12-1371-017211x4" BLOCKING (10)d NAILS 94",2 y" a
PERIMETER REFER TO PLAN FOR LIMITS
12 %a" CDX PLYWOOD SHEATHING
5W/10d @HANK RING NAILS � 6"
O.G. (4" PERIMETER)
-ENGINEERED WOOD -1
'F TRUSSES a 24' OIC.
GONG, TIE BEAM
SEE PLAN 4 SCHEDULE
S" MASONRY WALL W/#5 a 32"
OIC. IN 3000 PSI GROUT
FILLED CELLS W/ STP 90°HK.
HURRICANE STRAP
SEE PLAN.
USE (1) NYSTA-16—
AS MFR BY NU-YUE,
HOA# 00-0325.02
WK5)lOdxl.5 NAILS ON STRAP
(6)10dx1.5 NAILS ON SEAT
211x4" BLOCKING (10)61 NAILS a411,2 y" a ' EL. +\/ARIES _ — — — L—
PERIMI=TER REFER TO PLAN FOR LIMITS IrTOP OF RAKED SEBEAM /I [Iroll
/a" CDX PLYWOOD SNEATHINCx CONG. RAKED BEAM
WIIOd SHANK RING NAILS 0 6" E PLAN SCHEDULE
Q.G, (4" PERIMETER)12
�r�
HURRICANE STRAP-- � s) �
SEE PLAN.
\: EL. +20'-1 i'
I TOP OF BEAM
I' -6'I
O.H, (TYP.
1'-6"
O.H. (TYP.)
%4" CI
X PLYWOOD
=
_
duiU
U
51-1'ATIHING
W/10d
— U
4" CONC. SLAB REINF W/—\
U CL n Q �=
[Y
SHANK
RING NAILS LEDGER-
"All
-PIE
6x6-WI.4xW1.4 WWF OVER 6 MIL
-
cx Z5 >- n
� '
�
A'
0 6" 0.C,(4" 0 T)
-
r6"
C4)VLF1R 6 MIL VAPOR BARRIER
� � -j _
COMPACTED FIL�.�D.
PERIMETER)
= �
00
ELL COMPACTED FILLED.
`
HII
x x
EL. 4111-11,
— —
11
-
i
/
—
TOP/2nd FLOOR T,B.
y -
c1
GONG, TIE BEAM
SEE PLAN 4 SCHEDULE
24" PRE-ENGINEERED
FLAT FLOOR WOOD
TRUSSES @2411 OIC,
MA
0" MASONRY WALL W/#5
a 32" O/CIN 3000 PSI
GROUT FILLED CELLS
W/ STD 90°HK.
S C T f Oil C�
JL= 1/211=11
0
11
10
12
7
GONG. TIE BEAM
SEE PLAN 4 SCHEDULE
1
EL, 10'-0 i1
GROUND FL, FIN, r
i q u
- m �
EL, +20'-11•
PRE-ENGINEERED WOOD TOP OF BEAM
ROOF TRUSSES a 24' OIC, CONC, TIE BEAM
SEE PLAN 4 SCHEDULE
CONC, TIE BEAM
SEE PLAN 4 SCHEDULE
S MASONRY WALL W/05
a 32" OIG, IN 3000 PSI
GROUT FILLED CELLS
W1 5TD W'HK.
TRU55 GIRDER
(BEYOND)
a" MASONRY WALL W/#5
0 32" OIC- IN 3000 PSI
GROUT FILLED CELLS
W/ STD 90°HK,
_ = 4" GONG. SLAB REINF W/
(ox6-W1AxW1.4 WWF OVER 6 MIL
VAPOR BARRIER 4 WELL
- COMPACTED FILLED.
/
/
GONG, FOOTINGT.
(vEE PLAN �
SCHEDULE)
& CT f ON
5C4LE: 1/211=1'-0'
5/a" GDX PLYWOOD 5HEATHINIa
W110d SHANK RING NAILS a 6"
O,G. (4" a PERIMETER)
HURRICANE STRAP
SEE PLAN.
%a" CDX PLYWOOD SHEATHING
W/10d SHANK RING NAILS a 6"
O,C, (4" a PERIMETER)
PRE=ENGINEERED WOOD
ROOF TRUSSES a 24' OIC,
GONG, BEAM
5EE PLAN
4 SCHEDULE
LEXiER
TYPE "A"
GONG. BEAM
SEE PLAN
4 SCHEDULE
%" CDX PLYWOOD SHEATHING
W/106 SHANK RING NAILS 0 6"
O.G. (4" 0 PERIMETER)
—2"x411 E3LOCKING (IO)d NAILS 04"2
PERIMETER REFER TO PLAN FOR LIMITS
EL. +20'-1"
TOP OF BEAM
\—PRE-ENGINEERED WOOD
ROOF TRUSSES a 24' O/G.
