Res No 118-21-15738RESOLUTION NO. t 1 8_91 _1 s7gg
A Resolution authorizing the City Manager to execute a contract related to
professional construction services from Leadex Corporation for new park
improvements at South Miami Park.
WHEREAS, on September 15", 2020, the Mayor and City Commission passed and adopted
Resolution No. 115-20-15555, related to the complete design construction documents for new park
improvements at South Miami Park; and
WHEREAS, in summary, new park improvements entail demo of the existing rock -filled -in
pool area and support facilities; site restoration; new swings, playground, and outdoor fitness
structures; poured -in -place rubber safety surface; tree improvements; ADA and pedestrian access
stripping improvements, as well as concrete sidewalk access to new amenities; and
WHEREAS, on November 12, 2020, the City received a grant award from the Florida
Recreation Development Assistance Program ("FRDAP") in the amount of $50,000 to be used towards
construction of a new playground structure at South Miami Park; and
WHEREAS, through the Procurement Division, the City's Parks and Recreation Department
issued a Request for Proposal ("RFP") on Friday, April 9, 2021 for construction services related to
the aforementioned park improvements. The City received responses from eight (8) firms and a
total of nine (9) proposals/bids; and
Bidders
Bid Price Alternate Bid
Note s
Thunder Demolition
$13,000
Bid non -responsive
Tadeos Engineering LLC
$262,931.50
Withdrew bid proposal
Leadex Corporation
$390,597.79 $352,662.96 ✓
Staff recommended
Campus Construction Group Inc.
$415,000
UAG Construction
$386,266.05
M&J General Contractors
$415,841.14
Hartec Group Inc.
$488,133
Stonehenge Construction, LLC
$510,841.25
WHEREAS, City staff recommends entering into a contract with Leadex Corporation based
upon past related work experience with the City and throughout Florida's tri-county region (Palm
Beach, Broward, and Miami -Dade counties), quality of work, Certified Playground Safety Inspector
(CPSI) credentials from the National Recreation and Park Association, and compliance with the
terms of the RFP; and
WHEREAS, the proposal/contract amount shall not to exceed $352,662.96. A 10%
contingency in the amount of $35,266.30 is included for unforeseen conditions at the discretion of
the City Manager.
Pagel of 2
Res. No. 118-21-15738
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSIONERS OF THE
CITY OF SOUTH MIAMI, FLORIDA:
Section 1. The foregoing recitals are hereby ratified and confirmed as being true and
correct and are hereby made a specific part of this resolution upon adoption hereof.
Section 2. The City Manager is hereby authorized to enter into an agreement with Leadex
Corporation in the amount of $352,662.96 for new park improvements at South Miami Park. The City
Manager is also authorized to expend up to a 10% contingency in the amount of $35,266.30 for
unforeseen conditions. The total expenditure will be paid from the following accounts:
• $50,000 from FRDAP Grant Fund, account 106-2004-572-6450, which has a current available
balance of $50,000.
$60,000 from Park Impact Fund, account 117-2000-572-3450, which has a current available
balance of $60,000.
$277,929.26 from Parks & Recreation Capital Improvement Fund 301-2000-572-6450, which
has a current balance of $1,943,000.
Section 3. Corrections. Conforming language or technical scrivener -type corrections
may be made by the City Attorney for any conforming amendments to be incorporated into the
final resolution for signature.
Section 4. Severability. If any section clause, sentence, or phrase of this resolution is for
any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding will
not affect the validity of the remaining portions of this resolution.
Section S. Effective Date. This resolution will become effective immediately upon
adoption.
PASSED AND ADOPTED this 5' day of October, 2021.
ATTEST: APPROVED:
�) !19 ' we4z k
CITY CLE MAYOR
9
READ AND APPROVED AS TO FORM,
COMMISSION VOTE:
5-0
Mayor Philips:
Yea
Commissioner Harris:
Yea
Commissioner Gil:
Yea
Commissioner Liebman:
Yea
Commissioner Corey:
Yea
Page 2 of 2
Agenda Item No:2.
City Commission Agenda Item Report
Meeting Date: October 5, 2021
Submitted by: Quentin Pough
Submitting Department: Parks & Recreation
Rem Type: Resolution
Agenda Section:
Subject:
A Resolution authorizing the City Manager to execute a contract related to professional construction services
from Leadex Corporation for new park improvements at South Miami Park. 3/5 (City Manager -Parks &
Recreation Dept.)
Suggested Action:
Attachments:
Memo-SMP Improvements (QP).docx
Reso-SMP Improvements (QP1).docx
FRDAP Project No. A21127.pdf
Construction Plans.pdf
Leadex Alternate Proposal - Bid -Burke Playground Equipment.pdf
Leadex Proposal.pdf
Leadex Original Bid Proposal -Landscape Playground Equipment.PDF
RFP Advertise ment.pdf
Tadeos Engineering Email Thread.pdf
CITY OF SOUTH MIAMI
• OFFICE OF THE CITY MANAGER
SouthMiami INTER -OFFICE MEMORANDUM
THE CITY OF PLEASANT LIVING
To: The Honorable Mayor & Members of the City Commission
FROM: Shari Karnali, City Manager
Via: Quentin Pough, Director of Parks & Recreation
DATE: October 5, 2021
SUBJECT: A Resolution authorizing the City Manager to execute a contract related to
professional construction services from Leadex Corporation for new park
improvements at South Miami Park.
BACKGROUND: On September 15th, 2020, the Mayor and City Commission passed and
adopted Resolution No. 115-20-15555, related to the complete design
construction documents for new park improvements at South Miami Park.
In summary, new park improvements entail demo of the existing rock -filled -
in pool area and support facilities; site restoration; new swings, playground
and outdoor fitness structures; poured -in -place rubber safety surface; tree
improvements; ADA and pedestrian access stripping improvements, as well as
concrete sidewalk access to new amenities. The project limits for all
improvements herein are located on the northeast end within the existing
fenced -in area at South Miami Park as illustrated in the attached construction
plans, Sheet No. C-0.
GRANT FUNDING: On November 12, 2020, the City received a grant award from the Florida
Recreation Development Assistance Program ("FRDAP") in the amount of
$50,000 to be used towards construction of a new playground structure at
South Miami Park. According to the grant agreement, the project must be
completed before April 30, 2023 and all reimbursement requests and
closeout documents submitted within sixty (60) days after completion.
PROCUREMENT
PROCESS: Through the Procurement Division, the City's Parks and Recreation
Department issued a Request for Proposal ("RFP") on Friday, April 9, 2021 for
construction services related to the aforementioned park improvements. The
City received responses from eight (8) firms and a total of nine (9)
proposals/bids as outlined below.
2
South Miami
THE CITY OF PLEASANT LIVING
CITY OF SOUTH MIAMI
OFFICE OF THE CITY MANAGER
INTER -OFFICE MEMORANDUM
Bidders
Bid Price Alternate Bid
Note(s)
Thunder Demolition
$13,000
Bid non -responsive
Tadeos Engineering LLC
$262,931.50
Withdrew bid proposal
Leadex Corporation
$390,597.79 $352,662.96 ✓
Staff recommended
Campus Construction Group Inc.
$415,000
UAG Construction
$386,266.05
M&J General Contractors
$415,841.14
Hartec Group Inc.
$488,133
Stonehenge Construction, LLC
1 $510,841.25
Thunder Demolition is non -responsive because its proposal quoted
demolition only. City staff interviewed the second lowest bidder, Tadeos
Engineering LLC ("Tadeos"), on Wednesday, May 26, 2021. On Thursday, May
27, 2021, the Procurement Division accepted Tadeos' response/bid withdraw
based on an erroneous proposal submittal. Refer to the attached email dated
on Thursday, May 27th
City staff recommends entering into a contract with the third lowest, most
qualified and responsive firm, Leadex Corporation, based upon past related
work experience with the City and throughout Florida's tri-county region
(Palm Beach, Broward, and Miami -Dade counties), quality of work, Certified
Playground Safety Inspector (CPSI) credentials from the National Recreation
and Park Association, and compliance with the terms of the RFP. Leadex
Corporation will be responsible for all work and services as outlined in the RFP
and construction documents, including supply and install of Burke playground
structures and Greenfield's outdoor fitness equipment at South Miami Park.
VENDOR &
EXPENSE: Leadex Corporation. Proposal/contract amount shall not exceed
$352,662.96—Alternative Bid. A 10% contingency in the amount of $35,266.30
is included for unforeseen conditions at the discretion of the City Manager.
FUND &
ACCOUNT: The total expenditure ($387,929.26), which includes contingency funds for
unforeseen activity, will be paid from the following accounts:
• $50,000 from FRDAP Grant Fund, account 106-2004-572-6450, which
has a current available balance of $50,000.
• $60,000 from Park Impact Fund, account 117-2000-572-3450, which
has a current available balance of $60,000.
• $277,929.26 from Parks & Recreation Capital Improvement Fund 301-
2000-572-6450, which has a current balance of $1,943,000.
SoutYe)
hMiami
THE CITY OF PLEASANT LIVING
ATTACHMENT(S):
CITY OF SOUTH MIAMI
OFFICE OF THE CITY MANAGER
INTER -OFFICE MEMORANDUM
Resolution
FRDAP Project No. A21127
Construction Plans: SMP Playground & Park Improvements
Bid Tabulation Report
Proposal — Leadex Corporation
Alternate Bid: Burke Playground Equipment ✓
Original Bid: Landscape Playground Equipment
RFP Advertisement
Tadeos Engineering LLC — Email Thread/Communication
4
FLORIDA DEPARTMENT OF RonDeSanOs
Governor
Environmental Protection Jeanette Nunez
Lt. Governor
Marjory Stoneman Douglas Building Noah Valensteln
3900 Commonwealth Boulevard Secretary
Tallahassee, FL32399
November 12, 2020
Mr. Quentin Pough
CPRP, CPSI Director
City of South Miami
5800 SW 66 Street
South Miami, FL 33143
Re: South Miami Park Playground & Fitness
FRDAP Project No. A21127
Dear Mr. Pough:
The attached contains the fully executed grant agreement for the above referenced project.
Please visit our website at htWs://floridadep.gov/Grants, to read and familiarize yourself with
the FRDAP Administrative Rule, the required Commencement Documentation Checklist, as well
as the Project Status Report Form. This information has been provided on the website for your
review, as it will be extremely helpful and ensures compliance with the administrative
requirements of this grant.
In addition, the Project Completion Documentation Checklist and the Reimbursement Schedules
can be found on our website when that time approaches.
Reminders:
1. Construction cannot begin until all project commencement documentation has been
submitted and approved by this office. This process should be completed 180 days from
the execution of your grant agreement by (June 5, 2021). Once again, the commencement
checklist and other forms may be found at https:Hfloridadep.gov/Grants under FRDAP
Commencement Forms.
2. Quarterly status reports are required - January 5, May 5, and September 5. Please be sure
to summarize work accomplished, problems encountered (if any), and provide color
photographs of development progression.
3. The Department will not process your reimbursements request until the Grantee
completes the project and staff reviews and approves all Completion Documentation and
the final as -built product.
7
Mr. Quentin Pough
Page Two
November 12, 2020
4. The project should be completed before the completion date set forth in the grant
agreement (April 30, 2023) and all reimbursement requests and closeout documents
submitted within sixty days after completion.
If you have any questions, please contact our office at (850) 245-2501. We look forward to
working with you on this project.
Sincerely,
Tamika Bass
Community Assistant Consultant
Land and Recreation Grants Section
Florida Department of Environmental Protection
Mail Station #585
TMB/
Attachment (1)
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Standard Grant Agreement
This Agreement is entered into between the Parties named below, pursuant to Section 215.971, Florida Statutes:
1. Project Title (Project): Agreement Number:
South Miami Park Playground & Fitness A1127
2. Parties State of Florida Department of Environmental Protection,
3900 Commonwealth Boulevard
Tallahassee, Florida 32399 3000 (Department)
Grantee Name: City of South Miami Entity Type: A Local Government
Grantee Address: 5800 SW 66 Street, South Miami, FL 33143 FEID: 59-6000431
(Grantee)
3. Agreement Begin Date: Date of Expiration:
upon execution June 30, 2023
4. Project Number: A21127 Project Location(s): 4300 SW 58th Avenue, South Miami, FL 33143
(If differentfrom Agreement Number)
Project Description:
New playground and picnic tables.
5. Total Amount of Funding: Funding Source? Award #s or Line Item Appropriations: Amount per Sources :
$509000.00 ® State ❑Federal Line Item No.1728, GAA, FY2020-2021 $50,000.00
❑ State ❑Federal
❑ Grantee Match
Total Amount of Funding + Grantee Match, if any: $50,000.00
6. Department's Grant Manager Grantee's Grant Manager
Name: Tamika Bass Name: Mr. Quentin Pough
or successor or successor
Address: 3900 Commonwealth Blvd Address: 5800 SW 66 Street
MS# 585 South Miami, FL 33143
Tallahassee, FL 32399
Phone: 850-245-2501 Phone: 305-688-3867
Email: tamika.bass@floridadep.gov Email: QPough@southmiamiil.gov
7. The Parties agree to comply with the terms and conditions of the following attachments and exhibits which are hereby
;rir-rwnnratPti hu rPfPrP-nr-P.-
1Z Attachment 1: Standard Terms and Conditions Applicable to All Grants Agreements
5Z Attachment 2: Special Terms and Conditions
09 Attachment 3: Grant Work Plan
i! Attachment 4: Public Records Requirements
0 Attachment 5: Special Audit Requirements
iJ Attachment 6: Program -Specific Requirements
❑ Attachment 7: Grant Award Terms (Federal) *Copy availablc at https:-,tfacts.tldfs.com, in accordance with §215.985, F.S.
❑ Attachment 8: Federal Regulations and Terms (Federal)
❑ Additional Attachments (if necessary):
Iff Exhibit A: Progress Report Form
❑ Exhibit B: Property Reporting Form
W Exhibit C: Payment Request Summary Form
❑ Exhibit D: Quality Assurance Requirements for Grants
❑ Exhibit E: Advance Payment Terms and Interest Earned Memo
❑ Additional Exhibits (if necessary):
DEP Agreement No. A1127 Rev. 6/20/18
8. The following information applies to Federal Grants only and is identified in accordance with 2 CFR 200.33 1 (a)(1):
Federal Award Identification Number(s)
Federal Award Date to Department:
Total Federal Funds Obligated by this Agreement:
Federal Awarding Agency:
Award R&D?
❑ Yes ❑N/A
IN WITNESS WHEREOF, this Agreement shall be effective on the date indicated by the Agreement Begin Date above or the
last date signed below, whichever is later.
City of South Miami GRANTEE
Grantee Name
By 10/16/2020
;Authorized Signature) Date Signed
Shari Kamali / City Manager
Print Name and Title of Person Signing
State g9MM da Departmgntrof aumental Protection DEPARTMENT
e aven
DeHaven Date:2020.11.05
By 17:36:23 -05'00'
Secretary or Designee Date Signed
Callie DeHaven, Director, Division of State Lands
Print Name and Title of Person Signing
❑ Additional signatures attached on separate page.
DEP Az=ment No. A 1127
Rev. 6/20/18
10
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STANDARD TERMS AND CONDITIONS
APPLICABLE TO GRANT AGREEMENTS
ATTACHMENT 1
1. Entire Agreement.
This Grant Agreement, including any Attachments and Exhibits referred to herein and/or attached hereto (Agreement),
constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior
agreements, whether written or oral, with respect to such subject matter. Any terms and conditions included on
Grantee's forms or invoices shall be null and void.
2. Grant Administration.
a. Order of Precedence. If there are conflicting provisions among the documents that make up the Agreement, the
order of precedence for interpretation of the Agreement is as follows:
i. Standard Grant Agreement
ii. Attachments other than Attachment 1, in numerical order as designated in the Standard Grant
Agreement
iii. Attachment 1, Standard Terms and Conditions
iv. The Exhibits in the order designated in the Standard Grant Agreement
b. All approvals, written or verbal, and other written communication among the parties, including all notices, shall
be obtained by or sent to the parties' Grant Managers. All written communication shall be by electronic mail,
U.S. Mail, a courier delivery service, or delivered in person. Notices shall be considered delivered when reflected
by an electronic mail read receipt, a courier service delivery receipt, other mail service delivery receipt, or when
receipt is acknowledged by recipient. If the notice is delivered in multiple ways, the notice will be considered
delivered at the earliest delivery time.
c. If a different Grant Manager is designated by either party after execution of this Agreement, notice of the name
and contact information of the new Grant Manager will be submitted in writing to the other party and maintained
in the respective parties' records. A change of Grant Manager does not require a formal amendment or change
order to the Agreement.
d. This Agreement may be amended, through a formal amendment or a change order, only by a written agreement
between both parties. A formal amendment to this Agreement is required for changes which cause any of the
following: (1) an increase or decrease in the Agreement funding amount; (2) a change in Grantee's match
requirements; (3) a change in the expiration date of the Agreement; and/or (4) changes to the cumulative amount
of funding transfers between approved budget categories, as defined in Attachment 3, Grant Work Plan, that
exceeds or is expected to exceed twenty percent (20%) of the total budget as last approved by Department. A
change order to this Agreement may be used when: (1) task timelines within the current authorized Agreement
period change; (2) the cumulative transfer of funds between approved budget categories, as defined in Attachment
3, Grant Work Plan, are less than twenty percent (20%) of the total budget as last approved by Department; (3)
changing the current funding source as stated in the Standard Grant Agreement; and/or (4) fund transfers between
budget categories for the purposes of meeting match requirements. This Agreement may be amended to provide
for additional services if additional funding is made available by the Legislature.
e. All days in this Agreement are calendar days unless otherwise specified.
3. Agreement Duration.
The term of the Agreement shall begin and end on the dates indicated in the Standard Grant Agreement, unless
extended or terminated earlier in accordance with the applicable terms and conditions. The Grantee shall be eligible
for reimbursement for work performed on or after the date of execution through the expiration date of this Agreement,
unless otherwise specified in Attachment 2, Special Terms and Conditions. However, work performed prior to the
execution of this Agreement may be reimbursable or used for match purposes if permitted by the Special Terms and
Conditions.
4. Deliverables.
The Grantee agrees to render the services or other units of deliverables as set forth in Attachment 3, Grant Work Plan.
The services or other units of deliverables shall be delivered in accordance with the schedule and at the pricing outlined
in the Grant Work Plan. Deliverables may be comprised of activities that must be completed prior to Department
making payment on that deliverable. The Grantee agrees to perform in accordance with the terms and conditions set
forth in this Agreement and all attachments and exhibits incorporated by the Standard Grant Agreement.
