06-1154(2)-002GENERAL NOTES
1. THE CONTRACTOR SHALL VISIT THE PREMISES AND THOROUGHLY FAMILIARIZE HIMSELF WITH ALL DETAILS OF THE WORK
AND WORKING CONDITIONS. VERIFY ALL DIMENSIONS IN THE FIELD, AND ADVISE THE ARCHITECT / ENGINEER OF ANY
DISCREPANCY BEFORE PERFOi MW-5 714E WORK
2. THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED UNDER THIS CONTRACT FOR A COMPLETE INSTALLATION AND IN SUCH
MANNER THAT SURFACES NOT AFFECTED BY REMOVAL OF EXISTING OR FROM NEW WORK SHALL REMAIN UNDISTURBED AND
NORMAL ACTIVITIES AT THE INSTALLATION MAY CONTINUE WITH THE LEAST POSSIBLE INTERFERENCE. ALL DEBRIS SHALL BE
REMOVED FROM THE SITE OF THE WORK AT THE END OF EACH WOKINGG DAY. MATERIALS AND EQUIPMENT SHALL BE STORED
ONLY AT LOCATIONS APPROVED BY THE ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE STRUCTURES AND PERSONNEL DURING THE WORK UNDER T1415
CONTRACT. ALL ALTERING, CUTTING, DRILLING OF PAVEMENT, FLOOR AND OTHER MODIFICATIONS SHALL BE NEATLY AND
CAREFULLY DONE BY SKILLED MECHANICS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK, MATERIALS, AND EQUIPMENT AS A RESULT OF
HIS OPERATIONS. ALL DAMAGED WOW SHALL BE REPAIRED OR REPLACED WITH MATERIALS OF LIKE TYPE, QUALITY AND FINISH
BY SKILLED MECHANICS OF THE TRADES INVOLVED AT NO ADDITIONAL COST TO THE OWNER AND TO THE FULL SATISFACTION OF
THE ARCHITECT / ENGINEER
5. DISPOSAL OF ALL MATERIAL NOT SPECIFIED OR SHOUN TO BE SALVAGED AND / OR REUSED RESULTING FROM REMOVAL
OPERATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR ALL COSTS IN CONNECTION WITH DISPOSING OF THE
MATERIALS WILL BE AT THE CONTRACTOR'S EXPENSE. ALL LIABILITY OF ANY NATURE RESULTING FROM THE DISPOSAL OF THE
MATERIALS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR
(o. CONTRACTOR SHALL PROVIDE AND MAINTAIN ACCESS TO ALL EXISTING FACILITIES AND THOSE UNDER CONSTRUCTION
IN THE IMMEDIATE VICINITY, AT ALL TIMES DURING CONSTRUCTION OF PROPOSED PROJECT.
-1. CONTRACTOR SHALL INSTALL SECURITY FENCING AND BARRICADES AS REQUIRED BY THE LOCAL AUTHORITIES, AND/OR
DIRECTED BY ARCHITECT / ENGINEER
8. VERIFICATION OF EXISTING CONDITIONS: EACH CONTRACTOR SHALL DETERMINE AND VERIFY ALL DIMENSIONS AND CONDITIONS
AT THE BUILDING SITE AND SHALL BE RESPONSIBLE FOR SAME BEFORE COMMENCING T14E WOK DISCREPANCIES SHALL BE
REPORTED TO THE ARCHITECT AND/OR ENGINEER AND SHALL BE RESOLVED BEFORE RESUMING THE WOK DIMENSIONS
SHALL BE READ AND NEVER SCALED OR ESTIMATED FROM THE ARCHITECTURAL DRAWINGS.
9. CODE COMPLIANCE:
EACH CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE 2001, AND WITH ALL OTHER
CODES AND GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER HIS PORTION OF THE WORK EACH CONTRACTOR
SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR
SAFETY PRECAUTION AND PROGRAMS IN CONNECTION WITH HIS PORTION OF THE WORK
10. EXAMINATION OF THE CONTRACT DOCUMENTS AND SITE:
EACH CONTRACTOR FOR THIS PROJECT 514ALL STUDY AND FAMILIARIZE HIMSELF WITH THE SITE AND WITH ALL THE DRAWINGS FOR
ALL TRADES AND PARTS OF THE WORK SHOULD ANY CONTRACTOR HAVE THE OPINION THAT THERE EXISTS IN THE
ARCHITECTURAL DRAWINGS ANY ERRORS OR DISCREPANCIES, OR THAT CONDITIONS OF THE WORK OF ANY OTHER CONTRACTOR
15 SUCH THAT IT WILL PREVENT 141M FROM COMPLETING P15 WOW IN A COMPETENT MANNER, HE SHALL NOTIFY THE ARCHITECT OF
SUCH BEFORE PROCEEDING WITH 1415 WORK
THE CONTRACTOR SHALL HAVE AT THE BUILDING SITE, FROM START TO FINISH OF CONSTRUCTION, A RESPONSIBLE FOREMAN.
