Loading...
Res No 137-22-15890RESOLUTION NO.: 137-22-15890 A Resolution authorizing the City Manager to execute a professional service work order to Stantec Consulting Services, Inc., for Drainage Improvements on SW 63rd Ave from SW 69th St to SW 70th St. WHEREAS, the City Mayor and Comm ission wish to provide drainage improvements on SW 63rd Ave from SW 69th St to SW 70th St; and WHEREAS, this project was approved by Commission in the Capital Improvement Work Program; and WHEREAS, Stantec Consulting Services Inc., is one of four firms selected by Resolution No. 056- 22-15890, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287 .0 55, "Consultants Competitive Negotiation Act"; and WHEREAS, Stantec Consulting Services Inc., submitted a revised proposa l for professional engineering services; and WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and WHEREAS, the amount of $25,390 was found to be comprehensive and cost effective in its des ign approach; and WHEREAS, the Mayor and City Commission desire to aut h o rize the City Manager to execute a professiona l service work order with Stantec Consulting Services Inc., for the development of constructio n documents for drainage improvements on SW 63rd Ave from SW 69th St to SW 70th St for a total amount not to exceed $25,390. WHEREAS, the expenditure shal l be charged to the American Rescue Plan Act Fund account number 121-1730-541-6210 which has a balance of $5,263,483.26 prior to this request. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full he re in. Section 2. The City Manager is hereby authorized to execute a professional service work order w ith Stantec Consulting Services In c., for the developm ent of drain age improve m ents on SW 63rd Ave from SW 69th St to SW 70th St for a total amount not to exceed $25,390. The expenditu r e is to be charged to the American Rescue Plan Act Fund account number 121-1730-541-6210 which has a balance of $5,263,483.26 prior to this request. Section 3. Corrections. Conforming langua ge or technical scrivener-type correctio ns m ay be mad e by the City Attorney for any conformin g amendments to be in co rp o rat ed into the fin al r eso lution for signature. Page 1 of 2 Res. No. 137-22 -15890 Section 4 : Severability. If any section, clause, sentence, or ph r ase of th is reso l ution is fo r any reason h eld i nva li d o r u nco n stitut io n al by a co u rt of competent juri sdiction, the hold ing sh all not affect t h e valid ity of the re m aining porti o n s of this reso l ution. Section 5: Effective Da t e : Th i s resolution shall become effective immediately upon adoption. PASS ED AN D ADOP TED t h is 18th day o f Octobe r , 2022. ATT ES T: c,~~p APPROVED: OP /J' # LJ, ~r /MAYOR , tl REA D AND APPROV ED AS TO FORM, COMMISSION VOTE : 5-0 LA NGUAGE , LEGA LI TY AND ECUTION Mayor Ph ili ps: Yea Co m m i ss i o n er Harris: Yea Commiss i o n er Gil: Yea Commiss i oner Liebman: Yea Cir Commissioner Corey: Yea Page 2 of 2 Agenda Item No:11. City Commission Agenda Item Report Meeting Date: October 18, 2022 Submitted by: Aurelio Carmenates Submitting Department: Public Works & Engineering Item Type: Resolution Agenda Section: Subject: A Resolution authorizing the City Manager to execute a professional service work order to Stantec Consulting Services, Inc., for Drainage Improvements on SW 63rd Ave from SW 69th St to SW 70th St. 3/5 (City Manager-Public Works & Engineering Dept.) Suggested Action: Attachments: Memo CCNA Stantec for drain 63av btwn69-70st.docx Reso CCNA Stantec for drain 63av btwn69-70sts.docx Res No 056-22-15809.pdf SW 63 Ave - & SW 60 to 70 st St Drainage Improvements.pdf 1 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor & Members of the City Commission FROM:Shari Kamali, City Manager DATE:October 18, 2022 SUBJECT:A Resolution authorizing the City Manager to execute a professional service work order to Stantec Consulting Services, Inc., for Drainage Improvements on SW 63 rd Ave from SW 69th St to SW 70th St. BACKGROUND:The roadway segment along SW 63rd Avenue between SW 69th Street and SW 70th Street is experiencing localized flooding during rainstorm events due to improper drainage in the area. To address the localized ponding, StantecConsulting ServicesInc., will design and develop construction plans to provide new drainage system based on the 5-year 1- hour storm event, swale re-grading, mill and resurface the roadway and provide re- striping of pavement markings as required. Drainage Plans will