Loading...
09-49-076NOTES: 1. ALLOW SUFFICIENT SPACE BELOW DRAIN PAN FOR TRAP SLOPE PVC PIPE PER PLANS 2. PITCH DRAIN FOR PROPER RUNOFF. 3. MANUALLY PRIME FILL TRAP BEFORE START-UP TO FORM HEX W / INITIAL DRAIN SEAL. SELF PIERCING SCREW PIERCING 4. SUPPORT LENGTHY DRAIN LINES TO PREVENT SAG AND SIZE IT8,1' LONG, TYP. CONDENSATE OVERFLOW. 20 GA. MIN. GALV. / STRAP, ANCHOR TO ROOF SUPPORT SEE / UNIT CLEANOUT VENT LINE PLANS FOR SIZE. CAP (TYP.) PERFORATED CAP ATTACH TO ROOF WITH 'TAM -PRO 801' PITCH --~ i PLASTIC ROOF CEMENT OR EQUAL DRAIN PAN (MIAMWADE COUNTY APPROVED) PITCH v 1.5' DRAIN PIPE "1.5' PIPESTANO MODEL FABRICATED BY TO MATCH DRAIN u MIRO INDUSTRIES SET PER T�WrrH) RIGID POLYCARBONATE RESICARBON OUTLET SIZE.1.5" BLACK ADD. FOR UV :EBLPROVIDE NO. AS REO'D TO MAINTAIN SLOPE & CLEARANCE ROOF (SEE ARCH.) NOTE: CONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS. ACCOMMODATE HEIGHT OF SUPPORT IN ORDER TO COMPLY WITH AIR GAP REQUIREMENT AT ROOF DRAIN. CONDENSATE PIPE TERMINATION SHALL BE 2"ABOVE ROOF DRAIN STRAINER. PROVIDE SUPPORTS AS PER TABLE 305.4 OF F.B.C. 2004 - MECHANICAL ROOF PIPING SUPPORT DETAIL NOT TO SCALE THIS STANDARD DETAIL MUST BE REVIEWED AND SITE ADAPTED BY CONTRACTOR PRIOR TO USE FOR FINAL EQUIPMENT. (a) THIS DIMENSION IN INCHES MUST BE EQUAL TO THE MAXIMUM FAN SUCTION (NEGATIVE) STATIC PRESSURE IN INCHES WG (NTH DIRTY FILTERS, COILS, AND MAXIMUM AIR FLOW) + V W.G. (b) THIS DIMENSION IN INCHES MUST BE EQUAL TO MIN. 1/2 OF THE (a) ABOVE (c) EQUALS (a)+M+PIPE DIA+ +INSULATION DRAW THRU UNIT CONDENSATE TRAP NOT TO SCALE PROVIDE ROUND SECURED NICKEL BRONZE ADJUSTABLE TOP WITH'CO" CAST IN COVER PROVIDE CLEANOUT TOP WITH VARIATIONS SUITABLE FOR FLOOR COVERING (CARPET MARKER, RECESSED FOR TILE, SCORIATED FOR UNFINISHED FLOORS). PROVIDE BRONZE PLUG IN CAST IRON BODY. PROVIDE TEST TEE MEMBRANE CLAMP FLOOR SLAB ON GRADE WITH SCREWED COUNTER- SUNK ASS PLASTIC PLUG: TAPERED -THREAD WITH o TFE JOINT COMPOUND. WHERE CLEANOUT TEE IS CONCEALED IN A SAME SIZE AS SEWER CHASE OR PARTITION, UP TO 6' MAXIMUM. PROVIDE A ROUND 18 AS REQUIRED FOR GAUGE STAINLESS STEEL DEPTH OF SEWER COVER WITH BEVELED HUB AND SPIGOT LONG SWEEP ELBOW AT EDGES AND FLATHEAD CAST IRON PIPE END OR TURN OF RUN. MACHINE SCREW. BELOW FLOOR. COMBINATION WYE AND SANITARY OR STORM EIGHTH BEND IN RUN. SEWER LINE ENTER TOP OF PIPE. CONCRETE FLOOR _ I I I_ 3 <__ DIRECTION SLAB _ - --F- - OF FLOW LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS OF PIPE GREATER THAN 45 DEGREES, AT 50' INTERVALS ON STRAIGHT RUNS, AND WHERE SHOWN ON PLANS. PROVIDE BACKFILL PER ARCHITECTURAL SPECIFICATIONS. LOCATE CLEANOUTS WHERE THERE IS 18" CLEAR AROUND. CONSULT LOCAL CODES FOR OTHER FCO REQUIREMENTS. FLOOR CLEANOUT DETAIL NOT TO SCALE G\oSS 1 floes SYSTEM No. GAJ-2063 UF