Attachment 1
1 of 11
Rev. 5/6/2020
11
S. Performance Measures.
The Grantee warrants that: (1) the services will be performed by qualified personnel; (2) the services will be of the
kind and quality described in the Grant Work Plan; (3) the services will be performed in a professional and
workmanlike manner in accordance with industry standards and practices; (4) the services shall not and do not
knowingly infringe upon the intellectual property rights, or any other proprietary rights, of any third party; and (5) its
employees, subcontractors, and/or subgrantees shall comply with any security and safety requirements and processes,
if provided by Department, for work done at the Project Location(s). The Department reserves the right to investigate
or inspect at any time to determine whether the services or qualifications offered by Grantee meet the Agreement
requirements. Notwithstanding any provisions herein to the contrary, written acceptance of a particular deliverable
does not foreclose Department's remedies in the event deficiencies in the deliverable cannot be readily measured at
the time of delivery.
6. Acceptance of Deliverables.
a. Acceptance Process. All deliverables must be received and accepted in writing by Department's Grant Manager
before payment. The Grantee shall work diligently to correct all deficiencies in the deliverable that remain
outstanding, within a reasonable time at Grantee's expense. If Department's Grant Manager does not accept the
deliverables within 30 days of receipt, they will be deemed rejected.
b. Rejection of Deliverables. The Department reserves the right to reject deliverables, as outlined in the Grant
Work Plan, as incomplete, inadequate, or unacceptable due, in whole or in part, to Grantee's lack of satisfactory
performance under the terms of this Agreement. The Grantee's efforts to correct the rejected deliverablcs will
be at Grantee's sole expense. Failure to fulfill the applicable technical requirements or complete all tasks or
activities in accordance with the Grant Work Plan will result in rejection of the deliverable and the associated
invoice. Payment for the rejected deliverable will not be issued unless the rejected deliverable is made
acceptable to Department in accordance with the Agreement requirements. The Department, at its option, may
allow additional time within which Grantee may remedy the objections noted by Department. The Grantee's
failure to make adequate or acceptable deliverables after a reasonable opportunity to do so shall constitute an
event of default.
7. Financial Consequences for Nonperformance.
a. Withholding Payment. In addition to the specific consequences explained in the Grant Work Plan and/or
Special Terms and Conditions, the State of Florida (State) reserves the right to withhold payment when the
Grantee has failed to perform/comply with provisions of this Agreement. None of the financial consequences
for nonperformance in this Agreement as more fully described in the Grant Work Plan shall be considered
penalties.
b. Corrective Action Plan. If Grantee fails to correct all the deficiencies in a rejected deliverable within the specified
timeframe, Department may, in its sole discretion, request that a proposed Corrective Action Plan (CAP) be
submitted by Grantee to Department. The Department requests that Grantee specify the outstanding deficiencies
in the CAP. All CAPs must be able to be implemented and performed in no more than sixty (60) calendar days.
i. The Grantee shall submit a CAP within ten (10) days of the date of the written request from
Department. The CAP shall be sent to the Department's Grant Manager for review and approval.
Within ten (10) days of receipt of a CAP, Department shall notify Grantee in writing whether the
CAP proposed has been accepted. If the CAP is not accepted, Grantee shall have ten (10) days from
receipt of Department letter rejecting the proposal to submit a revised proposed CAP. Failure to
obtain Department approval of a CAP as specified above may result in Department's termination of
this Agreement for cause as authorized in this Agreement.
ii. Upon Department's notice of acceptance of a proposed CAP, Grantee shall have ten (10) days to
commence implementation of the accepted plan. Acceptance of the proposed CAP by Department
does not relieve Grantee of any of its obligations under the Agreement. In the event the CAP fails
to correct or eliminate performance deficiencies by Grantee, Department shall retain the right to
require additional or further remedial steps, or to terminate this Agreement for failure to perform.
No actions approved by Department or steps taken by Grantee shall preclude Department from
subsequently asserting any deficiencies in performance. The Grantee shall continue to implement
the CAP until all deficiencies are corrected. Reports on the progress of the CAP will be made to
Department as requested by Department's Grant Manager.
iii. Failure to respond to a Department request for a CAP or failure to correct a deficiency in the
performance of the Agreement as specified by Department may result in termination of the
Agreement_
Attachment 1
2 of 11
Rev. 5/6/2020 12
8. Payment.
a. Payment Process. Subject to the terms and conditions established by the Agreement, the pricing per deliverable
established by the Grant Work Plan, and the billing procedures established by Department, Department agrees
to pay Grantee for services rendered in accordance with Section 215.422, Florida Statutes (F.S.).
b. Taxes. The Department is exempted from payment of State sales, use taxes and Federal excise taxes. The Grantee,
however, shall not be exempted from paying any taxes that it is subject to, including State sales and use taxes, or
for payment by Grantee to suppliers for taxes on materials used to fulfill its contractual obligations with
Department. The Grantee shall not use Department's exemption number in securing such materials. The Grantee
shall be responsible and liable for the payment of all its FICA/Social Security and other taxes resulting from this
Agreement.
c. Maximum Amount of Agreement. The maximum amount of compensation under this Agreement, without an
amendment, is described in the Standard Grant Agreement. Any additional funds necessary for the completion of
this Project are the responsibility of Grantee.
d. Reimbursement for Costs. The Grantee shall be paid on a cost reimbursement basis for all eligible Project costs
upon the completion, submittal, and approval of each deliverable identified in the Grant Work Plan.
Reimbursement shall be requested on Exhibit C, Payment Request Summary Form. To be eligible for
reimbursement, costs must be in compliance with laws, rules, and regulations applicable to expenditures of State
funds, including, but not limited to, the Reference Guide for State Expenditures, which can be accessed at the
following web address:
hMs://www.mYfloridacfo com/Division/AA/ManuaWdocuments/RcferenceGuideforStateExpenditures.pdf.
e. Invoice Detail. All charges for services rendered or for reimbursement of expenses authorized by Department
pursuant to the Grant Work Plan shall be submitted to Department in sufficient detail for a proper pre -audit and
post -audit to be performed. The Grantee shall only invoice Department for deliverables that are completed in
accordance with the Grant Work Plan.
f. Interim Payments. Interim payments may be made by Department, at its discretion, if the completion of
deliverables to date have first been accepted in writing by Department's Grant Manager.
g. Final Payment Request, A final payment request should be submitted to Department no later than sixty (60) days
following the expiration date of the Agreement to ensure the availability of funds for payment. However, all
work performed pursuant to the Grant Work Plan must be performed on or before the expiration date of the
Agreement.
h. Annual Appropriation Contingency_. The State's performance and obligation to pay under this Agreement is
contingent upon an annual appropriation by the Legislature. This Agreement is not a commitment of future
appropriations. Authorization for continuation and completion of work and any associated payments may be
rescinded, with proper notice, at the discretion of Department if the Legislature reduces or eliminates
appropriations.
i. Interest Rates. All interest rates charged under the Agreement shall be calculated on the prevailing rate used by
the State Board of Administration. To obtain the applicable interest rate, please refer to:
w%v%v.myfloridacfo.com/Division/AANendors/default.htin.
j. Refund of Payments to the Department. Any balance of unobligated funds that have been advanced or paid must
be refunded to Department. Any funds paid in excess of the amount to which Grantee or subgrantee is entitled
under the teens of the Agreement must be refunded to Department. If this Agreement is funded with federal funds
and the Department is required to refund the federal government. the Grantee shall refund the Department its
share of those funds.
9. Documentation Required for Cost Reimbursement Grant Agreements and Match.
If Cost Reimbursement or Match is authorized in Attachment 2, Special Terms and Conditions, the following
conditions apply. Supporting documentation must be provided to substantiate cost reimbursement or match
requirements for the following budget categories:
a. SaIM/Wages. Grantee shall list personnel involved, position classification, direct salary rates, and hours spent
on the Project in accordance with Attachment 3, Grant Work Plan in their documentation for reimbursement or
match requirements.
b. Overhead/Indirect/General and Administrative Costs. If Grantee is being reimbursed for or claiming match for
multipliers, all multipliers used (i.e., fringe benefits, overhead, indirect, and/or general and administrative rates)
shall be supported by audit. If Department determines that multipliers charged by Grantee exceeded the rates
supported by audit, Grantee shall be required to reimburse such funds to Department within thirty (30) days of
written notification. Interest shall be charged on the excessive rate.
Attachment 1
3of11
Rev. 5/6/2020
13
c. Contractual Costs (Subcontractors). Match or reimbursement requests for payments to subcontractors must be
substantiated by copies of invoices with backup documentation identical to that required from Grantee.
Subcontracts which involve payments for direct salaries shall clearly identify the personnel involved, salary rate
per hour, and hours spent on the Project. All eligible multipliers used (i.e., fringe benefits, overhead, indirect,
and/or general and administrative rates) shall be supported by audit. If Department determines that multipliers
charged by any subcontractor exceeded the rates supported by audit, Grantee shall be required to reimburse such
funds to Department within thirty (30) days of written notification. Interest shall be charged on the excessive
rate. Nonconsumable and/or nonexpendable personal property or equipment costing $1,000 or more purchased
for the Project under a subcontract is subject to the requirements set forth in Chapters 273 and/or 274, F.S., and
Chapter 69I-72, Florida Administrative Code (F.A.C.) and/or Chapter 69I-73, F.A.C., as applicable: The Grantee
shall be responsible for maintaining appropriate property records for any subcontracts that include the purchase
of equipment as part of the delivery of services. The Grantee shall comply with this requirement and ensure its
subcontracts issued under this Agreement, if any, impose this requirement, in writing, on its subcontractors.
i. For fixed -price (vendor) subcontracts, the following provisions shall apply: The Grantee may
award, on a competitive basis, fixed -price subcontracts to consultants/contractors in performing the
work described in Attachment 3, Grant Work Plan. Invoices submitted to Department for fixed -
price subcontracted activities shall be supported with a copy of the subcontractor's invoice and a
copy of the tabulation form for the competitive procurement process (e.g., Invitation to Bid, Request
for Proposals, or other similar competitive procurement document) resulting in the fixed -price
subcontract. The Grantee may request approval from Department to award a fixed -price subcontract
resulting from procurement methods other than those identified above. In this instance, Grantee shall
request the advance written approval from Department's Grant Manager of the fixed price
negotiated by Grantee. The letter of request shall be supported by a detailed budget and Scope of
Services to be performed by the subcontractor. Upon receipt of Department Grant Manager's
approval of the fixed -price amount, Grantee may proceed in finalizing the fixed -price subcontract.
ii. If the procurement is subject to the Consultant's Competitive Negotiation Act under section
287.055, F.S. or the Brooks Act, Grantee must provide documentation clearly evidencing it has
complied with the statutory or federal requirements.
d. Travel. All requests for match or reimbursement of travel expenses shall be in accordance with Section 112.061,
F.S.
e. Direct Purchase FAWpment. For the purposes of this Agreement, Equipment is defined as capital outlay costing
$1,000 or more. Match or reimbursement for Grantee's direct purchase of equipment is subject to specific
approval of Department, and does not include any equipment purchased under the delivery of services to be
completed by a subcontractor. Include copies of invoices or receipts to document purchases, and a properly
completed Exhibit B, Property Reporting Form.
f. Rental/Lease of Equipment. Match or reimbursement requests for rental/lease of equipment must include copies
of invoices or receipts to document charges.
g. Miscellaneous/Other Expenses. If miscellaneous or other expenses, such as materials, supplies, non -excluded
phone expenses, reproduction, or mailing, are reimbursable or available for match or reimbursement under the
terms of this Agreement, the documentation supporting these expenses must be itemized and include copies of
receipts or invoices. Additionally, independent of Grantee's contract obligations to its subcontractor, Department
shall not reimburse any of the following types of charges: cell phone usage; attorney's fees or court costs; civil
or administrative penalties; or handling fees, such as set percent overages associated with purchasing supplies or
equipment.
h. Land Acquisition. Reimbursement for the costs associated with acquiring interest and/or rights to real property
(including access rights through ingress/egress easements, leases, license agreements, or other site access
agreements; and/or obtaining record title ownership of real property through purchase) must be supported by the
following, as applicable: Copies of Property Appraisals, Environmental Site Assessments, Surveys and Legal
Descriptions, Boundary Maps, Acreage Certification, Title Search Reports, Title Insurance, Closing
Statements/Documents, Deeds, Leases, Easements, License Agreements, or other legal instrument documenting
acquired property interest and/or rights. If land acquisition costs are used to meet match requirements, Grantee
agrees that those funds shall not be used as match for any other Agreement supported by State or Federal funds.
10. Status Reports.
The Grantee shall submit status reports quarterly, unless otherwise specified in the Attachments, on Exhibit A,
Progress Report Form, to Department's Grant Manager describing the work performed during the reporting
period, problems encountered, problem resolutions, scheduled updates, and proposed work for the next reporting
Attachment 1
4 of 11
Rev. 5/6/2020 14
period. Quarterly status reports are due no later than twenty (20) days following the completion of the quarterly
reporting period. For the purposes of this reporting requirement, the quarterly reporting periods end on March
31, June 30, September 30 and December 31. The Department will review the required reports submitted by
Grantee within thirty (30) days.
11. Retainage.
The following provisions apply if Department withholds retainage under this Agreement:
a. The Department reserves the right to establish the amount and application of retainage on the work performed
under this Agreement up to the maximum percentage described in Attachment 2, Special Terms and Conditions.
Retainage may be withheld from each payment to Grantee pending satisfactory completion of work and approval
of all deliverables.
b. If Grantee fails to perform the requested work, or fails to perform the work in a satisfactory manner, Grantee shall
forfeit its right to payment of the retainage associated with the work. Failure to perform includes, but is not
limited to, failure to submit the required deliverables or failure to provide adequate documentation that the work
was actually performed. The Department shall provide written notification to Grantee of the failure to perform
that shall result in retainage forfeiture. If the Grantee does not correct the failure to perform within the timeframe
stated in Department's notice, the retainage will be forfeited to Department.
e. No retainage shall be released or paid for incomplete work while this Agreement is suspended.
d. Except as otherwise provided above, Grantee shall be paid the retainage associated with the work, provided
Grantee has completed the work and submits an invoice for retainage held in accordance with the invoicing
procedures under this Agreement.
12. Insurance.
a. 1nmmce Requirements for Sub -Grantees and/or Subcontractors. The Grantee shall require its sub -grantees
and/or subcontractors, if any, to maintain insurance coverage of such types and with such terms and limits as
described in this Agreement. The Grantee shall require all its sub -grantees and/or subcontractors, if any, to
make compliance with the insurance requirements of this Agreement a condition of all contracts that are related
to this Agreement. Sub -grantees and/or subcontractors must provide proof of insurance upon request.
b. Deductibles. The Department shall be exempt from, and in no way liable for, any sums of money representing a
deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the
Grantee providing such insurance.
c. Proof of Insurance. Upon execution of this Agreement, Grantee shall provide Department documentation
demonstrating the existence and amount for each type of applicable insurance coverage prior to performance of
any work under this Agreement. Upon receipt of written request from Department, Grantee shall furnish
Department with proof of applicable insurance coverage by standard form certificates of insurance, a self -
insured authorization, or other certification of self-insurance.
d. Duty to Maintain Coverage. In the event that any applicable coverage is cancelled by the insurer for any
reason, or if Grantee cannot get adequate coverage, Grantee shall immediately notify Department of such
cancellation and shall obtain adequate replacement coverage conforming to the requirements herein and provide
proof of such replacement coverage within ten (10) days after the cancellation of coverage.
e. Insurance Trust. If the Grantee's insurance is provided through an insurance trust, the Grantee shall instead add
the Department of Environmental Protection, its employees, and officers as an additional covered party
everywhere the Agreement requires them to be added as an additional insured.
13. Termination.
a. Termination for Convenience. When it is in the State's best interest, Department may, at its sole discretion,
terminate the Agreement in whole or in part by giving 30 days' written notice to Grantee. The Department shall
notify Grantee of the termination for convenience with instructions as to the effective date of termination or the
specific stage of work at which the Agreement is to be terminated. The Grantee must submit all invoices for
work to be paid under this Agreement within thirty (30) days of the effective date of termination. The
Department shall not pay any invoices received after thirty (30) days of the effective date of termination.
b. Termination for Cause. The Department may terminate this Agreement if any of the events of default described
in the Events of Default provisions below occur or in the event that Grantee fails to fulfill any of its other
obligations under this Agreement. If, after termination, it is determined that Grantee was not in default, or that
the default was excusable, the rights and obligations of the parties shall be the same as if the termination had
been issued for the convenience of Department. The rights and remedies of Department in this clause are in
addition to any other rights and remedies provided by law or under this Agreement.
c. Grantee 4bligrations upon Notice of Termination. After receipt of a notice of termination or partial termination
unless as otherwise directed by Department, Grantee shall not furnish any service or deliverable on the date, and
Attachment 1
5of11
Rev. 5/6/2020
15
to the extent specified, in the notice. However, Grantee shall continue work on any portion of the Agreement
not terminated. If the Agreement is terminated before performance is completed, Grantee shall be paid only for
that work satisfactorily performed for which costs can be substantiated. The Grantee shall not be entitled to
recover any cancellation charges or lost profits.
d. Continuation of Prepaid Services. If Department has paid for any services prior to the expiration, cancellation,
or termination of the Agreement, Grantee shall continue to provide Department with those services for which it
has already been paid or, at Department's discretion, Grantee shall provide a refund for services that have been
paid for but not rendered.
e. Transition of Services Upon Termination, Expiration, or Cancellation of the Agreement. If services provided
under the Agreement are being transitioned to another provider(s), Grantee shall assist in the smooth transition
of Agreement services to the subsequent provider(s). This requirement is at a minimum an affirmative
obligation to cooperate with the new provider(s), however additional requirements may be outlined in the Grant
Work Plan. The Grantee shall not perform any services after Agreement expiration or termination, except as
necessary to complete the transition or continued portion of the Agreement, if any.
14. Notice of Default.
If Grantee defaults in the performance of any covenant or obligation contained in the Agreement, including, any of
the events of default, Department shall provide notice to Grantee and an opportunity to cure that is reasonable under
the circumstances. This notice shall state the nature of the failure to perform and provide a time certain for correcting
the failure. The notice will also provide that, should the Grantee fail to perform within the time provided, Grantee will
be found in default, and Department may terminate the Agreement effective as of the date of receipt of the default
notice.
