l permitting approvals. Th e services on thi s project will be performed by EAC Consulti ng, In c an d our sub cons ulta nt as follows: 1) Mc Harry Associate s -Complete arc hitecture deve lopmen t discipline; mechanical, building e lectrical, plumbing engi neerin g design servic es and Structural Design Serv i ces. 2) Longi tude Surveying and Mapping -Su rveying & Mappin g, Su bsurface Utility Engineering Scope of Work 1. Project Management & Administration 2. Coo rdin ati on (1) Meeting with City t o verify Inten t and Scope o f Work. 3. Limite d Surveying and Mapping an d Subsurface Utility Enginee ring a. Maximum 5 test holes at $1,000 per test hole. 4. Engineering Design and construction documents for a 8-inch waterma in extension. 5. Implementation of Thor Li ghting Predictio n System 6. Update Co n struction Documents a. Civi l Site b. Architectural c. Architect ural 3D Rend erings I. Two 3D rend erin g of Building Interior d. Specificati ons e. Enginee r 's Opinion of Probable Construction Costs 7. Cond u ct on e meeting w ith City to: a. Receive comments and feedback. 8. Re-Permitting and Ap prova ls for w ith MD-WASD, Fire Department, and Department of Hea lth 9. Implement DERM Com ments t o in co rporate grease trap. 5959 BLUE LAGOON DRIVE· SU I TE 410 • MIAMI, FL 33126 • 305 .265.5400 eacconsult.com Deliverabl es Submittal shall be grouped into three distinct packages as follows: 1. Pre-design Services a. Amended Topographical Survey b . Amended Sub-Surface Engineering Report (Test holes) 2. Draft Construction Documents a. Draft Civi l, Electrica l and Architectural Plans b. Specifications c. EOPCC 3. Fina l Construction Documents a. Final Civil, Electrica l and Architectural Plans b. Fi nal Specifications c. Final EOPCC d. Jurisdictional Approva ls/Permits e. Comment Register Assumptions The aforementioned scope of services assumes that: 1. This is an amendment to ori gina l scope of work. All previous assumptions are appl i cable to this amendment. 2. No Landscaping and/or Irr igation Des ign Services are included as part of this scope of work. Compensation The f ees for professional services was devel oped in accordance with the billing rates established for EAC Consulting and the City of South Miami as described in the Professional Service Agreement. Our fee proposal summary is provided below. A breakdown of our staff hou rs and l ump sum fee proposa l for the project is also provided in "Exhibit A". In addition, our sub consu ltants proposa l for their services is provided i n "Exhibit B". Item Descri pti on Unit Fees 1 Proj ect Managem ent LS $4,0 75.60 2 Engineering Services LS $34,526.76 EAC LS $16,439.36 Mc Harry Associates LS $10,087.40 Longitude Surveying and Mapping (Mapping) LS $3,000.00 Longitude Su rveying and Mappi ng (Test Ho l es) NTE $S,000.00 3 Re imbursables Expenses LS $5,000.00 Total $43,602.36 This proposa l is based on our understanding of the requirements for design services as itemized under the anticipated tasks listed above. Accordingly, we reserve the right to modify this proposal due to any changes in scope. If the above fee proposal and the t erms above are acceptable to you, p lease provide us with a work au thorization so we may begin wor k. The following informati on will be required for us to commence the work . 1. Signed approval of this proposal, a work/purchase order and/or written authorization to proceed with services. We look forward to our continued services to the City of South Miami. EXHIBIT "A" -FEE PROPOSAL BREAKDOWN City of South Miami Professional General Engineering and Architectural Services Agreement PW2016-22 South Miami Park Restrooms• Amendment 2 Fee Tabulation by Task and Staff Hours EAC Consulting, Inc. Task Di,~JpUon Prfndp&I Pfoltct Senior Dalgner CAD Constiuctlon (Cerlcal Total Hours Fee Manictr Eflcfneer Ttchntdan rnipector -. -----· $2ts.s2·_-.:$203,78 $128,03 ' $101;36_. • $90.69 I • ·$107,76 ' .$SUS~. 1 ProJed Management (Overall) 20 20 $4,075.60 _To~•• l{o~~ 0 20 0 0 0 0 0 20 $4,075,69 --·---• ---. tfoiirs orsi,ib,IW.PJ! . °" loo,4 .O?f ~-~ 91'. J>"L !CJ91'_ -p,---.