Rating - 2 Hr eL Sys e� I ---A SECTION A -A (1) FLOOR OR WALL ASSEMBLY - Min 4-1/2" thick reinforced lightweight or normal weight concrete for 2 Hr Fire Rating. Floor may be constructed of any min. 6" thick UL Classified hollow -core Precast Concrete units. O THROUGH PENETRATION - One nonmetallic pipe or conduit to be centered within the fire stop system. A non annular space of 1/4" is required within the fire stop system. Polyvinyl Chloride (PVC) Pipe - Nom. 4" diam. (or smaller) Schedule 40 cellular pipe for use in closed (process or suplly) or vented (drain, waste or vent) piping systems. Chlorinated polyvinyl Chloride (CPVC) Pipe - Nom. 4" diam. (or smaller) SDR 13.5 CPVC pipe for use in closed (process or suplly) piping systems. O FiRE STOP SYSTEM - The fire stop system shall consist of the following: 3A Packing Material - Mineral wool batt insulation firmly packed into annular space as a permant form. Packing material to extend throughout thickness of floor. 38 Fill, Void or Cavity Material - Sealant - Min. 1/2" thickness of fill material applied within the annulus, flush with top surface of floor. O F(II, Void or Cavity Material - Wra Strip - Nom. 3/16" thick material faced on both sides with plastic film, supplied in 2" wide strip. The number of wrap strips required: Dlam of Through No. of wrap stripes penetrant, in. 2 1 3 2 4 3 Drawing not to scale NOTE: PROVIDE WCO WHERE SHOWN ON PLAN, AND ON SANITARY WASTE BRANCHES NOT SERVED WITH A FLOOR CLEANOUT: LOCATE ABOVE FIXTURE FLOOD RIM WITHIN 4' OF FLOOR. CONSULT LOCAL CODES FOR OTHER WCO REQUIREMENTS. WALL CLEANOUT DETAIL Goss ) r/ SYSTEM No. GAJ-1402 I ow F Rating - 2 Hr Q Sy, COLUMN OR PARTITION AS SHOWN ON FLOOR PLAN CLEANOUT FACE SHALL BE WITHIN 4' OF WALL SURFACE. PROVIDE PIPE EXTENSION IF REQUIRED. i�vi Lvov-tu.r, SECTION A -A 1A FLOOR OR WALL ASSEMBLY - Min 2-1/2 in. thick reinforced light weight or normal weight (100-150 pcf) concrete. Floor may also be constructed of any min 6 in. thick UL Classified hollow -core precast units. 18 METALLIC SLEEVE (optional) - Nom 10 in. (or smaller), Schedule 10 (or heavier) steel pipe sleeve, cast or grouted into floor or wall assembly, flush with floor or wall surfaces. OTHROUGH PENETRATION - One metallic pipe or tubing to be Installed concentrically or eccentrically Into opening such that the annular space between the pipe and the periphery of the opening is min 0 in. (point of contact) to max 2-1/8 in. Pipe to be firmly supported on both sides of opening. The following types and sizes of pipes may be used: A. Steel Pipe - Nom 8 in. diam (or smaller) Schedule 40 (or heavier) steel pipe. B. Iron Pipe - Nom 8 in. diam (or smaller) cast or ductile iron pipe. C. Conduit - Nom 4 in. diam (or smaller) electrical metallic tubing or steel