15. Events of Default.
Provided such failure is not the fault of Department or outside the reasonable control of Grantee, the following non-
exclusive list of events, acts, or omissions, shall constitute events of default:
a. The commitment of any material breach of this Agreement by Grantee, including failure to timely deliver a
material deliverable, failure to perform the minimal level of services required for a deliverable, discontinuance of
the performance of the work, failure to resume work that has been discontinued within a reasonable time after
notice to do so, or abandonment of the Agreement;
b. The commitment of any material misrepresentation or omission in any materials, or discovery by the Department
of such, made by the Grantee in this Agreement or in its application for funding;
c. Failure to submit any of the reports required by this Agreement or having submitted any report with incorrect,
incomplete, or insufficient information;
d. Failure to honor any term of the Agreement;
e. Failure to abide by any statutory, regulatory, or licensing requirement, including an entry of an order revoking
the certificate of authority granted to the Grantee by a state or other licensing authority;
f. Failure to pay any and all entities, individuals, and furnishing labor or materials, or failure to make payment to
any other entities as required by this Agreement;
g. Employment of an unauthorized alien in the performance of the work, in violation of Section 274 (A) of the
Immigration and Nationality Act;
h. Failure to maintain the insurance required by this Agreement;
i. One or more of the following circumstances, uncorrected for more than thirty (30) days unless, within the
specified 30-day period, Grantee (including its receiver or trustee in bankruptcy) provides to Department adequate
assurances, reasonably acceptable to Department, of its continuing ability and willingness to fulfill its obligations
under the Agreement:
i. Entry of an order for relief under Title 11 of the United States Code;
ii. The making by Grantee of a general assignment for the benefit of creditors;
iii. The appointment of a general receiver or trustee in bankruptcy of Grantee's business or property;
and/or
iv. An action by Grantee under any state insolvency or similar law for the purpose of its bankruptcy,
reorganization, or liquidation.
16. Suspension of Work.
The Department may, in its sole discretion, suspend any or all activities under the Agreement, at any time, when it is
in the best interest of the State to do so. The Department shall provide Grantee written notice outlining the particulars
of suspension. Examples of reasons for suspension include, but are not limited to, budgetary constraints, declaration
of emergency, or other such circumstances. After receiving a suspension notice, Grantee shall comply with the notice.
Within 90 days, or any longer period agreed to by the parties, Department shall either: (1) issue a notice authorizing
Attachment 1
6of11
Rev. 5/6/2020 16
resumption of work, at which time activity shall resume; or (2) terminate the Agreement. If the Agreement is
terminated after 30 days of suspension, the notice of suspension shall be deemed to satisfy the thirty (30) days' notice
required for a notice of termination for convenience. Suspension of work shall not entitle Grantee to any additional
compensation.
17. Force Majeure.
The Grantee shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence
of Grantee or its employees or agents contributed to the delay and the delay is due directly to acts of God, wars, acts
of public enemies, strikes, fires, floods, or other similar cause wholly beyond Grantee's control, or for any of the
foregoing that affect subcontractors or suppliers if no alternate source of supply is available to Grantee. In case of
any delay Grantee believes is excusable, Grantee shall notify Department in writing of the delay or potential delay
and describe the cause of the delay either (1) within ten days after the cause that creates or will create the delay first
arose, if Grantee could reasonably foresee that a delay could occur as a result; or (2) if delay is not reasonably
foreseeable, within five days after the date Grantee first had reason to believe that a delay could result. THE
FOREGOING SHALL CONSTITUTE THE GRANTEE'S SOLE REMEDY OR EXCUSE WITH RESPECT
TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No
claim for damages, other than for an extension of time, shall be asserted against Department. The Grantee shall not be
entitled to an increase in the Agreement price or payment of any kind from Department for direct, indirect,
consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or
inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If
performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after
the causes have ceased to exist Grantee shall perform at no increased cost, unless Department determines, in its sole
discretion, that the delay will significantly impair the value of the Agreement to Department, in which case Department
may: (1) accept allocated performance or deliveries from Grantee, provided that Grantee grants preferential treatment
to Department with respect to products subjected to allocation; (2) contract with other sources (without recourse to
and by Grantee for the related costs and expenses) to replace all or part of the products or services that are the subject
of the delay, which purchases may be deducted from the Agreement quantity; or (3) terminate Agreement in whole or
in part.
18. Indemnification.
a. The Grantee shall be fully liable for the actions of its agents, employees, partners, or subcontractors and shall
fully indemnify, defend, and hold harmless Department and its officers, agents, and employees, from suits,
actions, damages, and costs of every name and description arising from or relating to:
i. personal injury and damage to real or personal tangible property alleged to be caused in whole or in
part by Grantee, its agents, employees, partners, or subcontractors; provided, however, that Grantee
shall not indemnify for that portion of any loss or damages proximately caused by the negligent act
or omission of Department;
ii. the Grantee's breach of this Agreement or the negligent acts or omissions of Grantee.
b. The Grantee's obligations under the preceding paragraph with respect to any legal action are contingent upon
Department giving Grantee: (1) written notice of any action or threatened action; (2) the opportunity to take over
and settle or defend any such action at Grantee's sole expense; and (3) assistance in defending the action at
Grantee's sole expense. The Grantee shall not be liable for any cost, expense, or compromise incurred or made
by Department in any legal action without Grantee's prior written consent, which shall not be unreasonably
withheld.
c. Notwithstanding sections a. and b. above, the following is the sole indemnification provision that applies to
Grantees that are governmental entities: Each party hereto agrees that it shall be solely responsible for the
negligent or wrongful acts of its employees and agents. However, nothing contained herein shall constitute a
waiver by either party of its sovereign immunity or the provisions of Section 768.28, F.S. Further, nothing herein
shall be construed as consent by a state agency or subdivision of the State to be sued by third parties in any matter
arising out of any contract or this Agreement.
d. No provision in this Agreement shall require Department to hold harmless or indemnify Grantee, insure or assume
liability for Grantee's negligence, waive Department's sovereign immunity under the laws of Florida, or
otherwise impose liability on Department for which it would not otherwise be responsible. Any provision,
implication or suggestion to the contrary is null and void.
19. Limitation of Liability.
The Department's liability for any claim arising from this Agreement is limited to compensatory damages in an amount
no greater than the sum of the unpaid balance of compensation due for goods or services rendered pursuant to and in
compliance with the terms of the Agreement. Such liability is further limited to a cap of $100,000.
Attachment 1
7 of 11
Rev. 5/6/2020
17
20. Remedies.
Nothing in this Agreement shall be construed to make Grantee liable for force majeure events. Nothing in this
Agreement, including financial consequences for nonperformance, shall limit Department's right to pursue its
remedies for other types of damages under the Agreement, at law or in equity. The Department may, in addition to
other remedies available to it, at law or in equity and upon notice to Grantee, retain such monies from amounts due
Grantee as may be necessary to satisfy any claim for damages, penalties, costs and the like asserted by or against it.
21. Waiver.
The delay or failure by Department to exercise or enforce any of its rights under this Agreement shall not constitute
or be deemed a waiver of Department's right thereafter to enforce those rights, nor shall any single or partial exercise
of any such right preclude any other or further exercise thereof or the exercise of any other right.
22. Statutory Notices Relating to Unauthorized Employment and Subcontracts.
a. The Department shall consider the employment by any Grantee of unauthorized aliens a violation of Section
274A(e) of the Immigration and Nationality Act. If Grantee/subcontractor knowingly employs unauthorized
aliens, such violation shall be cause for unilateral cancellation of this Agreement. The Grantee shall be responsible
for including this provision in all subcontracts with private organizations issued as a result of this Agreement.
b. Pursuant to Sections 287.133 and 287.134, F.S., the following restrictions apply to persons placed on the
convicted vendor list or the discriminatory vendor list:
i. Public Entity Crime. A person or affiliate who has been placed on the convicted vendor list
following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract
to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a
contract with a public entity for the construction or repair of a public building or public work; may
not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded
or perform work as a Grantee, supplier, subcontractor, or consultant under a contract with any public
entity; and may not transact business with any public entity in excess of the threshold amount
provided in Section 287.017, F.S., for CATEGORY TWO for a period of 36 months following the
date of being placed on the convicted vendor list.
ii. Discriminatory Vendors. An entity or affiliate who has been placed on the discriminatory vendor
list may not submit a bid, proposal, or reply on a contract to provide any goods or services to a
public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the
construction or repair of a public building or public work; may not submit bids, proposals, or replies
on leases of real property to a public entity; may not be awarded or perform work as a contractor,
supplier, subcontractor, or consultant under a contract with any public entity; and may not transact
business with any public entity.
iii. Notification. The Grantee shall notify Department if it or any of its suppliers, subcontractors, or
consultants have been placed on the convicted vendor list or the discriminatory vendor list during
the life of the Agreement. The Florida Department of Management Services is responsible for
maintaining the discriminatory vendor list and posts the list on its website. Questions regarding the
discriminatory vendor list may be directed to the Florida Department of Management Services,
Office of Supplier Diversity, at (850) 487-0915.
23. Compliance with Federal, State and Local Laws.
a. The Grantee and all its agents shall comply with all federal, state and local regulations, including, but not limited
to, nondiscrimination, wages, social security, workers' compensation, licenses, and registration requirements.
The Grantee shall include this provision in all subcontracts issued as a result of this Agreement.
b. No person, on the grounds of race, creed, color, religion, national origin, age, gender, or disability, shall be
excluded from participation in; be denied the proceeds or benefits of; or be otherwise subjected to discrimination
in performance of this Agreement.
c. This Agreement shall be governed by and construed in accordance with the laws of the State of Florida.
d. Any dispute concerning performance of the Agreement shall be processed as described herein. Jurisdiction for
any damages arising under the terms of the Agreement will be in the courts of the State, and venue will be in the
Second Judicial Circuit, in and for Leon County. Except as otherwise provided by law, the parties agree to be
responsible for their own attorney fees incurred in connection with disputes arising under the terns of this
Agreement.
24. Scrutinized Companies.
a. Grantee certifies that it is not on the Scrutinized Companies that Boycott Israel List or engaged in a boycott of
Israel. Pursuant to Section 287.135, F.S., the Department may immediately terminate this Agreement at its sole
Attachment 1
8of11
Rev. 5/6/2020 18
option if the Grantee is found to have submitted a false certification; or if the Grantee is placed on the Scrutinized
Companies that Boycott Israel List or is engaged in the boycott of Israel during the term of the Agreement.
b. If this Agreement is for more than one million dollars, the Grantee certifies that it is also not on the Scrutinized
Companies with Activities in Sudan, Scrutinized Companies with Activities in the Iran Petroleum Energy Sector
List, or engaged with business operations in Cuba or Syria as identified in Section 287.135, F.S. Pursuant to
Section 287.135, F.S., the Department may immediately terminate this Agreement at its sole option if the Grantee
is found to have submitted a false certification; or if the Grantee is placed on the Scrutinized Companies with
Activities in Sudan List, or Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or
engaged with business operations in Cuba or Syria during the term of the Agreement.
c. As provided in Subsection 287.135(8), F.S., if federal law ceases to authorize these contracting prohibitions then
they shall become inoperative.
25. Lobbying and Integrity.
The Grantee agrees that no funds received by it under this Agreement will be expended for the purpose of lobbying
the Legislature or a State agency pursuant to Section 216.347, F.S., except that pursuant to the requirements of Section
287.058(6), F.S., during the term of any executed agreement between Grantee and the State, Grantee may lobby the
executive or legislative branch concerning the scope of services, performance, term, or compensation regarding that
agreement. The Grantee shall comply with Sections 11.062 and 216.347, F.S.
26. Record Keeping.
The Grantee shall maintain books, records and documents directly pertinent to performance under this Agreement in
accordance with United States generally accepted accounting principles (US GAAP) consistently applied. The
Department, the State, or their authorized representatives shall have access to such records for audit purposes during
the term of this Agreement and for five (5) years following the completion date or termination of the Agreement. In
the event that any work is subcontracted, Grantee shall similarly require each subcontractor to maintain and allow
access to such records for audit purposes. Upon request of Department's Inspector General, or other authorized
State official, Grantee shall provide any type of information the Inspector General deems relevant to Grantee's
integrity or responsibility. Such information may include, but shall not be limited to, Grantee's business or financial
records, documents, or files of any type or form that refer to or relate to Agreement. The Grantee shall retain such
records for the longer of. (1) three years after the expiration of the Agreement; or (2) the period required by the
General Records Schedules maintained by the Florida Department of State (available at:
httg://dos Myflorida com/libMC -archives/records-management/general-records-scllcduleao.
27. Audits.
a. jgggctor General. The Grantee understands its duty, pursuant to Section 20.055(5), F.S., to cooperate with the
inspector general in any investigation, audit, inspection, review, or hearing. The Grantee will comply with this
duty and ensure that its sub -grantees and/or subcontractors issued under this Agreement, if any, impose this
requirement, in writing, on its sub -grantees and/or subcontractors, respectively.
b. Physical Access and Inspection. Department personnel shall be given access to and may observe and inspect
work being performed under this Agreement, with reasonable notice and during normal business hours, including
by any of the following methods:
i. Grantee shall provide access to any location or facility on which Grantee is performing work, or
storing or staging equipment, materials or documents;
ii. Grantee shall permit inspection of any facility, equipment, practices, or operations required in
performance of any work pursuant to this Agreement; and,
iii. Grantee shall allow and facilitate sampling and monitoring of any substances, soils, materials or
parameters at any location reasonable or necessary to assure compliance with any work or legal
requirements pursuant to this Agreement.
c. Special Audit Requirements. The Grantee shall comply with the applicable provisions contained in Attachment
5, Special Audit Requirements. Each amendment that authorizes a funding increase or decrease shall include an
updated copy of Exhibit 1, to Attachment 5. If Department fails to provide an updated copy of Exhibit 1 to include
in each amendment that authorizes a funding increase or decrease, Grantee shall request one from the
Department's Grants Manager. The Grantee shall consider the type of financial assistance (federal and/or state)
identified in Attachment 5, Exhibit 1 and determine whether the terms of Federal and/or Florida Single Audit Act
Requirements may further apply to lower tier transactions that may be a result of this Agreement. For federal
financial assistance, Grantee shall utilize the guidance provided under 2 CFR §200.330 for determining whether
the relationship represents that of a subrecipient or vendor. For State financial assistance, Grantee shall utilize the
form entitled "Checklist for Nonstate Organizations Recipient/Subrecipient vs Vendor Determination" (form
Attachment 1
9of11
Rev. 5/6/2020
19
number DFS-A2-NS) that can be found under the "Links/Forms" section appearing at the following website:
hyM:\lapps.fldfs.com\fsaa.
d. Pmof of Transactions, In addition to documentation provided to support cost reimbursement as described herein,
Department may periodically request additional proof of a transaction to evaluate the appropriateness of costs to
the Agreement pursuant to State guidelines (including cost allocation guidelines) and federal, if applicable.
Allowable costs and uniform administrative requirements for federal programs can be found under 2 CFR
200. The Department may also request a cost allocation plan in support of its multipliers (overhead, indirect,
general administrative costs, and fringe benefits). The Grantee must provide the additional proof within thirty
(30) days of such request.
e. No Commnrgling of Funds. The accounting systems for all Grantees must ensure that these funds are not
commingled with funds from other agencies. Funds from each agency must be accounted for separately. Grantees
are prohibited from commingling funds on either a program -by -program or a project -by -project basis. Funds
specifically budgeted and/or received for one project may not be used to support another project. Where a
Grantee's, or subrecipienfs, accounting system cannot comply with this requirement, Grantee, or subrecipient,
shall establish a system to provide adequate fund accountability for each project it has been awarded.
i. If Department finds that these funds have been commingled, Department shall have the right to
demand a refund, either in whole or in part, of the funds provided to Grantee under this Agreement
for non-compliance with the material terms of this Agreement. The Grantee, upon such written
notification from Department shall refund, and shall forthwith pay to Department, the amount of
money demanded by Department. Interest on any refund shall be calculated based on the prevailing
rate used by the State Board of Administration. Interest shall be calculated from the date(s) the
original payment(s) are received from Department by Grantee to the date repayment is made by
Grantee to Department.
ii. In the event that the Grantee recovers costs, incurred under this Agreement and reimbursed by
Department, from another source(s), Grantee shall reimburse Department for all recovered funds
originally provided under this Agreement and interest shall be charged for those recovered costs as
calculated on from the date(s) the payment(s) are recovered by Grantee to the date repayment is
made to Department.
iii. Notwithstanding the requirements of this section, the above restrictions on commingling funds do
not apply to agreements where payments are made purely on a cost reimbursement basis.
28. Conflict of Interest.
The Grantee covenants that it presently has no interest and shall not acquire any interest which would conflict in any
manner or degree with the performance of services required.
29. Independent Contractor.
The Grantee is an independent contractor and is not an employee or agent of Department.
30. Subcontracting.
a. Unless otherwise specified in the Special Terms and Conditions, all services contracted for are to be performed
solely by Grantee.
b. The Department may, for cause, require the replacement of any Grantee employee, subcontractor, or agent. For
cause, includes, but is not limited to, technical or training qualifications, quality of work, change in security status,
or non-compliance with an applicable Department policy or other requirement.
c. The Department may, for cause, deny access to Department's secure information or any facility by any Grantee
employee, subcontractor, or agent.
d. The Department's actions under paragraphs b. or c. shall not relieve Grantee of its obligation to perform all work
in compliance with the Agreement. The Grantee shall be responsible for the payment of all monies due under any
subcontract. The Department shall not be liable to any subcontractor for any expenses or liabilities incurred under
any subcontract and Grantee shall be solely liable to the subcontractor for all expenses and liabilities incurred
under any subcontract.
e. The Department will not deny Grantee's employees, subcontractors, or agents access to meetings within the
Department's facilities, unless the basis of Department's denial is safety or security considerations.
f. The Department supports diversity in its procurement program and requests that all subcontracting opportunities
afforded by this Agreement embrace diversity enthusiastically. The award of subcontracts should reflect the full
diversity of the citizens of the State. A list of minority -owned firms that could be offered subcontracting
opportunities may be obtained by contacting the Office of Supplier Diversity at (850) 487-0915.
g. The Grantee shall not be liable for any excess costs for a failure to perform, if the failure to perform is caused by
the default of a subcontractor at any tier, and if the cause of the default is completely beyond the control of both
Attachment 1
10ofll
Rev. 5/6/2020 20
Grantee and the subcontractor(s), and without the fault or negligence of either, unless the subcontracted products
or services were obtainable from other sources in sufficient time for Grantee to meet the required delivery
schedule.
