06-1154(2)-004Y HEATING -VENTILATING & AIR CONDITIONING NOTES AND SPECIFICATIONS 1- PROVIDE AND INSTALL A COMPLETE AIR CONDITIONING SYSTEM AS SHOW ON PLANS WITH WORKMANSHIP TO MEET OR EXCEED ALL LOCAL CITY CODES. OR F.B.C. CODES 2001 EDITION, AND INCLUDING THE LATEST EDITION OF THE FLORIDA STATE ENERGY CODE REQUIREMENTS SUPERSEDE ALL OF THE FOLLOWING. 2- ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST ISSUE OF NFPA 90A, 90B, 70 SMACNA MANUALS. 3- IT IS NOT THE INTENT OF THESE PLANS TO SHOW EVERY DETAILS OF CONSTRUCTION. CONTRACTOR IS EXPECTED TO PROVIDE ALL ITEMS THAT ARE REQUIRED FOR A COMPLETE AND WORKABLE HVAC SYSTEM TO THE EXTEND TO WHICH THE PLANS INDICATE. IT IS THE CONTRACTOR RESPONSIBILITY TO FURNISH ALL NECESSARY LABOR, MATERIALS AND MISCELLANEOUS ITEMS TO PLACE All EQUIPMENT IN PROPER WORKING ORDER. 4- CONTRACTOR SHALL EXAM THE PLANS AND SPECIFICATIONS OF ALL TRADES FOR PARTS OF WORK. IF ANY DISCREPANCIES EXIST BETWEEN DRAWINGS FOR HIS WORK AND OR WORK OF OTHER TRADES, HE SHALL REPORT SUCH DISCREPANCIES TO THE ENGINEER AND OBTAIN WRITTEN INSTRUCTION FOR ANY CHANGES IN WORK COVERED BY THESE PLANS AND SPECIFICATIONS. NEGLECT OR FAILURE OF CONTRACTOR TO REPORT SUCH DISCREPANCIES TO THE ENGINEER PRIOR TO BIDDING SHALL BE THE RESPONSIBUM OF THE CONTRACTOR. 5- CONTRACTOR SHALL PROVIDE ALL FEES, PERMITS AND INSURANCE AND SUBMIT TO THE OWNER AN UNCONDITIONAL WRITTEN GUARANTEE FOR THE REPAIR OR REPLACEMENT OF DEFECTIVE WORKMANSHIP AND MATERLALS PROVIDED UNDER THIS CONTRACT FOR A PERIOD OF ONE YEAR AFTER THE DATE OF ACCEPTANCE BY THE OWNER. 6- CONTRACTOR SHALL SUBMIT TO THE OWNER THE FOLLOWING SHOP DRAWINGS AND PRODUCT DATA PRIOR TO ORDERING OR COMMENCING WITH THE WORK: A- DUCT MATERIALS AND ACCESSORIES B- DIFFUSERS, GRILLS AND REGISTERS. C- FIRE DAMPERS. D- ALL EQUIPMENT SUCH AS A.H.U., C.U., FANS, VAV'S, THERMOSTATS ETC. 7- THE FIVE YEAR FACTORY WARRANTY OF THE COMPRESSOR MOTORS SHALL BE FILLED OUT IN THE NAME OF THE OWNER. THIS CONTRACTOR SHALL ALSO FURNISH TO THE OWNER ALL CERTIFICATES OF FINAL INSPECTIONS AND APPROVAL FROM THE INSPECTION AUTHORITIES HAVING JURISDICTION. THE INSTALLATION ACCEPTANCE FORMAT WHICH ACCOMPANIES THE EQUIPMENT FROM THE FACTORY SHALL BE FILLED OUT AND FURNISHED TO THE OWNER. 8- THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING THE NECESSARY CONDENSATE DRAIN LINE FROM THE APPARATUS TO THE EXTERIOR OF THE BUILDING WHETHER SHOWN ON PLANS. UTILIZE PVC OR COPPER MATERIAL DEPENDING THE CEILING FIRE RATING OR THE USE OF A RETURN AIR PLENUM, CONSULT LOCAL CODE REQUIREMENTS. CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH FIRE RESISTIVE 3/4" THICK FOAM PLASTIC INSULATION. 9- WHERE CALLED FOR ON PLANS OR THE USE OF FIBERGLASS IS APPROVED BY LOCAL CODE REQUIREMENTS, FIBERGLASS DUCT SHALL BE 1 1/2 THICK RIGID FIBROUS GLASS WITH ALUMINUM FOIL. GLASS SCRIM AND DRAFT OR PLASTIC JACKET VAPOR BARRIER. THE "K" VALUE OF THE DUCT SHALL BE 0.23 BTU/IN/SQ. FT./DEG F/HR. MINIMUM RATING AT 75 DEGREES. R-6 MIN. 10-EXHAUST DUCTS SHALL BE GALVANIZED STEEL LOCK FORMING QUALITY, HAVING ZINC COATING OF 1.25 OUNCES PER SQUIRE FOOT FOR :EACH SIDE. 11-REFRIGERANT LIQUID LINES BELOW 5/8" O.D. SIZE TO BE ACR TYPE L. SOFT COPPER LIQUID LINES 5/8" O.D. AND LARGER AND ALL SUCTION LINES SHALL BE ACR TYPE L HARD COPPER, 15% SILFLOS TO BE USE FOR WELDING OF REFRIGERANT PIPING ALL SUCTION LINES TO BE INSULATED WITH A MINIMUM 1/2 THICK ARMAFLEX OR EQUAL ROUGH -IN AND PRESSURE TEST ALL REFRIGERANT LINES WITH A 75 PSI PRESSURE, PRIOR TO CLOSING OFF THE REFRIGERANT LINES TO HOLD CHARGE FOR A MINIMUM OF 24 HOURS SIZE OF REFRIGERANT LINES TO BE AS PER MANUFACTURER RECOMMENDATIONS FOR THE ACTUAL LENGTH OF PIPE. 12-CONTRACTOR TO VERIFY EXISTING FIELD CONDITIONS BEFORE BIDDING THE PROJECT, FAILURE TO DO WILL RESULT THAT NECESSARY FIELD MODIFICATIONS SHALL BE -THE RESPONSIBILITY OF THE CONTRACTOR. 