conduit. D. Copper Tubing - Nom 4 in. diam (or smaller) Type L (or heavier) copper tubing. E. Copper Pipe - Nom 4 In. dlam (or smaller) Regular (or heavier) copper pipe. O3 PACKING MATERIAL - Min 1 in. diam backer rod firmly pressed into opening as a permanent form. Forming material to be recessed by min depth of 1/2 In. from top surface of floor or both surfaces of wall. O 4. FILL, VOID, OR CAVITY MATERIALS - Caulk - Min 1/2 In. thickness of fill material applied within the annulus, flush with top surface of floor or both surfaces of wall. A min 1/4 in. crown of the caulking material shall be applied around the entire circumference of the pipe at the level of the floor surface or both wall surfaces. When floor is constructed of hollow -core precast concrete units, fill material shall be installed symmetrically on both sides of the floor. UL/cUL System No. C-AJ-1402 Drawing not to scale W PLUMBING NOTES 1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH FBC 2004, APPLICABLE LOCAL CODES, RULES AND ORDINANCES. 2. PLUMBING CONTRACTOR SHALL VISIT THE JOB SITE AND THOROUGHLY FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. 3. ALL MATERIALS SHALL BE NEW. 4. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIVE. ALL EXCAVATION AND BACKFILL AS REQUIRED FOR THIS PHASE OF CONSTRUCTION SHALL BE A PART OF THIS CONTRACT. 5. REQUIRED INSURANCE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK 6. PLUMBING CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, INSPECTION AND TESTS, PLUMBING CONTRACTOR TO OBTAIN PERMIT AND APPROVED SUBMITTALS PRIOR TO BEGINNING WORK OR ORDERING EQUIPMENT. PLUMBING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS OF HIS WORK BY REGULATORY AUTHORITIES. 7. DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE FOR THE EXACT LOCATION OF FIXTURES, PIPING, EQUIPMENT, ETC. 8. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WiTH THE PROGRESS OF CONSTRUCTION. REPORT ANY DISCREPANCY TO ENGINEERIARCHITECT PRIOR TO BEGINNING CONSTRUCTION. 9. VERIFY LOCATION, SIZE, DIRECTION OF FLOW AND INVERTS OF ALL EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION. ADVISE ENGINEER OF ANY DISCREPANCIES. 10. WATER DISTRIBUTION PIPING ABOVE AND BELOW GROUND SHALL BE TYPE "V COPPER, COORDINATE WITH LOCAL JURISDICTION FOR ADDITIONAL REQUIREMENTS. PROVIDE ALTERNATE FOR CPVC PIPING EQUAL TO BFGOODRICH 'FLOWGUARD GOLD' FOR WATER KNOWN OR DETERMINED TO HAVE ACIDIC CHARACTERISTICS. CONTRACTOR SHALL PERFORM A WATER TEST TO DETERMINE WATER CHEMISTRY PRIOR TO ANY WORK OR PIPING INSTALLATION AND SHALL SUBMIT TEST RESULTS TO ENGINEER FOR REVIEW AND APPROVAL. 11. SOIL, WASTE, VENT AND RAINWATER PIPING SHALL BE CAST IRON OR PVC, WHERE CODE ALLOWS. PVC MAY NOT BE USED THRU RATED ASSEMBLIES OR IN PLENUMS. 