Loading...
Res No 148-21-15748RESOLUTION NO.: 148-21-15748 A Resolution authorizing the City Manager to execute a professional service work order to SRS Engineering Inc., for the construction support services of new water main extensions and installation of new water meter services as recommended in the City of South Miami (City) Sanitary Sewer Master Plan. WHEREAS, the City Mayor and Commission desire provide water main and water services to those properties currently on well, which are required to become Miami-Dade Water and Sewer Department (MD-WASD) customer before sewer services is provided; and WHEREAS, this project was approved by Commission in the Capital Improvement Work Program; and WHEREAS, the design construction drawings were completed, and the City executed a construction contract with JVA Engineering Contractor on September 21, 2021 with a Notice to Proceed start date of January 3, 2022; and WHEREAS, SRS Engineering Inc., is one of four firms selected by Resolution No. 060-17-14861, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act"; and WHEREAS, SRS Engineering Inc., submitted on November 24, 2021, a proposal for professional engineering services; and . WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and WHEREAS, the amount of $14,880 was found to be comprehensive and cost effective in its design approach; and WHEREAS, the Mayor and City Commission desire to authorize the City Manager to execute a professional service work order to SRS Engineering Inc., to provide construction support services of new water main extensions and installation of new water meter services as recommended in the City of South Miami (City) Sanitary Sewer Master Plan for a total amount not to exceed $14,880; and WHEREAS, the expense for this project shall be charged to the General Obligation Bond Fund Account 114-4011-541-6490 with a balance of $482,423 prior to this request. NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they are incorporated into this resolution by reference as if set forth in full herein. Section 2. The City Manager is authorized to execute a professional service work order to SRS Engineering Inc., for the construction support services of new water main extensions and installation of new water meter services as recommended in the City of South Miami (City) Sanitary Sewer Master Plan, Page 1 of 2 Res. No. 148-21 -15748 for a total amount not to exceed $14,880. The expenditure shall be charged $14,880 to the to the General Ob ligation Bond Fund account number 114-4 011·541-6490 which ha s a balance of $482,423 prior to this request. Section 3 . Corrections . Conforming language or technical scrivener-type corrections may be made by the City Attorney for any conforming amendments to be incorporated into the final reso lution for signature. Secti o n 4: Severability. If any section, clause, se ntence, or ph ra se of th is re sol ution is for any reason held invalid or unconstitutiona l by a court of competent jurisd i ction, the hold i ng sha ll n ot affect the va lidity of the remaining portions of thi s re so l ution. Section 5 : Effective Date: Thi s resolution shall become effective immediately upon adoption. PASSED AND ADOPTED this 7 th day of December, 2021. ATIEST: APPROVED: , l )X Ov~h f CITY UtRK a vlt " / ~ -8~~" /MAYOR' COMMISSION VO TE: 5-0 Mayor Philips: Yea Commissioner Harri s: Yea Commiss i oner Gil: Yea Commissioner Liebman: Yea Commissioner Corey : Yea Page 2 of 2 City Commission Agenda Item Report Meeting Date: December 7, 2021 Submitted by: Aurelio Carmenates Submitting Department: Public Works & Engineering Item Type: Resolution Agenda Section: Subject: Agenda Item No:3. A Resolution authorizing the City Manager to execute a professional service work order to SRS Engineering Inc., for the construction support services of new water main extensions and installation of new water meter services as recommended in the City of South Miami (City) SanitarY Sewer Master Plan. 3/5 (City Manager-Public Works & Engineering Dept.) Suggested Action: Attachments: Me mo_for_Const_Mgmt_for_Water_Project_Dec21.docx Citywide Water Mains -Const 11-24-21.con.pdf 1 THE CITY OF PLEASANT LIVING To: FROM: DATE: SUBJECT: BACKGROUND: AMOUNT: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Shari Kamali, City Manager December 7, 2021 A Resolution authorizing the City Manager to execute a professional service work order to SRS Engineering Inc., for the construction support services of new water main extensions and installation of new water meter services as recommended in the City of South Miami (City) Sanitary Sewer Master Plan. The City desires to execute a profeSSional service work order to SRS Engineering Inc., for the Construction Support Services to connect new water main extension to properties for water service connection, service line, meter box and water meter and coordination with Miami-Dade Water and Sewer Department (MD-WASD). The design construction drawings were completed, and the City executed a construction contract with JVA Engineering Contractor on September 21,2021 with a Notice to Proceed start date of January 3, 2022. As the next City's rotation list consultant, SRS Engineering Inc., was requested to provide a proposal for contract documents. On November 24, 2021, SRS Engineering Inc., submitted a proposal that is comprehensive and cost effective for the services requested. SRS Engineering Inc. is one of four firms selected by Resolution No. 060-17-14861, to provide professional service agreement for engineering services on as needed. Amount not to exceed $14,880 FUND & ACCOUNT: The expenditure shall be charged $14,880 to the to the General