Loading...
07-16-008ASCE 7-02 WIND LOAD CALCULATIONS MEAN ROOF HEIGHT = 13' < 30' WIND SPEED = 14ro MPH FROM 46GE 1- 02 SIMPLIFY METHOD CAN BE USED USE LINEAR INTERPOLATION ROOF PRESSURES EFFECTIVE WIND AREA ZONE + PRE55. - PRESS. 10 1 +15 -31 20 1 +14 -3ro.5 100 1 +10.5 -34.5 EFFECTIVE WIND AREA ZONE + PRE55. - PRESS. 10 2 +15 -G3.5 20 2 +14 -51 100 2 +10.5 -41 EFFECTIVE WIND AREA ZONE + PRE65. - PRESS. 10 3 +15 -'35.5 20 3 +14 -18.5 100 3 +10.5 -41 WALL PRE55URE5 SOIL STATEMENT: a. TH15 SITE HAS BEEN OBSERVED TO BE SOIL, SAND AND ROCK AND 15 CAPABLE OF 5UPPORTING A LOAD OF 2,000 P.S.F. THE DE5'GN LOAD OF THIS PROJECT DOES NOT EXECEED 2,000 P.5.F. b. A LETTER WILL BE 5U5MITTED AFTER GROUND HA5 BEEN BROKEN, ATTESTING TO THE FACTS THAT THE SITE HAS BEEN OBSERVED AND CONDITIONS ARE SIMILAR TO THOSE UPON WHICH THE DESIGN IS BASED EFFECTIVE WIND AREA ZONE + PRESS. - PRESS. 10 S.F. 4 +31.5 -41 50 5.F. 4 +33.5 -31.5 500 S.F. 4 +28 -32 10 S.F. 5 +31.5 - 50.5 50 5.F. 5 +33.5 - 43 500 S.F. 5 +28 -31.5 USE LINEAR INTERPOLATION, WE HAVE THE VALUES SHOWN ON THE ELEVATIONS AND THE ROOF PLAN CALCULATION FOR "a" 10% OF LEAST DIMENSION = .1 x 31' = 3.1' 0.4xh = 0.4xII' = 4.4' USE 3' THE VALUE FOR "a" JOINTS LAPPED 4'-0" MIN. 4"x4"x1/2 "TH. 6TEE1- COLUMN FILL W/ CONG. GROUT (TYP.) W/ 5/a' TYPE "X' GYP. BD. ENCA155ED AROUND THE COLUMN 4'x4'x2' CONC. PAD W/ (ro) "50 L.I.U. AND (�el) R51P 5.W. GRADE 4 v I v v YL v v° G v a < ° <� ° ° v G ° ° ° G � a ° v v v -6 v G < ° 4' - 0' 2 STEEL COLUMN DETAIL S- I j SCALE: 1 1 /2" = 1'-0" INTERIOR BEARING PTN. W/ 5/a" TYPE "X" GYP. BD. EA. SIDE 2x4 STUDS �@ 1(o" O.C. W/(2) 2x4 TOP PL. W/ RAFTER TIE ,aEA. STUD 4 P.T. 2x4 BOT. PL. W/ 11/2 "x1" L A.B. @ 2'-0" TO GONG. FTG. 2x4 BRACING BETWEEN STUDS '/2" x 1"A5 a) 2'-0" 12"H x 24' W. MONOLITHIC O.G. TO CONC. CONC. FTG. W/ 3 #5 0 4 FOOTING #5 0 TRANSVERSE a 2'-0" O.G. d P • • ° • d 4" WALL BEADING SECTION �-' SCALE: 3/4" = 1'-0" 8"x12" TB W/ (4) �E?0 - 4 (4) #3 � @ 12' O.C. a ENDS 1*3 0 48' REMAINING EL. 2nd FLOOR TB ' CONC. LINTEL W/ (2) 4 0 ELEVATION CON-C. LINTEL SCALE: 1 /2" = 1'-0" ISf6' USP TAPLIro STRAP CONTINUOUS WELD ALONG OF TOP FLANGE-\ WSX10 