be submitted to RER/DERM for drainage review. As the next City’s rotation list consultant, Stantec Consulting Services Inc., was requested to provide a proposal for drainage improvements. On June17, 2022,Stantec Consulting Services Inc., submitted a revised proposal for drainage improvements that is comprehensive and cost effective for the services requested. Stantec Consulting Services Inc., is one of four firms selected by Resolution No. 056-22- 15809, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, “Consultants Competitive Negotiation Act. AMOUNT:Amount not to exceed $ 25,390. Please refer to the consultant contract and fee schedule. FUND &ACCOUNT:The expenditure shall be charged $25,390 to the American Rescue Plan Act Fund account number 121-1730-541-6210 whichhas a balance of $5,263,483.26 prior to this request. ATTACHMENTS:Resolution Resolution #056-22-15809 Stantec Consulting Services Inc., proposal dated June 17, 2022 2 5 RESOLUTION NO.: 056-22-15809 A Resolution authorizing the City Manager negotiate and execute a Professional Service Agreement provided under Florida Statute 287.055 Consultant's Competitive Negotiation Act "CCNA", with SRS Engineering, Inc., EXP U.S. Services Inc., Stantec Consulting Services Inc., Calvin, Giordano & Associates, Inc., M&J Engineering P.C., and Kimley-Horn and Associates, Inc., for general engineering services on an as needed basis. WHEREAS, the City Mayor and Commission wish to negotiate and execute for general engineering and architectural services on an as needed basis and on a rotation basis ; and WHEREAS, in accordance with Florida Statute 287 .055, "Consultants Competitive Negotiation Act." (CCNA), the City issued a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services, on a rotational and as needed basis; and WHEREAS, a Selection Committee comprised of City staff, rev iewed the proposals received and is recommending, based on the final scores and ranking, six (6) firms for the Contract Negotiations phase of the process required by the CCNA; and WHEREAS, it was noted that two Respondents tied in ranking order, EXP U.S. Services Inc., and Stantec Consulting Services Inc., at 2.33; and WHEREAS, due to the number of proposals received (21}, the Selection Committee is recommending six (6) Respondents for Contract Negotiations phase of the CCNA process and execution of professional service agreement; and WHEREAS, the Mayor and City Comm ission wish to authorize the City Manager to negotiate and execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and providing the City Manager with sole discretion to renew the agreement for one (1) two (2) year renewal. The maximum term of any one contract, if the City Manager decides to renew it, will be five (5) consecutive years. The expenditures related this contract will be charged to the Capital Improvements Program Accounts on an as needed basis. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is hereby authorized to negotiate and execute a non-exclusive multi- year contract with the firms selected for professional surveying, studies, engineering, and architectural services for construction projects in accordance with Section 287 .055, "Consultants Competitive Negotiation Act" on a rotational and as needed basis . The term of each contract will be three (3) years and the City Manager will have an option to renew each contract for one (1) two (2) year term . A copy of Page 1 of 2 6 Res. No. 056-22-15809 a draft of the contract is attached. The contract may be amended in the event that the City Attorney finds that it is in the best i nterest of the City and that it comp lies with the CCNA process. The expenditures rela t ed these contracts will be charged to the Capital Improvements Program Accounts. Section 3. Corrections. Conforming language or technical scrivener -type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final resolution for signature. Section 4: Severability . If any section, clause, sentence, or phrase of this resolution is for any reason he ld invalid or unconstitutional by a court of competent jurisdiction , the holding shall not affect the validity of the remaining portions of this resolution. Section 5: Effective Date: This resolution shal l become effective immediately upon adoption. PASSED AND ADOPTED this 3 rd day of May, 2022. READ AND APPROV ED AS TO FORM, LANGUAGE, LEGALITY, AND EXECUTION Page 2 of 2 APPROVED: COMMISSION VOTE: Mayor Philips: 5-0 Yea Commissioner Harris: Yea Commissioner Gil: Yea Commissioner Liebman : Yea Commiss i oner Corey: Yea Stantec Consulting Services Inc. 901 Ponce de Leon Boulevard Suite 900, Coral Gables FL 33134-3070 June 17, 2022 File: 215681119 Attention: Mr. Aurelio Carmenates, P.E. Capital Improvements Project Manager City of South Miami Public Works Engineering & Construction Division 4795 SW 75th Avenue Miami, FL 33155 Main: (305) 403-2063 Dear Mr. Carmenates, Reference: Drainage Improvements on SW 63 Ave from SW 69 St to SW 70 St Scope of Project: We are pleased to present this proposal for professional engineering services for your consideration. The City of South Miami would like to improve the drainage on SW 63 Avenue between SW 69 Street and SW 70 Street. The City has received complaints of water flooding at the above location. See attached aerial for project limits. Scope of Services: Design Phase Our scope will consist of obtaining a topographic and boundary survey and a percolation test for use in our design. We will conduct a field assessment of existing conditions including a photo record. Utility coordination will be performed. Our design will consist of new drainage based on the 5-year 1-hour storm event. Stantec will provide milling and resurfacing plans, drainage, swale grading and limited pavement marking plans. We anticipate submittals of 90% and 100% plans to the City for review. We will also compile quantities and an estimate of probable cost with each submittal. Specifications will be provided on the plans and not in CSI format. Permitting Phase Our services include assistance and coordination to have the plans reviewed and approved by Miami-Dade DERM for the drainage. Permitting/review fees can be charged to the allowance task and billed to the City at cost. Procurement Assistance During this phase Stantec will be available for Assistance as requested by the City (limited to 8 hours). 7 June 17, 2022 Mr. Aurelio Carmenates, P.E. Page 2 of 3 Reference: Drainage Improvements on SW 63 Ave from SW 69 St to SW 70 St Post Design Services Phase Not included, but a proposal can be provided if needed. Exclusions: Traffic studies, traffic counts, electrical design, color renderings, certified arborist services, asphalt cores, landscaping, tree removal permit, irrigation or lighting are not included in our scope. Terms and Conditions: All terms and conditions shall be per our Professional Service Agreement for Professional General Engineering and Architectural Services as authorized by Resolution 060-17-14861. Our fees shall be as follows: 1. Design Phase (Lump Sum……………………….………….…...$19,190.00 2. Permitting Phase (Lump Sum) ……………………..…..……....$ 4,340.00 3. Procurement Assistance (Lump Sum) …………....……..…....$ 1,360.00 4. Permit Fee Allowance (If needed).………………………….......$ 500.00 TOTAL: $25,390.00 We are ready to begin working on this assignment upon your authorization to proceed. If acceptable to you, we will accept a signed copy of this form as your written authorization to proceed with the assignment. Regards, Stantec Consulting Services Inc. Sean Compel, P.E., LEED AP, ENV SP Principal Phone: 305 445 2900 x 2230 sean.compel@stantec.com 8 June 17, 2022 Mr. Aurelio Carmenates, P.E. Page 3 of 3 Reference: Drainage Improvements on SW 63 Ave from SW 69 St to SW 70 St By signing this proposal, City of South Miami authorizes Stantec to proceed with the services herein described. This proposal is accepted and agreed on the Day day of Month, 2022 Per: Print Name & Title Signature Attachment: Attachment c. C.C. cs document4 V:\2156\business_development\215681119 City of South Miami\SW 69 St & SW 63 Ave Drainage Imp\Revised proposal\SW 63 Ave - & SW 60 to 70 st St Drainage Improvements.docx 9 Stantec Consulting Services Inc.Fee Worksheet - Page 1 DATE:June 2, 2022 PROJECT:City of South Miami SW 69 St and SW 63 Ave Drainage Improvements Design Phase Principal Senior Project Manager Senior Engineer Engineer Intern Senior CAD Tech Clerical Project coordination & file setup 1 2 2 Utility as builts coordination 1 6 Site visit and photo log 1 1 Cover sheet, Key Sheet & notes 2 2 2 Drainage Design 8 12 16 Grading (including Swale) 8 8 16 Limited Pavement Marking 2 2 4 Typical Sections & Details 1 6 6 Quantities & Cost Estimate 1 3 1 Sub-Total Hours 0 25 0 42 47 0 Billing Rate 210.00$ 190.00$ 160.00$ 97.50$ 110.00$ 58.50$ Labor Cost $0 $4,750 $0 $4,095 $5,170 $0 $14,015 $1,675 $3,500 $19,190 Permitting Phase Principal Senior Project Manager Senior Engineer Engineer Intern Senior CAD Tech