Loading...
05-1298(2)-054i 120'24OV PANEL "A,. 200M.L.O. 1 PH,3W SURFACE MTD BRANCH CIRCUITS LOCATION WIRE AND CONDUIT TOTAL BREAKER TRIP CKT NO. CKT NO. BREAKER TRIP TOTAL WIRE AND CONDUIT LOCATION VA VA ENTRY #12-1/2'C * 1P-20 1 2 1P-20 16M 412-124C DINING REC. FOYER 3 4 16W APPLIANCES LIVING ROOM 5 6 1600 APPLIANCES LIVING ROOM 7 8 1600 APPLIANCES HALLWAY 9 10 1000 DISHWASHER VIDEO ROOM 11 12 800 G. DISPOSAL 13 14 1600 MICROWAVE 15 16 2P 3000 2#8,1#10 OVEN 17 18 40 3000 1#10 GRD-3/4'C #12.112"C TRASH COMPACTOR D.R. / BREEZEWAY 19 20 1P-20 1000 PLAY ROOM 21 22 1 P-20 1000 SPARE PLAY ROOM 23 24 2P 5600 2 #4.1-C AHU No. 1 OFFICE 25 26 60 65W (10 KW) 27 28 2P (3000) 2 #6-3/4'C C.U. No. t - 29 30 60 (3000) 31 32 1P'20 1000 #12-12'C DISHWASHER 33 34 900 #12-12"C SPARE BATH RECEPT. 35 36 900 SPARE SPACE 37 38 SPACE 39 40 11 41 42 11 * 2400 S.F. 7200 SUBTOTAL 7200 TOTAL = 38,300 31,100 SUBTOTAL (a) AFCI C/9 A/C @ 100%- 4200 HEAT @ 65'A=7150 DEMAND LOAD :s 27.3 KW FIRST 10 KW @ 100 % 17.3KW@40% A/C (a) (a) (a) 120240V PANEL " B" 200 M.L.O. 1 PH,3W SURFACE MTD BRANCH CIRCUITS LOCATION WIRE AND CONDUIT TOTAL BREAKER TRIP CKT NO. CKT NO. BREAKER TRIP TOTAL WIRE AND CONDUIT LOCATION VA VA WASHER #12-12'C 1500 1P-20 1 2 2P 6500 2#4-1'C AHIU No.2 G. OPENER 600 3 4 60 65W (101 KW) G. OPENER 600 5 6 2P (2000) 2 #8-3f4"C CUI NO.2 GARAGE 1000 7 8 60 (2000) GUEST ROOM * 9 10 2P 6000 3 #8-3/4'C W.LH. No.1 GUEST ROOM * 11 12 40 6000 TERRACE * 13 14 2P Y5M 3#10-12'C DRYER REFRIG. 15W 15 16 30 2600 W/GRD. BAR 15W 17 18 1 P-20 * #12-12"C GREAT ROOM BAR * 19 20 * GREAT ROOM BAR * 21 22 * OUTSIDE LTG. BAR * 23 24 * KITTCHEN LTG. MAIDS * 25 26 * KITTCHEN LTG. LAUNDRY ROOM 1500 27 28 900 MINI-AHU SPARE 900 29 30 2P 900 #10-12'C MINI SPACE 31 32 25 900 COND. 33 34 SPACE 35 36 SPACE 37 38 39 40 41 42 * 1100 S.F. 3300 SUBTOTAL 12,400 TOTAL = 42,200 29.800 SUBTOTAL (a) AFCI C/B 10.0 KW (b) ON TIMER = 6.92 KW (c) GFI = 1.15 KW 24.07 KW (100A) 120240V PANEL "CA' 1ODA M.C.B. 1 PH, 3W (CABANA) SURFACE M.T.D. BRANCH CIRCUITS LOCATION WIRE AND CONDUIT TOTAL BREAKER TRIP CKT NO. CKT NO. BREAKER TRIP TOTAL WIRE AND CONDUIT LOCATION VA VA STORAGE #12 -12*C 900 1P-20 1 2 2P 16W #10-12"C POOL BATH / PORCH 900 3 4 25 1500 PUMP BATH RECEPT 900 5 6 2P 1500 #10-12"C SPA WATER HEATER 3010 -12'C 2100 2P 7 8 25 1500 PUMP 2100 30 9 10 1 P-20 600 #12-12'C POOL / SPA LTG. SPARE 900 1P-20 11 12 1P-20 600 #12-12"C RECEPTACLE SPACE 13 14 SPACE 15 16 17 18 11 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SUBTOTAL 7,800 TOTAL = 15,000 7,200 SUBTOTAL (b) ON TIMER DEMAND LOAD: = 15.0 (c) GFI