- 2 Project Management (EACavll Scope) 4 4 $815.12 3 Update 100"-' Design Plans (Draft) 2 6 24 32 $3,040.78 4 Update 100"-' EOPCC (Draft) 2 6 8 $864.22 5 Update 1~ Spedficatlons (Draft) 2 2 $256.06 6 Revfev, Meeting (lncludlng meeting pre and 2 6 16 24 $2,797.50 action Items) 7 Permitting (MD•WASD) 2 6 24 32 $3,040.78 8 Permitting (MD·DERM) 0 0 0 0 $0.00 9 Permitting (MD-Water Control) 0 0 0 0 $0.00 10 Permitting (MD-FOOH) 2 2 24 28 $2,635.34 11 BIO Plans 0 2 0 4 24 30 $2,989.56 12 BIO Specification 0 0 0 $0.00 13 BIO Other Documents 0 0 0 0 $0.00 TotalHoui, 0 8 16 40 96 0 0 160 $16,439.36 ·-_tjou~_!~trt~uttCJn .9." St' 1°" ~-60~ 0~ -~ 100,C_ EAC Subtotal $20514.96 Architectural, Bulldlm1 Mechanical, Elecltlcal and PlumblnA Services-MC Harrv Associates, Inc $10,087A0 SuM!Vlng & Mapplng-lonaltude Survevfn& and Maoolna. LLC $3,000.00 Subsurface Utllltv Englneerlno IS test holes) lonaltude Surveyf ng and Maaalng, llC $5,000.00 Refmbursables • EAC $5,000.00 J/U/10Z4 $43,602.36 EXHIBIT "B" -SUBCONSULTANT FEE PROPOSAL December 12, 2023 Evelyn Rodriguez, P .E ., ENV SP Project Manager EAC Co nsu lting, In c. 5959 Blue Lagoon Drive, Su ite 410 Miami, FL 33126 ~ HARRY SS C A S Re: South Miami Restroom and Concession Building - Additional Services Fee for Grease Trap Addition per DERM Th is i s our proposal to provide additional se rv ices for the City So uth Miami Restroom and Concess ion Project 1. Implement grease t r ap pe r DERM comment. (Orgina ll y not in scope ) 2. Coordina tion by Arch itect of al l trades. Note: DERM official recommended the implementation of grease trap in case se r vices of build ing become more than on ly warming up concess ions. Below is our estimate of man hours in support of our LUMP SUM FEE presented below: - Rate MCHA BNI Hours Fee Hours Fee Pr incipal $ 181.46 0 $ -0 $ - Project Manager $ 171.58 2 $ 343.16 0 $ - Sen ior Engineer $ 148.22 1 $ 148.22 0 $ - CADD Technician $ 76.36 0 $ -0 $ - $ 491.38 $ - Total Additional Fee Reques t ed This proposal Is va lid for 90 days. Please f ell free t o contact me if you have any questions. Project M anager MC Harry Assoc iates Inc. 2780 Douglas Road 11302 Miami, FL 33133 305 -445 -3765 - RDZ Hours Fee 0 $ - 4 $ 686.32 5 $ 741.10 5 $ 38 1.80 $ 1,809.22 $ 2,300.60 February 9, 2024 Eduardo Garces, P.E., ENV SP Assistant Project Manager EAC Consulting, Inc. 5959 Blue Lagoon Drive, Suite 410 Miami, FL 33126 HARRY SSO Re: Sou t h Miami Rest r oom and Concessi on Buil ding - AS Render, Color Study, Lightning System Coordination & City Logo Sign This is our proposal to provide additional services for the City South Miami Restroom and Concession Project 1. Deve lop 3D model to include interior scope 2. Create renderings that accurately display architectural intent 3. Create renderings of ma le restroom and general ADA stall 3. Coordinate design with necesa rry discplines w ith addition of Thor Lightn ing Prediction System 4. Conduct (1) additional meeting with City about finishes of bathroom & exterior of project 5. Coordinate design with necessary disciplines with addition of City Logo sign on building facade Rate MCHA RDZ Hours Fee Hours Fee Hours Principal $ 181.46 2 $ 362.92 0 $ -0 Project Manager $ 171.58 10 $ 1,715.80 2 $ 343.16 2 Engineer $ 148.22 0 $ -2 $ 296.44 2 CADD Technician $ 76.36 so $ 3,818.00 4 $ 305.44 4 62 $ 5,896.72 8 $ 945 .04 8 Total Additiona l Fee Requested This proposal is 1 valid for 90 days. Please fell fre e to contact m e if you have any questions. // ~-1/ - Jalin~arri 6 n Assista ro Manager MC rry Associates Inc. 2780 Douglas Road t/302 Miami, FL 33133 305-445-3765 BNI Fee $ - $ 343.16 $ 296.44 $ 305.44 $ 945.04 $ 7,786 .80 LONGITUDE SURVEYORS------------- Wednesday, February 07, 2024 Mr. Eli as Gu e va ra, P.E. Engineer II eg uevera@eacco ns ult.com E ~ ,-' 1 1!.AC Consultlng , Inc, .--..