IN ADDITION, THE CONTRACTOR SHALL GIVE HIS PERSONAL. SUPERVISION TO THE WORK THE FOREMAN 514ALL BE ON DUTY
DURING ALL WORKING HOURS. ANY INSTRUCTIONS OR NOTICES GIVEN TO HIM SHALL HAVE THE SAME IMPORTANCE AS IF
GIVEN TO THE CONTRACTOR IN PERSON.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TEMPORARY PROVISIONS SUCH AS TOILETS,
WATER SUPPLY, LIGHT AND POWER AS WELL AS ANY OTHER DEEMED NECESSARY FOR THE COMPLETION OF THE BUILDING.
ANY ITEM OF WORK NECESSARY TO THE PROPER COMPLETION OF CONSTRUCTION UI41CH IS NOT SPECIFICALLY COVERED
IN THESE DOCUMENTS SHALL BE PERFORMED IN A MANNER DEEMED GOOD PRACTICE OF THE TRADE INVOLVED.
11. PERMITS, FEES AND TAXES: THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES LICEN5E5 AND DEPOSITS ANO BE
LIABLE FOR ALL STATE AND FEDERAL SALES TAXES, AND ALL OBLIGATION UNDER THE FEDERAL SECURITY ACT. UPON
COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL OBTAIN CERTIFICATES OF COMPLIANCE, APPROVAL OR ACCEPTANCE -
FROM ALL AUTHORITIES HAVING JURISDICTION OVER THE WORK AND DELIVER THESE CERTIFICATES TO THE OWNER ALONG WITH
OFFICIAL RECEIPTS FOR SAME.
12. PERFORMANCE OF WOK
NO SUBCONTRACTOR SHALL BEGIN 14I5 WOW UNLESS THE PREVIOUS TRADES, UPON WHOM HE IS DEPENDENT, HAS PERFORMED
THEIR WORK SATISFACTORILY ACCORDING TO THE PLA145 AND SPECIFICATIONS. ONCE THE CONTRACTOR HAS STARTED HIS
HE ASSUMES, FULL RESPONSIBILITY FOR T14AT WORK, BOT14 FOR MATERIALS AND LABOR PERFORMED. ALL SU5CONTRACT0RS
RESPONSIBLE FOR REMOVING DEBRIS RESULTING FROM THEIR WOW FROM THE PREMISES.
13. CLEANUP:
IN ADDITION TO THE REMOVAL OF ALL CONSTRUCTION DEBRIS FROM T14E PREMISES, IT IS THE FINAL RESPMIBILITY OF THE
CONTRACTOR TO REMOVE ALL SMIUDGES, SPOTS OF PLASTER PUTTY, CAULKING COMPOUND, ADHESIVE, PAINT AND PENCIL
MARKINGS, TAGS AND DESTINATION LABELS NOT CALLED FOR A$ BEING PERMANENT. 714E CONTRACTOR SHALL ALSO CLE4,'
EACH AREA SEPARATELY, INCLUDING THE WASHING OF ALL WINDOWS AND VACUUMING OR WAXING OF ALL FLOORS, PRIOR TO
HANDING THE COMPLETED PROJECT OVER TO THE OWNER
14. MATERIALS:
ALL MATERIALS SHALL BE NEW, AS CALLED FOR IN THE DRAWINGS, AND THE BEST OF THEIR RESPECTIVE KINDS. NO
SUBSTITUTIONS SHALL BE MADE BY THE CONTRACTOR WITHOUT PRIOR WRITTEN APPROVAL BY THE OWNER UNLESS SPECIFIED
OTHERWISE ON THE DRAWINGS. FOR PORTIONS OF THE WORK NOT SHOWN IN DETAIL, BUT WHICH ARE 0-44M GENERALLY, OR
ARE REASONABLY INFERABLE AS BEING REQUIRED FOR A COMPETENT AND COMPLETE INSTALLATION, T14E MATERIAL METHODS
-_-AND WORK',!Kr-!:.; 5r,`eL C, :4-41.AS A MINIMUM TO THE TYPICAL OR REPRESENTATIVE.
