Res No 145-23-16078RESOLUTION NO. 14S-23-16078 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICE WORK ORDER TO SRS ENGINEERING, INC., FOR THE DESIGN REVISIONS, BIDS AND POST DESIGN SERVICES TO INCORPORATE NEW LANDSCAPE AROUND THE PROPOSED PUMP STATION AND DESIGN EIGHT (8) NEW LATERALS AS REQUIRED DURING THE PERMITTING REVIEW BY MIAMI-DADE WATER AND SEWER DEPARTMENT FOR PHASE 1 OF THE SANITARY SEWER IMPROVEMENTS FOR THE AREA KNOWN AS SUBAREA "K" IN AN AMOUNT NOT TO EXCEED $13,901. WHEREAS, the Mayor and City Commission wish to revised the drawings to incorporate new landscape around the proposed pump station and design sewer laterals to eight (8) new additional properties as required during the pennitting review by Miami-Dade Water and Sewer Department (W ASD) along the alignment of the new sewer main along the west side of SW 62nd Avenue to phase l project of Sub-Area K; and WHEREAS, Since June 29, 2023, the City and the Florida Department of Environmental Protection have been wol'king to execute Grant Agreement LP A0683 with funding in the amount of$1,800,000 to be available for this project through a cost reimbursement grant to the City; and WHEREAS, SRS Engineering, Inc., is one of six firms selected by Resolution No. 056- 22-15809, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287 .055, "Consultants Competitive Negotiation Act; and WHEREAS, SRS Engineering Inc., submitted a proposal for professional engineering services; and WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and WHEREAS, the amount of$13,901.00 was found to be comprehensive and cost effective in its design approach: and Page 1 ofl Res. No. 145-23-16078 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to execute a professional seivice work order with SRS Engineering, Inc., for the professional engineering seivices to provide design revisions to incorporate new landscape and design sewer laterals to eight (8) new additional properties as required by Miami-Dade Water and Sewer Department (WASD) along the alignment of the new sewer main along the west side of SW 62nd Avenue. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AS FOLLOWS: Section 1. Recitals. The above-stated recitals are true and correct and are incorporated herein by this reference. Section 2. Approval of Pa•ofessional Service Work Order. The City Manager is hereby authorized to execute a professional seivice work order for SRS Engineering, Inc., to provide design revisions, bids and post design seivices to incorporate new landscape and design sewer laterals to eight (8) new additional properties as required by Miami-Dade Water and Sewer Department (W ASD) along the alignment of the new sewer main along the west side of SW 62nd Avenue located within Sub-Area K for an amount not to exceed $13,901.00. The expenditure shall be charged $8,400.00 to the American Rescue Plan Act (ARP A) Fund account number 121-1730- 541-3 l 00 and $5,501.00 to the Capital hnpmvement Program Fund account number 301-1790- 519-6450 which has a balance of $2, I 09,688.38 p1ior to this request. Section 3. Implementation. That the City Commission hereby authorizes the City Manager to execute a professional service work order with SRS Engineering Inc. Pnge2 of3 Res. No. 145-23-16078 Section 4. Col'l'ections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any confonning amendments to be incorporated into the final resolution for signature. Section 5. Severability. 1f any section c lause , sentence, or phrase of this Resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this Resolution. Section 6. Effective Date. This Resolution shall become effective inunediately upon adoption. PASSED AND ADOPTED this~ day of November, 2023. ATTEST: READ AND APPROVED AS TO FORM, LANGUAGE, LEGALITY AND EXECUTION THEREOF #- WEISS SEROT A HELFMAN COLE & BIERMAN, P.L. CITY ATTORNEY APPROVED: COMMISSION VOTE: Mayor Fernandez: Vice Mayor Bonich: Commissioner Calle: Commissioner Liebman: Commissioner Corey: Page 3 of3 5-0 Yea Yea Yea Yea Yea Agenda Item No:4. City Commission Agenda Item Report Meeting Date: November 7, 2023 Submitted by: Aurelio Carmenates Submitting Department: Public Works & Engineering Item Type: Resolution Agenda Section: Subject: A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICE WORK ORDER TO SRS ENGINEERING, INC., FOR THE DESIGN REVISIONS, BIDS AND POST DESIGN SERVICES TO INCORPORATE NEW LANDSCAPE AROUND THE PROPOSED PUMP STATION AND DESIGN EIGHT (8) NEW LATERALS AS REQUIRED DURING THE PERMITTING REVIEW BY MIAMI-DADE WATER AND SEWER DEPARTMENT FOR PHASE 1 OF THE SANITARY SEWER IMPROVEMENTS FOR THE AREA KNOWN AS SUBAREA “K” IN AN AMOUNT NOT TO EXCEED $13,901. 3/5 (CITY MANAGER-PUBLIC WORKS & ENGINEERING DEPT.) Suggested Action: Attachments: Memo-Adtl_Scope-Ph.1_of_Sub-areaK-10-20-23F (1).docx Reso_Addtl_Scole_Ph.I_sub_K-10-20-23F.docx Res No 082-23-16015.pdf Res No 056-22-15809.pdf SUBARE~1.PDF 47L5891-Project Work Order - Additional Services to SRS Sewer Subarea K CAv1.DOCX 1 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor, Vice Mayor, and Members of the City Commission FROM:Genaro “Chip” Iglesias,City Manager DATE:Tuesday, November 7, 2023 SUBJECT:Sanitary Sewer Improvements for Phase 1 to Sub-Area K Design Revisions, bid and post design services for new Landscape and addition of eight (8) new laterals RECOMMENDATION:Approve the proposal and project work/purchase order with SRS Engineering, Inc. to provide design revisions, bid,and post-design services to incorporate new landscape around the proposed pump station and design sewer laterals to eight (8) new additional properties as required by Miami-Dade Water and Sewer Department (WASD) along the alignment of the new sewer main along the west side of SW 62nd Avenue. BACKGROUND:On July 18, 2023, the City Mayor and Commission adopted, Resolution 082- 23-16015 authorizing the City Manager to enter into an agreement with SRS Engineering to provide design revisions to their original drawings, permitting,construction inspection,and management services to provide a new Sanitary Sewer System to the proposed phase I, of the previously designed and permitted Sanitary Sewer Improvements for the area known as Sub-Area K. The Phase I portion to be constructed will include services to provide a new Sanitary Sewer System to the proposed Community Building, a new pump station, force main, and gravity sewer mains and laterals along SW 85th Street, SW 60th Avenue, and SW 87th Street as shown on Exhibit “A”. During the design review, WASD requested the design to include new sewer laterals to eight (8) additional properties along the west side of SW 2 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM 62nd Avenue along the alignment of the new sewer mains. Additionally, residents adjacent to the proposed pump station requested a new landscape to serve as a screen to the proposed pump station. SRS Engineering Inc. was requested to provide a cost proposal for the new landscape and design new sewer laterals to eight (8) additional properties. SRS Engineering Inc. is one of six firms selected by Resolution No. 056-22- 15809, to provide professional service agreementsfor engineering services on an as-needed basis in accordance with Florida Statute 287.055, Consultants Competitive Negotiation Act. Staff recommends that the proposal from SRS Engineering Inc., dated October 18, 2023, be approved. VENDOR &EXPENSE:SRS Engineering, Inc. Proposal/contract amount not to exceed $13,901.00. FUND &ACCOUNT:Amount not to exceed $ 13,901.00. Please refer to the consultant contract and fee schedule. The expenditure shall be charged $8,400.00 to the American Rescue Plan Act (ARPA) Fund account number 121-1730-541- 3100 and $5,501.00 to the Capital Improvement Program Fund account number 301-1790-519-6450 which has a balance of $2,109,688.38 prior to this request. ATTACHMENTS:Resolution Resolution 082-23-16015 Resolution 056-22-15809 Proposal – SRS Engineering Inc., dated 10/18/2023 3 7 RESOLUTION NO. 082-23-16015 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND PROJECT/WORK ORDER WITH SRS ENGINEERING, INC. TO PROVIDE ENGINEERING AND DESIGN SERVICES FOR PHASE I OF THE SANITARY SEWER IMPROVEMENTS FOR THE AREA KNOWN AS SUBAREA "K"; PROVIDING FOR AUTHORIZATION, IMPLEMENTATION , CORRECTIONS, SEVERABILITY, AND AN EFFECTIVE DATE. WHEREAS on November 7 2016, the City of South Miami (the '•City ") completed a Citywide Sanitary Sewer Master Plan that identified 11 sub-areas that are not served by the Miami- Dade Water and Sewer Department public sewer