Loading...
05-1298-013JOHN R. MEDINA & ASSOC. A R C H I T E C T S X a E a" 0 0 0 G 0 Q + Top of Roof + 22'-11" Top of slab + 21'-T Top of beam + Top of Finish floor + 9'-Sr Top of Beam, Porte Cochere. CONCRETE - BEAM. SEE STRUCTURAL DRAWING. Lr"CMU WALL TRUSSES. SEE SPECS. ON ^'A ALHAMBRAA BEFI'P.) BARREL TILE •G IN MORTAR BED 2 (TYPO 3.1 CONCRETE BEAM. SEE STRUCTURAL DRAWING. SEE wNDow SCHEDULE ON SHEETA-8.1 G.C. TO CENTER EXPOSED RATTERS WITHIN SPACE �? PROVIDED. (TYP.1 1t— i STUCCO NG.4C. 01 CMU/GO WALL (REFER TO ELEVATIONS) FURRING ® I6.0. OVER Irl DRYWALL PORTE COCHERE SEI DOORS SCHr ON S-8.1 SEE FINISH SCHEDULE ON SHEETA$.I SLAB. SEE DETAILS ON STRUCTURAL DRAWING. 19 ENTRY SEE FINISH FLOOR SCHEDULE ON BEAM. SEE STRUCTURAL DRAWING. SEE RATING DETAILS ON 1 SHEET A62 Milli ,-•11 —n= •n n=.n n—r E:r =fr 7=�1=1:iluiln uali�_�n�l-R�rn • • .•L C 0 17 O LL_ + 24'-6" Top of Roof + 41'-2' Top of beam ALHAMBRAALHAMBRA BARRELTLE IN MORTAR BED (TYPO +11-9" Top of Finish floor + 9'-9" Top of Finish Floor SEE WINDOW SCHEDULE ON SHEET A-8.1 STUCCO ON Ir CMU /_ CONC. WALL (REFER TO ELEVATIONS FOR FINISH AND THICKNESS). TYP. fr-0" Adjacent grade. II FOOTING. _ REFER TO STRUCTURAL DWGS. SECTION 2 SCALE: 3/ 16t1= I f 0'1 r CONCRETE SUB. SEE STUCCO ON DETAILS ON CMU / CONC. STRUCTURAL WALL (REFER TO DRAWING. ELEVATIONS) ALHAMBRAAIHAMBRA BARREL TILE N MORTAR BED In'P) PROOFING SISTEM. SEE SPECS. ON SHEET A-6.1 BEAM. SEE S• CONCRETE DRAWING. EW NEW R R BEAM• I TION NEW R-30 DE TO FINISH SCHEDULE) INSULATION STRUCIU BLOCK AS SB• DRYWALL OVER SEE DOORI $DRYWALL DRAWING REQUI FOR 7B• METAL HIGH HATS SCHEDULE ON SCH E ON ON21(I LIGHT RES 018.O.C.OVERMIS' SEDUL CHANNESLS Q SM BL . OUT TO METAL STUDS 0 24• 1 or O.C. BE NPEN MINED IN O.C. SUSPENDED FROM STUCCO - FIELD NOT TO STRUCTURE (REFER ON CMU / SEE DOORSCOWL 1.7 WITH TO REFLECTED CONC.SCHEDULE ON CEILING FOR HEIGHT} WALL SHEET A-8.I (REFER TO ELEVATIONS) FOYE CL BEDRiDOIV 2 B•CMUBARREL TILE ITCONCRETE WALL IN MORTAR BED SLAB. SEE SEE FINISH (TYPO DETAT BOOR S TU 1 WT SH MB.1 5/8' DRYWALL 5/3' DRYWALL RAILING N ON 2 Tit ON 2 W —SEE DETAILS CHANNELS ® CHANNELS SHEET A62 16.O.C. 161 O.C. LIVING ROOM KITCHEN W^ Y 'I ---_--- - r ISLAND I I PROJECTION I SEE FINISH I IR- \ I I FLOOR SCHEDULEON METAL IT O.C. TRUSSES. SEE 9' CONCRETl4 SPECS. ON SUB. SEE SHEET A-QI CONCRETE BEAM. SEE DETAILS ON ALHAMBR BRA— P•I STRUCIMM D""N IT BARREL TILE IT DRAWING. IN MORTAR BED fn'P 2 .3.1 SCHEDULE CONCR 5p• NEW R�0 ON SHEET BE. SEEEE DRYWALL ON INSULATION 8• A-8.1 DETAILS ON 21rr CMU CONCRETE SLAB. STRUCTURAL CHANNELS STRUC SEESTRUC SEESTRUCTURAL DRAWING. N 16.O.C. SEEDOORS DRAWING.yV SCHEDULE BATHROOM ON SHEET RMRESEE A$.1 SCHEDULE FURRING STRIPS M ST R IT' CMU WALL MASTER BATHRO ON SHEET A-72 @ I e MIN. 5/9 ALL( � STUCCO ON 8" CMU / CONC. WALL (REFER TO ELEVA7IONS FOR FINISH AND THICKNESS). TYP. SEE FINISH SCHEDULE ON SHEET SEE FINISH A-8.1— SCHEDULE SM GYPSUM WALLBOARD. (2) 3 1 IT - METAL STUDS ® 24.O.C. CONCRETE - SLAB. SEE DETAILS ON STRUCTURAL I- _ DRAWING. SLAB.SEE DETAILS ON STRUCTURAL DRAWING. BARREL TILE IN MORTAR BED JOIST, REFER TO FP(P)STRUCTURAL DRAWING. ilk IN : 0 ..Y.: S V.. ....5:.