Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12-1372-035
MILANO September 0, 2012 ASCE7-10 Components and Cladding Output. Component Description Surface I Zone I z(ft) q(psf) I GCp GCpi I ExtPres(psf) I Net w/ +GCpi ROOFING A 1 24.7 73.9 0:50 0.18 37.0 23,6 24.7 73.9 -0.90 -66.5 -79.8 2 24.7 73.9 0.50 37.0 23.6 24.7 73.9 -1.70 -125.6 -138.9 3 24.7 73.9 0.50. 37.0 23.6 24.7 73.9 -1.70 -125.6 -138.9 MASONRY 1 st FLOOR 1 4 24.7 73.9 0.89 0.18 65.8 52.5 24.7 73.9 -0.99 -73.2 -86.5 MASONRY 2nd FLOOR 1 4 24.7 73.9 0.90 0.18 66.5 53.2 24.7 73.9 -1.00 -73.9 -87.2 TRUSS A A 1 24.7 73.9 0.46 0.18 34.0 20.7 24.7 73.9 -0.88 -65.0 -78.3 2 24.7 73.9 0.46 34.0 20.7 24.7 73.9 -1.59 -117.5 -130.8 3 24.7 73.9 0.46 34.0 20.7 24.7 73.9 -1.59 -117.5 -130.8 TRUSS B A 1 24.7. 73.9 0.30 0.18 22.2 8.9 24.7 73.9 -0.80 -59.1 -72.4 2 24.7 73.9 0.30 22.2 8.9 24.7 73.9 -1.20 -88.7 -102.0 3 24.7 73.9 0.30 222 8.9 24.7 73.9 -1.20 -88.7 -102.0 TRUSS C A 1 24.7 73.9 0.30 0.18 22.2 8.9 24.7 73.9 -0.80 -59.1 -72.4 2 24.7 73.9 0.30 22.2 8.9 24.7 73.9 -1.20 -88.7 -102.0 3 24.7 73.9 0.30 22.2 8.9 24.7 73.9 -1.20 -88.7 -102.0 TRUSS D A 1 24.7 73.9 0.30 0.18 22.2 8.9 24.7 73.9 -0.80 -59.1 -72.4 WLS4 -- [1.4] Copyright © 2020 SDG, Inc. Net w/ -GCpi (psf) 50.3 -53.2 50.3 -112.3 50.3 -112.3 79.1 -59.9 79.8 -60.6 47.3 -51.7 47.3 -104.2 47.3 -104.2 35.5 -45.8 35.5 -75.4 35.5 -75.4 35.5 -45.8 35.5 -75.4 35.5 -75.4 35.5 -45.8 Page 5 of 9