system as Sub-Areas A-K· and WHEREAS, to date a new sanitary sewer system ha been designed only for Sub-Area K, which consists of 205 residential home and Dante Fascell Park (the "Project); and WHEREAS, the City Commission has identified a portion of th e Project, known as Phase 1, which consists of a new sanitary sewer system (including a new pump station, force main , and gravity sewer mains and laterals along SW 85th Street, SW 60th Avenue, and SW 87th Street) to serve the proposed Dante Fascell Park community building and provide connections to forty three (43) residential properties, while allowing for future connections to the remaining one hundred and sixty two (162) properties located within Sub-Area K, and wishes to proceed with the sewer system improvements ( 'Phase I"); and WHEREAS, on February 7, 2023, the City Commission authorized the City Manager to request State Appropriations for Phase I of the Project in the amount of$1 ,800 000; and WHEREAS, on June 15, 2023 , the finn of Becker & Poliakoff indicated that Governor Ron DeSanti approved the funding in the State s final budget for the Project; and Page 1 of 4 8 Res. No. 082-23-16015 WHEREAS, on June 29, 2023, the Florida Department of Environmental Protection ("FDEP") provided documents for the City to draft an agreement for funding to be available through a cost reimbursement grant; and WHEREAS, in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act ("CCNA")", SRS Engineering, Inc. (the "Consultant") is one of various firms selected by the City Commission pursuant to RFQ No. PW2022-03, and approved in Resolution No. 056-22-15809 (the "CCNA Rotation"), to provide professional engineering services, as needed, and resulting in the City entering into a continuing Professional Services Agreement with Consultant dated May 3, 2022 for such services; and WHEREAS, the Consultant, as the next firm in the City's CCNA Rotation, was requested to provide a proposal to provide professional engineering and design services (the "Services") for Phase I of the Project; an WHEREAS, a proposal was received from the Consultant for the Services in the amount of $95,233.50 attached hereto as Exhibit "A" (the "Proposal"); and WHEREAS, City Staff negotiated the scope of services, staff allocation, and man-hours with the Consultant and found the Proposal was comprehensive and cost effective in its design approach; and WHEREAS, the City Commission desires to approve the Consultant's Proposal attached hereto as Exhibit "A" and authorize the City Manager to issue and execute a Project Work/Purchase Order with the Consultant for the Services, in substantially the form attached hereto as Exhibit "B," subject to the City Attorney's review as to form, content, and legal sufficiency, for a total amount not to exceed $95,233.50; and WHEREAS, the City Commission finds that this Resolution is in the best interest and welfare of the City. Page 2 of 4 9 Res. No. 082-23-16015 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AS FOLLOWS: Section 1. Recitals. The above-stated recitals are true and correct and are incorporated herein by this reference. Section 2. Approval and Authorization. The City Commission hereby approves the Consultant's Proposal attached hereto as Exhibit "A" and authorizes the City Manager to issue and execute a Project Work/Purchase Order with the Consultant for the Services, in substantially the form attached hereto as Exhibit "B," subject to the City Attorney's review as to form, content, and legal sufficiency, for a total amount not to exceed $95,233.50. The expenditure shall be charged to the Capital Improvement Program Fund number 301-1790-519-6450 which has a balance of $995,040 before this authorization. Section 3. Implementation. The City Manager is authorized to take any and all actions necessary to implement the purposes of this Resolution. Section 4. Corrections. Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 5. Severability. If any section clause, sentence, or phrase of this Resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this Resolution. Section 6. adoption. Effective Date. This Resolution shall become effective immediately upon PASSED AND ADOPTED this 18 th day of July. 2023. Page3 of4 10 Res. No. 082-23 -16015 ATTEST: READ AND AP PRO VED AS TO FORM LANGUAGE, LEGALITY AND EXoz:_ WEISS SER OT A HELFMAN COLE & BIERMAN, P.L. CITY ATTORNEY APP RO VED: ~- MAYOR COMM IS SION VOTE: Mayor Fernandez: Vice Mayor Bonich: Com mi ssioner Calle : Commiss ioner Liebman: Co mmissioner Corey: Page 4of4 5-0 Yea Yea Yea Yea Yea Agenda Item No:3. City Commission Agenda Item Report Meeting Date: July 18, 2023 Submitted by: Aurelio Carmenates Submitting Department: Public Works & Engineering Item Type: Resolution Agenda Section: Subject: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, APPROVING THE PROPOSAL AND PROJECT/WORK ORDER WITH SRS ENGINEERING, INC. TO PROVIDE ENGINEERING AND DESIGN SERVICES FOR PHASE I OF THE SANITARY SEWER IMPROVEMENTS FOR THE AREA KNOWN AS SUBAREA “K”; PROVIDING FOR AUTHORIZATION, IMPLEMENTATION, CORRECTIONS, SEVERABILITY, AND AN EFFECTIVE DATE. 3/5 (CITY MANAGER-PUBLIC WORKS & ENGINEERING DEPT.) Suggested Action: Attachments: Memo-San_Swr_Sub-Ph.1_of_Sub-areaK-7-10-23.docx 46V4703-Resolution Approving Phase I Sanitary Sewer Improvements - SRS Engineering - CAv2.docx Res No 056-22-15809.pdf 4680437-Project Work Purchase Order - SRS Engineering Sanitary Sewer SubArea K TAv2.pdf South Miami Sanitary Sewer Improvements Subarea K-Phase I 7-10-23.con.pdf 111 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor, Vice Mayor, and Members of the City Commission FROM:Genaro “Chip” Iglesias,City Manager DATE:Tuesday, July 18, 2023 SUBJECT:Design Revisions:Permitting and Construction Oversight for Sanitary System to proposed Dante Fascell Park Community Building RECOMMENDATION:Approve the proposal and project work/purchase order with SRS Engineering, Inc. to provide design revisions to their original drawings, permitting and construction oversight services to provide a new Sanitary Sewer System to the proposed Community Building known as phase I, of the previously designed and permitted Sanitary Sewer Improvements for the area known as Sub-Area K. BACKGROUND:The Citywide Sanitary Sewer Master Plan completed on November 7, 2016, studied the areas of the City that are not served by the MDWASD public sewer system and divided these areas into 11 smaller sub-areas or projects known as Sub-Areas A-K. One (1) has gone through design as adopted by the City Mayor and Commission on June 2017 with Reso 106-17-14907, which is referred to as subarea K. Sub-Area K serves 205 homes and it was selected since it did not require a system interconnection like other sub- areas and it is a priority sea-level Rise. It is the intent for this project to construct only a portion, Phase I, of the previously designed and permitted Sanitary Sewer Improvements for the area known as Sub-Area K. The Phase I portion to be constructed will include the new pump station, force main, and gravity sewer mains and laterals along SW 85th Street, SW 60th Avenue, and SW 87th Street as shown on Exhibit “A”. 212 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM As the next City’s rotation list consultant, SRS Engineering Inc., was requested to provide design revisions to their original drawings, permitting and construction inspection and management services to provide a new Sanitary Sewer System to the proposed Community Building known as phase I, of the previously designed and permitted Sanitary Sewer Improvements for the area known as Sub-Area K. SRS Engineering Inc., is one of six firms selected by Resolution No. 056-22-15809, to provide professional service agreements for engineering services on an as-needed basis in accordance with Florida Statute 287.055, “Consultants Competitive Negotiation Act. On February 7, 2023, the Mayor and Commission requested the City Manager to apply for State Appropriations for Phase I of the Septic to Sewer project for the proposed connection to the community building in the amount of $1,800,000.00. On June 15, 2023, the firm of Becker & Poliakoff indicated that the Governor has approved the funding in the final budget of the City’s septic to sewer project. On June 29, 2023, the Florida Department of Environmental Protection provided documents for the City to draft an agreement for funding to be available through a cost reimbursement grant. Staff recommends that the proposal from SRS Engineering Inc., dated February 28, 2023, be