Loading...
12-1371-017211x4" BLOCKING (10)d NAILS 94",2 y" a PERIMETER REFER TO PLAN FOR LIMITS 12 %a" CDX PLYWOOD SHEATHING 5W/10d @HANK RING NAILS � 6" O.G. (4" PERIMETER) -ENGINEERED WOOD -1 'F TRUSSES a 24' OIC. GONG, TIE BEAM SEE PLAN 4 SCHEDULE S" MASONRY WALL W/#5 a 32" OIC. IN 3000 PSI GROUT FILLED CELLS W/ STP 90°HK. HURRICANE STRAP SEE PLAN. USE (1) NYSTA-16— AS MFR BY NU-YUE, HOA# 00-0325.02 WK5)lOdxl.5 NAILS ON STRAP (6)10dx1.5 NAILS ON SEAT 211x4" BLOCKING (10)61 NAILS a411,2 y" a ' EL. +\/ARIES _ — — — L— PERIMI=TER REFER TO PLAN FOR LIMITS IrTOP OF RAKED SEBEAM /I [Iroll /a" CDX PLYWOOD SNEATHINCx CONG. RAKED BEAM WIIOd SHANK RING NAILS 0 6" E PLAN SCHEDULE Q.G, (4" PERIMETER)12 �r� HURRICANE STRAP-- � s) � SEE PLAN. \: EL. +20'-1 i' I TOP OF BEAM I' -6'I O.H, (TYP. 1'-6" O.H. (TYP.) %4" CI X PLYWOOD = _ duiU U 51-1'ATIHING W/10d — U 4" CONC. SLAB REINF W/—\ U CL n Q �= [Y SHANK RING NAILS LEDGER- "All -PIE 6x6-WI.4xW1.4 WWF OVER 6 MIL - cx Z5 >- n � ' � A' 0 6" 0.C,(4" 0 T) - r6" C4)VLF1R 6 MIL VAPOR BARRIER � � -j _ COMPACTED FIL�.�D. PERIMETER) = � 00 ELL COMPACTED FILLED. ` HII x x EL. 4111-11, — — 11 - i / — TOP/2nd FLOOR T,B. y - c1 GONG, TIE BEAM SEE PLAN 4 SCHEDULE 24" PRE-ENGINEERED FLAT FLOOR WOOD TRUSSES @2411 OIC, MA 0" MASONRY WALL W/#5 a 32" O/CIN 3000 PSI GROUT FILLED CELLS W/ STD 90°HK. S C T f Oil C� JL= 1/211=11 0 11 10 12 7 GONG. TIE BEAM SEE PLAN 4 SCHEDULE 1 EL, 10'-0 i1 GROUND FL, FIN, r i q u - m � EL, +20'-11• PRE-ENGINEERED WOOD TOP OF BEAM ROOF TRUSSES a 24' OIC, CONC, TIE BEAM SEE PLAN 4 SCHEDULE CONC, TIE BEAM SEE PLAN 4 SCHEDULE S MASONRY WALL W/05 a 32" OIG, IN 3000 PSI GROUT FILLED CELLS W1 5TD W'HK. TRU55 GIRDER (BEYOND) a" MASONRY WALL W/#5 0 32" OIC- IN 3000 PSI GROUT FILLED CELLS W/ STD 90°HK, _ = 4" GONG. SLAB REINF W/ (ox6-W1AxW1.4 WWF OVER 6 MIL VAPOR BARRIER 4 WELL - COMPACTED FILLED. / / GONG, FOOTINGT. (vEE PLAN � SCHEDULE) & CT f ON 5C4LE: 1/211=1'-0' 5/a" GDX PLYWOOD 5HEATHINIa W110d SHANK RING NAILS a 6" O,G. (4" a PERIMETER) HURRICANE STRAP SEE PLAN. %a" CDX PLYWOOD SHEATHING W/10d SHANK RING NAILS a 6" O,C, (4" a PERIMETER) PRE=ENGINEERED WOOD ROOF TRUSSES a 24' OIC, GONG, BEAM 5EE PLAN 4 SCHEDULE LEXiER TYPE "A" GONG. BEAM SEE PLAN 4 SCHEDULE %" CDX PLYWOOD SHEATHING W/106 SHANK RING NAILS 0 6" O.G. (4" 0 PERIMETER) —2"x411 E3LOCKING (IO)d NAILS 04"2 PERIMETER REFER TO PLAN FOR LIMITS EL. +20'-1" TOP OF BEAM \—PRE-ENGINEERED WOOD ROOF TRUSSES a 24' O/G. HURRICANE STRAP SEE PLAN, LEDGER TYPE "B" w 2"x4" PT BLOCKING 5ETWEEN C) TRUSSES W/(2)%4"� TAPCON5 0 `" PROVIDE (1) TA24 STRAP IL a EACH TRU55 AS MFR BY U5P FL 85984 W(11)10dx1/2" NAILS- %4" CDX PLYWOOD SHEATHING W/10d SHANK RING NAILS a 6" O.C. (4" 0 PERIMETER) -- EL, +11'-I" gil — — — — — — — — TOP/2nd FLOOR T.B. -5/a" CDX PLYWOOD SHEATHING W/10d SHANK RING NAILS a 6" O.G. (4" a PERIMETER) 12 5 LEDGER PRE-ENGINEERED WOOF)--/ TYPE "B" ROOF TRUSSES 0 24' O/C, 24" PRE-ENGINEERED CONC, TIE BEAM FLAT FLOOR WOOD SEE PLAN TRUSSES 02411 O/C, SCHEDULE 3'-311 11-911 c'rl GONG. 5LA6 REINF —_ --4" CONC. SLAB REINF W/ — U 4" CONC. SLAB REINF W/—\ <9 W/ 6x6-WI,4xWl.4 WWF 6x6-WI.4xW1.4 WWF OVER 6 MIL - I� r� A' VAPOR BARRIER 4 WELL - r6" C4)VLF1R 6 MIL VAPOR BARRIER - C COMPACTED FIL�.�D. _ = � co ELL COMPACTED FILLED. I COMPACTED FILLED. x x A. e. x'.'�...�. it x �'. % ,K�. "_'- tt•'-+r--;.may, k i / y - c1 w s � GONG. � (5EE PhAN _ SCHEDULE) i' GONG. FOOTING. S C T f Oil C� JL= 1/211=11 0 11 10 12 7 GONG. TIE BEAM SEE PLAN 4 SCHEDULE 1 EL, 10'-0 i1 GROUND FL, FIN, r i q u - m � EL, +20'-11• PRE-ENGINEERED WOOD TOP OF BEAM ROOF TRUSSES a 24' OIC, CONC, TIE BEAM SEE PLAN 4 SCHEDULE CONC, TIE BEAM SEE PLAN 4 SCHEDULE S MASONRY WALL W/05 a 32" OIG, IN 3000 PSI GROUT FILLED CELLS W1 5TD W'HK. TRU55 GIRDER (BEYOND) a" MASONRY WALL W/#5 0 32" OIC- IN 3000 PSI GROUT FILLED CELLS W/ STD 90°HK, _ = 4" GONG. SLAB REINF W/ (ox6-W1AxW1.4 WWF OVER 6 MIL VAPOR BARRIER 4 WELL - COMPACTED FILLED. / / GONG, FOOTINGT. (vEE PLAN � SCHEDULE) & CT f ON 5C4LE: 1/211=1'-0' 5/a" GDX PLYWOOD 5HEATHINIa W110d SHANK RING NAILS a 6" O,G. (4" a PERIMETER) HURRICANE STRAP SEE PLAN. %a" CDX PLYWOOD SHEATHING W/10d SHANK RING NAILS a 6" O,C, (4" a PERIMETER) PRE=ENGINEERED WOOD ROOF TRUSSES a 24' OIC, GONG, BEAM 5EE PLAN 4 SCHEDULE LEXiER TYPE "A" GONG. BEAM SEE PLAN 4 SCHEDULE %" CDX PLYWOOD SHEATHING W/106 SHANK RING NAILS 0 6" O.G. (4" 0 PERIMETER) —2"x411 E3LOCKING (IO)d NAILS 04"2 PERIMETER REFER TO PLAN FOR LIMITS EL. +20'-1" TOP OF BEAM \—PRE-ENGINEERED WOOD ROOF TRUSSES a 24' O/G. HURRICANE STRAP SEE PLAN, LEDGER TYPE "B" w 2"x4" PT BLOCKING 5ETWEEN C) TRUSSES W/(2)%4"� TAPCON5 0 `" PROVIDE (1) TA24 STRAP