12. ALL FIXTURES MUST BE PROVIDED WITH READILY ACCESSIBLE STOPS AND APPROPRIATELY MARKED ACCESS PANELS. COORDINATE LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO INSTALLATION. 13. FURNISH AND INSTALL APPROVED WATER HAMMER ARRESTORS FOR ALL (GROUP) PLUMBING FIXTURES, SIZED AND LOCATED PER MANUF.S INSTALLATION INSTRUCTIONS AND WH-PDI 201. 14. DIELECTRIC COUPLINGS ARE REQUIRED BETWEEN ALL DISSIMILAR METAL IN PIPING AND EQUIPMENT CONNECTIONS. 15. ISOLATE COPPER PIPE FROM HANGER OR SUPPORTS WITH ISOLATOR PADS OR MATERIAL. 16. ALL FIRE RATED FLOOR AND WALL PENETRATIONS SHALL BE PROPERLY PROTECTED FROM FIRE, SMOKE AND WATER PENETRATION BY FILLING VOIDS BETWEEN PIPE AND WALL/FLOOR SLEEVES WITH FIRE RATED FOAM, TO ACHIEVE THE SAME RATING AS WALLS OR FLOORS AS PART OF THE PLUMBER'S WORK. 17. PLUMBING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN ONE (1) YEAR FROM DATE OF ACCEPTANCE BY OWNER CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED. 18. PROVIDE ACCESS PANELS FOR ALL CONCEALED VALVES AND ALL WATER HAMMER ARRESTORS. ACCESS PANELS IN RATED WALLS MUST MAINTAIN THE SAME RATING AND MUST MATCH THE FINISH OF THE WALL IN WHICH IT IS INSTALLED. 19. PROVIDE COMBINATION COVER PLATE AND CLEANOUT PLUG OR ACCESS PANEL FOR ALL WALL CLEANOUTS FINISH TO MATCH FIXTURE TRIM. 20. NO COMBUSTIBLE MATERIAL TO BE USED IN MECHANICAL ROOMS OR IN CEILING SPACES WHERE USED AS RETURN AIR PLENUMS. 21. NO WATER, SANITARY OR DRAINAGE PIPING PERMITTED IN ELECTRICAL OR ELEVATOR EQUIPMENT ROOMS. 22, ALL CONTROL VALVES SHALL BE TAGGED AND MARKED. A REPRODUCIBLE DIAGRAM LOCATING ALL VALVES SHALL BE PROVIDED FOR OWNERIOPERATOR. 23. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE "L' COPPER WITH ARMAFLEX INSULATION PER F.B.C. 2004 CHAPTER 13 TABLE 411.1 WHERE USED IN A RETURN AIR PLENUM. PVC PIPING WITH ARMAFLEX INSULATION MAY BE USED IN LOCATIONS WHERE ALLOWED BY LOCAL CODES. SEE PLUMBING DRAWINGS FOR SIZE AND LOCATION OF PIPING. 24. CONDENSATE LINES SHALL NOT DRAIN ON THE ROOFING SYSTEM OR ANY OF ITS COMPONENTS AND CONDENSATE LINES NEED NOT COMPLY WITH MIN. CLEARANCE REQUIREMENTS PER F.B.C. BUILDING 2004, PAR 1522.3.5 25. PROVIDE ANGLE STOPS ON ALL WATER SERVICE LINES TO FIXTURES FOR INDIVIDUAL SHUT-OFF. 26. WATER PIPING INSULATION SHALL BE ARMAFLEX OR EQUAL INSTALLED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS FOR ALL HOT WATER PIPING. WHERE DOMESTIC WATER TEMPERATURES CAN CAUSE SWEATING ALL COLD WATER PIPING SHALL BE INSULATED WITH ARMAFLEX INSULATION, THICKNESS AS PER F.B.C. 2004 CHAPTER 13 TABLE 411.1 27. STUDOR MININAXI AIR ADMITTANCE VALVES MAY BE USED AS AN ALTERNATE TO VENT PIPING THRU ROOF WHERE ACCEPTABLE BY THE PLUMBING OFFICIAL AND LOCAL CODES. INSTALLATION SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS. 28. ALL HORIZONTAL RAINWATER