31. Guarantee of Parent Company.
If Grantee is a subsidiary of another corporation or other business entity, Grantee asserts that its parent company will
guarantee all of the obligations of Grantee for purposes of fulfilling the obligations of Agreement. In the event Grantee
is sold during the period the Agreement is in effect, Grantee agrees that it will be a requirement of sale that the new
parent company guarantee all of the obligations of Grantee.
32. Survival.
The respective obligations of the parties, which by their nature would continue beyond the termination or expiration
of this Agreement, including without limitation, the obligations regarding confidentiality, proprietary interests, and
public records, shall survive termination, cancellation, or expiration of this Agreement.
33. Third Parties.
The Department shall not be deemed to assume any liability for the acts, failures to act or negligence of Grantee, its
agents, servants, and employees, nor shall Grantee disclaim its own negligence to Department or any third party. This
Agreement does not and is not intended to confer any rights or remedies upon any person other than the parties. If
Department consents to a subcontract, Grantee will specifically disclose that this Agreement does not create any third -
party rights. Further, no third parties shall rely upon any of the rights and obligations created under this Agreement.
34. Severability.
If a court of competent jurisdiction deems any term or condition herein void or unenforceable, the other provisions
are severable to that void provision, and shall remain in full force and effect.
35. Grantee's Employees, Subcontractors and Agents.
All Grantee employees, subcontractors, or agents performing work under the Agreement shall be properly trained
technicians who meet or exceed any specified training qualifications. Upon request, Grantee shall furnish a copy of
technical certification or other proof of qualification. All employees, subcontractors, or agents performing work under
Agreement must comply with all security and administrative requirements of Department and shall comply with all
controlling laws and regulations relevant to the services they are providing under the Agreement.
36. Assignment.
The Grantee shall not sell, assign, or transfer any of its rights, duties, or obligations under the Agreement, or under
any purchase order issued pursuant to the Agreement, without the prior written consent of Department. In the event
of any assignment, Grantee remains secondarily liable for performance of the Agreement, unless Department expressly
waives such secondary liability. The Department may assign the Agreement with prior written notice to Grantee of its
intent to do so.
37. Execution in Counterparts and Authority to Sign.
This Agreement, any amendments, and/or change orders related to the Agreement, may be executed in counterparts,
each of which shall be an original and all of which shall constitute the same instrument. In accordance with the
Electronic Signature Act of 1996, electronic signatures, including facsimile transmissions, may be used and shall have
the same force and effect as a written signature. Each person signing this Agreement warrants that he or she is duly
authorized to do so and to bind the respective party to the Agreement.
Attachment 1
11 of 11
Rev. 5/6/2020
21
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Special Terms and Conditions
AGREEMENT NO. A1127
ATTACHMENT 2
These Special Terms and Conditions shall be read together with general terms outlined in the Standard Terms and
Conditions, Attachment 1. Where in conflict, these more specific terms shall apply.
1. Scope of Work.
The Project funded under this Agreement is South Miami Park Playground & Fitness. The Project is defined in
more detail in Attachment 3, Grant Work Plan.
2. Duration.
a. Reimbursement Period. The reimbursement period for this Agreement begins the first day of the fiscal year for
in which this Agreement was entered into, through the Date of Expiration.
b. Extensions. There are no extensions available for this Project.
c. Service Periods. Additional service periods are not authorized under this Agreement.
3. Payment Provisions.
a. Compensation. This is a cost reimbursement Agreement The Grantee shall be compensated under this
Agreement as described in Attachment 3.
b. Invoicing. Invoicing will occur after approval of the final delivereable(s).
c. Advance Pay. Advance Pay is not authorized under this Agreement.
4. Cost Eligible for Reimbursement or Matching Requirements.
Reimbursement for costs or availability for costs to meet matching requirements shall be limited to the following
budget categories, as defined in the Reference Guide for State Expenditures, as indicated:
Reimbursement Match a e
®
❑
Salaries/Wages
Overhead/Indirect/General and Administrative Costs:
®
❑
a. Fringe Benefits, which shall be calculated at the rate of 40% of
direct salaries.
®
❑
b. Indirect Costs, which shall be calculated at the rate of 15% of direct
costs.
®
❑
Contractual (Subcontractors)
❑
❑
Travel, in accordance with Section 112, F.S.
❑
❑
Equipment
®
❑
Rental/Lease of Equipment
®
❑
Miscellaneous/Other Expenses
❑
❑
Land Acquisition
5. Equipment Purchase.
No Equipment purchases shall be funded under this Agreement.
6. Land Acquisition.
There will be no Land Acquisitions funded under this Agreement.
7. Match Requirements
There is no match required on the part of the Grantee under this Agreement.
S. Insurance Requirements
Attachment 2
1 of 2
Rev. 6/2=020 22
Required Covem—e At all times during the Agreement the Grantee, at its sole expense, shall maintain insurance
coverage of such types and with such terms and limits described below. The limits of coverage under each policy
maintained by the Grantee shall not be interpreted as limiting the Grantee's liability and obligations under the
Agreement. Grantee shall provide coverage through a self-insurance program established and operating under the
laws of Florida. Additional insurance requirements for this Agreement may be required elsewhere in this
Agreement, however the minimum insurance requirements applicable to this Agreement are:
a. Commercial General Liability Insurance.
The Grantee shall provide adequate commercial general liability insurance coverage and hold such liability
insurance at all times during the Agreement. The minimum limits shall be $250,000 for each occurrence
and $500,000 policy aggregate.
b. Commercial Automobile Insurance.
If the Grantee's duties include the use of a commercial vehicle, the Grantee shall maintain automobile
liability, bodily injury, and property damage coverage. Insuring clauses for both bodily injury and property
damage shall provide coverage on an occurrence basis. The minimum limits shall be as follows:
$200,000/3009000 Automobile Liability for Company -Owned Vehicles, if applicable
$200,000/300,000 Hired and Non -owned Automobile Liability Coverage
c. Workers' Compensation and Employer's Liability Coverage.
The Grantee shall comply with the workers' compensation requirements of Chapter 440, F.S.
d. Other Insurance. None.
9. Quality Assurance Requirements.
There are no special Quality Assurance requirements under this Agreement.
10. Retainage.
Retainage is permitted under this Agreement. Retainage may be up to a maximum of 10% of the total amount of the
Agreement.
11. Subcontracting.
The Grantee may subcontract work under this Agreement without the prior written consent of the Department's
Grant Manager except for certain fixed -price subcontracts pursuant to this Agreement, which require prior approval.
Regardless of any subcontract, the Grantee is ultimately responsible for all work to be performed under this
Agreement.
12. State-owned Land.
The work will not be performed on State-owned land.
13. Office of Policy and Budget Reporting.
There are no special Office of Policy and Budget reporting requirements for this Agreement.
14. Additional Terms.
None.
Attachment 2
2 of 2
Rev. 6/22/2020
23
ATTACHMENT 3
GRANT WORK PLAN
FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM (FRDAP)
Project Name: South Miami Park Playground & Fitness
Grantee Name: City of South Miami
FRDAP Project # A21127
SUMMARY: The Grantee shall complete the Project Element(s), which were approved by the Department through the FRDAP Application Evaluation Criteria, pursuant to Chapter
62D-5, Florida Administrative Code (F.A.C.). Any alteration(s) to the Project Element(s) as submitted in the Grantee's application and listed in the Grant Work Plan is considered a
significant change, must be pre -approved by the Department, and may require a formal Amendment to this Agreement. All work must be completed in accordance with the FRDAP
Program, and local, state and federal laws, the approved Project plans, all required permits, and the Florida Building Code. Prior to the Department issuing a "Notice to Commence"
to the Grantee, as specified in Attachment 6 of the Agreement, Program Specific Requirements, the Department must receive evidence of and have approved all Deliverables in Task
l .
For the purpose of this Agreement, the terms "Project Element" and "Project Task" are used interchangeably to mean an identified facility within the Project.
The Project is located at 4300 SW 58th Avenue, South Miami, FL 33143 and is considered a "Small Project" pursuant to paragraph 62D-5.055(6)(a), F.A.C.
Retroactive Project.
❑This Project has been approved as a "Retroactive Project." Retroactive Projects are eligible for a FRDAP grant award if they otherwise meet the FRDAP rule criteria, funds are
available, and Project Costs have occurred within one (1) year prior to the approval for funding by the Governor.
®This Project has not been approved as a "Retroactive Project."
Project Completion: The Project Completion Date for this Agreement is April 30, 2023.
Budget: Reimbursement for allowable costs for the Project shall not exceed the maximum Grant Award Amount outlined below. There is no match required on the part of the
Grantee under this Agreement. The total estimated Project Cost provided below is based on the approved FRDAP Application. A detailed cost analysis will be provided in the
Deliverables for Task 1, prior to the Department issuing the "Notice to Commence." All final Project Costs shall be submitted to the Department with the payment request.
Maximum Grant Award Amount:
$50,000.00
Required Grantee Match Amount:
$0
Total Estimated Project Cost:
$50,000.00
Match Ratio:
0%
DEP Agreement No.: A] 127, Attachment 3, Page 1 of 3
FRDAP FY18-19
N
Scope of Work/Tasks
Deliverables
Due Date
Financial Consequences
TASK 1
DELIVERABLE 1
LA. Development of Commencement
The Department will issue "Notice to Commence" upon
180 calendar days
The Department shall terminate the
Project Agreement if the required
Documentation Checklist (DRP-107)1.
receipt and approval of:
after Execution of
Deliverables are not submitted and
Agreement2
approved by the Department.
1.B. A Cost Analysis Form, with detailed budget
LA. All applicable Project specific Commencement
(and In -House Cost Schedule(s), if applicable).
documentation listed on Commencement Documentation
Checklist (DRP-107)
l.B. A Cost Analysis Form, with detailed budget (and In -
House Cost Schedule(s), if applicable).
Project planning expenses, such as application preparation,
architectural and engineering fees, permitting fees, Project
inspection, and other similar fees are eligible for
reimbursement. However, reimbursement, if requested, shall
not exceed fifteen (l 5%) of total Project Cost, and shall be
invoiced upon Project completion, in accordance with the
Payment Request Schedule.
The Grantee may not proceed with development of the
Pro ect until Notice to Commence has been issued.
TASK 2
DELIVERABLE 2
2.A. Development of Primary and Support Project
The Grantee may request reimbursement upon Department
Due April 30,
2023, which shall
No reimbursement will be made for
Deliverables) deemed unsatisfactory by
Elements, which includes:
receipt and approval of:
also be the Project
the Department. Payment(s) will not be
New playground and picnic tables.
Completion Date
made for unsatisfactory or incomplete
2.A. Development of required Project Elements.
work. In addition, a Task may be
2.B. Development of Completion of
terminated for Grantee's failure to
Documentation Checklist (DRP-111).
2.B. All applicable Project specific Completion
perform.
documentation listed on Completion Documentation
2.C. Completion of Final Status Report (DRP-
Checklist (DRP-111)
109).
2.C. Final Status Report (DRP-109).
The Grantee may request reimbursement for allowable
budgeted expenses and costs pursuant to the Agreement that
are directly related to the successful development of the
Project site. Reimbursement shall not exceed the Grant
DEP Agreement No.: Al 127, Attachment 3, Page 2 of 3
FRDAP FYIS- 19
N
Award Amount, less any reimbursement requested for in
Deliverable 1, and shall be invoiced upon Project completion,
in accordance with the Payment Request Schedule below. Ten
percent (10%) of the Grant Award will be retained until the
Project is designated complete by the Department.
Project Task Performance Standard: The Department's Grant Manager will review the Project Completion Certificate and the Deliverables to verify compliance with the
requirements for funding under the FRDAP; approved plans and application approved for funding. Upon review and written acceptance by the Department's Grant Manager
of the Project Completion Certificate and the Deliverables under each Project Task, the Grantee may proceed with the payment request submittal.
Payment Request Schedule: Following Department approval of all Deliverables, the Grantee may submit a single payment request on Exhibit C, Payment Request
Summary Form, DRP-115, along with all required documentation as outlined in the Financial Reporting Procedures (DRP-110), as applicable, to support payment. A
payment request submitted as part of the reimbursement process must correspond with the Cost Analysis and supporting documents provided under Project Tasks.
Endnotes:
1. FRDAP documentation is available at httns:Hfloridadcl2.govAands/land-and-recreation-grants/content/frdop-assistance and/or from the Land and Recreational Grants
Section, State of Florida Department of Environmental Protection, 3900 Commonwealth Boulevard, MS# 585, Tallahassee, Florida, 32399-3000.
2. Project Agreement is subject to termination if Commencement documentations under Task l are not received and approved by the Department within 180 calendar
days of the Project Agreement execution.
3. Due Date will not be extended beyond the Grant Period as outlined in Subsection 62D-5.058(7), F.A.C.
DEP Agreement No.: A] 127, Attachment 3, Page 3 of 3
FRDAP FY18-19
N
Q!
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Public Records Requirements
Attachment 4
1. Public Records.
a. If the Agreement exceeds $35,000.00, and if Grantee is acting on behalf of Department in its performance of services
under the Agreement, Grantee must allow public access to all documents, papers, letters, or other material, regardless
of the physical form, characteristics, or means of transmission, made or received by Grantee in conjunction with the
Agreement (Public Records), unless the Public Records are exempt from section 24(a) of Article I of the Florida
Constitution or section 119.07(1), F.S.
b. The Department may unilaterally terminate the Agreement if Grantee refuses to allow public access to Public Records
as required by law.
2. Additional Public Records Duties of Section 119.0701, F.S., If Applicable.
For the purposes of this paragraph, the term "contract" means the "Agreement." If Grantee is a "contractor" as
defined in section 119.0701(1)(a), F. S., the following provisions apply and the contractor shall:
a. Keep and maintain Public Records required by Department to perform the service.
b. Upon request, provide Department with a copy of requested Public Records or allow the Public Records to be
inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, F.S., or
as otherwise provided by law.
c. A contractor who fails to provide the Public Records to Department within a reasonable time may be subject to
penalties under section 119.10, F.S.
d. Ensure that Public Records that are exempt or confidential and exempt from Public Records disclosure requirements
are not disclosed except as authorized by law for the duration of the contract term and following completion of the
contract if the contractor does not transfer the Public Records to Department.
e. Upon completion of the contract, transfer, at no cost, to Department all Public Records in possession of the contractor
or keep and maintain Public Records required by Department to perform the service. If the contractor transfers all
Public Records to Department upon completion of the contract, the contractor shall destroy any duplicate Public
Records that are exempt or confidential and exempt from Public Records disclosure requirements. If the contractor
keeps and maintains Public Records upon completion of the contract, the contractor shall meet all applicable
requirements for retaining Public Records. All Public Records stored electronically must be provided to Department,
upon request from Department's custodian of Public Records, in a format specified by Department as compatible with
the information technology systems of Department. These formatting requirements are satisfied by using the data
formats as authorized in the contract or Microsoft Word, Outlook, Adobe, or Excel, and any software formats the
contractor is authorized to access.
f IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF
CHAPTER 1199 F.S., TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC
RECORDS RELATING TO THE CONTRACT, CONTACT THE DEPARTMENT'S
CUSTODIAN OF PUBLIC RECORDS AT:
Telephone: (850) 245-2118
Email: public.services�a,floridadep.gov
Mailing Address: Department of Environmental Protection
ATTN: Office of Ombudsman and Public Services
Public Records Request
3900 Commonwealth Boulevard, MS 49
Tallahassee, Florida 32399
Attachment 4
1 of 1
Rev. 4/27/2018
27
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Special Audit Requirements
(State and Federal Financial Assistance)
Attachment 5
The administration of resources awarded by the Department of Environmental Protection (which may be referred to
as the "Department'; 'DEP'; "FDEP" or "Grantor'; or other name in the agreement) to the recipient (which may be
referred to as the "Recipient". "Grantee" or other name in the agreement) may be subject to audits and/or monitoring
by the Department of Environmental Protection, as described in this attachment.
MONITORING
In addition to reviews of audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit Requirements, and
Section 215.97, F.S., as revised (see "AUDITS" below), monitoring procedures may include, but not be limited to,
on -site visits by DEP Department staff, limited scope audits as defined by 2 CFR 200.425, or other procedures. By
entering into this Agreement, the recipient agrees to comply and cooperate with any monitoring procedures/processes
deemed appropriate by the Department of Environmental Protection. In the event the Department of Environmental
Protection determines that a limited scope audit of the recipient is appropriate, the recipient agrees to comply with any
additional instructions provided by the Department to the recipient regarding such audit. The recipient further agrees
to comply and cooperate with any inspections, reviews, investigations, or audits deemed necessary by the Chief
Financial Officer (CFO) or Auditor General.
Ilili�yl�.
PART I: FEDERALLY FUNDED
This part is applicable if the recipient is a State or local government or a non-profit organization as defined in 2 CFR
§200.330
A recipient that expends $750,000 or more in Federal awards in its fiscal year, must have a single or program -
specific audit conducted in accordance with the provisions of 2 CFR Part 200, Subpart F. EXHIBIT 1 to this
Attachment indicates Federal funds awarded through the Department of Environmental Protection by this
Agreement. In determining the federal awards expended in its fiscal year, the recipient shall consider all
sources of federal awards, including federal resources received from the Department of Environmental
Protection. The determination of amounts of federal awards expended should be in accordance with the
guidelines established in 2 CFR 200.502-503. An audit of the recipient conducted by the Auditor General in
accordance with the provisions of 2 CFR Part 200.514 will meet the requirements of this part.
2. For the audit requirements addressed in Part I, paragraph 1, the recipient shall fulfill the requirements relative
to auditee responsibilities as provided in 2 CFR 200.508-512.
3. A recipient that expends less than $750,000 in federal awards in its fiscal year is not required to have an audit
conducted in accordance with the provisions of 2 CFR Part 200, Subpart F-Audit Requirements. If the
recipient expends less than $750,000 in federal awards in its fiscal year and elects to have an audit conducted
in accordance with the provisions of 2 CFR 200, Subpart F-Audit Requirements, the cost of the audit must
be paid from non-federal resources (i.e., the cost of such an audit mist be paid from recipient resources
obtained from other federal entities.
4. The recipient may access information regarding the Catalog of Federal Domestic Assistance (CFDA) via the
internet at Rw►,Nv.cfda.Qov
Attachment 5
1 of b
BGS-DEP 55-215 rcviscd 7/2019 28
PART II: STATE FUNDED
This part is applicable if the recipient is a nonstate entity as defined by Section 215.97(2), Florida Statutes.