approved. VENDOR &EXPENSE:SRS Engineering, Inc. Proposal/contract amount not to exceed $95,233.50. FUND &ACCOUNT:Amount not to exceed $ 95,233.50. Please refer to the consultant contract and fee schedule. The expenditure shall be charged $93,233.50 to the Capital Improvement Program Fund account number 301-1790-519-6450 which has a balance of $554,035.07 prior to this request. ATTACHMENTS:Resolution Resolution 056-22-15809 Revised Proposal – SRS Engineering Inc., dated 7/10/2023 313 814 RESOLUTION NO.: 056-22-15809 A Resolution authorizing the City Manager negotiate and execute a Professional Service Agreement provided under Florida Statute 287.055 Consultant's Competitive Negotiation Act "CCNA", with SRS Engineering, Inc., EXP U.S. Services Inc., Stantec Consulting Services Inc., Calvin, Giordano & Associates, Inc., M&J Engineering P.C., and Kimley-Horn and Associates, Inc., for general engineering services on an as needed basis. WHEREAS, the City Mayor and Commission wish to negotiate and execute for general engineering and architectural services on an as needed basis and on a rotation basis ; and WHEREAS, in accordance with Florida Statute 287 .055, "Consultants Competitive Negotiation Act." (CCNA), the City issued a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services, on a rotational and as needed basis; and WHEREAS, a Selection Committee comprised of City staff, rev iewed the proposals received and is recommending, based on the final scores and ranking, six (6) firms for the Contract Negotiations phase o f the process required by the CCNA; and WHEREAS, it was noted that two Respondents tied in ranking order, EXP U.S. Services Inc., and Stantec Consulting Services Inc., at 2.33; and WHEREAS, due to the number of proposals received (21), the Selection Committee is recommending six (6) Respondents for Contract Negotiations phase of the CCNA process and execution of professional service agreement; and WHEREAS, the Mayor and City Comm iss ion wish to authorize the City Manager to negotiate and execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and providing the City Manager with sole discretion to renew the agreement for one (1) two (2) year renewal. The maximum term of any one contract, if the City Manager decides to renew it, will be five (5) consecutive years. The expenditures related this contract will be charged to the Capital Improvements Program Accounts on an as needed basis. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is hereby authorized to negotiate and execute a non-exclusive multi- year contract with the firms selected for professional surveying , studies, engineering, and architectural services for construction projects in accordance with Section 287.055 , "Consultants Competitive Negotiation Act" on a rotational and as needed basis . The term of each contract will be three (3) years and the City Manager will have an option to renew each contract for one (1) two (2) year term . A copy of Page 1 of 2 915 Res. No. 056-22-15809 a draft of the contract is attached. The contract may be amended in the event that the City Attorney finds that it is in the best i nterest of the City and that it complies with the CCNA process. The expenditures rela t ed these contracts will be charged to the Capital Improvements Program Accounts. Section 3. Corrections. Conforming language or technical scrivener -type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4: Severability. If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 5: Effective Date: This resolution shall become effective immediately upon adoption. PASSED AND ADOPTED this 3rd day of May, 2022. READ AND APPROV ED AS TO FORM, LANGUAGE, LEGALITY, AND EXECUTION THEREOF ~o z ~ Page 2 of 2 APPROVED: COMMISSION VOTE: Mayor Philips: Commissioner Harris: Commissioner Gil: Commissioner Liebman: Comm i ssioner Corey: 5-0 Yea Yea Yea Yea Yea 1 of 1 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Sanitary Sewer Improvements – Subarea K Phase 1 – Revisions to Drawings, Permitting and Construction Phase Services 1016 1 of 4 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Sanitary Sewer Improvements – Subarea K Phase 1 – Revisions to Drawings, Permitting and Construction Phase Services Subject to the provisions contained in the “Professional Services Agreement for Professional General Engineering and Architectural Services” (hereinafter referred to as the “Professional Services Agreement”) between the CITY OF SOUTH MIAMI, FLORIDA (hereinafter referred to as “City”) and SRS ENGINEERING, INC., (hereinafter referred to as “Consultant”) dated May 3, 2022, which Professional Services Agreement was competitively procured through Request For Qualifications (RFQ) No. PW2022- 03 in accordance with Section 287.955, Florida Statutes. This Project Work/Purchase Order is made effective as of the day of , 2023, and authorizes the Consultant to provide the services as set forth below: SECTION 1. SCOPE OF SERVICES 1.1 Consultant shall provide professional engineering services, including ____________________________________________________________________________________ for the SANITARY SEWER IMPROVEMENTS – SUBAREA K, PHASE 1 – REVISIONS TO DRAWINGS, PERMITTING AND CONSTRUCTION PHASE SERVICES PROJECT and complete the tasks that are identified and described in the Project Proposal, attached hereto as Exhibit “1,” for the City (the “Services”). 1.2 The City may request changes that would increase, decrease, or otherwise modify the scope of services outlined under the Project Proposal attached hereto as Exhibit “1.” Such changes must be contained in a written change order executed by the parties in accordance with the provisions of the Professional Services Agreement, prior to any deviation from the terms of this Project Work/Purchase Order, including the initiation of any extra work. SECTION 2. DELIVERABLES 2.1 As part of the scope of services and project schedule, the Consultant shall provide the City with the Deliverables identified in the Project Proposal attached hereto as Exhibit “1.” SECTION 3. TERM/TIME OF PERFORMANCE/DAMAGE 3.1 Term. This Project Work/Purchase Order shall commence on the date this instrument is fully executed by all parties and shall continue in full force and effect until terminated pursuant to Section 6 or other applicable provisions of this Project Work/Purchase Order. The City Manager, in his sole discretion, may extend the term of this Project Work/Purchase Order through written notification to the Consultant. Such extension shall not exceed 90 days. No further extensions of this Agreement shall be effective unless authorized by the City Manager. 1117 2 of 4 3.2 Commencement. Services provided by the Consultant under this Project Work/Purchase Order and the time frames applicable to this Project shall commence upon the date provided in a written Notice to Proceed (“Commencement Date”) provided to the Consultant by the City. The Consultant shall not incur any expenses or obligations for payment to third parties prior to the issuance of the Notice to Proceed. Consultant must receive written notice from the City Manager prior to the beginning the performance of services. 3.3 Contract Time. Upon receipt of the Notice to Proceed, the Consultant shall provide services to the City on the Commencement Date, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the Project Proposal attached and incorporated into this Agreement as Exhibit “1”. The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, whichever shall last occur, shall constitute the Contract Time. 3.4 All limitations of time set forth in this Agreement are of the essence. SECTION 4. AMOUNT, BASIS AND METHOD OF COMPENSATION 4.1 Compensation. Consultant shall be compensated for the provision of the Services in accordance with Exhibit “1” attached hereto. Consultant shall receive a total lump sum fee of $63,352.50 for this Project. 4.2 Reimbursable Expenses. All reimbursable expenses are included in the total compensation listed in Section 4.1 above. SECTION 5. BILLING AND PAYMENTS 5.1 Invoices 5.1.1. Compensation and Reimbursable Expenses. Consultant shall submit invoices which are identified by the specific project number on a monthly basis in a timely manner. These invoices shall identify the nature of the work performed, the phase of work, and the estimated percent of work accomplished in accordance with the Payment Schedule attached hereto as Exhibit “1”, attached hereto and made part of this Agreement. Invoices for each phase shall not exceed amounts allocated to said phase plus reimbursable expenses accrued during each phase. The statement shall show a summary of fees with accrual of the total and credits for portions paid previously. 