FIRST 10 KW @ 100% = 10.0 5.0KW@400/9 = 2.0 12.00 KW (50A) 120R40V PANEL "M" 400AML0 1 PH, 3W W.PROCf) SURFACE MTD CKT. NO. DESCRIPTION CS TRIP LOAD WIRE OONDUIT REMARKS 1 PNL 'A' 2P-200 38.300 313/0, 1/6 GRO-1'C MAIN %I 2 PNL "B' 2P-200 42.200 3)3/0' 1#6 GRD-1 C MAIN /2 3 PNL 'C' 2P-100 15,900 3#3, 116-lyC MAIN #3 4 PNL 'CA' 2P-100 15,000 3/3, 1 16 GRD-12 C MAIN /4 5 PNL "EM' 2P-125 29,900 3%1. 1 /6 GRD-2 C MAIN #5 TOTAL: 141,300 FIRST 10KW O 100X - 10.0 98.3 KW O 4OX - 39.32 A/C - 21.65 TOTAL - 70.97 KW (296A) DEMAND- PNL 'A' 27.3 7.15 PNL "B' 31.2 7.15 PNL "C' 15.9 -- PNL "CA' 15.0 -- PNL "EM' 18.9 7.15 108.3 21.45 DEMAND LOAD = 31.2 KW A/C @ 100%= 4200 NEAT � 65%=7150 FIRST 10 KW @100 %= '10.0 KW 21.2 KW @ 40 % = 8.48 KW A/C (7.15) = 7.15 KW ,25.63 KW (107A) 120/240V PANEL'EM' 125A M..L.O. 1PH, 3W (EMERGENCY) BRANCH CIRCUITS LOCATION WIRE AND CONDUIT TOTAL BREAKER TRIP CKT NO. CKT NO. BREAKER TRIP TOTAL WIRE AND CONDUIT LOCATION VA VA REFRIGERATOR #12-12'C 16W 1P-20 1 2 2P 65W 2#4-1'C A.H.U. No..3 FREEZER 16W 3 4 60 56W (10 KW) MICROWAVE 15W 5 6 2P (3000) 2#6-3/4"C C.U. No.31 KITCHEN LTG. 900 7 8 60 (3000) FOYER / HALLWAY 900 9 10 1 P-20 900 #12-1 /2"C GREAT RIM. / MAIDS OFFICE / PLAY ROOM 900 1 J 11 12 900 2nd FL. LTG. COOK TOP 2#8, 1#10 3000 2P 13 14 900 M. BEDRC)OM LTG. 1#10, GRD-3/4-C 3000 40 15 900 M. BEDRC)OM LTG. SPARE 1 P-20 17 18 900 OFFICE SPACE 19 116 20 600 M. BEDRC)OM RECEPT. 21 22 600 M. BEDRCOOM RECEPT. 23 24 SPARE 25 26 27 28 SPARE 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SUBTOTAL 13,200 TOTAL = 29,900 16,700 SUBTOTAL (a) AFCI C/B DEMAND LOAD: = 18.9 KW (b) ON TIMER FIRST 10 KW @ 100% = 7.15 (c) GFI 8.9 KW @ 40% = 10.0 A/C = 3.56 COMPLY WTH NEC MOAB) %iOKE DETECTOR uNE sty t2ov av SWTCH SYATCi sWTCH LEG �. 11 PHASE CONDUCTOR SMOKE DETECTOR CONNECTION DETAIL NTS. NOTES: 1-SMOKE DETECTOR SHALL BE HARO'MRED (110 CULT TYPE) TO A NON-SYATCHABLE LIGHTING CIRCUIT KITH BATTERY BACK-UP AND SHALL NOT BE CONNECTED ONTO THE LOAD SIDE OF GROUND FAULT CIRCUIT INTERRUPTER ALL SMOKE DETECTORS VIl" EACH UNIT SHALL BE INTERCONNECTED(AFCI PROTECTED) 2-SMOKE DETECTOR SHALL NOT BE PLACED NITHIN 3FT. OF ANY A/C GRILL 3-SMOKE DETECTORS LOCATED OUTSIDE OF SLEEPING AREAS SHALL NOT BE PLACED CLOSER THAN 3FT. TO BATHROOM DOOR. 4-THE MOUNTING AND LOCATION OF UNIT SMOKE DETECTORS SHALL COMPLY WTH NFPA 72 SEC.2-all.fl . COLING MOUNTS NOT LESS THAN 4' FROM A WALL -WALL MOUNTS NOT LESS THAN V RN OEAJNG NOR MORE THA if TO TOP OF DETECTOR. 