Clerical Provide Plans Miami-Dade County DERM 2 2 Comments and revisions (2 Submittals)6 8 8 Plans resubmittal 2 6 Sub-Total Hours 0 10 0 16 8 0 Billing Rate 210.00$ 190.00$ 160.00$ 97.50$ 110.00$ 58.50$ Labor Cost $0 $1,900 $0 $1,560 $880 $0 $4,340 Project Procurement Phase Principal Senior Project Manager Senior Engineer Engineer Intern Senior CAD Tech Construction Inspector Assistance with Procurement 8 Sub-Total Hours 0 8 0 0 0 0 Billing Rate 210.00$ 170.00$ 160.00$ 97.50$ 110.00$ 97.50$ Labor Cost $0 $1,360 $0 $0 $0 $0 $1,360 $500 Total Fee:$25,390 Permitting Phase Total: Permit Allowance: Project Procurement Phase Total: FEE WORKSHEET Design Sub-Total: Survey: Design Phase Total: Geotechnical: 10 SW 63 Ave Drainage From SW 69 St to SW 70 St Legend 200 ft N➤➤N 11 L O N G I T U D E SURVEYORS LONGITUDE SURVEYORS 7769 NW 48 Street ▪ Suite 375 ▪ Doral, FL 33166 ▪ Ph: 305.463.0912 ▪ Fax: 305.513.5680 Wednesday, June 15, 2022 VIA EMAIL: carlos.herdocia@stantec.com SW 63 AVENUE DRAINAGE IMPROVEMENTS Mr. Carlos M. Herdocia, PE, LEED AP Project Manager 901 Ponce de Leon Boulevard, Suite 900 Coral Gables, FL 33134 786.502.0701 RE: Surveying and Mapping services for SW 63 Avenue, South Miami, FL Dear Mr. Herdocia, Pursuant to your request regarding a fee estimate for Surveying and Mapping services for the above-referenced project, LONGITUDE SURVEYORS, LLC (LS) is pleased to submit the following proposal for your consideration. A. Scope of Work – Topographic Survey:  Longitude will show rights-of-way computing field evidence, plats, deeds, and other documentation relative to the project. All lot lines and ownership lines within the survey limits will be shown graphically.  LS will establish horizontal and vertical control within the limits of the survey.  Elevations will be referenced to the National Geodetic Vertical Datum of 1929 (NGVD29).  Longitude will collect all the following aboveground improvements; pavement, sidewalks, curb and gutters, driveways, medians, round-about, hedges and general limits of shrubbery, mailboxes, trees, palms, fences, signs, poles, aboveground structures and utilities, overhead lines, etc.  A Tree Survey will not be performed.  Elevations will be collected equivalent to a twenty-five (25) foot grid throughout the survey limits. B. Survey Limits: Along SW 63 Avenue between SW 69 Street and SW 70 Street from right of way to right of way being in South Miami, FL 33143, as per the attached Exhibit provided by the Client. C. Deliverables: LS will provide a digitally signed PDF and a CAD file of the resulting survey. Signed and sealed hardcopies can be provided upon request. D. Time of Completion: Longitude has estimated fifteen (15) business days from Notice to Proceed (NTP) to complete this task. Notice to Proceed (NTP) is considered effective twenty-four (24) hours after this proposal is signed and sent back to the undersigned. E. Fee: The total professional fee to complete the Scope of Work shall be a lump sum of $3,500.00. I understand and agree by signing below “I APPROVE AND ACCEPT” this proposal as a legal binding contract. By: Date: (Authorized Signature) Title: (Typed or printed name) On behalf of the firm, I thank you for the opportunity to present this proposal. We look forward to utilizing our best professional efforts on your behalf on this very important project. Respectfully Yours, Eduardo M. Suarez, PSM/President 12 SW 63 Ave Dranage From SW 69 St to SW 70 St Legend 200 ft N➤➤N 13 2051 NW 112th AVENUE, STE. 126 ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 May 24, 2022 Stantec Attn: Mr. Carlos Herdocia 901 Ponce De Leon Boulevard, Suite 900 Coral Gables, FL 33134 Phone: 305.445.2900/ Cell: 786.502.0701/ Email: carlos.herdocia@stantec.com Re: Proposal/Agreement for Geotechnical Exploration Services SW 69th Street & SW 63rd Avenue Drainage Improvements City of South Miami, FL Dear Mr. Herdocia: Nutting Engineers of Florida, Inc. (NE) is pleased to present this proposal for performing exfiltration testing services for the referenced project. Per your email dated May 23, 2022, and review of the aerial provided, it was requested that we provide a proposal/ agreement for performing exfiltration testing services at the referenced site. Based on your request for proposal and our understanding of the project, we propose the following scope of work and fee schedule. SCOPE OF WORK We propose to perform one usual type open-hole exfiltration test in general accordance with South Florida Water