5.1.2. Florida Prompt Payment Act. The City shall pay the Contractor in accordance with the Florida Prompt Payment Act after approval and acceptance of the Services by the City Manager. 5.2 Disputed Invoices. In the event that all or a portion of an invoice submitted to the City for payment to the Consultant is disputed, or additional backup documentation is required, the City shall notify the Consultant within fifteen (15) working days of receipt of the invoice of such objection, modification or additional documentation request. The Consultant shall provide the City within five (5) working days of the date of the City’s notice. The City may request additional information, including but not limited to, all invoices, time records, expense records, accounting records, and payment records of the Consultant. The City, at its sole discretion, may pay to the Consultant the undisputed portion of the invoice. The parties shall endeavor to resolve the dispute in a mutually agreeable fashion. 1218 3 of 4 5.3 Suspension of Payment. In the event that the City becomes credibly informed that any representations of the Consultant, provided pursuant to Subparagraph 5.1, are wholly or partially inaccurate, or in the event that the Consultant is not in compliance with any term or condition of this Project Agreement, the City may withhold payment of sums then or in the future otherwise due to the Consultant until the inaccuracy, or other breach of Project Agreement, and the cause thereof, is corrected to the Owner’s reasonable satisfaction. 5.4 Retainage. The City reserves the right to withhold retainage in the amount of ten percent (10%) of any payment due to the Consultant until the project is completed. Said retainage may be withheld at the sole discretion of the City and as security for the successful completion of the Consultant’s duties and responsibilities under the Project Agreement. Intentionally Deleted. 5.5 Final Payment. Submission to the Consultant’s invoice for final payment and reimbursement shall constitute the Consultant’s representation to the City that, upon receipt from the City of the amount invoiced, all obligations of the Consultant to others, including its consultants, incurred in connection with the Project, shall be paid in full. The Consultant shall deliver to the City all documents requested by the City evidencing payments to any and all subcontractors, and all final specifications, plans, or other documents as dictated in the Scope of Services and Deliverable. Acceptance of final payment shall constitute a waiver of all claims against the City by the Consultant. SECTION 6. TERMINATION/SUSPENSION 6.1 For Cause. This Project Work/Purchase Order may be terminated by either party upon five (5) calendar days written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination and fails to cure the failure to perform within such five (5) day period. In the event that Consultant abandons this Project Work/Purchase Order or causes it to be terminated by the City, the Consultant shall indemnify the City against any loss pertaining to this termination. In the event that the Consultant is terminated by the City for cause and it is subsequently determined by a court by a court of competent jurisdiction that such termination was without cause, such termination shall thereupon be deemed a termination for convenience under Section 6.2 and the provision of Section 6.2 shall apply. 6.2 For Convenience. This Project Work/Purchase Order may be terminated by the City for convenience upon fourteen (14) calendar days’ written notice to the Consultant. In the event of such termination a termination, the Consultant shall incur no further obligations in connections with the Project and shall, to the extent possible terminate any outstanding subconsultant obligation. The Consultant shall be compensated for all services performed to the satisfaction of the City and reimbursable expenses incurred prior the date of termination. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 5.1. Under no circumstances shall the City make payment of profit to the Consultant for services which have not been performed. 6.3 Assignment upon Termination. Upon termination of this Project Work/Purchase Order, a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) working days of receipt of written direction from the City, transfer to either the City or its authorized designee, a copy of all work product in its possession, including but not limited to designs, specifications, drawings, studies, reports and all other documents and data in the possession of the Consultant pertaining to this Project Work/Purchase Order. Upon the City’s request, the Consultant shall additionally assign its rights, title and interest under any subcontractor’s agreements to the City. 6.4 Suspension for Convenience. The City shall have the right at any time to direct the Consultant to suspend its performance, or any designated part thereof, for any reason whatsoever, or without reason, for a cumulative period of up to thirty (30) calendar days. If any such suspension is directed 1319 4 of 4 by the City, the Consultant shall immediately comply with same. In the event the City directs a suspension of performance as provided herein, through no fault of the Consultant, the City shall pay the Consultant as full compensation for such suspension the Consultant’s reasonable cost, actually incurred and paid, of demobilization and remobilization. Section 7. American Rescue Plan Act Contract Conditions. 7.1 The Consultant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Local Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act (“ARPA”). Towards that end, the Consultant shall be required to comply with all laws, rules, regulations, policies, and guidelines (including any subsequent amendments to such laws, regulations, policies, and guidelines) required by ARPA, as further detailed in the ARPA Addendum. If compliance with the ARPA Addendum is required, the City shall select this box: . [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.] 1420 1 of 1 IN WITNESS WHEREOF, the parties hereto have caused this Work/Purchase Order executed as of the day and year as first stated above CITY: ATTEST: CITY OF SOUTH MIAMI, FLORIDA, a Florida Municipal Corporation By: CITY CLERK Genaro “Chip” Iglesias, City Manager Date: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: CITY ATTORNEY CONSULTANT: SRS ENGINEERING, INC. By: Name: Ignacio Serralta Title: President Date: 3/30/23 WITNESSES: Print Name: Print Name: 1521 EXHIBIT “1” PROJECT PROPOSAL (SCOPE OF SERVICES AND SCHEDULE AND PAYMENT SCHEDULE) 1622 July 10, 2023 (Revised) Mr. Aurelio J. Carmenates, P.E. Capital Improvement Project Manager City of South Miami Public Works Engineering & Construction Division 4795 SW 75th Avenue Miami, FL 33155 Re: City of South Miami Sanitary Sewer Improvements – Subarea K Phase I – Revisions to Drawings, Permitting, and Construction Phase Services Dear Mr. Carmenates, We appreciate this opportunity to prepare this Proposal for Professional Services for the referenced project. In accordance with our Professional Services Agreement for General Engineering and Architecture Services, we are submitting our understanding of the Scope of Work and Fee Proposal to provide Engineering Services in connection with the referenced project. SCOPE OF WORK It is the intent of the City to construct only a portion, Phase I, of the previously designed and permitted Sanitary Sewer Improvements for the area known as Subarea “K”. The Phase I portion to be constructed will include the new pump station, force main, and gravity sewer mains and laterals along SW 85th Street, SW 60th Avenue, and SW 87th Street as known on attached Exhibit “A”. Our scope of work shall consist of the following: Design of Pump Station, Force Main and Gravity Sewer Mains 1. General project management including 2. Attend and coordinate meetings with City, MDWASD, MDCPWD, RER, and FPL. 3. Assist City in renewing Water & Sewer Agreement with MDWASD. Our services will include requesting agreement in writing, reviewing and coordinating of the agreement approval with City and MDWASD. This task includes two coordination/negotiation meetings with City and MDWASD. 