-••cco,1.M.11.com 5100 Northwest 33 Avenue, Suite 243 Fort Lauderdale, FL 33309 954,714.2023 RE : (Longitude Project No. 19211.0.03) Survey ing, Mappin g, and Subsurface Ut ility Engineering (SUE) services for th e roadway of Cha rl es Ave nue loca ted in Miami, FL 33133 . Dear Mr. Guevara, P ursuant to your request regardin g a fee estim ate for Surveying, Mapping, a nd Subs urface Utility Engineer ing (SUE) services for the above-refere n ced proj ect, LONGIT UDE SURVEYORS, LLC (LS) is pl eased to s ubmit the foll owing proposal for your consideration. A. SCOPE OF WORK: ► TASK 1 -Additional Survey: ► LS will show ri ghts-of-way computing field evidence, plats, d eeds, and othe r documentation r elative to the project. Lot lines a nd owne rship lin es, inclusive of locations, b earings , and dime ns ions, within th e s urvey limits will be s h own graphically. ► LS wi ll s h ow a ny easemen ts, coven a nts , r es tricti ons, etc. tha t can b e fo und on plats, d eeds, and other public r ecord s relative to the project. However, without a Title Co mmitment or Title Sear ch there is no gu ara ntee that easements, coven a nts, res trictions, e tc. will be shown on the smvey. ► LS will establish hor izontal and vertical control w ithin the limits of the s mvey. ► The smvey will b e geo-referenced to the Florid a State Plane Coor dinate System based on the North Am e ri can Datum o f 1983/2011 (NAD83/11). ► El evations will b e refere nce d to t h e Na t ional Geodetic Vert ical Datum of 1929 (NGVD29). ► LS will coll ect s ignificant aboveground improvements including but not limited to; e d ge of pavem en t lines, pavement, sidewalks, fence s and gates, utility poles, utilities, valves, signs , and a n y other significan t above- ground improvem ents and utilities within the smvey limits . ► Elevat ions will be co ll ected equival e nt to a twen ty -five (25 ) foot g rid t hro u gho u t th e s urvey limits. Additional elevations will b e collected s uffi cient to identify gr ade ch an ges and fe atures of interest within th e s urvey limits. ► Task 2 -Subsurface Utility Engineel'ing (SUE) Quality Level "Il" Desig nating: ► LS will perform Quality Level "B" SUE Des ign ation servi ces accordin g to the American Soci ety of Civil Engin eers ' (AS CE) standards within the s urvey limits, to d etermine if t h e re a re any underground utility con fli ct s. ► LS will use s urface d etection equipment s uch as Elec t romagne tic Locator a n d Grou nd Pen etratin g Radar (GPR). ► Pl ease n ote factors s u ch as soil composi tion, mo istme, a nd t h e type and d epth of utility controls the effectiven ess of the GPR. Satm ated soils severely limit the effe ctiveness of the GPR s ign al. In addition, co n fined or obs tructed areas that res trict the scanning pa tte rn can impede the data coll ected and red uce the accuracy of the des ired results. Desig n a t e d utility lin es wi ll be coll ected and sh own on om delive rable. Any d es ign ate d utility lin es provided will be within 1:\-vo (2) feet horizo ntally of either s id e of the d epicted lin e . ► LS will collect a ny utili ty lin es found. LS will s how any coll ected lines on om CA D fil e d eliverabl e. ► Task 3 (Optional) -Subsurface Utility E ngineering (SUE) Quality Level "A" Soft-Digs: ► LS will perfo rm s ubs urface explora tion a t one (1) Soft-Dig/Verified Vertic al Elevatio n a nd Horizontal Location (VVH). ► LS will mark one (1) Soft-Dig locati ons wi th white paint (whitelin e) for the utilities. ► LS will coordina t e dig ticke t(s) with Sunshine 8 11 as n eed ed. ► LS will provide Quality Level "A" SUE Soft-Dig servi ces at one (1) location, which inclu des the horizontal pos ition and elevation of the top of ut ili ty. LS will attemp t to provide bottom of utility, s ize, type o f material and direction . LON G ITUD E SURV EYORS 7700 North Ke ndall Driv e , Su it e 705 ·Miami.FL 33 156 . Ph : 305 .463 .09 12 LONGITUDE SURVEYORS-------------- ► LS will locate the Soft-Dig horizontal positions referenced to the Horizontal Datum 1983/2011 and ground elevations refere nced to the National Geodetic Vertical Datum of 1929 (NGVD29). ► LS will prepare the Verifi ed Vertical Elevation and Horizo ntal Location (VVH) report for each Soft-Dig . .!h SURVEY LIMITS: Approximately one hundred (100) feet to the North of the corner of Southwest 44 Terrace and Southwest 59 Avenue, extending the full width of the public right-of-way, as per the attached Exhibit. C. DELIVERABLES: Designated utilities will be delineated on the ground us ing spray paint and a color-coordinated system. LS will provide a digitally signed and sealed PDF and a CAD of the resulting survey. Signed and sealed hardcopies can be provided upon request. D. COST: The total professional fee to complete Task 1 and 2 d escribed h erein shall b e a lump sum of $3,000.00. The total professional fee to complete the Optional Task 3 described herein shall be a lump sum of $1,000.00 per hole LS has estimated twelve (12) bus iness days from the date of Notice to Proceed (NTP) to complete these tasks. Notice to Proceed (NTP) is considered effective twenl:y-four (24) hours after this proposal agreement has been executed and returned to the undersigned. I agree that by s igning below "I APPROVE AND ACCEPT" this proposal as a legal binding contract. By: Date: (Authorized Signature) Title: -------------------(Typed or printed n ame) On behalf of the firm , I thank you for the opportunity to present this proposal. We lo ok forward to utilizi n g our best professional efforts on your b ehalf on this very importa nt project. Respectfully Yours, c:: ~~ LON G ITUDE SURVEY ORS 7700 No rt h Ken dall Drive , Suite 705 ·Mia mi.FL 33 15 6 . Ph: 305 .4 63.091 2 EXHIBIT "C" -WATER MAIN EXTENSION ·r ~I! -;, ; ~ - I. J I j ,~,~~,~~ SOUTH MIAMI PARK : I I • I -I lrST.4" I I I PROP.S-WM NEW EXTENSION i, -·••f1 Ii 11 I ' I ' I \I I I :1 C I I, I I I I 1. " I \i j\ IJ 'I I "I -~, I -·--··-. .s I I :----i PROP.S-WM _ ..... --------·- 7 I .... i ··········,······ I~ h I • w 0 t ~ i I ,j 0 . ._. PROP.S-WM I I I I I I j ~ t EXIST.12" _ r l WM -;ksf.l:- -~e,m=-,:'?1CII,,,, I '~ -"' --® • • ~Colin _ _.......__ ... ..---, =..:::..-=---=.:::= ~@enu CITYCF SOOT>< MIAMI PAA:KS & RECREATION CEl'AR'TMEHT ..... .,. -,.,rw ....... f\»tQ --- E ~,-----------,.,&LC'~Ma,rf#tf :::.::: -=--------- SOUTH MIAMI PARK RESTROOMS & CONCESSIONS 4.30C1 SW 55TH AVEMJE MIAMl. f'L331Q ~-,oi_~_ °"rtl_i,.- 1-:::..,,:'c,t1 I WATER MAIN EXHIBIT NXT_o,_!!_ t~o..o.«TTAL Agenda Item No:3. City Commission Agenda Item Report Meeting Date: February 20, 2024 Submitted by: Quentin Pough Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING ADDITIONAL ARCHITECTURE AND ENGINEERING SERVICES FOR THE PROPOSED RESTROOM-CONCESSION BUILDING AT SOUTH MIAMI PARK; AUTHORIZING THE CITY MANAGER TO ISSUE A PURCHASE ORDER TO EAC CONSULTING, INC. IN THE AMOUNT OF $43,602.36 FOR SUCH SERVICES; PROVIDING FOR IMPLEMENTATION, CORRECTIONS, AND AN EFFECTIVE DATE. 3/5 (CITY MANAGER-PARKS & RECREATION DEPT.) Suggested Action: Attachments: Memo-EAC_Consulting-Additional_Services__2.docx 4879248-Resolution - EAC Consulting Additional Services v1.DOCX Exhibit A-EAC Consulting, Inc.-Additional Services Proposa.pdf Reso 71-19-15343 EAC for SMP.pdf Reso 099-22-15852 EAC for SMP.pdf 1 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor, Vice Mayor, and Members of the City Commission FROM: Genaro “Chip” Iglesias, City Manager DATE: February 20, 2024 SUBJECT: Additional services for architecture and engineering services related to the combo restroom-concession building at South Miam Park SUBJECT:Authorize the City Manager to issue a purchase order to EAC Consulting, Inc. for additional architecture and engineering services related to the proposed combo restroom-concession building at South Miam Park in the amount of $43,602.36. BACKGROUND:On Tuesday, June 4th, 2019, the Mayor and City Commission passed and adopted Resolution No. 71-19-15343, which authorized the City Manager to execute a professional service work order to EAC Consulting, Inc. for the completion of construction documents for a proposed restroom- concession facility at South Miami Park. The contract amount approved was $99,519.20. The initial proposal assumed that Miami-Dade County Water and Sewer Department (“M-DWASD”)would complete the new 3- inch Low Pressure Forcemain (“sewer easement”) sometime in 2021 or, at the latest, in 2022.The low-pressureforce main was installed August 2023. On Tuesday, August 16, 2023, the Mayor and City Commission passed and adopted Resolution No. 099-22-15852, which entailed additional services related to project delays and conditions for approval from M-DWASD’s permitting process. The total contract amount was $91,971.19. Said conditions were as follows: Update construction documents and calculations to the latest FBC 2020 (7th edition) from 2017 (6th edition). Surveying and geotechnical services for a new 8-inch watermain extension SW 45th Street and along SW 58th Avenue. Engineering design and construction documents for the 8-inch watermain extension along SW 45th Street and along SW 58th Avenue per M-DWASD Point of Connection letter. 2 SoutOOiami THE CITY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM Electrical Engineering Services for a new lift pump station (E-One) as required by M-DWASD. The proposal before you, additional services #2, includes further architecture and engineering services as follows: Surveying, geotechnical services, and engineering design for a proposed 8-inch watermain extension along SW 59th Avenue, as required by M-DWASD. Grease interceptors/traps to allow for separation of solids and grease in the concession area, as required per M-DWASD. Re-permitting and approval coordination, as required per M- DWASD. Updated 3D renderings of building interior (2); add city logo branding on exterior building, and incorporation of Thor Guard Lighting Prediction System. Miami-Dade Water and Sewer Department has agreed to approve the E- One pump system, therefore, no further exploration for a new pump system is required by the City’s Consultant, EAC Consulting, Inc. The estimated timeframe to complete the revised contract plans and re- submit for permitting is six (6) to eight (8) weeks from the issuance of a purchase order to the consultant. VENDOR:EAC Consulting, Inc. EXPENSE AMOUNT:$43,602.36 FUND ACCOUNT:The proposal/contract amount shall not exceed $43,602.36 American Rescue Plan Act (ARPA) – account number 121-2000-572-6550. ATTACHMENT(S):Resolution Exhibit A –EAC Consulting, Inc. Proposal – Additional Services #2 Resolution #71-19-15343 Resolution #099-22-15852 3 THE CITY OF PLEASANT LIVING 19 RESOLUTION NO.: 71-19-15343 A Resolution authorizing the City Manager to execute a professional service work order to EAC Consulting, Inc. for the completion of construction documents for a proposed restroom-concession facility at South Miami Park. WHEREAS, pursuant to the Professional Services Agreement provided by the city for professiona l ge neral engineering and architectural services (RFQ #PW2016-22), city staff desires to engage EAC Consulting, Inc. to provide construction documents for a new restroom-concession facility at South Miami Park; and WHEREAS, as the next firm listed in the City's rotation, EAC Consulting, Inc. has submitted a competitive proposal to provide contract documents for the construction of a new restroom - concessio n facility located on the east side of the existing multipurpose field at South Miami Park. All improvements within this project shall be in accordance with the American with Disabilities Act {ADA); and WH EREAS, in summary, the scope of work entails pre-design services; geotechnical and survey se rvic es; project management and permit coordination with Miami-Dade Water and Sewer fo r wate r ma in extension and agreement, specs and bid package preparation, final signed and sealed co nstruction documents, anticipated/preliminary construction costs, as well as po st assistance with pre -bid conference{s) and construction administration services; and WHEREAS, the total expenditure shall not exceed $99,519.20 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Secti on 1: The City Manager is authorized to execute a professional service work order to EAC Cons ult in g, Inc. for the completion of construction documents for a proposed restroom- concessio n fa ci lity at South Miami Park for an amount not