Obligation Bond Fund account number 114-4011-541-6490 which has a balance of $482,423 prior to this request. ATTACHMENTS: Resolution Resolution #060-17-14861 SRS Engineering Inc., proposal letter dated November 24, 2021 Notice to Proceed Water Main Extension RFP#PW2021-36 Page 1 ofl 2 November 24, 2021 Mr. Aurelio J . Carmenates, P.E. Capital Improvement Program Project Manager City of South Miami Public Wo rks Engineering & Construction Division 6130 Sunset Drive Miami , FI 33143 Re: City of South Miami Citywide Water Main Improvements Additional Services -Construction Phase Servi ces Dear Mr. Carmenates, We appreciate this opportunity to prepare this Proposa l for Professional Services for the referenced project. In accordance w ith our Professional Services Agreement for General Engineering and Arch itecture Services , we are submitting our understanding of the Scope of Work and Fee Proposal to provide Engineering Services in connection with the referenced project. SCOPE OF WORK The scope of work for this project is to provide limited construction phase support services to the City of South Miami for the construction of water main improvements . Our Basic Professional Services will consist of: 1. Construction Phase Services -wi ll co nsist of limited construction support services including attending pre-construction meeting with City , responding to request for information , and review and approval of shop drawings . Assumi ng a 3-month construction duration . New wat er mains shall be located ; a . SW 63 ,d TerL between SW 671h Avenue and Cul-de-sac (8 -inch diameter, 375 '). b. SW 681h Avenue between SW 74 1h Street South 250 ' (8-inch diameter, 250'). c. SW 72 ,d Street between SW 681h Avenue and SW 691h Aven ue (16 -inch diameter, 700 ') d. SW 42 ,d Terrace between SW 63 ,d Avenue and SW 62 ,d Court (8-inch diameter, 400') e. SW 61 51 Avenue between SW 40lh Street South 650 ' (8-inch diameter, 650). f . SW 70lh Street between SW 63 ,d Avenue and SW 63,d Court (8-inch diameter, 350'). ~ Attend pre-construction meeting (1) and prepare minutes for distribution. ~ Marking in the field the location of the new water m eters as requested by WASD (16 meter locations), and coordination wi th City to clear, trim , or remove any existing trees , bushes , or other items in conflict with meter installation. >-Review and process construction shop drawings. 5 November 24 ,2021 Page 2 ~ Respond to Contractor's request for information and clarification of contract documents. ~ Review and recommend Contractor's change order requests , if any. ~ Review and approval of Contractor's payment requisition s (4 total). ~ Inspecti ons during construction , assume almost daily site visits (24 visits total). ~ Prepare substa ntial completion punch list and construction close out, and certification of construction completion. Our Add itional Professional Services, if requested by you in w riting which are not within the scope of this contract and wou ld be negotiated as per our contract agreement with the City of South Miami. • Add itional construction phase services other than those mentioned above. • Meeting with local residents and/or providing liaison services . • Other professional engineering services as may be requested by you . COMPENSATION Our Engineering Fees for the above described Basic Services w ill be a lump sum amo unt of FOURTEEN·THOUSAND EIGHT·HUNDRED AND EIGHTY DOLLARS ($14,880.00). Ours fees for Basic Services include the cost of regular expenses . Payment wi ll be based on monthly in vo ic ing as a percentage of completion of work. We would expect to commence our services promptly after receipt of your acceptance of this proposal. This Proposal and our standard contract agreement with the C it y represents the entire understanding between City of South Miami and SRS Engineering , Inc. in respect t o the Project and may only be modified in writing when signed by both of us . If it satisfactoril y sets forth you r understanding of our agreement, we would appreciate you signing both cop ies of th is Proposal and returning one (1) copy to us , retaining a copy for you r fi les. Very truly ours , cY, J~ Ignacio erralta , P .E. Presi nt cty...,de watermans-consI11-24-21 COlclool: Accepted this __ day of _____ , 2021 Ti tle' ______________ _ 6 ACTIVITY PRINCIPAL B Y SR S HRS RA TE CONSTRUCTION PH ASE $180.00 At1end pre-conSlruc tion meeling and minutes , 0 S1 8000 Ma11<.rng In f ield location of new water mele~s (1 6) $18000 Rev iew 01 shop drawing s, RFls , COs $180 00 Re v iew and approva l of Contract or's Payments $18000 Provide hm~ed construction Inspections (2 4 site v isrts @2.0 ITs) $18000 Conduct P unch list and Close Out ,0 $18000 T OTAL 2.0 S180 .00 ACTIVITY BY OTHE RS ACTlVITlES BY SRS (Satanes ) AC TlVITlES BY OTHERS ENGINEERI NG COST BREAKDOWN City of South Miami Citywide Water Mains ( Constr uction Phase Ser v ic es) SR. PRO J. MGR SR. ENGIN EER ENGINEER HRS RATE HR S RATE HRS RATE $150.00 $125.00 590.00 30 515000 6.0 $12500 59000 40 $15000 320 $12500 59000 30 5 150 00 60 $12500 59000 30 5150 00 40 $12500 590 00 40 5 15000 $125 00 480 590 00 60 $15000 60 $12500 59000 230 $150.00 $40 $12500 '60 59000 DESC RlP TI ON SUMMARY CAD TECH C LE RICAl HRS RA TE HRS RATE $65.00 $45.00 66500 54500 $6500 $4500 56500 54500 66500 54500 $65 00 54500 56500 54500 00 $65.00 00 $45.00 TO TAL S14,880 x ~ ________________ ___ Estimated OUT OF POCKET EXPENSES Includ ing rm lt fees. reproduct ion costs. etc TOTAL T HI S PRO POSA L DATE: 1112512021 TO TAL TOTAl HOURS COST 10 .0 36.0 90 70 520 130 1270 51.36000 54,600 00 51.200 00 5950 00 $4,92000 $1 ,83000 $14,880.00 COST SO.OO $14 .88000 5 000 $14 ,880.00 7