Loading...
12-1372-074LEGEND: 1� 3/4" SMOOTH STUCCO FINISH PAINTED WITH SHERWING WILLIAMS SW 60-18 REALIST BEIGE. O 6" WIDE SMOOTH STUCCO FINISH BAND I" THICK, PAINT WITH SHERWING WILLIAMS SW (o168 MODERNS WHITE. 3O 4" WIDE SMOOTH STUCCO FINISH SAND 1" THICK PAINT WITH SHERWING WILLIAMS SW 6168 MODERNE WHITE. �4 1"X6 "WD. FASCIA OVER 2"XS"WD. SUBFACIA. PAINT WITH 6HERWING WILLIAMS SW 6 168 MODERNE WHITE. Q 2" WIDE BAND CIRCLE WITH REVIEWS ON CENTER USE SHERWING WILLIAMS SW 6168 MODERNE WHITE FOR SAND AND SW 6018 REALIST" BEIGE ON CENTER. O ORANGE CLAP SPANISH TILE ROOF TOP OF TIE BEAM BUILDING HEIGHT N TOP OF TIE BEAM ON 4 1 � ZONE 5 +60.4 -An G 3 ZONE 5 413.90 —— — — — — —— ±�9(om FRONT ELEVATION (EAST) RIGHT SIDE ELEVATION (NORTH) SCALE: 1/4" = 1'-0" TOP OF TIE BEAM TOP OF TIE BEAM ON SECOND FLOOR ALE: 1/4" = 1'-0" —!d _ TOP OF TIE BEAM 12 5� iiff"I _ TOP OF TIE SEAM ON SECOND FLOOR 3 12 5 11 TOP OF AVERAGE ROOF TOP OF TIE BEAM TOP OF TIE BEAM ON SECOND FLOOR TOP OFF. +/-0'-0"-- TOP /-m'-m"-- A 2 4 REAR ELEVATION (WEST) SCALE: 1/4" = 1'-0" r HR -44 0 EGRESS ZONE 4 +5 3.4 -� -64.5 TOP OF AVERAGE ROOF TOP OF TIE BEAM ON 4 HR -34 ZONE 4 +60.4 -65.5 LEFT SIDE ELEVATION (SOUTH) SCALE: 1/4" = 1'-0" LOT 3 RL"fBIM L- 2.- 3.- 46— DATE =SEPTEMBER, 2012 SHOWN DRAWN. M. GASTELLON DENGN BX JR JOB Na A-5 /ch CY5 C) o C) 1+) /f Q o cc CD L 0 U E 0 U r LLLu z M U �-�-- W 110-0 p (D ca Ua Z :EW W �_ J CL. 0 C/) 0 J � Q 0 LL 0 C) LIJ CD; J Ur O O C:) Z U N (T3 LU n 04 � " hh! iEf hA g, � ;�, a p Y �• • a. 1{ T� 'til � %d•�� g i�4f�� e � ' LOT 3 RL"fBIM L- 2.- 3.- 46— DATE =SEPTEMBER, 2012 SHOWN DRAWN. M. GASTELLON DENGN BX JR JOB Na A-5 /ch o /f Q o L 0 U E 0 U r LLLu z M U �-�-- W 110-0 p (D ca Ua Z :EW W �_ J CL. 0 C/) 0 J � Q 0 LL 0 C) LIJ to J Ur O C:) Z U (T3 LU n 04 � " hh! iEf hA g, � ;�, a p Y �• • a. 1{ T� 'til � %d•�� g i�4f�� e � ' LOT 3 RL"fBIM L- 2.- 3.- 46— DATE =SEPTEMBER, 2012 SHOWN DRAWN. M. GASTELLON DENGN BX JR JOB Na A-5