4. Attend two City organized community meetings to inform residents of the project and coordinate locations of new sewer laterals. Individual meetings with residents/property owners and general public involvement to be provided by City. Additional public involvement by SRS can be provided as additional services. 5. It is assumed that no revisions to the existing pump station drawings will be required, other than revising Sheet MP-1 to the Phasing, and that no changes to connection pressures or 1723 July 10, 2023 Page 2 site conditions have occurred. SRS, therefore, shall resubmit to WASD and DERM for reissuance of permits. If WASD issues new comments or conditions requiring redesign or revisions to drawings, these services shall be considered additional and negotiated as additional services. 6. SRS shall revise the previously permitted gravity sewer main and force main drawings to show the Phase I portion of the construction. 7. Submit the gravity sewer and force main drawings to WASD and DERM to renew permits. If WASD issues new comments or conditions requiring redesign or additional revisions to drawings, these services shall be considered additional and negotiated as additional services. 8. Incorporate review minor comments and modify drawings accordingly. 9. Prepare engineer’s estimate of probable construction cost. 10. Preparation of project specifications and assist City in the preparation of Bid Documents. 11. Obtain sewer allocation and Utility Transmission (UT) approval. Prepare and submit applications and construction drawings for “Dry-Run” and “Final” review and permit approval by City of South Miami, MDWASD, RER, and MDCPWD. Design of Roadway Restoration 12. Preparation of construction drawings for the restoration of all roadways within project limits new sewer mains including restoration of pipeline trenches, milling and resurfacing of entire roadway cross section, and restriping pavement markings. This task including title sheet, general notes, roadway restoration plans, miscellaneous design, pavement marking and signage plans, and SWPPP plans. This work shall not include any drainage improvements. It is assumed existing drainage system are adequate and will not require additional improvements. 13. Prepare engineer’s estimate of probable construction cost. 14. Preparation of project specifications and assist City in the preparation of Bid Documents. 15. Submit 90% and 100% completion roadway restoration construction documents to City for review and comment. 16. Incorporate review comments and modify drawings accordingly. 17. Prepare construction drawings and applications for submittal to City of South Miami Public Works Department for review and permitting of the roadway improvements. 18. Prepare the NPDES Notice of Intent application for submittal to the FDEP for notice of stormwater discharge and approval of the erosion control system. 1824 July 10, 2023 Page 3 Bid Phase Services: 19. Attend pre-bid meeting 20. Provide supplemental information and/or clarification of construction documents to prospective bidders during the bid solicitation process. 21. Review bid submittals and attend bid-opening meeting. Construction Phase Services 22. The Limited Construction Support Services will include the following items, assuming a construction duration of 6 months.  Attend (one) Pre-Bid Meeting  Attend (one) Pre-Construction Meeting  Respond to Contractor request for information and clarification of contract documents.  Review and process Shop Drawings  Conduct periodic site visit by Engineer to observe construction (12 total)  Plan Revisions During Construction (if required)  Review and approval to Contractor’s change order requests (if requested)  Attending bi-weekly Teams construction meetings and prepare minutes for distribution.  Coordinate utility issues/conflicts.  Process all construction correspondence and documents.  Review and recommend Contractor payment requisitions.  Review and recommend Contractor change order requests, if any.  Provide a construction inspector to conduct 3 site visits per week for a total of 12 hours per week, assuming 24 weeks construction duration.  Provide photo history of project in digital format.  Attend (one) PS Start Up Inspection.  Project Close-out. ASSUMPTIONS  Existing topographical survey will not require updating.  Pump station point of connection pressure have not changed and will not require revisions to pump station drawings and calculations. EXCLUSIONS Expressly omitted from the services to be provided by SRS are the following. These services or fees shall be considered additional to this contract and would have to be renegotiated as additional services.  Preparation of easement documents or surveys that may be required for pump station and FPL transformer area. 1925 July 10, 2023 Page 4  Preparation of “As-Built” drawings.  Payment of impact, mitigation or regulatory agency review and permit fees.  Additional Construction Phase services beyond the estimated 6 month construction duration. ACCEPTANCE This proposal and fee schedules are based on the acceptance within thirty (30) days of the date of preparation. If not accepted by you within that time period, we reserve the right to re-evaluate the terms and conditions contained herein. ACCEPTANCE OF PROPOSAL We would expect to commence our services promptly after receipt of your acceptance of this proposal. COMPENSATION Our Engineering Fees for the above described Basic Services will be a lump sum amount of NINETY-FIVE THOUSAND TWO-HUNDRED and THIRTY-THREE DOLLARS and FIFTY CENTS ($95,233.50). Please see enclosed fee breakdown for additional information. In addition, City of South Miami will be responsible for payment of all filing, plan review, impact and permitting fees. Reimbursable expenses include cost of printing drawings for review and permitting, plus ten additional sets for the City’s use. Payment will be based on monthly invoicing as a percentage of completion of work as follows: This Proposal and our City Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement were indicated below and return to our office. Very truly yours, Ignacio Serralta, P.E. President 2026 July 10, 2023 Page 5 I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this _______ day of______________, 2023 City of South Miami By: __________________________________ Title: _______________________________ Enclosure 2127 DATE:7/10/2023 TOTAL TOTAL HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HOURS COST Task No.DESIGN OF SEWER SYSTEM $210.00 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 1 General Project Management 3 $210.00 9 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 4 $58.50 16 $2,574.00 2 Attend project coordination meetings 3 $210.00 9 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 12 $2,340.00 3 Assist City in obtaining Water & Sewer Agreements with MDWASD $210.00 6 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 6 $1,140.00 4 Attend two city organized meetings 4 $210.00 6 $190.00 $140.00 $115.00 2 $75.00 $105.00 $87.00 $58.50 12 $2,130.00 5 Resubmit Pump Stations Drawings for approval 1 $210.00 4 $190.00 4 $140.00 2 $115.00 2 $75.00 $105.00 $87.00 $58.50 13 $1,910.00 6 Revise Gravity Sewer Main Drawings for Ph. I.1 $210.00 8 $190.00 16 $140.00 24 $115.00 16 $75.00 $105.00 $87.00 $58.50 65 $7,930.00 7 Submit to WASD and DERM to Renew Permits $210.00 4 $190.00 4 $140.00 2 $115.00 2 $75.00 $105.00 $87.00 $58.50 12 $1,700.00 8 Incorporate review comments and modify drawings accordingly $210.00 2 $190.00 4 $140.00 8 $115.00 8 $75.00 $105.00 $87.00 $58.50 22 $2,460.00 9 Prepare engineer’s estimate of probable construction cost $210.00 1 $190.00 4 $140.00 6 $115.00 $75.00 $105.00 $87.00 $58.50 11 $1,440.00 10 Preparation of project specifications $210.00 2 $190.00 4 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 6 $940.00 11 Obtain sewer allocation and Utility Transmission (UT) approval $210.00 4 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 4 $760.00 DESIGN OF ROADWAY RESTORATION $210.00 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 0 $0.00 12 Prepare roadway restoration and PM&S Drawings 1 $210.00 4 $190.00 8 $140.00 24 $115.00 24 $75.00 $105.00 $87.00 $58.50 61 $6,650.00 12 Prepare SWPPP Drawings $210.00 1 $190.00 $140.00 4 $115.00 4 $75.00 $105.00 $87.00 $58.50 9 $950.00 13 Prepare engineer’s estimate of probable construction cost $210.00 1 $190.00 3 $140.00 4 $115.00 $75.00 $105.00 $87.00 $58.50 8 $1,070.00 14 Preparation of project specifications $210.00 2 $190.00 6 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 8 $1,220.00 15,16,17 Submit Roadway Restoration Drawings to City for review and permitting.