PIPING THAT RECEIVES CONDENSATE DISCHARGE FROM AIR CONDITIONING EQUIPMENT SHALL BE INSULATED WITH 1' THK ARMAFLEX. SLOPE OF HORIZONTAL STORM DRAINAGE PIPING SHALL BE 1/8" PER FOOT, UNLESS OTHERWISE NOTED. Q 29. AFTER ALL PLUMBING FIXTURES ARE INSTALLED ALL FLOORS MUST BE RESEALED. COLD WATER SUPPLY TO WATER HEATER MIN. 4 GAL EXPANSION TANK HEAT TRAP HOT WATER TO FIXTURES AS SHOWN ON PLANS PROVIDE FULL PORT BALL 1 �1 SHUT-OFF VALVES PROVIDE PIPE UNIONS, DIELECTRIC IF REQUIRED FOR DISSIMILAR METALS THERMOSTAT AND PRESSURE REGU- LATOR FURNISHED WITH WATER HEATER PROVIDE A DRAIN PAN, RUN OVERFLOW LINE TO NEARESTAPPROVED INDIRECT WASTE PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFER TO ISOMETRIC RISER FOR PIPE SIZES. SET HEATER THERMOSTAT AT 120' F. PROVIDE A 210T TEMPERATURE AND 150 PSI PRESSURE RELIEF VALVE WITH TEST LEVER SIZED WITH AGAICGA TEMPERATURE STEAM RATING 10%OVER HEATER INPUT. /-- PROVIDE A HARD COPPER RELIEF VALVE DISCHARGE LINE FULL SIZE OF VALVE OUTLET RUN TO INDIRECT WASTE IN SAME ROOM WITH A VISIBLE AIR GAP DRAIN VALVE BY HEATER MANUFACT DRAIN PAN WITH MINIMUM 2' HIGH SIDES WATER HEATER DETAIL NOT TO SCALE PLUMBING LEGEND --- CO CLEAN OUT -j SANITARY SEWER PIPING FD FLOOR DRAIN fr - - VENT PIPING - CW DOMESTIC COLD WATER DOMESTIC COLD WATER PIPING HW DOMESTIC HOT WATER - - - '--S HOT WATER PIPING (110') HB HOSE BIBB �- CD -S CONDENSATE PIPING _ _ _ _ VTR VENT THRU ROOF SD -4 STORM DRAIN PIPING DQ GATE VALVE S-{>-s PIPE RISE UP 4# WATER HAMMER ARRESTER (PDI No.) PIPE DOWN OR DROP FD FLOOR DRAIN r-- CAPPED END OF PIPE �{ CLEAN OUT �- POINT OF CONNECTION P-TRAP PLUMBING FIXTURE SCHEDULE LAV LAVATORY TO BE BY OWNER/ARCHITECT. HLAV HANDICAP LAVATORY TO BE BY OWNERIARCHITECT. WC WATER CLOSET TO BE BY OWNERIARCHITECT. HWC HANDICAP WATER CLOSET TO BE BY OWNERiARCHITECT. UR URINAL TO BE BY OWNER/ARCHITECT. HDFIDF DRINKING FOUNTAIN TO BE BY OWNER/ARCHITECT. MOP SINK MOP SINK TO BE BY OWNERIARCHITECT. SK SINK TO BE BY OWNER/ARCHITECT. SK-2 2-COMP. SINK TO BE BY OWNER/ARCHITECT. SK-3 3-COMP. SINK TO BE BY OWNERIARCHITECT. LSK LAB SINK TO BE BY OWNERIARCHITECT. ES EMERGENCY SHOWER TO BE BY OWNERIARCHITECT. EW EYEWASH TO BE BY OWNERIARCHITECT. H8 HOSE 8198 TO BE WOODFORD MODEL B24 WITH BOX, 3/4' STRAIGHT INLET CONNECTION, ANTI -SIPHON. GET GREASE TRAP TO BE WADE MODEL 5120. EWC WATER HEATER SHALL BE 50 GAL. ELECTRIC 208V, 3 PHASE, 9.0 KW. LOCHINVAR STANDARD HI -POWER MODEL HST09.50. GENERAL NOTES: 1) - FIXTURES SHALL BE AS SHOWN OR EQUAL. ( O Ly W TWLE0 B C L E DIN C S F R I D CO I CL D NG ONE OM 01, 009 (3) - ALL FIXTURE TRIM PACKAGES INCLUDING BUT NOT LIMITED TO TRAP, ANGLE STOP, FLUSH VALVE, SUPPLY TUBES, AND CLEANOUT COVER PLATES SHALL BE OF THE SAME FINISH AS THE ABOVE SPECIFIED FAUCET AND PER ARCHITECTURAL FINISH