Loading...
06-1154(2)-005GENERAL PLUMBING NOTES 1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA BUILDING CODE AND LOCAL ORDINANCES. 2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1/8" PER FT. MIN. FALL. ANY DEVIATIONS SHALL BE APPROVED BY ARCHITECT/ENGINEER. , 3. PROVIDE CLEANOUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK. ALL CLOSEOUTS TO BE FLUSH MOUNTED. 4. MATERIALS SHALL BE ALL NEW AND AS FOLLOWS: A. DRAINAGE WASTE AND VENT PIPING INCLUDING GREASE WASTE; PVC DRAINAGE WASTE AND PIPING (DWV) CONFORMING TO ASTM D-2665, NO HUB CAST IRON CISPI STANDARD 301 ABOVE GROUND AND CAST IRON HUB, PLAIN END ASTM A-74 WITH NEO- PRENE GASKETS UNDERGROUND. B. WATER PIPING: COPPER TYPE "L" ASTM B-88 ABOVE GROUND AND COPPER TYPE "K" ASTM B-88 UNDERGROUND. C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B-88 INSIDE THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND. PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN PIPING. D. FLOOR DRAINS (IF REQUIRED): JOSAM SERIES 30,000 OR EQUAL EXCEPT AT TRANSFORMER VAULT WHICH SHALL BE JOSAM SERIES 32,000 OR EQUAL. KITCHEN FLOOR DRAIN: JOSAM 35420-50, 12" SQUARE NHCALOY TOP, SATIN FINISH, 1/2" PRIMER CONNECTION, BRONZE SEDIMENT BUCKET. E. FLOOR CLEANOUTS: JOSAM SERIES 56020 OR EQUAL. F. WALL CLEANOUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL. G. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL H. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER. I. ELECTRIC WATER HEATER: GLASS -LINED, P & T RELIEF VALVE, 5 YEAR WARRANTY MINIMUM. 5. PERFORM THE FOLLOWING TEST: A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESS TEST OF 100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE E TIRE SYSTEM BUT NOT LESS THAN ONE HOUR. B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, 'I E END OF THE SYSTEM SHALL BE CAPPED & ALL LINES FILLED WITH WATER TO HIGHEST POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AhT WATER TZVELS REMAIN CONSTANT. C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS. D. COMPLETE SYSTEM FIXTURE & EQUIPMENT SHALL BE GIVEN .:21 IN-SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUND33 OF CHLORINATED LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVALIBLE CHLORINE.) RETAIN MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THROUGHLY . TH POTABLE WATER BEFORE PLACING IN SERVICE. 6. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSIiIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE, REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD. 7. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING U'PILITIES AND POINTS OF CONNECTION BEFORE COMMENCING ANY WORK. 8. PLUMBING CuIMP14CTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION CHARGES REQUIREL. 9. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR INSTALLATION. 10.OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC. AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS. 11. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDESAIE DRAIN AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DARINS. 