$210.00 4 $190.00 4 $140.00 4 $115.00 2 $75.00 $105.00 $87.00 $58.50 14 $1,930.00 18 Prepare NPDES NOI.$210.00 1 $190.00 $140.00 2 $115.00 $75.00 $105.00 $87.00 $58.50 3 $420.00 BID PHASE SERVICES $210.00 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 0 $0.00 19 Attend pre-bid meeting 2 $210.00 2 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 4 $800.00 20 Respond to Bidders RFIs $210.00 4 $190.00 6 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 10 $1,600.00 21 Review Bid Submittals and attend opening meeting $210.00 2 $190.00 8 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 10 $1,500.00 CONSTRUCTION PHASE SERVICES **$210.00 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 0 $0.00 22 General Project Management 4 $210.00 $190.00 $140.00 $115.00 $75.00 12 $105.00 $87.00 $58.50 16 $2,100.00 23 Attend (one) Pre-Bid Meeting 3 $210.00 3 $190.00 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 6 $1,200.00 24 Attend (one) Pre-Construction Meeting $210.00 3 $190.00 3 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 6 $990.00 25 Review Shop Drawings $210.00 2 $190.00 6 $140.00 16 $115.00 $75.00 $105.00 $87.00 $58.50 24 $3,060.00 26 Conduct periodic site visit to observe construction (12 total)3 $210.00 9 $190.00 12 $140.00 24 $115.00 $75.00 $105.00 $87.00 $58.50 48 $6,780.00 27 Plan Revisions During Construction $210.00 4 $190.00 4 $140.00 8 $115.00 8 $75.00 $105.00 $87.00 $58.50 24 $2,840.00 28 Review and approval to change order requests (if requested)$210.00 6 $190.00 12 $140.00 $115.00 $75.00 $105.00 $87.00 $58.50 18 $2,820.00 29 Attend bi-weekly Teams progress meetings and prepare for minutes for distribution $210.00 $190.00 $140.00 $115.00 $75.00 24 $105.00 $87.00 $58.50 24 $2,520.00 30 Process Contractor request for information and clarification of contract documents $210.00 $190.00 $140.00 $115.00 $75.00 4 $105.00 $87.00 $58.50 4 $420.00 31 Coordinate utility issues/conflicts $210.00 $190.00 $140.00 $115.00 $75.00 1 $105.00 $87.00 $58.50 1 $105.00 32 Process all construction correspondence and documents $210.00 $190.00 $140.00 $115.00 $75.00 4 $105.00 $87.00 $58.50 4 $420.00 33 Review and recommend Contractor payment requisitions $210.00 $190.00 $140.00 $115.00 $75.00 12 $105.00 $87.00 $58.50 12 $1,260.00 34 Provide part-time inspector (3 site visits per week, 12 hrs per week, 24 weeks).$210.00 $190.00 $140.00 $115.00 $75.00 $105.00 288 $87.00 $58.50 288 $25,056.00 35 Attend (one) PS Start Up Inspection $210.00 8 $190.00 8 $140.00 $115.00 $75.00 $105.00 $87.00 1 $58.50 17 $2,698.50 TOTAL 25 $210.00 111 $190.00 116 $140.00 128 $115.00 68 $75.00 57 $105.00 288 $87.00 5 $58.50 798 $93,733.50 ACTIVITY COST BY OTHERS TOTAL = SUMMARY ACTIVITIES BY SRS (Salaries)X 1.00 $93,733.50 ACTIVITIES BY OTHERS $0.00 Estimated OUT OF POCKET EXPENSES including permitting fees, reproduction costs, etc.$1,500.00 ** ASSUMING 6 MONTHS CONSTRUCTION DURATION TOTAL THIS PROPOSAL = ENGINEERING COST BREAKDOWN Sanitary Sewer Improvements - Subarea K - Phase I ACTIVITY BY SRS PRINCIPAL SR. PROJ. MGR SR. ENGINEER ENGINEER CAD TECH CLERICALCONST INSP.CONST. MGR. DESCRIPTION $95,233.50 $93,734 $0.00 2228 Phase I Exhibit “A” 2329 30 RESOLUTION NO.: 056-22-15809 A Resolution authorizing the City Manager negotiate and execute a Professional Service Agreement provided under Florida Statute 287.055 Consultant's Competitive Negotiation Act "CCNA", with SRS Engineering, Inc., EXP U.S. Services Inc., Stantec Consulting Services Inc., Calvin, Giordano & Associates, Inc., M&J Engineering P.C., and Kimley-Horn and Associates, Inc., for general engineering services on an as needed basis. WHEREAS, the City Mayor and Commission wish to negotiate and execute for general engineering and architectural services on an as needed basis and on a rotation basis ; and WHEREAS, in accordance with Florida Statute 287 .055, "Consultants Competitive Negotiation Act." (CCNA), the City issued a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services, on a rotational and as needed basis; and WHEREAS, a Selection Committee comprised of City staff, rev iewed the proposals received and is recommending, based on the final scores and ranking, six (6) firms for the Contract Negotiations phase of the process required by the CCNA; and WHEREAS, it was noted that two Respondents tied in ranking order, EXP U.S. Services Inc., and Stantec Consulting Services Inc., at 2.33; and WHEREAS, due to the number of proposals received (21}, the Selection Committee is recommending six (6) Respondents for Contract Negotiations phase of the CCNA process and execution of professional service agreement; and WHEREAS, the Mayor and City Comm ission wish to authorize the City Manager to negotiate and execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and providing the City Manager with sole discretion to renew the agreement for one (1) two (2) year renewal. The maximum term of any one contract, if the City Manager decides to renew it, will be five (5) consecutive years. The expenditures related this contract will be charged to the Capital Improvements Program Accounts on an as needed basis. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is hereby authorized to negotiate and execute a non-exclusive multi- year contract with the firms selected for professional surveying, studies, engineering, and architectural services for construction projects in accordance with Section 287 .055, "Consultants Competitive Negotiation Act" on a rotational and as needed basis . The term of each contract will be three (3) years and the City Manager will have an option to renew each contract for one (1) two (2) year term . A copy of Page 1 of 2 31 Res. No. 056-22-15809 a draft of the contract is attached. The contract may be amended in the event that the City Attorney finds that it is in the best i nterest of the City and that it comp lies with the CCNA process. The expenditures rela t ed these contracts will be charged to the Capital Improvements Program Accounts. Section 3. Corrections. Conforming language or technical scrivener -type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4: Severability . If any section, clause, sentence, or phrase of this resolution is for any reason he ld invalid or unconstitutional by a court of competent jurisdiction , the holding shall not affect the validity of the remaining portions of this resolution. Section 5: Effective Date: This resolution shal l become effective immediately upon adoption. PASSED AND ADOPTED this 3rd day of May, 2022. READ AND APPROV ED AS TO FORM, LANGUAGE, LEGALITY, AND EXECUTION Page 2 of 2 APPROVED: COMMISSION VOTE: Mayor Philips: 5-0 Yea Commissioner Harris: Yea Commissioner Gil: Yea Commissioner Liebman : Yea Commiss i oner Corey: Yea October 18, 2023 Mr. Aurelio J. Carmenates, P.E. Capital Improvement Project Manager City of South Miami Public Works Engineering & Construction Division 4795 SW 75th Avenue Miami, FL 33155 Re: City of South Miami Sanitary Sewer Improvements – Subarea K, Phase I Additional Services – Landscaping and 8 additional properites Dear Mr. Carmenates, We appreciate this opportunity to prepare this Proposal for Additional Services for the referenced project. In accordance with our Agreement for General Engineering and Architectural Services, we are submitting this proposal for additional services for the design, bid and post design services to prepare landscaping plans for the new sewer pump station. SCOPE OF WORK The Scope of Work will consist of the following: Landscaping Plans Task 1: Review site conditions to understand context and limitations Task 2: Prepare preliminary landscape plan, tree disposition plans with notes and details for implementation. Coordinate with engineers. Prepare cost estimate for landscape improvements. Submit to City for review. Meet with neighbor to discuss plans. Task 3: Prepare final landscape plans incorporating City comments. Update cost estimate. Final coordination and submittal for final permitting, bidding and implementation. Post Design Services: Visit site to review work done, prepare a punch list for corrections. Do final inspection. Please let attached fee proposal from Curtis and Roger for additional information. SRS shall provide project management and coordination services including attending meetings with City and adjacent property owners, coordinating design, and submittals to regulatory agencies. Additional 8 Properties 32 October 18, 2023 Page 2 As required by WASD, SRS shall design