13-ALL EQUIPMENT SUPPORTS SHOWN ON PLANS ARE DIAGRAMMATIC AND REQUIRE APPROVAL OF ARCHITECTS, STRUCTURAL ENGINEER AND EQUIPMENT MANUF4r_'TiJPR.F_ PRIOP_ Tn HANGING. 14-CONTRACTOR TO VERIFY WITH THE ARCHITECT OF RECORD THE CEILING/FLOOR FIRE RATING TO DETERMINE REQUIREMENTS FOR FIRE DAMPERS, BEFORE BEGINNING WORK. 15-THERMOSTAT TO BE MANUFACTURED BY HONEYWELL OR EQ. THERMOSTAT LOCATION TO BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION . 16-A C CONTRACTOR TO VERIFY WITH ARCHITECT THE UNITS EER RATING REQUIRED BASED ON FLORIDA ENERGY CODE COMPLIANCE HVAC SYMBOLS 125 CFM SUPPLY AIR DIFFUSER C C EF-1 CM EXHAUST FAN FIBERGLASS A/C DUCT M= FLEXIBLE A/C DUCT 8"0 INSULATION NOTE: PROVIDE MINIMUM INSULATION OF R-4.1 IN WALLS R-30 IN CEILING. OT PROGRAMABLE THERMOSTAT, INSTALL 48" A.F.F. 0- - - RL - - -o REFRIGERATION LINES. PROVIDE "L" COPPER LINES FOR REFRIGERANT. PROVIDE 6" PVC SCH-40 SLEEVE. PROVIDE A MIN. OF 3/4" PERMAFLEX INSULATION ON GAS LINE. MIN. O.D. OF GAS LINE TO BE 1-1/8" MIN. O.D. OF LIQUID LINE TO BE 3/8". INTERLOCK CONTROL OF EACH EXHAUST FAN TO LIGHT SWITCHES EACH BATHROOM. TERMINATE W/GOOSNECK & INSERT SCREEN. INSTALL 6"0 DUCT. NOTES: 1.- PROVIDE THERMOSTAT WITH SUB -BASE. 2.- PROVIDE SOLENOID VALVES, ACCUMULATORS AND OTHER ACCESSORIES RECOMMENDED BY MFGR. FOR PROPER OPERATION. 3.- APPROVED EQUAL MANUFACTURERS ARE ACCEPTABLE. 4.- PROVIDE ACRYLIC COATING ON ALL PARTS OF AHU'S AND CU'S INCLUDING COILS AND FINS. SPECIAL NOTE: PROVIDE 4" CLEARANCE IN ALL AHU ENCLOSURES. TEST AND BALANCE NOTE: 1. THIS CONTRACTOR SHALL PROVIDE A INDEPENDENT TEST AND BALANCE WHERE INDICATED ON THIS DRAWING TO ASSURE THE REQUIRED AMOUNT OF "CFM" ARE PROVIDED AND NOTIFY OF ANY CONFLICT TO REACH THE AMOUNT OF "CFM" REQUIRED. CLOSER MAXO M INTERVALS MAY BE SPECIFIED AS A CONDITION OF U.I. L=TING. PARTICULARLY IN I = RATED FLOOR-CEENG ASSEMBIM. FLEXIBLE DUCT SUPPORTS DUCT SHOULD EXTEND STRAIGHT FOR SEVERAL INCHES FROM A CONNECTION BEFORE BENDING. HVAC DESIGN REQUIREMENTS YES NO DUCT SMOKE DETECTORS X FIRE DAMPERS X SMOKE DAMPERS X FIRE RATED ENCLOSURE CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X FLEXIBLE DUCT INSTALLATION STANDARDS 1. Unless otherwise designate', the term "flexible air duct" is used for all ducts classified by UL as either flexible air ducts or flexible connectors. 2. These provisions apply to ductz used for indoor comfort heating, ventilating, and air conditioning service. They do not apply to senAce for conveying :.-articulates, corrosive fumes and vapors, high temperature air, corrosive or contaminated atmosphere, etc. 3. It is presumed that project specifications define Lie specific materials, pressure limits, velocity limits, friction rate, thermal conductivity, acoustical ratings, and other attributes. 4. When ducts must conform to N'Pa Standard 90A 90B, flexible ducts must be tested in accordance with Underwriters Laboratory's Standard for Factory made Duct Materials, UL-181, and must be installed in accordance with the conditions of their UL listing. Separate installation limitations for flexible connectors and flexible ducts are identified in NFPA Standard 90A. By UL Standard 181, a flexible cor.Dector is defined as . a flexible air duct not having certain flame penetration, puncture, and impact tests. 5. The minimum length of flexible duct should be iiscd. 