STEEL BEAM CORNER COLUMN 14, 41 141 41 i J TY 4'x4'x'/2 "TH. STEEL �COLUMN (TYP.) W/ DECCRATIVE CLADDING ENCAISSED AROUND THE COLUMN \ - 4'x4'xO25' CONCRETE �ELLMLEDCOUN IP 12'x0.50'x12' NOTE: w/ 4-1/8'm HOLES VERIFY DIMENSION5 WITH FOR 3/4'0 EXP. BOLTS TRUSS 1ANUFAGTURER 8' MIN. E115EDMENT, NOTE: - ALL 3/4'0 THR1 BOLTS TO BE ASTM A325. - ALL 1/4' STEEL PLATES TO BE A371 A36. - ALL 6PECiFIED MATERIALS ABOVE TO BE EQUAL OR BETTER - 1/4' FILLET WELD FOR ALL PLATE CONNECTIONS. NOTE: - ALL BOLT HOLES TO BE 1/6'0 FOR 3/4'0 BOLTS. - ALL EXPAN61ON BOLTS TO BIE HILTI <Wi< BOLT II. - ALL THRU BOLTS TO BE ASTf•1 A325. BUCKET UPLIFT CAPACITY: - ALL STEEL PLATES TO BE ABTM A36. ONE 3/4'0 THRU BOLT IN - 1/4' FILLET IJELD3 ALL AROUIND FOR PLATE AND COLUMN GOI NECTiONS. DOUBLE SHEAR, EQUALS: -ALL BOLT HOLES 71/8" FOR 4BOLTS. LOAD PERPENDICULAR TO GRAIN = 1,330 LB6. - USE PLYWOOD FILLEE RS5 WHEN REQUIRED. LOAD PARALLEL TO GRAIN = 3,300 LB6, BUCKET UPLIFT CAPACITY: WITH SHORT DURATION LOAD FACTOR Cp -- 1.6 - 4,000 LBS UPLIFT �ER ONE 3/4'0 THRU BOLT. USING 1.3 FACTCR, 1,000 L53 x 1.3 = 1�29 LB3/5OLT BCK -9A (2 MEMBER) a i,�, ntrri r,i i`-✓rr FOUNDATION SCHEDULE REINFORCING MARK 61ZE REMARKS CONT. TRANS\/. j F-2 4'-O"x4'-O"x2'-O" (3) #'� 0 (3) *5 0 - CONC. PAD MF 24 24"W_x12"H. - - (3) #5 ^5 2'-0"', MONOLITHIC FTC. 4.5"X4.5'X3/4" TH. STEEL BASE PLATE WELDED TO STEEL BEAM BEAM D ETA I L - SCALE: 2" = 1'-0" VXV STARTER COLUMN W/(2) 05 0 VERT. (TYP.) 05 0 DOWEL INTO EX16T\ FOUNDATION PLAN N 0 RT H SCALE: 1/4'. = 1'-0" 1 0 1 . o1 t 3 7 J z' DIAMETER HILTI KWIK BOLT II 2 LOCATIONS r-- 1/4' X BENT STL f ,L-A E , - WELDED TO STEEL BE�Artwj s W SX1ro STEEL BEAM BEAM D ETA I L SCALE: 2" = 1'-0" w � w Z J W z Q H 0 z j�a j a. low Q 0 a M U 0 U (n W W coZ w wm~Oa°o R.- u=u:p�M�v u W •� ,� a� jliii J U �. u. 0 a- ."� UCcQ w O J J J u.. Q tJ S U) -. L o Z v V > a) a� 'N Q rn -a M -.= Ln �O _O (D 0 N rd Ln a Ln • 0 Q (.0 rn • r�o�nrn W N d• Ln l� Orn "Z00Ne 4v L. "o Ln V �0� -rn c W ^ J ■ O O V J CIOLj- tAL v L CLnr--Q I , OOLn- V urn ' m o, D � N U C a CL Q M W. 0RAVVN G.C. C. M. D DATE 12-11-2006 SCALE AS SHOWN JAB hJ0 22-2006 SHEET S-1 3 7 S-,EE-