Management District (SFWMD) specifications to a depth of 15 feet. At the completion of the on-site work, we will provide a brief report describing the testing proce dures and the hydraulic conductivity (k value) of the soils. We assume the site is accessible to truck mounted drilling equipment and that the underground utilities will be cleared by Call Sunshine prior to our performing the on-site work. FEE SCHEDULE The above indicated scope of work will be performed for an estimated cost of $1,675.00 based on the following rates and quantities: Technician site visit, utility clearance Lump Sum $200.00 Mobilization of equipment/ crew 1 @ $400.00 $400.00 SFWMD exfiltration test Lump Sum $800.00 Project Engineer Lump Sum $225.00 Clerical/ Administration Lump Sum $50.00 14 Stantec SW 69th St & SW 63rd Ave Drainage Improv exfil City of South Miami, FL Page 2 of 3 2051 NW 112th AVENUE – STE. 126 ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 Once we receive the executed/ signed proposal, project scheduling will commence. The on-site work should take approximately one business day to complete. The test report should be available within approximately 10 – 12 business days after the on-site work is completed. Thank you for providing us the opportunity to present this propos al. We look forward to working with you on this and future projects. Respectfully submitted, NUTTING ENGINEERS OF FLORIDA, INC. Scott Ersland Richard C. Wohlfarth, P.E. Division Manager Principal/ Director of Engineering Reports and invoices will be addressed to the client as listed below unless other instructions are provided in writing with this executed proposal. The undersigned, as an authorized representative of the entity listed below, approves this proposal and agrees to be bound by the terms and conditions contained in this proposal. Deposit amounts are collected at time of written authorization to proceed. If you are a first-time client, we request that the balance due for these services be paid at the time of report completion. Once your account is established, our terms are net 30 days. Any invoices over 30 days will be assessed a 1 1/2 percent service charge per month until paid in full. PLEASE ENTER INFORMATION LEGIBLY BELOW SO IT CAN BE UTILIZED FOR PROJECT SET-UP: SIGNATURE: ____________________________________________ DATE: _______________________________ PRINT NAME: ______________________________________________TITLE: __________________________ COMPANY NAME: ____________________________________________________________________________ ADDRESS: ___________________________________________________________________________________ ___________________________________________________________________________________________ PHONE: ____________________________ EMAIL: __________________________________________________ SW 69th St & SW 63rd Ave Drainage Improv Stantec City of South Miami Exfil Miami 5-24-22 General Terms and Conditions For the purpose of this project, the addressee of this proposal will be known as the Client. The client is expected to furnish NUTTING ENGINEERS OF FLORIDA, INC. (“NE”), with accurate information including sketch of survey and/or site plan, construction drawings/specifications as appropriate, details of proposed construction including the proposed structural system and loads or existing construction problem information and site accessibility information as appropriate. Other information requirements may be detailed in the enclosed proposal. IF ANY CONDITIONS CHANGE such as building layout, loading, project specifications/design, or unusual site conditions are observed, NE should be notified immediately in writing about the changed condition for possible review and comment. Should the Client wish to impose other conditions and requirements beyond those contained in this proposal such as in a separate contract, we reserve the option to modify contract language, fee amounts, to remove our proposal from consideration or other measures as may be indicated. Delivery – Scheduled upon receipt of written authorization to proceed and deposit unless other arrangements are agreed to in writing. Additional report copies can be provided for a nominal fee to the Client. NE will exercise appropriate measures to ensure project completion within a reasonable time frame subject to existing workloads. However, NE will not be held responsible for unavailability of necessary project data and site access within the time frame agreed upon for