1. In the event that the recipient expends a total amount of state financial assistance equal to or in excess of
$750,000 in any fiscal year of such recipient (for fiscal years ending June 30, 2017, and thereafter), the
recipient must have a State single or project -specific audit for such fiscal year in accordance with Section
215.97, F.S.; Rule Chapter 69I-5, F.A.C., State Financial Assistance; and Chapters 10.550 (local
governmental entities) or 10.650 (nonprofit and for -profit organizations), Rules of the Auditor General.
EXHIBIT 1 to this form lists the state financial assistance awarded through the Department of Environmental
Protection by this agreement. In determining the state financial assistance expended in its fiscal year, the
recipient shall consider all sources of state financial assistance, including state financial assistance received
from the Department of Environmental Protection, other state agencies, and other nonstate entities. State
financial assistance does not include federal direct or pass -through awards and resources received by a
nonstate entity for Federal program matching requirements.
2. In connection with the audit requirements addressed in Part II, paragraph 1; the recipient shall ensure that the
audit complies with the requirements of Section 215.97(8), Florida Statutes. This includes submission of a
financial reporting package as defined by Section 215.97(2), Florida Statutes, and Chapters 10.550 (local
governmental entities) or 10.650 (nonprofit and for -profit organizations), Rules of the Auditor General.
3. If the recipient expends less than $750,000 in state financial assistance in its fiscal year (for fiscal year ending
June 30, 2017, and thereafter), an audit conducted in accordance with the provisions of Section 215.97,
Florida Statutes, is not required. In the event that the recipient expends less than $750,000 in state financial
assistance in its fiscal year, and elects to have an audit conducted in accordance with the provisions of Section
215.97, Florida Statutes, the cost of the audit must be paid from the non -state entity's resources (i.e., the cost
of such an audit must be paid from the recipient's resources obtained from other than State entities).
4. For information regarding the Florida Catalog of State Financial Assistance (CSFA), a recipient should access
the Florida Single Audit Act website located at https://apps.fldfs.com/fsaa for assistance. In addition to the
above websites, the following websites may be accessed for information: Legislature's Website at
http•/hvww.leg.state.fl.us/Welcome/index.cfm, State of Florida's website at http:/hvww.myflorida.com/,
Department of Financial Services' Website at http://www.fldfs.com/and the Auditor General's Website at
http://www.myflarida.com/audacn/.
PART III: OTHER AUDIT REQUIREMENTS
(NOTE: This part would be used to speck any additional audit requirements imposed by the State awarding entity
that are solely a matter of that State awarding entity's policy (i.e., the audit is not required by Federal or State laws
and is not in conflict with other Federal or State audit requirements). Pursuant to Section 215.97(8), Florida Statutes,
State agencies may conduct or arrange for audits of State financial assistance that are in addition to audits conducted
in accordance with Section 215.97, Florida Statutes. In such an event, the State awarding agency must arrange for
funding the full cost of such additional audits.)
PART IV: REPORT SUBMISSION
1. Copies of reporting packages for audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit
Requirements, and required by PART I of this form shall be submitted, when required by 2 CFR 200.512, by
or on behalf of the recipient directly to the Federal Audit Clearinghouse (FAC) as provided in 2 CFR 200.36
and 200.512
A. The Federal Audit Clearinghouse designated in 2 CFR §200.501(a) (the number of copies required by
2 CFR §200.501(a) should be submitted to the Federal Audit Clearinghouse), at the following address:
Attachment 5
2of6
BGS-DEP 55-215 revised 7/2019
29
By Mail:
Federal Audit Clearinghouse
Bureau of the Census
1201 East loth Street
Jeffersonville, IN 47132
Submissions of the Single Audit reporting package for fiscal periods ending on or after January 1,
2008, must be submitted using the Federal Clearinghouse's Internet Data Entry System which can
be found at hyR://harvester.census.gi v/facweb/
2. Copies of financial reporting packages required by PART II of this Attachment shall be submitted by or on
behalf of the recipient directly to each of the following:
A. The Department of Environmental Protection at one of the following addresses:
By Mail:
Audit Director
Florida Department of Environmental Protection
Office of Inspector General, MS 40
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
Electronically:
FDEPSingleAuditQdep.state. fl.us
B. The Auditor General's Office at the following address:
Auditor General
Local Government Audits/342
Claude Pepper Building, Room 401
111 West Madison Street
Tallahassee, Florida 32399-1450
The Auditor General's website (httpJ/flauditor.govn provides instructions for filing an
electronic copy of a financial reporting package.
Copies of reports or management letters required by PART III of this Attachment shall be submitted by or
on behalf of the recipient directly to the Department of Environmental Protection at one of the following
addresses:
By Mail:
Audit Director
Florida Department of Environmental Protection
Office of Inspector General, MS 40
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
Electronically:
FDEPSingleAudit dep.state.fl.us
4. Any reports, management letters, or other information required to be submitted to the Department of
Environmental Protection pursuant to this Agreement shall be submitted timely in accordance with 2 CFR
200.512, section 215.971 F.S., and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and
for -profit organizations), Rules of the Auditor General, as applicable.
Attachment 5
3 of 6
BGS-DEP 55-215 revised 7/2019 30
5. Recipients, when submitting financial reporting packages to the Department of Environmental Protection for
audits done in accordance with 2 CFR 200, Subpart F-Audit Requirements, or Chapters 10.550 (local
governmental entities) and 10.650 (non and for -profit organizations), Rules of the Auditor General, should
indicate the date and the reporting package was delivered to the recipient correspondence accompanying the
reporting package.
PART V: RECORD RETENTION
The recipient shall retain sufficient records demonstrating its compliance with the terms of the award and this
Agreement for a period of five (5) years from the date the audit report is issued, and shall allow the Department of
Environmental Protection, or its designee, Chief Financial Officer, or Auditor General access to such records upon
request. The recipient shall ensure that audit working papers are made available to the Department of Environmental
Protection, or its designee, Chief Financial Officer, or Auditor General upon request for a period of three (3) years
from the date the audit report is issued, unless extended in writing by the Department of Environmental Protection.
Attachment 5
4of6
13GS-DEP 55-215 revised 7/2019
31
EXHIBIT — l
FUNDS AWARDED TO THE RECIPIENT PURSUANT TO THIS AGREEMENT CONSIST OF THE FOLLOWING:
Note: If the resources awarded to the recipient represent more than one federal program, provide the same information shown below for each federal program
and show total federal resources awarded
Federal Resources
Awarded to the Reci cent Pursuant to this
Agreement Consist of the Following:
Federal
Program
A
Federal A enc
CFDA
Number
CFDA Title
Funding Amount
State
Appropriation
Category
Federal
Program
B
Federal Agency
CFDA
Number
CFDA Title
Funding Amount
State
Appropriation
Category
Note: Of the resources awarded to the recipient represent more than one federal program, list applicable compliance requirements for each federal program in
the same manner as shown below:
Federal
Program
A
First Compliance requirement: i.e.: (what services of purposes resources must be used for)
Second Compliance requirement: i.e.:(eligibility requirement for recipients of the resources
Etc.
Etc.
Federal
Program
B
First Compliance requirement: i.e.: (what services of purposes resources must be used for)
Second Compliance requirement: i.e.: (eligibility requirement for recipients of the resources
Etc.
Etc.
BGS-DEP 55-215
Revised 7/2019
Attachment S, Exhibit 1
5 of 6
W
tv
Note: If the resources awarded to the recipient for matching represent more than one federal program, provide the same information shown below for each
federal nrn"am and .9hnw eotal .ante resnurre_c awarded fnr matching.
State Resources Awarded to the Recipient
Pursuant to this A cement Consist of the Following Matching Resources for Federal Pro
Ins:
Federal
Program
A
Federal Agency
CFDA
CFDA Title
Funding Amount
State
Appropriation
Category
Federal
Program
B
Federal Agency
CFDA
CFDA Title
Funding Amount
State
Appropriation
Category
Note: Ifthe resources awarded to the recipient represent more than one state project, provide the same information shown below for each state project and show
total statefinancial assistance awarded that is subject to section 215.97, F.S.
State Resources Awarded to the Recipient
Pursuant to this Agreement
Consist
of the Following Resources Subject to Section 215.97 F.
State
CSFA Title
State
Program
State
CSFA
or
Appropriation
A
State Awarding Agency
Fiscal Year'
Number
Funding Source Description
Funding Amount
Category
General Appropriations Act
Line Item 1728 —
Fixed Capital Outlay
Original
Florida Recreation
2020-2021
37.017
Florida Recreation Development
S50,000.00
140002
Agreement
Development Assistance
Assistance Program
Grants from General
Revenue Fund and Florida
Forever Trust Fund
Note: List applicable compliance requirement in the same manner as illustrated above for federal resources. For matching resources provided by the Department
for DEP for federal programs, the requirements might be similar to the requirements for the applicable federal programs. Also, to the extent that different
requirements pertain to different amount for the non-federal resources, there may be more than one grouping (i.e. I, 2, 3, etc.) listed under this category.
For each program identified above, the recipient shall comply with the program requirements described in the Catalog of Federal Domestic Assistance (CFDA)
[www.cfda.gov] and/or the Florida Catalog of State Financial Assistance (CSFA) [httos•//aoos.fldfs.com/fsaalsearchCatalog.asl)x], and State Projects Compliance
Supplement (Part Four: State Projects Compliance Supplement [httos:l/at)ps.fldfs.com/fsaa/state project compliance.aspx]. The services/purposes for which the
funds are to be used are included in the Agreement's Grant Work Plan. Any match required by the Recipient is clearly indicated in the Agreement.
Subject to change by Change Order.
Attachment 5, Exhibit 1
6of6
a05-ORP 55-215
R.W'M a019
w
tlr
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
PROGRAM SPECIFIC REQUIREMENTS
FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM
ATTACHMENT 6
1. Project Submittal Forms.
Administrative Forms, Reimbursement Forms, and Guidelines referenced in this Agreement may be found at
httns:// loridadep.govAands/land-and-rccreatioti-grants/contcni/frdan-assistance, or by contacting the Department's
Grant Manager.
2. Notice to Commence.
Prior to commencement of the Project, the Grantee shall submit to the Department for approval all documentation and
completion of responsibilities listed on the Commencement Documentation Checklist, DRP-107. In addition to the
Checklist items, the Grantee shall submit a copy of all executed subcontracts to the Department. Upon satisfactory
approval by the Department, the Department will issue written "Notice to Commence" to the Grantee to commence
the Project. The Grantee SHALL NOT proceed until the Department issues the "Notice to Commence." Until
the Department issues the "Notice to Commence," the Department is not obligated to pay or reimburse Grantee for
fees, costs, or general expenses of any kind that were incurred prior to the "Notice to Commence," except for Pre -
Agreement Expenses as more fully described in subsection 62D-5.054(34), F.A.C.
3. Site Plans.
Project site facilities must be attractive for public use and compatible with the environment. Plans and specifications
for Project site improvements and facilities must be in accordance with current engineering and architectural standards.
The Grantee should emphasize the health and safety of users, accessibility to the general public, and the protection of
the recreational and natural values of the area. The Grantee may alter a conceptual site plan only after written
approval by the Department.
The Grantee shall have final site plans (site, engineering, and architectural) prepared for the Project and sealed by a
registered architect or engineer licensed in accordance with the laws of the State of Florida (collectively the "Project
Plans"). The Grantee must deliver a complete original, signed, and sealed set of the Project Plans to the Department
before the Department will issue a "Notice to Commence."
4. Project Completion.
All work under this Agreement must be completed no later than 60 days before the expiration date of the Agreement,
known as the "Project Completion Date." The Department may require the Grantee to do additional work.before
designating the Project "complete." If the Project has not been designated as complete by the Department by midnight
of the Date of Expiration, the Project funds will revert to the revenue fund from which they were appropriated
(paragraph 62D-5.058(7)(a), F.A.C.).
5. Project Completion Certification.
To certify completion, the Grantee will submit to the Department the Project Completion Certification, DRP-112,
available online and incorporated herein by reference. The Project must be designated complete prior to the
Department releasing final reimbursement. The Department shall designate the Project complete upon receipt and
approval of all deliverables and when Project site is open and available for use by the public for outdoor recreation
purposes. The Department will release the retainage when the Department approves the Completion Documentation
set forth in paragraph 62D-5.058(7)(d), F.A.C. The final payment of the retained amount will be processed within
thirty (30) days of the Project designated complete by the Department.
6. The following modifies paragraph 8.d, Attachment 1, Standard Terns and Conditions:
a. Reimbursement for Costs.
Attachment 6
1 of 3
Rcv. 51&2020
34
Project Costs will be reimbursed as provided in paragraph 62D-5.058(2)(a), F.A.C., and in the Project Agreement.
The Grantee is eligible for reimbursement, in whole or in part, for Department -approved Pre -Agreement Expenses
and, if applicable, costs associated with Retroactive Projects, through the Project Completion Date of this
Agreement. The Grantee shall be paid on a cost reimbursement basis for all eligible Project costs upon the
completion, submittal, and approval of each deliverable identified in the Grant Work Plan. Reimbursement shall
be requested on Exhibit C, Payment Request Summary Form. To be eligible for reimbursement, cost(s) must meet
all FRDAP requirements, financial reporting requirements, and rules and regulations applicable to expenditures
of state funds, including, but not limited to, the Reference Guide for State Expenditures, which can be accessed
at the following web address:
https://w%,%%,.myfloridacfo.coni Division/AAIManuals/documents/RefercnceGuideforStateExpenditures.pdf.
i. Pre -Agreement Expenses. Pursuant to subsection 62D-5.054(34), F.A.C., Pre -Agreement Expenses means
expenses incurred by a Grantee for accomplishment of an eligible FRDAP project prior to full execution of
the Project Agreement. Parties hereby acknowledge and agree, Grantee is entitled to submit for cost -
reimbursement eligible Pre -Agreement Expenses, which are expenses Grantee incurred for the
accomplishment of the Project prior to full execution of this Agreement.
7. The following is added to paragraph 8, Attachment 1, Standard Terms and Conditions:
k. Project Costs. The Department will reimburse Project costs pursuant to paragraph 62D-5.058(2)(a), F.A.C., and
as provided herein. Project costs, except for Pre -Agreement Expenses, shall be incurred between the effective
date of the Agreement, and the Project Completion Date as set forth in the Project Completion Certification
determined and identified herein. If the total cost of the Project exceeds the grant amount and the required match
(if applicable), Grantee must pay the excess cost.
1. Cost Limits. Pursuant to paragraphs 62D-5.058(2)(a) and (b), F.A.C., project planning expenses, such as
application preparation, surveys (boundary and topographic), title searches, project signs, architectural and
engineering fees, permitting fees, project inspection fees, and other similar fees are eligible Project costs provided
that such costs do not exceed fifteen percent (15%) of the total Project cost.
8. The following hereby replaces paragraph 8.h, Attachment 1, Standard Terms and Conditions:
h. Annual App—mgriation Contingency. The State's performance and obligation to pay under this Agreement is
contingent upon an annual appropriation from the Recommended Application Priority List by the Florida
Legislature. Authorization for continuation and completion of work and any associated payments may be
rescinded, with proper notice, at the discretion of the Department if the Legislature reduces or eliminates
appropriations. It is further understood that Grant Awards may be revised by the Department due to the
availability of FRDAP program funds.
9. The following replaces paragraph 10, Attachment 1, Standard Terms and Conditions:
Status Reports.
a. The Grantee must utilize, Project Status Report Form, DRP-109, available online and incorporated herein by
reference, to describe the work performed during the reporting period, problems encountered, problem
resolutions, schedule updates and proposed work for the next reporting period. The Project Status Reports must
be submitted to the Department's Grant Manager no later than January 5, May 5, and September 5. The
Department's Grant Manager has thirty (30) calendar days to review the required reports and deliverables
submitted by the Grantee.
b. Additionally, the Grantee shall comply with the reporting and inventory requirements set forth in the Statewide
Comprehensive Outdoor Recreation Plan (SCORP), available online: https://floridadcp.aoviparks/florida-scom-
outdoor-recreation-florida and hereby incorporated by reference, by updating the Florida Outdoor Recreation
Inventory (FORI) system (hns://floridadep.gov/parks/florida-outdoor-recreation-inventor).
10. Site Dedication.
a. Land owned by the grantee and developed or acquired with FRDAP funds must be dedicated in perpetuity as an
outdoor recreational site for the use and benefit of the general public in accordance with Rule 6213-5.059, F.A.C.
Land under control other than by ownership of the Grantee such as by lease, must be dedicated as an outdoor
recreation area for the use and benefit of the general public for a minimum period of twenty-five (25) years from
the Project Completion Date as set forth in the Project Completion Certificate. The dedications must be recorded
in the county's public property records by the Grantee. Execution of this Agreement by the Department constitutes
an acceptance of a Project site(s) dedication on behalf of the general public of the State of Florida.
Attachment 6
2 of 3
Rev. 5/6/2020
35
b. Should the Grantee's interest in the land change, either by sale, lease, or other written legal instrument, the Grantee
is required to notify the Department in writing of the change no later than ten (10) days after the change occurs,
and the Grantee is required to notify all subsequent parties with interest to the land of the terms and conditions as
set forth in this Agreement.
11. Management of Project Sites.
a. Site Inspections. Grantees must ensure by site inspections that facilities on the Project site are being operated and
maintained for outdoor recreation for a minimum period of twenty-five (25) years from the Project Completion
Date set forth in the Project Completion Certificate. The Project site must be open at reasonable times and must
be managed in a safe and attractive manner.
b. Non -Compliance. The Department will terminate an agreement and demand return of the program funds
(including interest) for non-compliance if a Grantee fails to comply with the terms stated in with the Agreement.
If the Grantee fails to comply the Agreement, the Department will declare the Grantee ineligible for further
participation in FRDAP until such time as the Grantee comes into compliance.
c. Public Accesmbility. All facilities must be accessible to the public on a non-exclusive basis, without regard to
age, sex, race, religion, or ability level.
d. Entrance Fees. Reasonable differences in entrance fees for other FRDAP projects may be allowed on the basis
of residence, but only if the Grantee can clearly show that the difference in entrance fees reflects, and is
substantially related to, all economic factors related to park management, and it is not simply related to the
amount of tax dollars spent by the residents for the park; and that a definite burden on the Grantee in park
maintenance costs clearly justifies a higher fee for nonresidents.
e. Native Plantings. In developing a FRDAP project with program funds, the Grantee must primarily use
vegetation native to the area, except for lawn grasses.
f. The Grantee will obtain Department approval prior to any current or future development of facilities on the Project
Site(s), which is defined in subsection 62D-5.054(46), F.A.C. This Agreement is not transferable.