6. Bends shall be made with not less than 1 duct diameter centerline radius. Ducts should extend a few inches beyond the end of a sheet metal connection before bending. Ducts should not be compressed. 7. Ducts shall be located away from hot equipment such as furnaces and steam pipes to avoid excess temperature exposure. 8. Illustrations of accessories, sleeves, and collars are representative of classes of items. The use of components not precisely identical to these is acceptable. 9. If the application guidelines dictated by the flexible duct manufacturer are more stringent than the specifications in this manual, those of the manufacturer shall govern. SPECIFICATION FOR SUPPORTING FLEXIBLE DUCT 1. Flexible duct shall be supported at the manufacturer's recommended intervals but at least every 5' (1.5m). Maximum permissible sag is a 1/2 inch per foot (41.7 mmlm) of spacing between supports. A connection to another duct or to equipment is considered a support point. 2. Hanger or saddle material in contact with the flexible duct shall be wide enough so that it does not reduce the internal diameter of the duct when the supported section rests on the hanger or saddle material. In no case will the material contacting the flexible duct be less than I" wide. Narrower hanger material may be used in conjunction with a sheet metal saddle that meets this specification. This saddle must cover one-half the circumference of the outside diameter of the flexible duct and fit neatly around the lower half of the duct's outer circumference. 3. Factory -installed suspension systems that are integral to the flexible duct are acceptable for hanging when the manufacturer's recommended procedures are followed. 4. Hangers shall be adequately attached to the building structure. 5. To avoid tearing the vapor barrier, do not support the entire weight of the flexible duct on anyone hanger during installation. Avoid contacting the flexible duct with sharp edges of the hanger material. Damage to the vapor barrier may be repaired with approved tape. If the internal core is penetrated, replace the flexible duct or treat the tear as a connection. 6. Terminal devices connected by flexible duct shall be supported independently of the flexible duct. SPLIT SYSTEM SCHEDULE AIR HANDLING UNIT AIR COOLED CONDENSING UNIT SYSTEM DATA *TRANE CFM HEATER FAN ELECTRICAL *TRANE COMPRESSOR ELECTRICAL MAX CAPACITY MARK MODEL I MARK MODEL EER I NUMBER TOTAL OA KW STEP ESP AMPS VOLTS-PH-HZ NUMBER N0. TONS FLA VOLTS-PH-H FCU USE TMBH SMBH AHU-1 0T3 E13FB 1,000 100 7.5 1 0.6 4.30 208-1-60 CU-1 40 OAl00A 1 2.5 18.5 208-1-60 40 31.00 22.90 14.00 * PROVIDE TRANE UNIT OR EQUAL TO MATCH THE SPECIFICATIONS SHOWED. EXTEND 5"0 SHEETMETAL TOILET DUCT TO EXISTING 5"0 PROVIDED BY LANLORD FOR FUTURE USE. 0- EXTEND REFRIGERATION LINES TO CU AT ROOF. COORDINATE LOCATION OF CU AT FIELD. APPROXIMAT] DISTANCE I00FT. CONDENSATE DRAIN NOTE: THE PLUMBING CONTRACTOF SHALL EXTEND THE %* PIP] FOR CONDENSATE DRAIN TO DISCHARD AT EXISTING 2". COORDINATE EXACT LOCATION FOR 2" PIPE AT FIELD. 1-1/27C22 GAUGE METAL STRAP ANCHORD TO SLAB W/SPANSION ANCH. • BFP. MAX = GAL. METAL STRAP SUPPORT W/METAL MAX 5 FP. SPACING SCREW BETW. SUPPORT -'--LOW VE A)CITY FLEEBIE DUCT R-8 INS. MIN. F .FXIB .. DUCT SUPPORT DETAIL MECHANICALFIRST FLOOR PLAN SCALE: 1/4' =1'-0' ;;, s °t '• I3ANIEL F. GUTIERREZ, P.E. 3360 CORAL WAY +=''0' LTC. #049086 SUITE #5 MIAMI FL 33145 PH. (305)461-3178 �• DFG FAX (305)461-6229 •a CONSULTING ENGINEERS, INC. .DE.SIG.N - INSPECT'x 1S.T.S' 0 z F--i F4 W Q W .--� co FN� W U w U� O F-i F-1 F 4 CO project no. date: 05/22/06 drawn by: WA checked by:DFG approved by:DFG REVISIONS no./item/date SHEET M-1 1 OF 1