20.71 KW (86A) C'WP (METAL) CU 5/8' COPPERCLAD GROUND ROD 10 FT. LONG (a) 120/240V PANEL "C' 1 ODA M. L.O. 1 PH, 3W (2nd FLOOR) FLUSH M.T.D. BRANCH CIRCUITS LOCATION WIRE AND CONDUIT TOTAL BREAKER TRIP CKT NO. CKT NO. BREAKER TRIP TOTAL WIRE AND CONDUIT LOCATION VA VA BEDROOM No. 1 #12 -1/2 C * 1 P-20 1 2 2P 3000 3#8.3/4'C W. HTR. No.1 3 4 40 3000 No.2 No. 2 5 6 1P-20 900 #12-M1/2'C FLOOD LIGHTS No. 2 7 8 1 P-20 900 SPARE MASTER BEDROOM 9 10 1 P-20 * #12 -12"C BATH RECEPT. 11 12 1 P-20 * #12 -12V BATH RECEPT. 13 14 SPACE DEN / CORRIDOR 15 16 DEN / CORRIDOR 17 18 SPARE 900 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 * 2400 S.F. 7200 SUBTOTAL 8100 TOTAL = 15,900 7,800 SUBTOTAL ELECTRICAL NOTES DEMAND LOAD: 15.9 FIRST 10 KW @ 100 % = 10.0 5.9 KW @ 40 % = 2.36 = 12.36 KW (52A) 1. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND ALL APPLICABLE LOCAL CODES. 2. COORDINATE ELECTRICAL SERVICE W/FLORIOA POWER AND LIGHT COMPANY. 3. ALL TELEPHONE RELATED EQUIPMENT PER SFBC 4502.2(Ax11) AND ANSI/EIA/TIA-570 4. ELECTRICAL INSTALLATION DESIGN OF THIS PLAN IN IN COM- PUANCE AS SET FORTH BY STATFT OF FLORIDA STATUTES MODEL ENERGY EFFICIENCY CODES. 5. THE CONTRACTOR ALL EXAMINE THE JOB SITE AND DETERMINE FOR HIMSELF PRIOR TO SUBMISSION OF 810 EXISTING CONDITIONS. 6. ALL ELECTRICAL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR. IT ALL BE HIS RESPONSIBILITY TO SECURE AND PAY FOR ANY PERMITS. CERTICATES OF INSPECTION. AS REQUIRED. (a) 7. SUBSTITUTE MATERIALS EQUIPMENT OR METHODS SHALL NOT BE MADE ATHOUT APPROVAL OF THE ENGINEER. IF THE USE OF A (a) SUBSTITUTE REQUIRES ANY CHANGE IN WORK. THE NECESSARY FOR SUCH CHANGE WILL BE BROUGHT TO THE ATTENTION OF THE ENGI- NEER. AND IF APPROVED, SHALL BE MADE AT NO COST TO THE OWNER. (a) 8. CLEAN UP SUCH TRASH AND DEBRIS GENERATED BY THE WORK AND LEAVE COMPLETED WORK IN A CLEAN, UNDAMAGED. AND FINISHED (a) CONDITION READY TO RECEIVE WITHOUT FURTHER PREPARATION, UNLESS SO SPECIFIED IN OTHER SECTIONS, ANY ADJACENT OR ABUTTING WORK TO BE PERFORMED BY OTHERS. 120/240V 1 PH, 3W 3 15W THAN (CU) 3' C (EA) 3 #500 THWN (CU) 3'C (EA) 1# 1/0 (CU) - 3/4-C BLDG. FOUNDATION STEEL M ■ CWP (METAL) 5/8' COPPERCLAD GROUND ROD 10 FL LONG ELECT. RISER., SCHEDULES & NOTES N.T.S. SCALE: SE�DYRCRAF� �� NTs JOHN R. MEDINA & ASSOC. A R C HIT E C T S 4901 S.W.75th Avenue Miami, Florida 33155 T 305.740.0554 F 305.740.5355 jrmainc@bellsouth.net _ REVISIONS DATE BY B. DEPT. -10- 10-05 R.L.G. 9. MATERIALS, APPLIANCES, DEVICES AND EQUIPMENT SHALL MEET WITH THE REQUIREMENTS OF UNDERWRITERS' LABORATORIES AND SHALL BE NEW AND THE LATEST STANDARD PRODUCTS OF MANUFAC- TURERS REGULARLY ENGAGED W THE PRODUCTION OF THE ITEM. UNLESS OTHERWISE INDICATED. LIKE ITEMS SHALL BE THE PRO- DUCT OF A SINGLE MANUFACTURER. 