12. Procurement Requirements for Grantee.
The Grantee must secure all goods and services for the Project according to its adopted procurement procedures.
13. Signage.
The Grantee must erect a permanent information sign on the Project site that credits funding (or a portion thereof) to
the Florida Department of Environmental Protection and the Florida Recreation Development Assistance Program.
The sign must be made of appropriate materials, which are durable for a minimum of twenty-five (25) years after the
Project is complete. The sign must be installed on the Project site and approved by the Department before the
Department processes the final Project reimbursement request.
14. Termination and Ineligibility.
In addition to the remedies provided elsewhere in this Agreement, if the Grantee fails to comply with the terms stated
in this Agreement or with any provisions in Rule Chapter 62D-5, F.A.C., the Department will terminate this
Agreement and demand return of the program funds (including interest). Furthermore, the Department will declare
the Grantee ineligible for further participation in FRDAP until the Grantee complies. Further, the Grantee agrees to
ensure that all necessary permits are obtained prior to implementing any Grant Work Plan activity that may fall under
applicable federal, state, or local laws.
15. Conversion.
The Project Site acquired and/or developed with FRDAP assistance must be retained and used for public outdoor
recreation. Should the Grantee, within the periods set forth in subsections 62D-5.059(1) and (2), F.A.C., convert all
or part of the Project site to other than public outdoor recreational uses, the Grantee must replace the area, facilities,
resource, or Project site at its own expense with an acceptable project of comparable scope, and quality.
Attachment 6
3 of 3
Rev. 5/6/2020
36
EXHIBIT No. I
SCOPE OF SERVICES
Attachment A
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
I. GENERAL REQUIREMENTS:
The work specified in this Request for Proposal (RFP) consists of furnishing all goods,
materials, supplies and services necessary to provide a completed project that meets all
of the needs described in this Scope of Services and as otherwise described in this RFP
(the Work). The Work is to be performed per specifications and the contract documents.
The Work is to be performed in accordance with the specifications and the contract
documents (as defined in the Instructions for Respondents) that are provided to the
Contractor by the City as well as in accordance with those plans, drawings and
specifications that are required to be produced by the Contractor and that are approved
by the City. This includes but is not limited to keeping the project site clean and safe;
furnishing all labor of the Contractor and the labor of all allowable subcontractors;
providing dumpster(s); disposing of materials; providing all necessary engineering and
architectural plans, drawings and technical specifications; all permits; all necessary
equipment, including rental equipment, machinery, tools, transportation and freight;
coordination with any other City contractor, subcontractors and utility companies (i.e.
power, gas, water); erecting construction safety measures, including fencing, privacy
screening and cones, and ensuring that the safety measure are in place at the end of each
working day; root pruning and sod restoration at affected areas to the City's satisfaction;
cleaning the construction site at the end of each working day; maintenance of traffic and
hiring of off duty City police officer if required by the City; and any other goods and
services necessary to perform all of the Work.
After being awarded the contract but prior to any digging, Contractor must locate all
underground utilities and other facilities as well as contacting Sunshine 811 to
coordinate the process between excavators and utilities in Florida so that the utilities can
mark the approximate location of all their underground facilities, including power lines,
telephone lines, cables and pipes for gas, water, and sewage on the construction site.
In all cases, it is the responsibility of Contractor to obtain and pay for all licenses and
other permits (including tree permits), provide signed and seal footing and foundation
specifications for permitting, as well as all laboratory tests, engineering and architectural
specifications, drawings and plans that are necessary to secure any and all permits and
licenses required to complete Work. In addition, Contractor will be required to obtain,
pay for and deliver to the City as -built plans for all of the Work. Permit fees are waived
for permits required to be issued directly by the City of South Miami. Permit fees charged
by other government entities, if required, are the responsibility of the Contractor.
However, in all cases; it is the responsibility of Respondent/Contractor to secure any
and all permits that may be required for this project.
All work is to be done in accordance with Exhibit 1, Scope of Services, Attachments
A, B, C & D and public playground safety standards, rules and guidelines; all federal, state
and local requirements, guidelines and regulations included the Florida Building Code, the
City of South Miami Land Development Code, all applicable ordinances of Miami -Dade
County and the City of South Miami and the Americans with Disabilities Act (ADA).
39 of 112
ATTESTED: OWNER: CITY OF SOUTH MIAMI
(n� 1
Signature: ,W Signature: C� xc�-J�
Nkeng . Payn Shari Karnali
City Clerk City Manager
Read and Approved as to Form, Language,
Legality, and Execution Thereof:
Signature: ✓
ity Attorney
ATTESTED:
Signature:
Nkengiok Payne
City Clerk
Read and Approved as to Form, Language,
Legality, and Execution Thereof.
Signature:
Attorney
OWNER: CITY O SOUTH MIAMI
i
Signature
Shari Karnali
City Manager
110 of 112
EXHIBIT 6
Supplementary Conditions
CONSTRUCTION CONTRACT
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
A Consultant: In accordance with ARTICLE I of the General Conditions the consultant (CONSULTANT) is
defined as the person identified as the consultant in the Supplementary Conditions or if none, then
OWNER's designated representative as identified in the Supplementary Conditions. CONSULTANT's, if
any, and OWNER's Designated Representative's name, address, telephone number and facsimile number
are as follows:
Consultant:
SRS ENGINEERING, INC
5001 S.W. 74 Court
Suite 201
Ph: 305/662-8887
Fax: 3051662-8858
B. Termination or Substitution of Consultant: Nothing herein will prevent the City Manager from terminating
the services of CONSULTANT or from substituting another "person" to act as CONSULTANT.
C. Plans for Construction: The successful CONTRACTOR will be furnished sets of Contract
Documents without charge. Any additional copies required will be furnished to CONTRACTOR at a cost
to CONTRACTOR equal to the reproduction cost.
D. The Scope of Services, also referred to as the Work in the contract documents, is as set forth in the RFP
and in the attached EXHIBIT I. Attachments A. B. C & D to the RFP and if there is a conflict the
attached Exhibit will take precedence.
E. Contractor must comply with the insurance and indemnification requirements is set forth in the RFP and in
the document set forth in the attached EXHIBIT 2 to the RFP and if there is a conflict the attached
Exhibit will take precedence.
F. The Work must be completed in 75 calendar das unless a shorter time is set forth in the Contract and
in such event the Contract will take precedent notwithstanding any provision in the General Conditions to
the Contract that may be to the contrary.
G. CONTRACTOR has reviewed and checked all information and data with respect to existing Underground
Facilities or conditions at or contiguous to the site and assumes responsibility for the accurate location of
all Underground facilities and conditions that may affect the Work. It is agreed by the parties that no
additional examinations, investigations, explorations, tests, reports or similar information or data in respect
to any Underground Facilities or conditions are, or will be, required by CONTRACTOR to perform and
furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms
and conditions of the Contract Documents.
H. CONTRACTOR has given the City Manager written notice of all conflicts, errors or discrepancies that it
has discovered in the Contract Documents and, if any conflicts, errors or discrepancies have been found
and notice given, CONTRACTOR represents, by submitting its proposal to the City Manager, that
CONTRACTOR has received sufficient notice of the resolution thereof from the City Manager, that such
resolution is acceptable to CONTRACTOR and that CONTRACTOR waives any claim regarding the
conflicts, errors or discrepancies.
IN WITNESS WHEREOF, the parties hereto have executed the Supplementary Conditions to
acknowledge their inclusion as part of the Contract on this 20 day of MAY , 20 2L
CONTRACTOR: LEADEX CORPORATION
Signature: L—�
Print Signatory's Name: F K I FONSECA, P.E.
Title of Signatory: PRESIDENT
109 of 112
ARTICLE 23 — FORCE MAJEURE.
23.1 Neither parry may hold the other responsible for damages or for delays in performance caused by force
majeure, acts of God, or other acts or circumstances beyond the control of a party or that could not have
been reasonably foreseen, prevented or avoided. For this purpose, such acts or circumstances include, but
not limited to, weather conditions affecting performance, Floods, epidemics, war, riots, strikes, lockouts, or
other industrial disturbances, or protest demonstrations. Should such acts or circumstances occur, the
parties will use their best efforts to overcome the difficulties and to resume the work as soon as reasonably
possible.
ARTICLE 24- E-VERIFYf448.095(2)
24.1 As a condition precedent to entering into this Agreement, and in compliance with Section 448.095, Fla. Stat,
Contractor and its subcontractors must register with and use the E-Verify system to verify work
authorization status of all employees hired after January I. 2021.
24.1.1 Contractor must require each of its subcontractors to provide Contractor with an affidavit stating
that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien.
Contractor must maintain a copy of the subcontractors affidavit as part of and pursuant to the records
retention requirements of this Agreement
24.1.2 The City, Contractor, or any subcontractor who has a good faith belief that a person or entity with
which it is contracting has knowingly violated Section 448.09(I), Fla. Scat or the provisions of this
section must terminate the contract with the person or entity.
24.1.3 The City, upon good faith belief that a subcontractor knowingly violated the provisions of this section,
but that the Contractor otherwise complied, must promptly notify Contractor and Contractor must
immediately terminate the contract with the subcontractor.
24.1.4 A contract terminated under the provisions of this Section is not a breach of contract and may not
be considered such.
24.1.5 Any contract termination under the provisions of this Section may be challenged no later than 20
calendar days after the date on which this Agreement is terminated pursuant to paragraph b. or c.
above.
24.1.6 Contractor acknowledges that upon termination of this Agreement by the City for a violation of this
Section by Contractor, Contractor may not be awarded a public contract for at least one (1) year.
Contractor further acknowledges that Contractor is liable for any additional costs incurred by the
City as a result of termination of any contract for a violation of this Section.
24.1.7 Subcontracts. Contractor or subcontractor must insert in any subcontracts the clauses set forth in
this Section, including this Subsection, requiring the subcontractors to include these clauses in any
lower tier subcontracts. Contractor is responsible for compliance by any subcontractor or lower tier
subcontractor with the clauses set forth in this Section and Contractor's failure to enforce compliance
is a substantial and material breach of this Agreement
IN WITNESS WHEREOF, the parties hereto have executed the General Conditions to acknowledge
their inclusion as part of the Contract Documents on this 20 day of MAY .20 21,
CONTRACTOR:
LEADEX CORPORATION
Signature:
Print Signatory's
ame: FRANK J FONSECA, P.E.
Title of Signatory:
PRESIDENT
107 of 112
and accounting records of CONTRACTOR which relate to the Project. CONTRACTOR will retain and
make available to City Manager all such books and records and accounts, financial or otherwise, which
relate to the Project and to any claim for a period of three (3) years following final completion of the
Project During the Project and the three (3) year period following final completion of the Project,
CONTRACTOR must provide City Manager access to its books and records upon five (5) business day's
written notice.
19.2 CONTRACTOR and all of its subcontractors are required to comply with the public records law
(s.119.0701) while providing services on behalf of OWNER and CONTRACTOR, under such conditions,
must incorporate this paragraph in all of its subcontracts for this Project CONTRACTOR and its
subcontractors are specifically required to: (a) Keep and maintain public records required by the public
agency to perform the service; (b) Upon request from the public agency's custodian of public records,
provide the public agency with a copy of the requested records or allow the records to be inspected or
copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as
otherwise provided by law; (c) Ensure that public records that are exempt or confidential and exempt
from public records disclosure requirements are not disclosed except as authorized by law for the
duration of the contract term and following completion of the contract if the contractor does not transfer
the records to the public agency; and (d) Upon completion of the contract, transfer, at no cost, to the
public agency all public records in possession of the contractor or keep and maintain public records
required by the public agency to perform the service. If the contractor transfers all public records to the
public agency upon completion of the contract, the contractor must destroy any duplicate public records
that are exempt or confidential and exempt from public records disclosure requirements. If the
contractor keeps and maintains public records upon completion of the contract, the contractor must
meet all applicable requirements for retaining public records. All records stored electronically must be
provided to the public agency, upon request from the public agency's custodian of public records, in a
format that is compatible with the information technology systems of the public agency.
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO
THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS
AT 30S-663-6340; E-mail: npayne@southmiamM.gov; 6130 Sunset Drive,
South Miami, FL 33143.
19.3 If CONTRACTOR or its subcontractor does not comply with a public records request, the City Manager
has the right to enforce this contract provision by specific performance and the person who violates this
provision is liable to OWNER for its costs of enforcing this provision, including attorney fees incurred in
all proceedings, whether administrative or civil court and in all appellate proceedings.
A TICLE 20 — SEVERASILITY.
20.1 If any provision of the Contract or the application thereof to any person or situation is, to any extent,
held invalid or unenforceable, the remainder of the Contract, and the application of such provisions to
persons or situations other than those as to which it is held invalid or unenforceable will not be affected
thereby, and will continue in full force and effect, and be enforced to the fullest extent permitted by law.
ARTICLE 21 — INDEPENDENT CONTRACTOR.
21.1 CONTRACTOR is an independent CONTRACTOR under the Contract Services provided by
CONTRACTOR must be by employees of CONTRACTOR and subject to supervision by
CONTRACTOR, and not as officers, employees, or agents of OWNER. Personnel policies, tax
responsibilities, social security and health insurance, employee benefits, purchasing policies and other
similar administrative procedures, applicable to services rendered under the Contract must be those of
CONTRACTOR.
ARTICLE 22 — ASSIGNMENT.
22.1 CONTRACTOR may not transfer or assign any of its rights or duties, obligations and responsibilities
arising under the terms, conditions and provisions of this Contract without prior written consent of the
City Manager. The City Manager will not unreasonably withhold and/or delay OWNER'S consent to the
assignment of CONTRACTOR's rights. The City Manager may, in the manager's sole and absolute
discretion, refuse to allow CONTRACTOR to assign its duties, obligations and responsibilities. In any
event, OWNER is not obligated to consent to such assignment unless CONTRACTOR remains jointly
and severally liable for any breach of the Agreement by the assignee, the assignee meets all of OWNER's
requirements to the City Manager's sole satisfaction and the assignee executes all of the Contract
Documents that were required to be executpA �yRNTRACTOR.
15.6 If, through no act or fault of CONTRACTOR, the Work is suspended for a period of more than ninety
(90) calendar days by the City Manager or by order of other public authority, or under an order of court
or CONSULTANT fails to act on any Application for Payment within thirty (30) calendar days after it is
submitted, or OWNER fails to pay CONTRACTOR any sum approved by CONSULTANT, within thirty
(30) calendar days of its approval, and presentation, then CONTRACTOR may, upon twenty (20)
calendar days written notice to the City Manager and CONSULTANT, terminate the Contract The City
Manager may remedy the delay or neglect within the twenty (20) calendar days. If timely remedied by
OWNER, the Contract will not be considered terminated. In lieu of terminating the Contract, if
CONSULTANT has failed to act on an Application for Payment or OWNER has failed to make any
payment as afore said, CONTRACTOR may upon ten (10) calendar days' notice to the City Manager and
CONSULTANT stop the Work until it has been paid all amounts then due.
Indemnificallon of Independent Consultant
15.7 CONTRACTOR and the City Manager hereby acknowledges that if CONSULTANT is an independent
contractor of OWNER, CONSULTANT may be reluctant to rule on any disputes concerning the
Contract Documents or on the performance of CONTRACTOR or OWNER pursuant to the terms of
the Contract Documents. Therefore, OWNER, at CONSULTANT's request, agrees to provide
CONSULTANT with a written indemnification and hold harmless agreement to indemnify and hold
CONSULTANT harmless as to any decision in this regard before CONSULTANT makes an
interpretation, de -certifies a payment application, decertifies Substantial Completion, decertifies Final
Completion, certifies an event of default, or approves any action which requires the approval of
CONSULTANT.
ARTICLLE 16 — MISCELLANEOUS.
16.1 Whenever any provision of the Contract Documents requires the giving of written notice it will be
deemed to have been validly given if delivered in person to the individual or to a member of the firm or
to an officer of the corporation for whom It is intended, or if delivered at or sent by registered or
certified mail, postage prepaid, to the last known business address.
16.2 The Contract Documents are the property of OWNER. CONTRACTOR and CONSULTANT will have
the right to keep one record set of the Contract Documents upon completion of the Project.
16.3 The duties and obligations imposed by these General Conditions, Special Conditions and Supplementary
Conditions, if any, and the rights and remedies available hereunder, and, in particular but without
limitation, the warranties, guarantees and obligations imposed upon CONTRACTOR by the Contract
Documents and the rights and remedies available to OWNER and CONSULTANT thereunder, will be in
addition to, and will not be construed in any way as a limitation of, any rights and remedies available by
law, by special guarantee or by other provisions of the Contract Documents.
16.4 Should OWNER or CONTRACTOR suffer injury or damage to its person or property because of any
error, omission, or act of the other or of any of their employees or agents or others for whose acts they
are legally liable, claim must be made in writing to the other party within twenty-one (21) calendar days of
the first observance of such injury or damage.
ARTICLE 17 - WAIVER OF JURY TRIAL,
17.1 OWNER and CONTRACTOR knowingly, irrevocably voluntarily and intentionally waive any right either
may have to a trial by jury in State or Federal Court proceedings in respect to any action, proceeding,
lawsuit or counterclaim arising out of the Contract Documents or the performance of the Work
thereunder.
ARTICLE 18 - ATTORNEYS FEES JURISDICTION I VENUE / GOVERNING LAW,
18.1 The Contract will be construed in accordance with and governed by the law of the State of Florida.
18.2 The parties submit to the jurisdiction of any court of competent jurisdiction in Florida regarding any claim
or action arising out of or relating to the Contract or Contract Documents. The parties agree that venue
of any action to enforce the Contract is in Miami -Dade County, Florida.
18.3 Except as may be otherwise provided in the Contract Documents, all claims, counterclaims, disputes and
other matters in question between OWNER and CONTRACTOR arising out of or relating to this
Contract or the breach thereof, will be decided in a court of competent jurisdiction within the State of
Florida.
ARTICLE 19 - PROJECT RECORDS,
19.1 The City Manager has the right to inspect and copy during regular business hours at OWNER'S expense,
the books and records and accounts of CONTRACTOR which relate in any way to the Project, and to
any claim for additional compensation made WGIDWRACTOR, and to conduct an audit of the financial
14.12.4 there is Defective Work the value of which, if deducted from the contract price would reduce
the amount owing to CONTRACTOR BY 20% in the case of Substantial Completion and 5% in
the case of Final Completion.