12.PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND LIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT. 13.000RDINATE WORK WITH OTHER TRADES. 14.FURNISH AND INSTALL FIXTURES AS SPECIFIED IN SCHEDULE IF PROVIDED, OTHERWISE PROVIDE SHOP DRAWINGS. 15.EACH BATHROOM GROUP AND KITCHEN SHALL BE PROVIDE WITH AIR CHAMBERS OR SHOCK ABSORBER AS PER S.F.B.C. I6.PROVIDE SHUT-OFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE. 17.WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. 18.MECHANICAL CONTRACTOR SHALL COORDINATE AND VERIFY HEIGHT AND LOCATION OF STUB -UPS. 19.REFER TO SUPPLIER DRAWING AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND COORDINATION OF EQUIPMENT TERMINATION DETAILS. 20.PROVIDE AT REFRIGERATOR LOCATION: 3/8" C.W. LINE TO 1/4" PETCOCK 6" ABOVE FLOOR . FURNISH 48" OF 1/4" SOFT COPPER TUBING FOR CONNECTION TO REFRIGERATOR . 21. PROVIDE ANTI SCALD AT ALL TUB AND SHOWERS. 2"VTR ,— PLUMBING SYMBOLS S- • — - — • -S COLD WATER PIPE f---S HOT WATER PIPE 'Q WATER HAMMER ARRESTOR n AIR CHAMBER HB HOSE BIBB W / VACUUM BREAKER AND SHUT-OFF VALVE S S SANITARY LINE S C.D. S CONDENSATE LINE WCO WALL CLEANOUT FCO FLOOR CLEANOUT GATE VALVE ( SHUT-OFF VALVE ) Sr' - j ►♦� WATER METER "(2FU) 3 "(4 33"(9FU)»�I PLUMBING FIXTURE CONNECTION SCHEDULE MARK DESCRIPTION FU'S WASTE C.W. B.W. REIfARK3/SPECS P-1 WATER CLOSET 3 S. 1/2. - FLOOR MOUNTED. FLUSH TANK P-2 BATHTUB 2 2' 1/2' 1/2" 5 FT. LONG. PRESSURE BALANCING FAUCET P-2A SHOWER 2 2" 1/2' 1/2- PRESS. BALANCING FAUCET. P-3 LAVATORY 1 1 1/2' 1/2" 1 1/2' COUNTER TOP P-3A LAVATORY 1 1 1/2' 1/2' 1/2" FLOOR MOUNTED P-4 KITCHEN SDLI( 2 1 1/2' 1/2' 1/2' COUNTER TOP P-5 DISH WASHER 1 1/2" 1/2' 1/2- __------ P-8 WASHER (RESIDENTIAL) 2 2' 1/2' 1/2' WATER SUPPLY VALVE & DRAIN IN RECESSED BOX WALL MOUNTED. P-7 BIDET 4 2' 3/4' -- ---------- P-8 REFRIGERATOR I -- -- 1 1/2- -- ---------- NOTE : CONTRACTOR TO COORDINATION PLUMBING FIXTURE SELECTION, WITH OWNER/ ARCHITECT FOR FIXTURE AND FAUCET STYLE & COLOR. NOTE- 2- PIPE & LESS • 1/4- SLOPE 3- PIPE & MORE • 1/8- SLOPE SCOPE OF WORKS INSTALATION OF NEW BATHROOM: THE DRAIN LINES AND VENTS ARE EXISTING BY LAND LORD EXISTING 4" PIPE PROVIDE FOR BATHROOM,MAX. FU PERMITED 10 FU CONDENSATE DRAIN NOTE: THIS CONTRACTOR SHALL EXTEND THE %it CONDENSATE DRAIN FOR THE AHU PIPE TO DISCHARD AT EXISTING 2". COORDINATE EXACT LOCATION FOR 2" PIPE AT FIELD. ii PLUMBINGDRAIN FLOOR PLAN SCALE:1/4"=1'-0' EXISTING 4" PIPE PROVIDE FOR BATHROOM MAXI FU PERMITED 10 FU 12 " VENT 4N"'� L.-.� 2"(2FU) LAV WC0 WC 3""(4FU) / 3"(9FU) 3"(4FU) F DQ��1] 6#)we SANITARY RISER DMaEL F. GUTIERREZ, P. E LIC #049066 SUITE #5 WAX FL 33145 { 78 FAX (3 5)461 8229 DI=G - = CON.SULFING ENGF)" INC. _TDx.S'SGN i'ION.S' �o coco �"-4... c co • � �w A a� ~ C> ,4r' wCO � w O co W � cfl 0? O O Z �� � rD o Z � O � O O co f C) z14 W A O a Cl) C coH f� I� w O � L-4 CD � project no. date: 05/22/06 drawn by: WA checked by:DFG approved by:DFG REVISIONS no./item/date SHEET P.1 1 OF 1