10. ALL CONDUCTORS SHALL BE COPPER AND RUN IN CONDUIT. ARE SIZE SHALL BE THWN UNLESS OTHERWISE NOTED ON PLANS. PROVIDE GROUND CONDUCTOR PER NEC ARTICLE 250-122. SUgIfC ref( 11. LOCATION OR OULETS IN ELECTRICAL DRAWINGS IS DIAGRAMMATIC: /) CHECK Mj%NUFACTURER'S DRAWING FOR EXACT LOCATION OF OUTLETS. f/rQ OIr 12. PROVIDE TYPEWRITTEN SCHEDULES FOR ALL PANELBOARDS. COMPLY W/ SFBC 4504.4 13. A/C EQUIPMENT WIRING, BREAKER AND FUSE SIZES ARE BASED ON A/C EQUIPMENT SPECIFIED ON ORIGINAL CONTRACT DRAWINGS CON- TRACTOR IS RESPONSIBLE FOR PROVIDING ALL WIRING, BREAKER AND FUSES SIZES IN ACCORDANCE WITH A/C EQUIPMENT NAMEPLATE REQUIREMENTS IF DIFFERENT FROM THAT SPECIFIED ON DRAWINGS. V ,< A"i 1'i s`."i I AS WELL AS ANY FEEDER CHANCES BONO AFFECTED BY HIS CHANGE.:r;t! CONTRACTOR SHALL MAKE ABOVE MENTIONED CHA14CES AT NO EXTRA ufmir EQUIPM,NT s Cx a yip ' "e,I COST. HACK CIRCUIT BREAKERS MAY BE USED IN PLACE OF FUSES. USE AND Ct:�.;2EC;C �W1Rti. Slj. NON -AUTOMATIC SWITCH FOR A/C COND. DISCONNECT. (COMPLY W/NEC 110-26) }' 2v7'T.c- 014E<<c;IJIZKFCdT IIJI 14. ALL SMOKE DETECTORS TO BE INTERCONNECTED ON SAME s tY11J'`1' 13r CKT (KITCHEN OR BATH LTG.) 15. RANGE AND DRYER SHALL HAVE BOW NEUTRAL & GROUNDING ARE PER NEC ARTICLE 250-140. 16. ALL BEDROOM OU`i .ETS SHALL BE PROTECTED BY AN 'ARC -FAULT CIRCUIT INTERRUPTOR".(AF(l) 22k, PNL C M M- M-3 l J6 (CU)-3/4- 2P-125A TRANSFER SWITCH PNL - PNL CA EM ■ �I 3y1, 1 #6 GRD 2-C 25 2P-12125A /1 SEPARATELY NON -DERIVED SYSTEM DIESEL-NEMA 3R ENCLOSURE BLDG. FOUNDATION STEEL JOB j: 05-074 GUERRERO GONZALEZ (GbENGINEERS, INC. Me w C. GuerEn% Uc, P.E. M•ctwnical Eny. Lk. J15235 R°fol L Gonxot•z. P.E 0#06cal Er4 Lie. #11057 43W S.W. 73rd AwK^ Suits 0107A Miami, Florid° 33153 Tel. (305) 202-3944. Fox (305) 262-8211 E-wxk PROJECT ENG64EERS.COM U" nl O W U W 4- U 0 () 7(3 70 r� .lam U 6.G.. r 0 Or Drowings and Specifications (is irhstnenent of M R &IRS. P I NO service are and shall rerndn the property of the Architect and shall remain the property RESIDENCE. of the Architect whether the project for which they were mode is ewecuted or not. They are not to be used in any marmer on other projects or extensions to this project except by agreement in wrifng and with the MR. 8. MRS. PINO appropriate compensation to the Architect. 6864 SW 68 th ST., Reproduction of dvdngs and Miami, FL 33155 specifications withoutthevrittencoreentof Mr. Patricia Espinosa. the Architect is prohibited 305. PANELBOARDS/NOTES SCALE:3/16"=F-9' RISER DIAGRAM DATE: 06-1-05 DRAWN: M.A.R. E 3 t{f f