14.13 If CONSULTANT de -certifies any portion of the Work that was certified ("Initral Certification') by
CONSULTANT, CONTRACTOR must repay to OWNER any money paid as a result of said Initial
Certification being issued which will be paid only when the decertified work is re -certified.
ARTICLE IS — SUSPENSION OF WORK ANp TERMINTION.
15.1 The City Manager may, at any time and without cause, suspend the Work or any portion thereof for a
period of not more than ninety (90) calendar days by notice in writing to CONTRACTOR and
CONSULTANT, which will fix the date on which Work will be resumed. Except for the City Manager's
exercising his right to suspend or terminate the contract pursuant to Article 6, Section 6.21 due to a state
of emergency, CONTRACTOR will be allowed an increase in the Contract Price or an extension of the
Contract Time, or both, directly attributable to any suspension and if a claim is timely made and if it is
allowed under the terms of Articles I I or Article 12.
City May Terminate
15.2 If CONTRACTOR is adjudged bankrupt or Insolvent, or If he makes a general assignment for the benefit
of its creditors, or if a trustee or receiver is appointed for CONTRACTOR or for any its property, or if
he files a petition to take advantage of any debtor's act, or to reorganize under bankruptcy or similar laws,
or if he repeatedly falls to supply sufficient skilled workmen or suitable materials or equipment, or if he
repeatedly fails to make prompt payments to Subcontractors or for labor, materials or equipment or he
disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction, or if he
disregards the authority of CONSULTANT, or if he otherwise violates any provision of, the Contract
Documents, then the City Manager may, without prejudice to any other right or remedy and after giving
CONTRACTOR and the Surety seven (7) calendar days written notice, terminate the services of
CONTRACTOR and take possession of the Project and of all materials, equipment, tools, construction
equipment and machinery thereon owned by CONTRACTOR, and finish the Work by whatever method
it may deem expedient In such case CONTRACTOR will not be entitled to receive any further payment
until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct and indirect
costs of completing the Project, including compensation for additional professional services, such excess
will be paid to CONTRACTOR. If such costs exceed such unpaid balance, CONTRACTOR or the
Surety on the Performance Bond must pay the difference to OWNER. Such costs incurred by OWNER
will be determined by CONSULTANT and incorporated in a Change Order.
If after termination of CONTRACTOR under this Section, it is determined by a court of competent
jurisdiction for any reason that CONTRACTOR was not in default, the rights and obligations of OWNER
and CONTRACTOR will be the same as if the termination had been issued pursuant to Section 15.5
15.3 Where CONTRACTOR'S services have been so terminated by the City Manager said termination will not
affect any rights of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any
retention or payment of moneys by OWNER due CONTRACTOR will not release CONTRACTOR
from liability.
15.4 Upon seven (7) calendar days' written notice to CONTRACTOR and CONSULTANT, the City Manager
may, without cause and without prejudice to any other right or remedy, elect to terminate the Contract
for the convenience of OWNER. In such case, CONTRACTOR will be paid for all Work executed and
accepted by the City Manager as of the date of the termination, minus any deduction for damage or
Defective Work. No payment will be made for profit for Work which has not been performed.
I SAA OWNER reserves the right in the event CONTRACTOR cannot provide an item(s) or service(s) in a
timely manner as requested, to obtain the good and/or services from other sources and deducting the
cost from the Contract Price without violating the Intent of the Contract.
Removal of Equipment
15.5 In the case of termination of this Contract before completion for any cause whatever, CONTRACTOR, if
notified to do so by the City Manager, must promptly remove any part or all of its equipment and supplies
from the property of OWNER. Should CONTRACTOR not remove such equipment and supplies, the
City Manager will have the right to remove them at the expense of CONTRACTOR and
CONTRACTOR agrees that OWNER will not be liable for loss or damage to such equipment or
supplies. Equipment and supplies will not be construed to include such items for which CONTRACTOR
has been paid in whole or in part
Contractor May Stop Work or Terminate 104 of 112
14.6 CONSULTANT may refuse to approve the whole or any part of any payment if, in its opinion, it is unable
to make such representations to OWNER as required this Section 14. It may also refuse to approve any
payment, or it may void any prior payment application certification because of subsequently discovered
evidence or the results of subsequent inspection or tests to such extent as may be necessary in its
opinion to protect OWNER from loss because:
14.6.1 of Defective Work, or completed Work has been damaged requiring correction or replacement,
14.6.2 the Work for which payment is requested cannot be verified,
14.6.3 claims of Liens have been filed or received, or there is reasonable evidence indicating the probable
filing or receipt thereof,
14.6.4 the Contract Price has been reduced because of modifications,
14.6.5 OWNER has corrected Defective Work or completed the Work in accordance with Article 13.
14.6.6 of unsatisfactory prosecution of the Work, including failure to clean up as required by paragraphs
6.29 and 6.30,
14.6.7 of persistent failure to cooperate with other contractors on the Project and persistent failure to
carry out the Work in accordance with the Contract Documents,
14.6.8 of liquidated damages payable by CONTRACTOR, or
14.6.9 of any other violation of, or failure to comply with provisions of the Contract Documents.
14.7 Prior to Final Acceptance, City Manager, with the approval of CONSULTANT, may use any completed or
substantially completed portions of the Work provided such use does not interfere with
CONTRACTOR's completion of the Work. Such use will not constitute an acceptance of such portions
of the Work.
14.8 The City Manager has the right to enter the premises where the Work is being performed for the
purpose of doing Work not covered by the Contract Documents. This provision may not be construed
as relieving CONTRACTOR of the sole responsibility for the care and protection of the Work, or the
restoration of any damaged Work except such as may be caused by agents or employees of OWNER.
14.9 Upon completion and acceptance of the Work CONSULTANT will issue a Certificate attached to the
Final Application for Payment that the Work has been accepted by it under the conditions of the
Contract Documents. The entire balance found to be due CONTRACTOR, including the retained
percentages, but except such sums as may be lawfully retained by OWNER, will be paid to
CONTRACTOR within thirty (30) calendar days of completion and acceptance of the Work.
14.10 Upon The awarded CONTRACTOR will be strongly encouraged to register as an ePayables Vendor with
OWNER. The Bank of America ePayables Solution is an automated card payment process that shifts
accounts payable disbursements to corporate purchasing cards. - ePayables, streamline the process of
making payments to your organization going forward, City Manager will provide CONTRACTOR with a
credit card account number to keep on file. This card has unique security features, with $0 of available
funds until an invoice is approved for payment. After an invoice has received proper and complete
approval, an electronic remittance advice will be sent via e-mail, or fax, which notifies CONTRACTOR
that the funds have been transferred in to the account linked to the card for the amount listed on the
invoice and/or remittance email. Please refer to the ePayables Questions & Answers Form contained in
this RFP or contact OWNER's Finance department at (305) 663-6343 with any questions.
Accepsance_of Final Payment m Release
14.11 The Acceptance by CONTRACTOR of Final Payment will be and will operate as a release to OWNER
and a waiver of all claims and all liability to CONTRACTOR other than claims previously filed and
unresolved. The waiver includes all things done or furnished in connection with the Work and for every
act and neglect of OWNER and others relating to or arising out of this Work. Any payment, however,
final or otherwise, will not release CONTRACTOR or its sureties from any obligations under the
Contract Documents or the Performance Bond and Payment Bonds.
14.12 CONSULTANT may void any certification of Substantial Completion or Final Completion of the Work as
may be necessary in his opinion to protect OWNER from loss if he determines, because of subsequently
discovered evidence or the results of subsequent inspection or tests, that:
14.12.1 the Work is defective, or that the completed Work has been damaged due to the fault of
CONTRACTOR or any individual or entity operating under or through it requiring correction
or replacement to the extent that the project is no longer Substantially Completed, or in the
case of Final Completion certification, is no longer Finally Competed.
14.12.2 the Work necessary to be completed for the purpose of certifying the work as being
Substantially Completed or Finally Completed cannot be verified,
14.12.3 claims or Liens have been filed or received, or there is reasonable evidence indicating the
probable filing or receipt thereof that, if valid and paid, would reduce the amount owing to
CONTRACTOR BY 20% in the rase of Substantial Completion and 5% in the case of Final
Completion.
103 of 112
indirectly, which was Incorporated Into the Work. If any person refuses to provide such a release or
provides a conditional release, the City Manager will have the right to issue a joint check made payable to
CONTRACTOR and such person.
14.3 Punch list
City Manager and CONTRACTOR will develop a single list of items required to render complete,
satisfactory, and acceptable the construction services purchased by the local governmental entity. Within
30 calendar days after reaching substantial completion of the Project, City Manager will prepare a punch
list of items that need to be completed and, within S days after the list of items has been developed and
reviewed, the City Manager will deliver the punch list to CONTRACTOR. If the Project relates to more
than one building or structure, or Involves a multiphase project, the City Manager will prepare a separate
punch list for each building and structure and if it is a multiphase project, for each phase, within 30 days of
substantial completion of such building, structure and phase. [See Sec. 255.07, Fla. Stat.]
The final contract completion date may not be less than 30 days after the delivery of the list of items. If
the list is not timely delivered to CONTRACTOR, the contract time for completion must be extended by
the number of days OWNER exceeded the required delivery date.
Contractor's Warranty of Tide
14.3 CONTRACTOR warrants and guarantees that tide to all Work, materials and equipment covered by an
Application for Payment whether the Work, material or equipment is incorporated in the Project or not,
will have passed to OWNER prior to the making of the Application for Payment, free and clear of all
liens, claims, security interest and encumbrances (hereafter in these General Conditions referred to as
"Liens`; and that no Work, materials or equipment, covered by an Application for Payment, will have
been acquired by CONTRACTOR or by any other person performing the Work at the site or furnishing
materials and equipment for the Project, under or pursuant to an agreement under which an Interest
therein or encumbrance thereon is retained by the seller or otherwise imposed by CONTRACTOR or
such other person.
Approval of EMent
14.4 CONSULTANT's approval of any payment requested in an Application for Payment will constitute a
representation by him to OWNER, based on CONSULTANT's on site observations of the Work in
progress as an experienced professional and on his review of the Application for Payment and supporting
data, that the Work has progressed to the point indicated in the Application for Payment; that, to the
best his knowledge, information and belief, the quality of the Work is In accordance with the Contract
Documents (subject to an evaluation of the Work as a functioning Project upon substantial completion as
defined in Article I, to the results of any subsequent tests called for in the Contract Documents and any
qualifications stated in his approval); and that CONTRACTOR is entitled to payment of the amount
approved. However, the approval of such payment does not mean and may not imply that
CONSULTANT made exhaustive or continuous on -site observations to check the quality or the quantity
of the Work, or that he has reviewed the means, methods, techniques, sequences and procedures of
construction or that he has made any examination to ascertain how or for what purpose
CONTRACTOR has used the moneys paid or to be paid to him, or that tide to any Work, materials, or
equipment has passed to OWNER free and dear of any liens.
14.5 CONTRACTOR will not be entitled to be paid unless:
(a) the labor and materials listed on a payment application have been used in the construction of this
Work or, as to materials Included in the request for payment that have not yet been incorporated into
the construction, such materials are on the site or stored at an approved location, and
(b) payment received from the last payment application has been used to fully pay for all the laborers,
subcontractors and materials reflected in that request, other than amounts that are in dispute and that
are listed In the payment application with reasonable clarity as to the reason for withholding payment with
the name, addresses and telephone number of the person whose request is being withheld. The payment
application must contain the forgoing statement and the statement must be certified by CONTRACTOR
as being true.
In the event that CONTRACTOR withholds payment from a Subcontractor or Supplier, the same amount
of money will be withheld from CONTRACTOR's payment until the issue is resolved by written
agreement between them and then a joint check will be made payable to the person in question and
CONTRACTOR in accordance with the settlement agreement, otherwise the money will be held by
OWNER until a judgment is entered in favor of CONTRACTOR or the person, in which case the money
will be paid according with said judgment. Nothing contained herein will indicate an intent to benefit any
third persons who are not signatories to the Contract
102 of 112
through either the manufacturer or CONTRACTOR directly, all materials and equipment furnished and
Work performed for three (3) years from the date of Final Acceptance as indicated in CONSULTANT
Letter of Recommendation of Acceptance, if issued, the Certificate of Occupancy, if issued, or the
Certificate of Completion, if issued by City Manager, whichever is applicable and if more than one is
applicable, the one that is issued last, for latent Defective Work. The City Manager will give notice of
observed defects with reasonable promptness. In the event that CONTRACTOR should fail to commence
to correct such Defective Work within ten (10) calendar days after having received written notice of the
defect, or should CONTRACTOR commence the corrective work, but fail to prosecute the corrective
work continuously and diligently and in accordance with the Contract Documents, applicable law, rules and
regulations, the City Manager may declare an event of default, terminate the Contract in whole or in part
and cause the Defective Work to be removed or corrected and to complete the Work at
CONTRACTOR's expense, and the City Manager will charge CONTRACTOR the cost thereby
incurred. The Performance Bond will remain in full force and effect through the guarantee period.
131 The specific warranty periods listed in the Contract Documents, if different from the period of time listed
in Section 13.1. will take precedence over Section 13.1.
13.3 CONTRACTOR must act as agent, on a limited basis for OWNER, at the City Manager's option, solely
for the follow-up concerning warranty compliance for all items under manufacturer's
Warranty/Guarantee and for the purpose of completing all forms for Warranty/Guarantee coverage
under this Contract
13.4 In case of default by CONTRACTOR, the City of South Miami may procure the articles or services from
other sources and hold CONTRACTOR responsible for any excess costs occasioned or Incurred
thereby.
133 The City Manager may withhold acceptance of, or reject items which are found upon examination, not to
meet the specification requirements. Upon written notification of rejection, items must be removed
within five (S) business days by CONTRACTOR at his own expense and redelivered at his expense.
Rejected goods left longer than thirty (30) calendar days will be regarded as abandoned and City Manager
will have the right to dispose of them as its own property and CONTRACTOR thereby waives any claim
to the good or to compensation of any kind. Rejection for Non -Conforming Work or failure to meet
delivery schedules may result in the Contract being found in default
ARTICLE 14 - PAYMENTS AND COMPLETION.
Payments to Cont or
14.1 CONTRACTOR will not be entitled to any money for any work performed before the issuance of a
Notice to Proceed on the form described in the Contract Documents and the issuance by City Manager
of a "purchase order", or any other document, does not and will not authorize the commencement of the
Work. At least ten (10) calendar days before each progress payment falls due (but not more often than
once a month), CONTRACTOR must submit to CONSULTANT a partial payment estimate filled out and
signed by CONTRACTOR covering the Work performed during the period covered by the partial
payment estimate and supported by such data as CONSULTANT may reasonably require. All progress
payment applications after the first progress payment must be accompanied by partial releases of lien
executed by all persons, firms and corporations who have furnished labor, services or materials
incorporated into the work during the period of time for which the previous progress payment was made,
releasing such claims and lien rights, if any, of those persons. If payment is requested on the basis of
materials and equipment not incorporated in the Work but delivered and suitably stored at or near site,
the partial payment estimate must also be accompanied by such supporting data, satisfactory to the City
Manager, which establishes OWNER's title to the material and equipment as well as certificates of
insurance providing coverage for 100% of the value of said material and equipment covering the material
and equipment from all casualties as well as theft, vandalism, fire and flood. CONTRACTOR must
replace at its expense any stored materials paid for which are either damaged or stolen before
installation. CONSULTANT will within ten (10) calendar days after receipt of each partial payment
estimate, either certifying in writing its approval of payment and present the partial payment estimate to
the City Manager, or return the partial payment estimate to CONTRACTOR, indicating in writing his
reasons for refusing to approve payment. In the latter case, CONTRACTOR may make the necessary
corrections and resubmit the partial payment estimate. OWNER, will within thirty (30) calendar days of
presentation to it of any approved partial payment estimate, pay CONTRACTOR a progress payment on
the basis of the approved partial payment estimate. City Manager may retain ten (10%) percent of the
amount of each payment until Final Completion and Acceptance of all Work covered by the Contract
Documents. Any interest earned on the retainage will accrue to the benefit of OWNER.
14.2 CONTRACTOR, before it receives final payment, must deliver to the City Manager a Contractor's Final
Payment Affidavit as set forth in the Florida Construction Lien Statute as well as final releases of lien
executed by all persons who have performed4hAWshed labor, services or materials, directly or
12.1 Time is of the essence to this contract and the date of beginning and the time for completion of the Work
are essential conditions of the Contract Therefore, the Work must be commenced on the date specified
in the Notice to Proceed and completed within the time specified for completion of the work.
12.2 CONTRACTOR must proceed with the Work at such rate of progress to ensure full completion within
the Contract Time. It is expressly understood and agreed, by and between CONTRACTOR and City
Manager, that the Contract Time for the completion of the Work described herein is a reasonable time,
taking into consideration the average climatic and economic conditions and other factors prevailing in the
locality of the Work. No extension of time will be granted due conditions that CONTRACTOR knew of
or should have known of before bidding on the project or due to inclement weather, except as provided
in section 12.7.
12.3 If CONTRACTOR fails to complete the Work within the Contract Time, or extension of time granted by
the City Manager, then CONTRACTOR must pay to OWNER the amount of liquidated damages as
specified in the Contract Documents for each calendar day after the scheduled date for completion as
adjusted by written Change Orders that extended the completion date.
12.3.1 These amounts are not penalties but are liquidated damages incurred by OWNER for its inability
to obtain full use of the Project Liquidated damages are hereby fixed and agreed upon between
the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will
be sustained as a consequence of such delay, and both parties desiring to obviate any question or
dispute concerning the amount of said damages and the cost and effect of the failure of
CONTRACTOR to complete the Contract on time. The above -stated liquidated damages will
apply separately to each phase of the Project for which a time for completion is given.
12.31 City Manager is authorized to deduct the liquidated damages from monies due to
CONTRACTOR for the Work under this Contract
12.4 The Contract Time may only be changed by a written Change Order. Any claim for an extension in the
CONTRACT TIME will be based on written notice delivered to the City Manager and CONSULTANT
within five (5) business days of the occurrence of the event giving rise to the claim and stating the general
nature of the claim including supporting data. All claims for adjustment In the Contract Time will be
evaluated and recommended by CONSULTANT, with final approval by the City Manager. Any change in
the Contract Time resulting from any such claim must be incorporated in a written Change Order.