TERS LABORATORY RA-rW.X- UJHERE A5'^EMBLIES OR THEIR VARIOUS COMPONENTS MATERIALS
�, ✓ 15. FIRE RESISTANCE / uwr-r WRI
OR CONSTRUCTION SYSTEMS ARE INDICATED TO HAVE FIRE RESIST,W-S RATINGS / UNDERWRITERS LABORATORY RATINGS, ALL
SUCH SHALL BE COMPOSED OF MATERIALS AND BE ASSEMBLED 50 AS TO CONFORM TO T14E STANDARDS ESTABLISHED IN
GOVERNING CODES IN ORDER TO ACHIEVE THE REQUIRED RATING N THE COMPLETED WORK
16. CUTTING AND PATCHING:
EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING, FITTING, PATCHING AND MATCHING OF 1415 NEW WORK TO
EXISTING WOW WHERE APPLICABLE AND INDICATED N THE DRAWINGS. NO CONTRACTOR SHALL ENDANGER ANY WORK OF
ANY OTHER CONTRACTOR BY EXCAVATING CUTTING OR OTHERWISE ALTERING ANY WOW OF ANY OTHER CONTRACTORS.
I'1. DEMOLITION:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF DEBRIS REQUIRED TO COMPLETE
THE CONSTRUCTION AS SPECIFIED ON THE DRAWINGS. EXISTING UNUSED ELECTRIC AND PLUMBING SHALL BE REMOVED
OR ADEQUATELY CAPPED AS ALLOWED BY CODE.
24'x305d/4'
GLASS MIRRO
LA
(MN
11
COVER ALL
PIPES IF HO
IS PROVIDED
:36' S.S. GRAB
AT 1-1/2' FROM
1440CAP
WATERCLOSET
20'
WALL
2 KEY PLAN
SCALE: NTS
3-5/8' MTL. STUDS BRACING CN
4'-0' OL. AS REQ.
BOTTOM OF SLAB
ELEV. VARJES
METAL STUD FIRE
EXTEND STEEL STUDS
TO BOTTOM OF SLAB
FIN. CLG. ELEV.
SEE REF.CLG. PLAN
FINISH CEILING SEE REFLECTED CEILING PLAN
3 5/8' OR 6' METAL STUDS AT 16' O/C
(MINIMUM 25 GAGE) PROVIDE MOISTURE RESISTANT
GYPSUM BOARD 9 ALL TOILETS ROOMS
5/8' STUD PAINTED DRYWALL
BOTH SIDES
PTD. COLOR TO BE SELECTED
METAL STUD BRACING
AS REQUIRED
(MAXIMUM 4'-0' C/C)
FASTEN BOTTOM OF STUDS
TO FLOOR STRUCTURE W12 010 GA
5 -REW5 is 48' O.C. (TYP. THROUGHT).
BASE -SEE FIN. SCHEDULE
FINISH FLOOR
(: )
3 PROPOSAL FLOOR PLAN
SCALE: 1 1/2'=1'-0'
I-1/2'x3b'
BAR AT I
MNDCAP
WATERCLC
ELEVATION 1 ELEVATION 2
SCALE : 1/2' = 1'-0'
SCALE :in, = i'-0'
1 PROPOSAL FLOOR PLAN
SCALE:
PROPOSAL REFLECTED CEILING PLAN
SCALE: 1 /4'=V-0"
LEGEND
EXISTING WALL TO REMAIN
NEW CBS WALL
NEW PAWITION
NEW PARTITION I HR. FIRE RATED
I''
KEY NOTES
No.
DESCRIPTION
REFER
O7
2'x4' FLUORESCEME LIGHT FIXTURE SEE
ELECTRICAL PLANS
<
T& FLUORESCENTE LIGHT FIXTURE SEE
ELECTRICAL PLANS
O3
2'x4' ACCCUSTICAL TILE ON QED
METAL GRID
4
2W' ACCCIISTICAL TILE ON SUSPENDED
METAL GRID
O
V
1—
W
Q
O
H
Q
E-�
d{
O
I-1
Z
�D
^
project no.
date: 05/22/06
drawn by. WA j
checked by -Mr C
approved by.:'YC:
REVISIONS
no./item/date
•
•'•,~'=,_.
DFG Consulting Enginears, Inc.
- - ' 'P
3P60 Coral Way, Suite 5
SHEET
- ��
,Miami, FloNda 33145
1 :
'
r,015;
T� 305-461-3178 F. 305-461-8229
Daniel F. Gutierrez, P.E.
0-� roi .
1 OF
1