HURRICANE STRAP
SEE PLAN,
LEDGER TYPE "B"
w 2"x4" PT BLOCKING 5ETWEEN
C) TRUSSES W/(2)%4"� TAPCON5
0
`" PROVIDE (1) TA24 STRAP
IL
a EACH TRU55 AS MFR BY U5P
FL 85984 W(11)10dx1/2" NAILS- %4" CDX PLYWOOD SHEATHING W/10d
SHANK RING NAILS a 6" O.C.
(4" 0 PERIMETER)
-- EL, +11'-I" gil
— — — — — — — — TOP/2nd FLOOR T.B.
-5/a" CDX PLYWOOD SHEATHING
W/10d SHANK RING NAILS a 6"
O.G. (4" a PERIMETER)
12
5
LEDGER PRE-ENGINEERED WOOF)--/
TYPE "B" ROOF TRUSSES 0 24' O/C,
24" PRE-ENGINEERED
CONC, TIE BEAM
FLAT FLOOR WOOD
SEE PLAN
TRUSSES 02411 O/C, SCHEDULE
3'-311 11-911
c'rl
GONG. 5LA6 REINF
—_
--4" CONC. SLAB REINF W/
— U
4" CONC. SLAB REINF W/—\
<9
W/ 6x6-WI,4xWl.4 WWF
6x6-WI.4xW1.4 WWF OVER 6 MIL
-
I� r�
A'
VAPOR BARRIER 4 WELL
-
r6"
C4)VLF1R 6 MIL VAPOR BARRIER
- C
COMPACTED FIL�.�D.
_
= �
co
ELL COMPACTED FILLED.
I
COMPACTED FILLED.
x x
A.
e. x'.'�...�. it
x �'. % ,K�. "_'- tt•'-+r--;.may,
k
i
/
y -
c1
w
s
�
GONG.
�
(5EE PhAN
_
SCHEDULE) i'
GONG. FOOTING.
S C T f Oil C�
JL= 1/211=11
0
11
10
12
7
GONG. TIE BEAM
SEE PLAN 4 SCHEDULE
1
EL, 10'-0 i1
GROUND FL, FIN, r
i q u
- m �
EL, +20'-11•
PRE-ENGINEERED WOOD TOP OF BEAM
ROOF TRUSSES a 24' OIC, CONC, TIE BEAM
SEE PLAN 4 SCHEDULE
CONC, TIE BEAM
SEE PLAN 4 SCHEDULE
S MASONRY WALL W/05
a 32" OIG, IN 3000 PSI
GROUT FILLED CELLS
W1 5TD W'HK.
TRU55 GIRDER
(BEYOND)
a" MASONRY WALL W/#5
0 32" OIC- IN 3000 PSI
GROUT FILLED CELLS
W/ STD 90°HK,
_ = 4" GONG. SLAB REINF W/
(ox6-W1AxW1.4 WWF OVER 6 MIL
VAPOR BARRIER 4 WELL
- COMPACTED FILLED.
/
/
GONG, FOOTINGT.
(vEE PLAN �
SCHEDULE)
& CT f ON
5C4LE: 1/211=1'-0'
5/a" GDX PLYWOOD 5HEATHINIa
W110d SHANK RING NAILS a 6"
O,G. (4" a PERIMETER)
HURRICANE STRAP
SEE PLAN.
%a" CDX PLYWOOD SHEATHING
W/10d SHANK RING NAILS a 6"
O,C, (4" a PERIMETER)
PRE=ENGINEERED WOOD
ROOF TRUSSES a 24' OIC,
GONG, BEAM
5EE PLAN
4 SCHEDULE
LEXiER
TYPE "A"
GONG. BEAM
SEE PLAN
4 SCHEDULE
%" CDX PLYWOOD SHEATHING
W/106 SHANK RING NAILS 0 6"
O.G. (4" 0 PERIMETER)
—2"x411 E3LOCKING (IO)d NAILS 04"2
PERIMETER REFER TO PLAN FOR LIMITS
EL. +20'-1"
TOP OF BEAM
\—PRE-ENGINEERED WOOD
ROOF TRUSSES a 24' O/G.
HURRICANE STRAP
SEE PLAN,
LEDGER TYPE "B"
w 2"x4" PT BLOCKING 5ETWEEN
C) TRUSSES W/(2)%4"� TAPCON5
0
`" PROVIDE (1) TA24 STRAP
IL
a EACH TRU55 AS MFR BY U5P
FL 85984 W(11)10dx1/2" NAILS- %4" CDX PLYWOOD SHEATHING W/10d
SHANK RING NAILS a 6" O.C.