new sewer laterals to 8 additional properties along the west side of SW 62nd Avenue (along the alignment of the new sewer main). This task shall include conducting site visit to determine best locations for sewer laterals, design of plans and lateral profiles, update tables of property folios for DERM, and update pump station hydraulic calculations for the additional flows from the 8 new properties. ACCEPTANCE This proposal and fee schedules are based on the acceptance within thirty (30) days of the date of preparation. If not accepted by you within that time period, we reserve the right to re-evaluate the terms and conditions contained herein. ACCEPTANCE OF PROPOSAL We would expect to commence our services promptly after receipt of your acceptance of this proposal. COMPENSATION Our Engineering Fees for the above-described Basic Services will be a lump sum amount shown below. Payment will be based on monthly invoicing as a percentage of completion of work. Our Engineering Fees are as follows: Project Management and Coordination (SRS) .................................. $ 5,501.00 Landscape Plans Re-Design (C+R) ................................................... $ 8,400.00 Total Additional Services ................................................................. $ 13,901.00 This Proposal and our City Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement where indicated below and return to our office. Very truly yours, Ignacio Serralta, P.E. President I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this _______ day of______________, 2023. City of South Miami By: __________________________________ Title: _______________________________ 33 ENGINEERING COST BREAKDOWN City of South Miami DATE:9/14/2023 ACTIVITY PRINCIPAL SR. PROJ. MGR SR. ENGINEER ENGINEER CAD TECH CLERICAL TOTAL TOTAL BY SRS HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HRS RATE HOURS COST Contract Support Services $210.00 $190.00 $140.00 $92.00 $85.00 $58.50 Project Administration and Coordination with City and Consultants 2 $210.00 2 $190.00 $140.00 $92.00 1 $85.00 $58.50 5 $885.00 Attend meetings with City and Owners (2 meetings)2 $210.00 4 $190.00 $140.00 $92.00 $85.00 $58.50 6 $1,180.00 Revise drawings and PS Calcs for additional 8 properties 1 $210.00 2 $190.00 4 $140.00 8 $92.00 8 $85.00 $58.50 23 $2,566.00 Submit to WASD and RER for Permit 1 $210.00 2 $190.00 2 $140.00 $92.00 $85.00 $58.50 5 $870.00 TOTAL 6 $0.00 10 $0.00 6 $0.00 8 $0.00 9 $0.00 0 $0.00 39 $5,501.00 Curtis + Rogers Design Studio $8,400.00 SUMMARY ACTIVITIES BY SRS (Salaries)X 1.00 $5,501.00 ACTIVITIES BY OTHERS $8,400.00 Estimated OUT OF POCKET EXPENSES including reproduction costs and permitting fees, etc. TOTAL THIS PROPOSAL = DESCRIPTION COSTACTIVITY BY OTHERS TOTAL = $8,400.00 $13,901.00 $5,501 Landscape Architecture Sanitary Sewer Improvements - Subarea K, Phase I - Landscaping Improvements 34 Sept 14, 2023 Scope of Work City of South Miami WASAD Pump Station Landscape Architecture Project Goal: Provide a simple landscape screen for pump station. Landscape shall be drought resistant and have no irrigation. Scope: Task 1: Review site conditions to understand context and limitations Task 2: Prepare preliminary landscape plan, tree disposition plans with notes and details for implementation. Coordinate with engineers. Prepare cost estimate for landscape improvements. Submit to City for review. Meet with neighbor to discuss plans. Task 3: Prepare final landscape plans incorporating City comments. Update cost estimate. Final coordination and submittal for final permitting, bidding and implementation. Post Design Services: Visit site to review work done, prepare a punchlist for corrections. Do final inspection. Fees: Lump Sum $8400 C U R T I S + R O G E R S D E S I G N S T U D I O I N C. L a n d s c a p e A r c h i t e c t u r e 7 5 2 0 S. R E D R O A D S U I T E M S O U T H M I A M I F L O R I D A 3 3 1 4 3 T E L E P H O N E 3 0 5-4 4 2-1 7 7 4 F A C S I M I L E 3 0 5 -4 4 5-9 4 8 8 L L C. LC 000241 www.curtisrogers.com 35 Project:South Miami WASAD Pump StationAida CurtisProject No:Prime:SRSAida Ralph Robert$0.002$250.004$340.000$0.00$0.00$590.001$150.004$500.0010$850.000$0.00$0.00$1,500.001$150.002$250.004$340.00$0.00$0.00$740.00$0.002$250.002$170.00$0.00$0.00$420.001$150.002$250.008$680.000$0.00$0.00$1,080.001$0.002$250.008$680.000$0.00$0.00$930.001$150.002$250.004$340.00$0.00$0.00$740.00$0.002$250.004$0.00$0.00$0.00$250.00$0.002$250.004$340.00$0.00$0.00$590.00$0.002$250.002$170.00$0.00$0.00$420.00$0.002$250.006$510.00$0.00$0.00$760.000$0.001$125.003$255.00$0.00$0.00$380.000$0.00$0.00$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00525590$600.00$3,125.00$4,675.00$0.00$0.00$0.00TOTAL FEE:$8,400.00Total Staff HoursTotal Staff CostTotal % of Work by PositionSTAFF CLASSIFICATION Final Inspections2. Construction DocumentsPlanting Plan/Notes/DetailsCost EstimateCoordination w CivilPermitting1. Conceptual/Schematic DesignCoordination w Civil/CitySite Visit ‐Site AnalysisPrepare Preliminary Plans (Dispo/Planting)Tree Disposition Plan/Notes/DetailsStaff Hours by Activity    3.  Bidding/ Construction Phase ServicesReview bidsConstruction Phase ServicesSite visits/reports (2)Arborist$125.00Man‐hoursCost/ActivityMan‐hoursCost/ActivityOther$0.00Man‐hours Cost/ActivityMeeting w Neighbor9/14/2023Job ClassificationStaff Name:Hourly Rate:Task:Sr. Land Arch$150.00Man‐hoursCost/ActivityProject Land Arch         ( Registered)$125.00Man‐hoursCost/ActivityLand Arch (Non‐registered)$85.0036 1 of 1 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Sanitary Sewer Improvements – Subarea K, Phase 1 Additional Services – Landscape and 8 Additional Properties 37 1 of 4 PROJECT WORK/PURCHASE ORDER Between CITY OF SOUTH MIAMI, FLORIDA And SRS ENGINEERING, INC. Project Name: Sanitary Sewer Improvements – Subarea K, Phase 1 Additional Services – Landscape and 8 Additional Properties Subject to the provisions contained in the “Professional Services Agreement for Professional General Engineering and Architectural Services” (hereinafter referred to as the “Professional Services Agreement”) between the CITY OF SOUTH MIAMI, FLORIDA (hereinafter referred to as “City”) and SRS ENGINEERING, INC.,(hereinafter referred to as “Consultant”) dated May 3, 2022, which Professional Services Agreement was competitively procured through Request For Qualifications (RFQ) No. PW2022- 03 in accordance with Section 287.955, Florida Statutes. This Project Work/Purchase Order is made effective as of the day of , 2023, and authorizes the Consultant to provide the services as set forth below: SECTION 1. SCOPE OF SERVICES 1.1 Consultant shall provide professional engineering services, including ____________________________________________________________________________________ for the SANITARY SEWER IMPROVEMENTS – SUBAREA K PHASE 1, ADDITIONAL SERVICES – LANDSCAPE AND 8 ADDITIONAL PROPERTIES and complete the tasks that are identified and described in the Project Proposal, attached hereto as Exhibit “1,” for the City (the “Services”). 1.2 The City may request changes that would increase, decrease, or otherwise modify the scope of services outlined under the Project Proposal attached hereto as Exhibit “1.” Such changes must be contained in a written change order executed by the parties in accordance with the provisions of the Professional Services Agreement, prior to any deviation from the terms of this Project Work/Purchase Order, including the initiation of any extra work. SECTION 2. DELIVERABLES 2.1 As part of the scope of services and project schedule, the Consultant shall provide the City with the Deliverables identified in the Project Proposal attached hereto as Exhibit “1.” SECTION 3. TERM/TIME OF PERFORMANCE/DAMAGE 3.1 Term. This Project Work/Purchase Order shall commence on the date this instrument is fully executed by all parties and shall continue in full force and effect until terminated pursuant to Section 6 or other applicable provisions of this ProjectWork/Purchase Order. The CityManager, in his sole discretion, may extend the term of this Project Work/Purchase Order through written notification to the Consultant. Such extension shall not exceed 90 days. No further extensions of this Agreement shall be effective unless authorized by the City Manager. 