SCHEDULE. (4) - ALL FIXTURES SHALL BE ROUGHED IN PER MANUFACTURER CUT SHEET TO MAINTAIN UNIFORMITY. WATER HAMMER ARRESTER SPECS. P.D.I. UNITS F.U. RATING MODEL No. MANUFACTURER CONNECTIONS A 1 -11 652 - A SIOUX CHIEF 1/2" B 12 - 32 653 - B SIOUX CHIEF 3/4" NOTE: 1. SIOUX CHIEF WATER HAMMER ARRESTORS ARE APPROVED FOR INSTALLATION WITHOUT ACCESS DOOR REQUIRED. CONFORMS TO ANSVASSE 1010 STANDARDS. SLOPE OF HORIZONTAL DRAINAGE PIPE AS PER TABLE 704.1 - FBC PLUMBING SIZE (INCHES) MINIMUM SLOPE (INCH PER FOOT) 2 1/2 OR LESS @ 1/4' / FT 3TO6 @1/8'/FT 8 OR LARGER @ 1/16' / FT MAXIMUM FLOW RATES AND CONSUMPTION FOR PLUMBING FIXTURES AND FIXTURE FITTINGS (AS PER TABLE 604.4 - FBC PLUMBING) PLUMBING FIXTURE OR FIXTURE FITTING MAXIMUM FLOW RATE LAVATORY, PRIVATE 1.5 GPM AT 60 PSI LAVATORY, PUBLIC 0.5 GPM AT 60 PSI SINK FAUCET 1.5 GPM AT 60 PSI URINAL WATERLESS OR 0.5 GPM PER FLUSHING CYCLE WATER CLOSET 1.28 GALLONS PER FLUSHING CYCLE WALL HUNG FIXTURES SHALL BE SUPPORTED AS PER FBC 2517.5.1.1 Steel studs supporting wall hung plumbing fixtures shall be doubled or not or less than 20 gauge with a minimun effective moment of Inertia equal to 0.864 Ind (360m4 ). Nk REMOs I1 _ J4LEJANDR0 REMOS R.A. Ili--r-Ohlieidts Alejandro Remos R.A. 0011702 -18501 Pines Blvd. _Suite 107 Pemorok9 Pines FL- :W29 jj TeZ (954) 442 7122 Fa .:(954)-442 7 :90, e-mail: remosbldggaol.com SOMERSET CHARTER SCHOOL South Miami -5876 SW 68th Street South Miami, FL 33143 CONSULTANTS: JEANETH ARDILA architect ALBERTO CHINCHILLA architect ALEJANDRO CABAL -CABAL architect MARCEL ADRIAN PEREZ architect -18501 Pines Blvd., Suite 107 Pembroke Pines FL 33029 STRUCTURAL ENG.: EDUARDO GONZALEZ P.E. INC. Structural Engineers State of Florida CA No. 6188 J. Eduardo Gonz6lez P.E. -717 Ponce de Le6n Blvd., Suite 335 Coral Gables FL 33134 Tel: (305) 445 5100 Fax: (305) 445 6644 e-mail: eddygon@bellsouth.net M.E.P. MG.: INGEMEL SA LLC. ENGINEERING COMPANY STATE OF FLORIDA CA No. 9113 Pedro Arlas P.E. 63813 Patricia Morales P.E. 63818 -20871 Johnson Street, Suite 115 Pembroke Pines FL 33029 USA Tel: (954) 318 2264 Fax: (954) 450 7218 e-mail: pedroapingemel.com pmorales@ingemel.00m CIVIL ENG.: Consulting Engineering & Science, Inc. Nelson H. Ortiz P.E. 575H -10700 North Kendall Drive Suite 400 Miami FL 33176 Tel: (305) 378 5555 Fax: (305) 279 4553 e-mail: noniz@CESMIAMI.com LANDSCAPE ARCH.: M. L. A. GROUP INC. Scott McClure RLA SWUS5 -690 NE 13th Street Suite 105 Fort Lauderdale FL 33304 Tel: (954) 763 4071 Fax: (954) 4671688 e-mall: mlagroupinc@yahoo.com SEAL: .•. • C) � U :i tcl - P.E. 63818 REVISIONS: Project No: USC13-1 Model File: Drawn by: A.G. Approved by: P.M.M. Date: 09/08/08 Scale: As Shown Copyright Sheet Title PLUMBING NOTES, DETAILS AND SCHEDULES Sheet Number P=5 SOMERSET SOUTH MIAMI i