to exceed $99,519.20. The total expenditure shall be charged to account number 301-2000-572 -6450, which has a balance of $519,781 before this request was made. Secti on 2: If any section clause, sentence, or phrase of this resolution is for any reason held invalid or uncon st itutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Sect ion 3: This resolution shall become effective immediately upon adoption. PASSE D AND ADOPTED this 4th day of June. 2019. Page 1 of2 20 Resolution No. 7 1 -1 9-15343 ATTEST: CITYCLE Page 2 of 2 APPROVED: COMMISS ION VOTE: Mayor Stoddard : Vic e Mayor Harris : Commissioner Gil: Commissioner Liebman: Commissioner Welsh: 5-0 Yea Yea Yea Yea Yea 21 RESOLUTION NO. 099 -22 -15852 A Resolution authorizing the City Manager to execute amendment #1 for additional design services from EAC Consulting, Inc. for the completion of construction documents related to a new restroom-concession combo facility at South Miami Park. WHEREAS, on Tuesday , June 4111 , 2019, the Mayor and City Commission passed and adopted Resolution No. 71-19-15343, which auth orized the City Manager to execute a professional service work order to EAC Consult in g, In c. for the complet ion of construction documents for a proposed restroom-concession facility at South Miami Park . The contract amount approved was $99,519.20. The i niti al proposal assumed that Miami-Dade County Water and Sewer Department ("M-DWASD ") wou ld complete the new 3-inch Low Pressure Forcemain sometime in 2021 or, at the latest, in 2022; and WHEREAS, on Tuesday, February 2, 2021, the Mayor and City Commission passed and enacted Ordinance No. 02-21-2392 , grantin g a sewer easement to M-DWASD as set forth in the attached Se wer Easement Agreeme n t; and WHEREAS, overall progress towards the installation of the sewer easement has been slow; and WHEREAS, furthermore, project delays have resu lted from the pandemic, M-DWAS A's inability to prioritize the city's project and to pro vide the City and its consultant with relevant forcemain information in a timely manner, sewer easement contract negotiation and execution, and permit coordination with M-DWASA; and WHEREAS, according to recent discussions between staff and M-DWASD regarding the sewer easement status, M-DWASD is planning to complete design updates and perm itting by the end of 2022 and construction will beg in w inter 2023 to be completed in 120 working days from comm encement; and WHEREAS, EAC Con su ltin g, Inc. has subm itted an amendment proposal due to project delays and recent conditions for approval from M -DWASD permitting process; and WHEREAS, ame ndm ent #1 total amount shall not to exc eed $91,971.19. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recit als are hereby ratified and confirmed as being true and correct and are hereby made a specific part of this resolution upon adoption hereof. P,1gc 1 of 2 22 Res. No. 099-22-15852 Section 2. The City Manager is hereby a uthorized t o e xecute amendment #1 for additional design services from EAC Consulting, Inc. for the completion of construction docum ents related to a new restroom-concession combo facility at South Miami Park in the amount of $91,971.19. The total expenditure shall be charged to the Parks and Recreation Capital Improvement account number 301-2000 -572-6450, which has a balance of $564,810 before this request was made. Section 3. Corrections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4. Severability. If any section clause, sentence , or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding will not affect the validity of the remaining portions of this resolution . Section 5. Effective Date. This resolution will become effective immediately upon adoption. PASSED AND ADOPTED this 16 th day of Augu st , 2022 . ATTEST: APPROVED: t /' ' - CITY CLERK ~ READ AND APPROVED AS TO FORM , COMMISSION VOTE: 5-0 LANGUAGE , LEGALITY, AND Mayo r Philips: Yea EXECUTION THEREO~r Commissioner Harris: Yea -7 ~~ i Commissioner Gil: Yea J ]1 ;(l~fl?r Commissioner Liebman: Yea Commissioner Corey: Yea or? ATTORNEY " Pag e 2 o f2