38 2 of 4 3.2 Commencement. Services provided by the Consultant under this Project Work/Purchase Order and the time frames applicable to this Project shall commence upon the date provided in a written Notice to Proceed (“Commencement Date”) provided to the Consultant by the City. The Consultant shall not incur any expenses or obligations for payment to third parties prior to the issuance of the Notice to Proceed. Consultant must receive written notice from the City Manager prior to the beginning the performance of services. 3.3 Contract Time. Upon receipt of the Notice to Proceed, the Consultant shall provide services to the City on the Commencement Date, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the Project Proposal attached and incorporated into this Agreement as Exhibit “1”. The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, whichever shall last occur, shall constitute the Contract Time. 3.4 All limitations of time set forth in this Agreement are of the essence. SECTION 4. AMOUNT, BASIS AND METHOD OF COMPENSATION 4.1 Compensation. Consultant shall be compensated for the provision of the Services in accordance with Exhibit “1” attached hereto. Consultant shall receive a total lump sum fee of $13,901.00 for this Project. 4.2 Reimbursable Expenses. All reimbursable expenses are included in the total compensation listed in Section 4.1 above. SECTION 5. BILLING AND PAYMENTS 5.1 Invoices 5.1.1.Compensation and Reimbursable Expenses. Consultant shall submit invoices which are identified by the specific project number on a monthly basis in a timely manner. These invoices shall identify the nature of the work performed, the phase of work, and the estimated percent of work accomplished in accordance with the Payment Schedule attached hereto as Exhibit “1”, attached hereto and made part of this Agreement. Invoices for each phase shall not exceed amounts allocated to said phase plus reimbursable expenses accrued during each phase. The statement shall show a summary of fees with accrual of the total and credits for portions paid previously. 5.1.2.Florida Prompt Payment Act. The City shall pay the Contractor in accordance with the Florida Prompt Payment Act after approval and acceptance of the Services by the City Manager. 5.2 Disputed Invoices. In the event that all or a portion of an invoice submitted to the City for payment to the Consultant is disputed, or additional backup documentation is required, the City shall notify the Consultant within fifteen (15) working days of receipt of the invoice of such objection, modification or additional documentation request. The Consultant shall provide the City within five (5) working days of the date of the City’s notice. The City may request additional information, including but not limited to, all invoices, time records, expense records, accounting records, and payment records of the Consultant. The City, at its sole discretion, may pay to the Consultant the undisputed portion of the invoice. The parties shall endeavor to resolve the dispute in a mutually agreeable fashion. 39 3 of 4 5.3 Suspension of Payment. In the event that the City becomes credibly informed that any representations of the Consultant, provided pursuant to Subparagraph 5.1, are wholly or partially inaccurate, or in the event that the Consultant is not in compliance with any term or condition of this Project Agreement, the City may withhold payment of sums then or in the future otherwise due to the Consultant until the inaccuracy, or other breach of Project Agreement, and the cause thereof, is corrected to the Owner’s reasonable satisfaction. 5.4 Retainage. The City reserves the right to withhold retainage in the amount of ten percent (10%) of any payment due to the Consultant until the project is completed. Said retainage may be withheld at the sole discretion of the City and as security for the successful completion of the Consultant’s duties and responsibilities under the Project Agreement. Intentionally Deleted. 5.5 Final Payment. Submission to the Consultant’s invoice for final payment and reimbursement shall constitute the Consultant’s representation to the City that, upon receipt from the City of the amount invoiced, all obligations of the Consultant to others, including its consultants, incurred in connection with the Project, shall be paid in full. The Consultant shall deliver to the City all documents requested by the City evidencing payments to any and all subcontractors, and all final specifications, plans, or other documents as dictated in the Scope of Services and Deliverable. Acceptance of final payment shall constitute a waiver of all claims against the City by the Consultant. SECTION 6. TERMINATION/SUSPENSION 6.1 For Cause. This Project Work/Purchase Order may be terminated by either party upon five (5) calendar days written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination and fails to cure the failure to perform within such five (5) day period. In the event that Consultant abandons this Project Work/Purchase Order or causes it to be terminated by the City, the Consultant shall indemnify the City against any loss pertaining to this termination. In the event that the Consultant is terminated by the City for cause and it is subsequently determined by a court by a court of competent jurisdiction that such termination was without cause, such termination shall thereupon be deemed a termination for convenience under Section 6.2 and the provision of Section 6.2 shall apply. 6.2 For Convenience. This Project Work/Purchase Order may be terminated by the City for convenience upon fourteen (14) calendar days’ written notice to the Consultant. In the event of such termination a termination, the Consultant shall incur no further obligations in connections with the Project and shall, to the extent possible terminate any outstanding subconsultant obligation. The Consultant shall be compensated for all services performed to the satisfaction of the City and reimbursable expenses incurred prior the date of termination. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 5.1. Under no circumstances shall the City make payment of profit to the Consultant for services which have not been performed. 6.3 Assignment upon Termination. Upon termination of this Project Work/Purchase Order, a copy of all work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) working days of receipt of written direction from the City, transfer to either the City or its authorized designee, a copy of all work product in its possession, including but not limited to designs, specifications, drawings, studies, reports and all other documents and data in the possession of the Consultant pertaining to this Project Work/Purchase Order. Upon the City’s request, the Consultant shall additionally assign its rights, title and interest under any subcontractor’s agreements to the City. 6.4 Suspension for Convenience. The City shall have the right at any time to direct the Consultant to suspend its performance, or any designated part thereof, for any reason whatsoever, or without reason, for a cumulative period of up to thirty (30) calendar days. If any such suspension is directed 40 4 of 4 by the City, the Consultant shall immediately comply with same. In the event the City directs a suspension of performance as provided herein, through no fault of the Consultant, the City shall pay the Consultant as full compensation for such suspension the Consultant’s reasonable cost, actually incurred and paid, of demobilization and remobilization. Section 7. American Rescue Plan Act Contract Conditions. 7.1 The Consultant acknowledges that the Services authorized under this Project Agreement may be fully or partially funded utilizing Coronavirus State and Local Fiscal Recovery Funds allocated to the City pursuant to the American Rescue Plan Act (“ARPA”). Towards that end, the Consultant shall be required to comply with all laws, rules, regulations, policies, and guidelines (including any subsequent amendments to such laws, regulations, policies, and guidelines) required by ARPA, as further detailed in the ARPA Addendum. If compliance with the ARPA Addendum is required, the City shall select this box: . [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.] 41 1 of 1 IN WITNESS WHEREOF, the parties hereto have caused this Work/Purchase Order executed as of the day and year as first stated above CITY: ATTEST:CITY OF SOUTH MIAMI, FLORIDA, a Florida Municipal Corporation By: CITY CLERK Genaro “Chip” Iglesias, City Manager Date: APPROVED AS TO FORM AND LEGAL SUFFICIENCY: CITY ATTORNEY CONSULTANT: SRS ENGINEERING, INC. By: Name: Title: Date: WITNESSES: Print Name: Print Name: 42 EXHIBIT “1” PROJECT PROPOSAL (SCOPE OF SERVICES AND SCHEDULE AND PAYMENT SCHEDULE) 43