the investigation. Project delivery may be delayed if the ENTIRE signed proposal and deposit are not received in a timely manner. The ENTIRE signed quotation should be returned along with the requested project information. This unsigned proposal is valid for 60 days. Payment – No deposit required with signed agreement. Directing NE to proceed with the work shall constitute acceptance of the terms of NE’s proposal and these General Terms and Conditions. Interest at the rate of 18% per annum or the highest rate allowable by law whichever is less, will be added to all amounts not paid within 30 days after date of invoice. All attorney fees and expenses associated with collection of past due invoices will be paid by Client. 15 Stantec SW 69th St & SW 63rd Ave Drainage Improv exfil City of South Miami, FL Page 3 of 3 2051 NW 112th AVENUE – STE. 126 ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 Insurance – NE maintains Workers' Compensation and Employer's Liability Insurance in conformance with state law. In addition, we maintain Comprehensive General Liability Insurance and Automobile Liability Insurance with bodily injury limits of $1,000,000.00 and property damage limits of $1,000,000.00. A certificate of insurance can be supplied evidencing such coverage which contains a clause providing that fifteen days written notice be given prior to cancellation. Right-of-Entry - Unless otherwise agreed, Client will furnish right-of-entry on the property for NE to make the planned borings, surveys, and/or explorations. NE will not be responsible for removing fences, earth berms, vegetation or other obstructions for purposes of our investigation. NE will take reasonable precautions to minimize damage to the property caused by its equipment and sampling procedures, but the cost of restoration or damage which may result from the planned operations is not included in the contracted amount. If Client desires to restore the property to its former condition, NE will accomplish this and add the cost to its fee. Client agrees to waive all claims arising from or related to the failure to provide NE with proper access to conduct its work. Damage to Existing Man-made Objects - It shall be the responsibility of the Owner or his duly authorized representative to disclose the presence and accurate location of all hidden or obscure man-made objects relative to routes of access, field tests, sampling, or boring locations. When cautioned, advised or given data in writing that reveal the presence or potential presence of underground or over-ground obstructions, such as utilities, septic tanks, etc., NE will give special instructions to its field personnel. In addition, Client waives any claim against NE arising from damage to existing man-made objects. Warranty and Limitation of Liability - NE shall perform services for Client in a professional manner, using that degree of care and skill ordinarily exercised by and consistent with the standards of competent consultants practicing in the same or a similar locality as the project. In the event any portion of the services fails to comply with this warranty obligation and NE is promptly notified in writing prior to one year after completion of such portion of the services, NE will re-perform such portion of the services, or if re-performance is impracticable, NE will refund the amount of compensation paid to NE for such portion of the services. This warranty is in lieu of all other warranties. No other warranty, expressed or implied, including warranties of merchantability and fitness for a particular purpose is made or intended by the proposal for consulting services, by furnishing an oral response of the findings made or by any representations made regarding the services included in this agreement. In no event shall NE or any of its professional employees be liable for any special, indirect, incidental or consequential loss or damages, including but not limited to impact and delay claims. The remedies set forth herein are exclusive and the total liability of consultant whether in contract, tort (including negligence whether sole or concurrent), or otherwise arising out of, connected with or resulting from the services provided pursuant to this Agreement shall not exceed the total fees paid by Client or $50,000.00, whichever is greater. At additional cost, Client may obtain a higher limit prior to commencement of services. PURSUANT TO §558.0035, FLORIDA STATUTES, NE’S INDIVIDUAL EMPLOYEES AND/OR AGENTS