IL a EACH TRU55 AS MFR BY U5P FL 85984 W(11)10dx1/2" NAILS- %4" CDX PLYWOOD SHEATHING W/10d SHANK RING NAILS a 6" O.C. (4" 0 PERIMETER) -- EL, +11'-I" gil — — — — — — — — TOP/2nd FLOOR T.B. -5/a" CDX PLYWOOD SHEATHING W/10d SHANK RING NAILS a 6" O.G. (4" a PERIMETER) 12 5 LEDGER PRE-ENGINEERED WOOF)--/ TYPE "B" ROOF TRUSSES 0 24' O/C, 24" PRE-ENGINEERED CONC, TIE BEAM FLAT FLOOR WOOD SEE PLAN TRUSSES 02411 O/C, SCHEDULE 3'-311 11-911 SEECT f ON SCALE: 1/211=1'- 011 5-4 1 0" MASONRY WALL W/#5 a 32" O/C. IN 3000 PSI GROUT FILLED CELL5 W/ 5T0 90°HK HURRICANE STRAP SEE PLAN. 1'-6" O.H, (TYP c'rl GONG. 5LA6 REINF --4" CONC. SLAB REINF W/ _ � U 6" GONG. SLAB REINF W/— <9 W/ 6x6-WI,4xWl.4 WWF 6x6-WI.4xW1.4 WWF OVER 6 MIL 6x6-WlAxW1.4 UJWF OVER 6 MIL I� r� VAPOR BARRIER 4 WELL l r6" C4)VLF1R 6 MIL VAPOR BARRIER VAPOR 5ARRIER 4 WELL _ co ELL COMPACTED FILLED. I COMPACTED FILLED. e. x'.'�...�. it x �'. % ,K�. "_'- tt•'-+r--;.may, k y - � w s � cfl � v / GONG. FOOTING. (5EE FLAN 4 / ! /\y. SCHEDULE) 77-4 7/7/ %� ;/% <',/ j /i ��% 2 #5 DONT. I-0 • GONG. FOOTING, (5EE PLAN 4 eC,-IEDULE) SEECT f ON SCALE: 1/211=1'- 011 5-4 1 0" MASONRY WALL W/#5 a 32" O/C. IN 3000 PSI GROUT FILLED CELL5 W/ 5T0 90°HK HURRICANE STRAP SEE PLAN. 1'-6" O.H, (TYP TOP OF BEAM FIN. GARAGE FL, N SECTIO �_a D ,y. SCALE: 1/211=1'-01' S-4 �� t"filo@ E. 9 �(J c'rl 17, CDZ- / _ � U 6" GONG. SLAB REINF W/— <9 6x6-WI.4xW1.4 WWF OVER 6 MIL = I� r� VAPOR BARRIER 4 WELL l COMPACTED FILLED. _ co e. x'.'�...�. it x �'. % ,K�. "_'- tt•'-+r--;.may, k y - � w s � cfl � v GONG. FOOTING. (5EE FLAN 4 / ! /\y. SCHEDULE) TOP OF BEAM FIN. GARAGE FL, N SECTIO �_a D ,y. SCALE: 1/211=1'-01' S-4 �� t"filo@ E. 9 �(J SEAL REVISIONS z -- 3.- 4.- 5.- 6. - DATE : SEP (EMBER, 2012 Sill AS NO 1 ED LOT 5 1 I�I DRAWN: Y SOSA D GN BYBY� PAM JOB NO: pnnCONSULTING '�!1: VIxE,,GINERS STRUCTRAu�z IN " E I � V . 626ZQjRD'P TE 2K, MIA FL 315 F .�� qC�® Sm4mO L 0 �a•° ����' PAUL A. fffi� NEZ FLORIDAREGTJ.pV65t 5 PMMCE JOB # 11019 c'rl 17, CDZ- / L <9 I� r� J l co � w s � � v SEAL REVISIONS z -- 3.- 4.- 5.- 6. - DATE : SEP (EMBER, 2012 Sill AS NO 1 ED LOT 5 1 I�I DRAWN: Y SOSA D GN BYBY� PAM JOB NO: pnnCONSULTING '�!1: VIxE,,GINERS STRUCTRAu�z IN " E I � V . 626ZQjRD'P TE 2K, MIA FL 315 F .�� qC�® Sm4mO L 0 �a•° ����' PAUL A. fffi� NEZ FLORIDAREGTJ.pV65t 5 PMMCE JOB # 11019