(4" 0 PERIMETER)
-- EL, +11'-I" gil
— — — — — — — — TOP/2nd FLOOR T.B.
-5/a" CDX PLYWOOD SHEATHING
W/10d SHANK RING NAILS a 6"
O.G. (4" a PERIMETER)
12
5
LEDGER PRE-ENGINEERED WOOF)--/
TYPE "B" ROOF TRUSSES 0 24' O/C,
24" PRE-ENGINEERED
CONC, TIE BEAM
FLAT FLOOR WOOD
SEE PLAN
TRUSSES 02411 O/C, SCHEDULE
3'-311 11-911
SEECT f ON
SCALE: 1/211=1'- 011 5-4
1
0" MASONRY WALL W/#5
a 32" O/C. IN 3000 PSI
GROUT FILLED CELL5
W/ 5T0 90°HK
HURRICANE STRAP
SEE PLAN.
1'-6"
O.H, (TYP
c'rl
GONG. 5LA6 REINF
--4" CONC. SLAB REINF W/
_ � U
6" GONG. SLAB REINF W/—
<9
W/ 6x6-WI,4xWl.4 WWF
6x6-WI.4xW1.4 WWF OVER 6 MIL
6x6-WlAxW1.4 UJWF OVER 6 MIL
I� r�
VAPOR BARRIER 4 WELL
l
r6"
C4)VLF1R 6 MIL VAPOR BARRIER
VAPOR 5ARRIER 4 WELL
_
co
ELL COMPACTED FILLED.
I
COMPACTED FILLED.
e. x'.'�...�. it
x �'. % ,K�. "_'- tt•'-+r--;.may,
k
y -
�
w
s
�
cfl
�
v
/
GONG. FOOTING.
(5EE FLAN 4
/ ! /\y.
SCHEDULE)
77-4
7/7/
%� ;/% <',/ j /i ��%
2 #5 DONT.
I-0
•
GONG. FOOTING,
(5EE PLAN 4
eC,-IEDULE)
SEECT f ON
SCALE: 1/211=1'- 011 5-4
1
0" MASONRY WALL W/#5
a 32" O/C. IN 3000 PSI
GROUT FILLED CELL5
W/ 5T0 90°HK
HURRICANE STRAP
SEE PLAN.
1'-6"
O.H, (TYP
TOP OF BEAM
FIN.
GARAGE FL, N
SECTIO �_a
D ,y.
SCALE: 1/211=1'-01' S-4 ��
t"filo@ E. 9
�(J
c'rl
17, CDZ-
/
_ � U
6" GONG. SLAB REINF W/—
<9
6x6-WI.4xW1.4 WWF OVER 6 MIL
=
I� r�
VAPOR BARRIER 4 WELL
l
COMPACTED FILLED.
_
co
e. x'.'�...�. it
x �'. % ,K�. "_'- tt•'-+r--;.may,
k
y -
�
w
s
�
cfl
�
v
GONG. FOOTING.
(5EE FLAN 4
/ ! /\y.
SCHEDULE)
TOP OF BEAM
FIN.
GARAGE FL, N
SECTIO �_a
D ,y.
SCALE: 1/211=1'-01' S-4 ��
t"filo@ E. 9
�(J
SEAL
REVISIONS
z --
3.-
4.-
5.-
6. -
DATE : SEP (EMBER, 2012
Sill AS NO 1 ED
LOT 5 1 I�I DRAWN: Y SOSA
D GN BYBY� PAM
JOB NO:
pnnCONSULTING
'�!1: VIxE,,GINERS
STRUCTRAu�z IN " E I �
V
.
626ZQjRD'P TE 2K,
MIA FL 315
F
.�� qC�® Sm4mO
L 0 �a•° ����'
PAUL A. fffi� NEZ
FLORIDAREGTJ.pV65t 5
PMMCE JOB # 11019
c'rl
17, CDZ-
/
L
<9
I� r�
J
l
co
�
w
s
�
�
v
SEAL
REVISIONS
z --
3.-
4.-
5.-
6. -
DATE : SEP (EMBER, 2012
Sill AS NO 1 ED
LOT 5 1 I�I DRAWN: Y SOSA
D GN BYBY� PAM
JOB NO:
pnnCONSULTING
'�!1: VIxE,,GINERS
STRUCTRAu�z IN " E I �
V
.
626ZQjRD'P TE 2K,
MIA FL 315
F
.�� qC�® Sm4mO
L 0 �a•° ����'
PAUL A. fffi� NEZ
FLORIDAREGTJ.pV65t 5
PMMCE JOB # 11019