MAY NOT BE HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE ARISING OUT OF, CONNECTED WITH, OR RESULTING FROM THEIR SERVICES PROVIDED PURSUANT TO THIS AGREEMENT. Indemnification – Client agrees to defend, indemnify and save harmless NE from all claims, including negligence claims, suits, losses, personal injuries, death and property liability resulting from NE’s performance of the proposed work, whether such claims or damages are caused in part by NE, and agrees to reimburse NE for expenses in connection with any such claims or suits, including reasonable attorney’s fees. Client’s obligation to indemnify is limited to $2 million per occurrence, which Client agrees bears a reasonable commercial relationship to the Work undertaken by NE. Client further agrees that these general conditions are a part of the Work’s specifications or bid documents, if any. Sampling or Testing Location - Unless specifically stated to the contrary, the unit fees included in this proposal do not include costs associated with professional land surveying of the site or the accurate horizontal and vertical locations of tests. Field tests or boring locations described in our report or shown on our sketches are based on specific information furnished to us by others and/or estimates made in the field by our technicians. Such dimensions, depths or elevations should be considered as approximations unless otherwise stated in the report. It is understood that all drilling locations are accessible to conventional truck mounted drilling equipment unless otherwise specified by the client. If unscheduled remobilizations or use of portable or all terrain equipment is required additional charges will apply. NE will attempt to clear utilities at our excavation/test locations by manual drilling to 3' below land surface (BLS). Any utilities/obstructions present at client specified test locations or below 3' BLS will be the responsibility of the client. Sample Handling and Retention – Generally soil test samples are retained for approximately three months after which time they will be discarded unless written instructions to the contrary are received from the client. Legal Jurisdiction - The parties agree that any actions brought to enforce any provision of this Agreement shall only be brought in a court of competent jurisdiction located in Palm Beach County, Florida. Any and all causes of action arising out of NE's performance of the Work, including but not limited to claims for indemnity, contribution and equitable subrogation, shall be deemed to have accrued and the applicable statutes of limitations shall commence to run not later than the date of NE's last invoice for the Work performed hereunder. Force Majeure - NE shall not be held responsible for any delay or failure in performance of any part of this Agreement to the extent such delay or failure is caused by fire, flood, explosion, war, strike, embargo, government requirement, civil or military authority, acts of God, act or omission of subcontractors, carriers, client or other similar causes beyond its control. Documents - NE shall be entitled to rely upon the accuracy and completeness of all surveys, reports and information furnished by the client. If conditions different from those described in our report are found at the site, NE should be notified in writing immediately upon discovery. NE reserves the right to revise conclusions and recommendations presented in the final report should additional information regarding the project become available. All permits will be obtained by others unless otherwise specified in this proposal or in writing to NE. NE has no liability for consequences of information not provided or unavailable or otherwise not reviewed or known from the normal sources customarily examined by NE in such investigations within the time frame allowed for this investigation under this agreement. The client, entities identified in writing on the address portion of our report, design team professionals engaged by our client and building official staff are entitled to use and rely upon NE’S reports for purposes of the current project. Other parties are not authorized to use or rely upon NE’S reports unless NE so states in writing. NE - General Contract Terms and Conditions May 2017 cc: Connie Gworek – Business Development Associate SW 69th St & SW 63rd Ave Drainage Improv Stantec City of South Miami Exfil Miami 5-24-22 16 SW 63 Ave Drainage From SW 69 St to SW 70 St Legend 200 ft N➤➤N 17