Loading...
09-49-004PAVING -GRADING -DRAINAGE NOTES 1. GRADING SHALL CONSIST OF ALL EXCAVATION, FILLING, SHAPING AND SLOPING NECESSARY FOR THE CONSTRUCTION, PREPARATION AND COMPLETION OF ALL SUBGRADES SHOULDERS, SLOPES, INTERSECTIONS, PAVEMENTS AND OTHER AREAS, ALL IN ACCORDANCE WITH THE ALIGNMENT AND GRADES SHOWN IN THESE DRAWINGS. 2. DRAINAGE STRUCTURES SHALL BE AS DETAILED IN THESE DRAWINGS. DRAINAGE PIPE TO BE CORRUGATED POLYETHYLENE. 3. SAWCUT ALL PAVEMENT EDGES WHERE EXISTING PAVEMENT IS TO REMAIN. 4. CONCRETE CURB, SIDEWALK AND SLABS SHALL CONSIST OF 3,000 PSI PORTLAND CEMENT CONCRETE, AS SHOWN IN THESE DRAWINGS. 5. ALL REINFORCING, ALL SIZES, SHALL CONFORM TO ASTM A615, GRADE 60. 6. ALL EXPOSED CONCRETE SURFACES SHALL RECEIVE A LIGHT BROOM FINISH, UNLESS OTHERWISE DIRECTED. 7. TESTING LABORATORY SHALL BE RETAINED BY THE CONTRACTOR TO VERIFY SPECIFIED COMPACTION DENSITY AND CONCRETE STRENGTH. FAILURE OF ANY TESTING TO MEET SPECIFIED REQUIREMENTS SHALL BE DEEMED NON -COMPLYING. FLOODPLAIN MANAGEMENT ANALYSIS Process # : Folio #:09-4025-028-1390/1400/1410/1420/1430 5896 S.W. 68th STREET Address : SOUTH MIAMI, FLORIDA Average Crown/Road Elv.: 11.58 Highest crown of road elevation above was taken from a certified survey prepared by FERNANDO GATELL PLS Lic # : 2821 Elevation Lowest Floor Adjacent Grade Lowest Catch Basin Existing N/A 11.75 N/A Proposed 12.35 11.95 11.10 A Tie -Beam Elevation Certificate, is required before making any inspection above lowest floor and a Final Elevation Certificate is required before issuance of certificate of occupancy or completion (Completion HOLD 1 86) (1 1 c3-3d3) Call (305) 375-6685 PROP. BUILDING FINISHED FLOOR J4 ELEV. 12.35 IV FINISHED FLOOR ii ELEV. 12.35 IV R/W /LINE CONC. I SDWK VARIES 1 5'-0" 2' SLOPE 2.0% (MA NEW CONCRETE SIDEWALK PROP. BUILDING � um�nm L — EXIST. 2' CURB & GUTTER 18' EXIST. ROADWAY TO BE MILLED & RE -SURFACED (1 " DEPTH MIN.) S*- E I SECTION B-B R/W SCALE : 1 " = 3/1 6' /LINE 50' R/W CONC. I SDWK 4.65' 1 5'-0" 2' SLOPE (w NEW CONCRETE SIDEWALK EXIST. ROADWAY TO REMAIN II I .................. III • • • • • • • • EXISTING ASPHALTIC PAVEMENT TO REMAIN II l...........III EXISTING ASPHALTIC PAVEMENT I III • • • • • • .... III TO BE MILLED & RESURFACED " " " " " ' "III SLOPE II I............'.'.'.'.'.'.'....I II -_rT --- NEW ASPHALTIC PAVEMENT II ..................... + XIST. CONCRETE �I �...........I...........I �I J SIDEWALK '• /. •'• • •'•'• • •' NEW CONCRETE WALKS/PAVEMENTS// :.�,.:.;�•.•�:� /// ........................\\\ � R W LINE EXIST. 2' CURB R/W LINE / \ / & GUTTER � / ..........................� \ W W NEW TURF BLOCK / ///............ • \\\ (COORD. W/ ARCH. DWG S) / ...... j \ W W ► / /. .. . . ..'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'• \ \ _ _ _ _ ///..................................\\� RIME NEW BRICK PAVERS EXIST. SIDEWALK ���/!\��� EXIST. SIDEWALK (COORD. W/ ARCH. DWG'S) _ _ _ __..:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:..:...................:.� _ _ __ _ _ __ 7. EX1ST..'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'LLLLLL.'.'.'.'.'.'.'.'.'..'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.' .' '. EXIST. PAVERS EX(ST.;.'2 .'.'.'.'.'.'.'.'.'.'.'.'.'.'.' EXIST.. •2 LLLLLLCB........................................................................... 25 LLLLLL (TO REMAIN) CURB:....GUTTER.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.. '.'.'.....'.'.....'.'."I'.'.'.'.'.'.'.'....'......'.'..........'.'.....'.....•CURB::&:::GUTTER:.'.'. S.W. 68th STREET 18' 18' 2 5 - 0 I - - - - - - = - �� EXISTING SPOT ELEVATION (SEE SURVEY FOR ..........:....:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.'..::.:.:.:.:.:.:.:.:.:.:.:.:.;..'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'........... EXIST. ROADWAY TO BE EXIST. ROADWAY TO ADDITIONAL INFORMATION) MILLED& RE -SURFACED REMAIN XIST:..2,.......................................................'.'.'.'.'.'.'.'.'...'.'.'.'...'.'.'...'.'.'.'...'.'.'.'.'.'.''.EXIST:.'.2'.'.'...'.'.'.'.'.'. (1„ DEPTH MIN.) I1­_� .URB.:.&.:GUTTER.*.'.*.'.*.'.*.*.*.*. :.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:....::::::::::.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:...... :.:.:.:.'..:.CURB.:.Bt.'.GUTTER:.'.'. I I 8.50 NEW SPOT ELEVATION 0 ------------ ............................ _----------- ��........................................../ �i EXIST. SIDEWALK �� EXIST. SIDEWALK �'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'..'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'. OA NEW STRUCTURE I.D. - - - -\\'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.................i.j/, - - - SLOPE- I SL�� \ ............... ............... , ')\\\...............�.............. ;.�._ .. �- ��- R/W LINE \\\\.:.'.'.'.'.'.'.'.'.'.'.''.'.'.'.'.:.......:.'.' I// /R/W LINE L /�1 1 l ]._ �.\-] 1 1 Lam\ 1 L LL\-] ._1 �L I L= ---- — — — - I J XIST. CONCRETE NEW CATCH BASIN \\\....... /// SIDEWALK\'.'.'.'.'.'.'.'.'.'.'..'.'.'.'.'.'.'.'.'.'.'/// EXIST. 2CURB & GUTTER I EXIST. 2' CURB FD NEW FRENCH DRAIN & GUTTER SECTION A -A SCALE : 1 " = 3/1 6' Q D H W IL rCALL 48 HOURS BEFORE YOU DIG IN FLORIDAI 1-800-432-4770 ,SUNSHINE STATE ONE CALL OF FLORIDA, INC. Arch Projeci No: 0880 Model File: Drawn b V.Q. / A.M. Appro�ed by: N.H.O. Date: 1 12/23/08 Scale:, AS SHOWN CES PROJECT No. 08065 Copyright Sheet Title PAVING - GRADING DRAINAGE PLAN AND NOTES Sheet Number �C=2 SOMERSET SOUTH MIAMI