•.•AY.•.::. .:t.. •::�:.S.t ::::t::.Y :•:::.:l:.h::•::..::: •.•.:s::S � S:v: CONCRETE BEASEE 5/8" M DETAILS ON CHANNESLS STRUCTURAL DRAWING. DRYWALL ON @ICO.C. IPCONCRErE SLAB. REFER TO WA STRUCTURAL WING. LLBOA RD . spr DRYWALL ON 1 2 Irr ll CHANNESLS ®16- C. 5ArDRYWALL SLAB. REFER TO CNN 21/2' STRUCTURAL CHANNESLS 0 DRAWING. I e O.C. SEE DOORS OFFICE ROOM a �� A-8.1 SEE DOORS I' S I SCHEDULE HEET ON SHEET A-8.1 A -&I SEE FINISH o �� FOOTING. REFER TO STRUCTURAL DWGS. SLAB. SEE DETAILS ON STRUCTURAL DRAWING. PROOFING S51ELL.SEE SPECS. ON -CONCRETE BEAM. SEE STRUCTURAL DRAWING. G.C. TO CENTER EXPOSED IRS WITHIN SPACE PROVIDED. STUCCO ON CMU/CONIC. WALL (REFER TO ELEVATIONS) CMU/CONC. WALL (REFER TO ELEVATIONS) TERRACE WAT PROOFING MEMBRANE PRIOR TO TLE INSTALATION. WATER PROOFING TCONCRETE SLAB. SSTEM• SEE SPECS. SEE DErA1LS ON ON SHEET A-6.1 STRUCTURAL ON 2 1 /Y CHANNESLS 16 O.C. GUES ROOM CONCRETE SLAB. SEE DETAILS ON STRUCTURAL DRAWING. 8"C1V1U NEwR30 5/8•DRYWALL BAR INSULATION WALL ON 2 IR CHANNESLS 16" O.C. SEE DOORS SCHEDULE ON FEET"�' GARAGE O FINISH F��\ REFER TO SCH - CONCRETE - SLAB. SEE DETAILS ON STRUCTURAL DRAWING. FOOTING. REFER TO STRUCTURAL DWGS, PROOFING SLAB. SEE SSTEM SEE BRA .) +16'1 Top of bean Wing Room Binning Rom CONCRETE BEAM. SEE STRUCTURAL DRAWING. LIVING ROOM STUCCO ON 17 CMU / CONC. WALL (REFER TO ELEVATIONS FOR FINISH AND PARTITION THICKNESS). TYP. WAL SLAB. SEE DETAILS ON STRUCTURAL DRAWING. FOOTING. REFER TO STRUCTURAL DWGS. SEE FLASH FLOOR SCHEDULE ON SHEET A-8.1 NEW R-W INSULATION REFER TO STRUCTURAL DWGS. 4901 S.W.75th Avenue Miami, Florida 33155 T 305.740.0554 F 305.740.5355 jrmainc@bellsouth.net +22'-6" �r.mr.:xelt IsrAM. sit Top of Beam STRUCTURAL DRAWING. Guess Room. STUCCO ONCMU / REVISIONS DATE CONC. WALL (REFER TO ELEVATIONS FOR FINISH AND THICKNESS). REVISION # 1 03.30.06 FURRING STRIPS ® 1 B MIN. , R-42 INSULATION AND Iff DRYWALL RE1NF. CMU (TYP.) STUCCO ON 8• CMU / CONIC. WALL (REFER TO ELEVATIONS FOR FINISH AND tHICKNEss). NP. +(Y-( UN W O Q U Q \AN`J W �n 0 U 0 N N Q 06 W L U_ Bn•B� O �J Drawings and Specifications as instrument of M R & M RS service are and shall remain the property of the Architect and shall remain the property ES P I N OSA of the Architect whether the project for which they were made is executed or not. RESIDENCE. They are not to be used In any manner on other projects or extensions to this project except by agreement in writing and with the MR. & MRS. ESPINOSA appropriate compensation to the Architect. 6864 SW 68 th ST., Reproduction of drawings and Miami, FL 33155 specifications without the written consent of Mr. Patricia Espinosa. the Architect is prohibited. 305- SECTIONS SCALE: 3/16'=I -U' DATE: 05-07 DRAWN: CAP BY CAP