12.5 All time limits stated in the Contract Documents are of the essence of the Contract
12.6 No damage claim for delay Is allowed and CONTRACTOR's sole remedy for delay caused by OWNER
will be an extension of time for the period of delay.
12.7 Extensions to the Contract Time for delays caused by the effects of inclement weather will not be granted
unless the weather was unusual for South Rorida and could not have been anticipated, the abnormal
weather is documented by records from the national weather service and the abnormal weather is
documented to have had a substantial affected on the construction schedule.
12.8 No Damages for Delay: CONTRACTOR agrees that he will not have any claim for damages due to delay
unless the delay exceeds 6 months, whether individually or cumulatively, and then the damages will be
limited to increased cost of materials that were unanticipated and that would not have been incurred but
for the delay. Other than as set forth above, the only remedy for any delay will be limited to an extension
of time as provided for in Section 12.4 which will be the sole and exclusive remedy for such resulting
delay. Other than as set forth above, CONTRACTOR will not be entitled to an increase in the Contract
Price or payment or compensation of any kind from OWNER for direct, indirect, consequential, impact
or other costs, expenses or damages, including but not limited to, costs of acceleration or inefficiency,
overhead or lost profits, arising because of delay, disruption, interference or hindrance from any cause
whatsoever, whether such delay, disruption, interference or hindrance be reasonable or unreasonable,
foreseeable or unforeseeable, or avoidable or unavoidable.
12.9 CONTRACTOR waives all claims that are not presented to City Manager in writing on or before the
21 st day following the date of the event upon which the claim is based.
12.10 Dispute Resolution: If any dispute concerning a question of fact arises under the Contract, other than
termination for default or convenience, CONTRACTOR and the city department responsible for the
administration of the Contract will make a good faith effort to resolve the dispute. If the dispute cannot
be resolved by agreement, then the department with the advice of the City Attorney and CONSULTANT
will rule on the disputed issue and send a written copy of its decision to CONTRACTOR.
CONTRACTOR must comply with such decision and may not delay the project
.ARTICLE 13 — GUARANTEE.
13.1 CONTRACTOR guarantees and unconditionally warrants through either the manufacturer or
CONTRACTOR directly, all materials and equipment furnished and Work performed for patent Defective
Work for a period of one (1) year from the date of Final Acceptance as indicated in CONSULTANT Letter
of Recommendation of Acceptance, if issued, the Certificate of Occupancy, if issued, or the Certificate of
Completion, if issued by City Manager, whicWer!42ippl1cable and If more than one is applicable, the one
that is issued last, for patent Defective Work,. CONTRACTOR guarantees and unconditionally warrants
and offer OWNER the opportunity to deposit funds with CONTRACTOR for the payment for
Items that offer a discount. Cash discounts will accrue to CONTRACTOR unless
CONTRACTOR falls to timely notify the City Manager of the discounts or if OWNER deposits
funds with CONTRACTOR with which to make payments in which cases the cash discounts will
accrue to OWNER. All trade discounts, rebates and refunds, and all returns from sale of surplus
materials and equipment will accrue to OWNER, and CONTRACTOR must make provisions so
that they may be obtained.
1 1.8.3 Payments made by CONTRACTOR to the Subcontractors for Work performed by
Subcontractors. If required by City Manager, CONTRACTOR must obtain competitive bids from
Subcontractors acceptable to him and must deliver such bids to City Manager who will then
determine, with the advice of CONSULTANT, which Bids will be accepted. No subcontract may
be a cost-plus contract unless approved in writing by the City Manager. If a Subcontract provides
that the Subcontractor is to be paid on the basis of Cost of Work plus a fee, the cost of the
Work w€II be determined in accordance this section 11.8 and in such case the word
"Subcontractor" will be substituted for the word "CONTRACTOR".
11.8.4 Rentals of all construction equipment and machinery, except hand tools, and the parts thereof
whether rented from CONTRACTOR or others in accordance with rental agreements
approved by City Manager with the advice of CONSULTANT, and the costs of transportation,
loading, unloachng, installation, dismantling and removal thereof - all in accordance with terms of
said rental agreements. The rental of any such equipment, machinery or parts must cease when
the use thereof is no longer necessary for the Work.
11.8.5 Sales, use or similar taxes related to the Work, and for which CONTRACTOR is liable, imposed
by any governmental authority.
1 1.8.6 Payments and fees for permits and licenses. Costs for permits and licenses must be shown as a
separate item.
11.8.7 The cost of utilities, fuel and sanitary facilities at the site.
11.8.8 Minor expenses such as telegrams, long distance telephone calls, telephone service at the site,
expressage and similar petty cash items in connection with the Work.
11.8.9 Cost of premiums for additional Bonds and insurance required solely because of changes in the
Work, not to exceed two percent (2%) of the increase in the Cost of the Work.
11.9 The term "Cost of the Work" does NOT include any of the following:
11.9.1 Payroll costs and other compensation of CONTRACTOR'S officers, executives, principals (of
partnership and sole proprietorships), general managers, engineers, architects, estimators, lawyers,
agents, expediters, timekeepers, clerks and other personnel employed by CONTRACTOR
whether at the site or in its principal or a branch office for general administration of the Work
and not specifically Included in the schedule referred to in Subparagraph 11.5.
11.9.2 Expenses of CONTRACTOR'S principal and branch offices other than its office at the site.
1 1.9.3 Any part of CONTRACTOR'S capital expenses, including interest on CONTRACTOR'S capital
employed for the Work and charges against CONTRACTOR for delinquent payments.
11.9.4 Cost of premiums for ail bonds and for all insurance policies whether or not CONTRACTOR is
required by the Contract Documents to purchase and maintain the same (except as otherwise
provided in Subparagraph 11.8.9).
11.9.5 Costs due to the negligence of CONTRACTOR, any Subcontractor, or anyone directly or
indirectly employed by any of them or for whose acts any of them may be liable, including but not
limited to, the correction of defective work, disposal of materials or equipment wrongly supplied
and making good any damage to property.
11.9.6 Other overhead or general expense costs of any kind and the costs of any item not specifically
and expressly included in Paragraph 11.8.
11.10 CONTRACTOR'S fee which will be allowed to CONTRACTOR for its overhead and profit will be
determined as follows:
1 1.10.1 A mutually acceptable firm fixed price; or if none can be agreed upon.
1 1.10.2 A mutually acceptable fixed percentage (not to exceed 15%).
11.11 The amount of credit to be allowed by CONTRACTOR to OWNER for any such change which results in
a net decrease in cost will be the amount of the actual net decrease in costs calculated in the same
manner as provided in 11.8. When both additions and credits are involved in any one change, the net will
be computed to include overhead and profit, identified separately, for both additions and credit, provided
however, CONTRACTOR will not be entitled to claim lost profits for any Work not performed.
ARTICLE 12 - TIME FOR COMPLETION. LIQUIDATED DAMAGES AND CHANGE OF THE
COMI ACT TIME.
99 of 112
10.5 It is CONTRACTOR'S responsibility to notify its Surety of any changes affecting the general Scope of the
Work or change in the Contract Price or Contract Time and the amount of the applicable bonds will be
adjusted accordingly. CONTRACTOR must furnish proof of such an adjustment to the City Manager
before commencement of the Change Order Work. The Work will be stopped until CONTRACTOR
provides such proof of adjustment in the Bond amount and any such delay will be charged to
CONTRACTOR.
ARTICLE 1 I — CHANGE OF CONTRACT PRICE.
11.1 The Contract Price constitutes the total compensation payable to CONTRACTOR for Performing the
Work. All duties, responsibilities and obligations assigned to or undertaken by CONTRACTOR will be at
its expense without changing the Contract Price.
11.2 The City Manager may, at any time, without written notice to the sureties, by written order designated or
indicated to be a Change Order, make any change in the Work within the general scope of the Contract,
including but not limited to changes to or in:
11.2.1 Specifications (including drawings and designs);
11.2.2 Method or manner of performance of the Work.
11.2.3 OWNER -furnished facilities, equipment, materials, services, or site; or
11.2.4 Acceleration in the performance of the Work
11.3 Except as provided in this section, or sections referred to in this section, no order, statement, or conduct
of the City Manager will be treated as a Change Order or entitle CONTRACTOR to an equitable
adjustment unless and until the change In the Work is specifically and expressly provided for in a written
Change Order, or as otherwise provided in another section of the Contract Documents.
11.4 When a Change Order is issued by CONSULTANT and signed by the City Manager or issued by the City
Manager in writing, CONTRACTOR must perform the Work even if CONTRACTOR does not agree
with the dollar amount of the Change Order. if any Change Order causes an increase or decrease in
CONTRACTOR'S cost of, or the time required for, the performance of any part of the Work under this
Contract, for which the City Manager and CONTRACTOR cannot reach a timely agreement, an equitable
adjustment based on the cost of the Work will be made and the Contract modified accordingly.
11.5 If CONTRACTOR intends to assert a claim for an equitable adjustment or contest the equitable
adjustment made by CONSULTANT, it must, within ten (10) calendar days after receipt of a written
Change Order, submit to the City Manager and CONSULTANT a written notice including a statement
setting forth the general nature and monetary extent of such claim for equitable adjustment, time
extension requested and supporting data In determining the cost of the Change Order, the costs will be
limited to those listed in section 11.7 and 11.8.
11.6 No claim by CONTRACTOR for an equitable adjustment hereunder will be allowed if not submitted in
accordance with this section or if asserted after final payment under this Contract
11.7 The value of any Work covered by a Change Order or of any claim for an Increase or decrease in the
Contract Price will be determined in one of the following ways:
11.7.1 By negotiated lump sum.
11.7.2 On the basis of the reasonable cost and savings that results from the change in the Work plus a
mutually agreed upon fee to CONTRACTOR to cover overhead and profit not to exceed 15%. If
CONTRACTOR disagrees with CONSULTANT's determination of reasonable costs, the
CONTRACT must provide a list of all costs together with backup documentation
11.8 The term cost of the Work means the sum of all direct extra costs necessarily incurred and paid by
CONTRACTOR in the proper performance of the Change Order. Except as otherwise may be agreed
to in writing by City Manager, such costs must be in amounts no higher than those prevailing in Miami -
Dade County and may only Include the following items.
11.8.1 Payroll costs for employees in the direct employ of CONTRACTOR in the performance of the
Work described In the Change Order under schedules of job classifications agreed upon by City
Manager and CONTRACTOR. Payroll costs for employees not employed full time on the Work
must be apportioned on the basis of their time spent on the Work Payroll costs must be limited
to: salaries and wages, plus the costs of fringe benefits which may include social security
contributions, unemployment, excise and payroll taxes, workers' compensation, health and
retirement benefits, sick leave, vacation and holiday pay applicable thereto. Such employees may
include superintendents and foremen at the site. The expenses of performing Work after regular
working hours, on Sunday or legal holidays will be included in the above only if authorized by
OWNER and provided It was not in any way, whether in whole or in part the result of the fault of
CONTRACTOR due to negligence of CONTRACTOR or those acting by or through him or due
in whole or in part to Defective Work of CONTRACTOR.
11.8.2 Cost of all materials and equipment furnished and incorporated in the Work, including costs of
transportation and storage, and manufacturers' field services required in connection
therewith. CONTRACTOR must nAf?f61-2City Manager of all cash discounts that are available
Measurement of Quantities:
9A All Work completed under the Contract will be measured by CONSULTANT according to the United
States Standard Measures. All linear surface measurements will be made horizontally or vertically as
required by the item measured.
Rejecting Defective Work:
9.5 CONSULTANT will have authority to disapprove or reject Work that is "Defective Work" as defined in
Article 1. It will also have authority to require special inspection or testing of the Work including Work
fabricated on or off site, installed or completed as provided. if CONSULTANT requires testing of
completed Work, the cost of such inspections and/or testing must be approved In writing by the City
Manager. All consequential cost of such Inspections and testing, including but not limited to the cost of
testing and inspection, the cost of repairing any of the Work, or the work of others, the cost to move
furniture and equipment and/or the cost to provide alternative facilities until the repair work can be
completed, must paid by CONTRACTOR if the Work is found to be Defective Work.
Shop Drawings. Change Orders and Payments:
9.6 In connection with CONSULTANT responsibility as to Shop Drawings and samples, see paragraphs 6.25
through 6.28, inclusive.
9.7 In connection with CONSULTANrs responsibility for Change Orders see Articles 10, 11, and 12.
9.8 In connection with CONSULTANT responsibilities with respect to the Application for Payment, etc., see
Article 14.
Decisions on Disagreements:
9.10 CONSULTANT will be the initial interpreter of the Construction Documents.
Limitations on Consultant's Responsibilities:
9.11 CONSULTANT will not be responsible for the construction means, methods, techniques, sequences or
procedures, or the safety precautions and programs incident thereto.
9.12 CONSULTANT will not be responsible for the acts or omissions of CONTRACTOR, or any
Subcontractors, or any of their agent, servants or employees, or any other person performing any of the
Work under or through them.
ARTICLE 10 -CHANGES IN THE WO L
10.1 Without invalidating the Contract, the City Manager may, at any time or from time to time, order
additions, deletions or revisions in or to the Work which will only be authorized by a written Change
Orders. Upon receipt of a Change ?rder, CONTRACTOR must proceed with the Work involved. All
such Work must be performed under the applicable conditions of the Contract Documents. If any
authorized written Change Order causes an increase or decrease in the Contract Price or an extension
or shortening of the Contract Time, ian equitable adjustment will be made as provided in Article I 1 or
Article 12. A written Change Order signed by the City Manager and CONTRACTOR indicates their
agreement to the terms of the Change Order. All Change Orders must be certified by CONSULTANT
as to the appropriateness and value Qf the change In the Work as well as to any change in the time to
complete the Work under the circumstances. The failure to include a time extension in the Change
Order or in the request for a change order will result in a waiver of any extension of time due to the
change in the work as reflected in thle Change Order.
10.2 CONSULTANT may authorize minor changes or alterations in the Work not involving extra cost and not
inconsistent with the overall intent of the Contract Documents without the need for a formal written
Change Order provided CONTRACTOR does not request additional time or additional
compensation. These may be accomplished by a written Field Order. If CONTRACTOR believes that
any change or alteration authorized by CONSULTANT's Field Order would entities CONTRACTOR to
an increase In the Contract Price or (,extension of Contract Time, it must submit a written notice of intent
to demand a Change Order within enty-four (24) hours of the issuance of the Field Order and submit a
written proposal for Change Order within four (4) days thereafter, otherwise CONTRACTOR will be
deemed to have waived such claim.
10.3 Additional Work performed by CONTRACTOR without authorization of a written Change Order will
not entitle it to an increase in the Contract Price or an extension of the Contract Time, except in the
case of an emergency as provided in i paragraph 6.21 and except as provided in paragraph 10.2.
10A The City Manager will execute appropriate Change Orders prepared by CONSULTANT covering
changes in the Work, to be performed as provided in paragraph 4.4, and Work performed in an
emergency as provided in paragraph 6.21 and any other claim of CONTRACTOR for a change in the
Contract Time or the Contract Price which is approved by CONSULTANT.
97 of 112
7.6 Necessary chases, slots, and holes not built or left by CONTRACTOR must be cut by the separate
contractor requiring such alterations after approval of CONTRACTOR. CONTRACTOR must do all
patching and finishing of the work of other contractors where it is cut by them and such patching and
finishing will be at the expense of CONTRACTOR
7.7 Cooperation is required in the use of site facilities and in the detailed execution of the Work. Each
contractor must coordinate their operation with those of the other Contractors for the best interest of
the Work In order to prevent delay in the execution thereof.
7.8 Each of several contractors working on the Project Site must keep themselves informed of the progress
of the work of other contractors. Should lack of progress or defective workmanship on the part of other
contractors Interfere with CONTRACTOR's operations, CONTRACTOR must notify CONSULTANT
immediately and In writing. Lack of such notice to CONSULTANT will be construed as acceptance by
CONTRACTOR of the status of the work of other contractors as being satisfactory for proper
coordination of CONTRACTOR's own Work.
7.9 The cost of extra Work resulting from lack of notice, untimely notice, failure to respond to notice,
Defective Work or lack of coordination will be CONTRACTOR's cost
7.10 The City Manager reserves the right in the event CONTRACTOR cannot provide an item(s) or service(s)
in a timely manner as requested, to obtain the good and/or services from other sources and deducting the
cost from the Contract Price without violating the intent of the Contract
ARTICLE 8 — CITrS RESPONSIBILITIES,
8.1 The City Manager will issue all communications to CONTRACTOR through CONSULTANT.
8.2 In cases of termination of employment of CONSULTANT, the City Manager will appoint a
CONSULTANT whose status under the Contract Documents will be that of the former CONSULTANT.
8.3 The City Manager will promptly furnish the data required of them under the Contract Documents.
8.4 OWNER'S duties in respect to providing lands and easements are set forth in Paragraphs 4.1 and 4.2.
8S OWNER will have the right to take possession of and use any completed or partially completed portions
of the Work, notwithstanding the fact that the time for completing the entire Work or any portion
thereof may not have expired; but such taking possession and use will not be deemed an acceptance of
any Work not completed in accordance with the Contract Documents.
ARTICLE 9 — CONSULTANTS' STATUS DURING CONSTRUCTION.
00 Representative:
9.1 CONSULTANT will be OWNER'S representative during the construction period. The duties and
responsibilities and the limitations of authority of CONSULTANT as OWNER'S representative during
construction are set forth in Articles I through 16 of these General Conditions and will not be extended
without written consent of the City Manager and CONSULTANT.
9.1.1 CONSULTANTs decision, In matters relating to aesthetics, will be final, if within the terms of the
Contract Documents.
9.1.2 Except as may be otherwise provided In this contract, all claims, counterclaims, disputes and other
matters in question between OWNER and CONSULTANT arising out of or relating to this
Contract or the breach thereof, will be decided in a court of competent jurisdiction within the
State of Florida.
Visits to Site:
9.2 CONSULTANT must provide an inspector to make periodic visits to the site at each phase of
construction to observe the progress and quality of the executed Work and to determine if the Work is
proceeding In accordance with the Contract Documents. His efforts must be directed toward providing
assurance for OWNER and all applicable regulatory agencies that construction is in compliance with the
Construction Documents and applicable laws, rules and regulations. On the basis of these on site -
observations as an experienced and qualified design professional, he must keep the City Manager informed
of the progress of the Work and must guard OWNER against defects and deficiencies in the Work of
CONTRACTOR.
Clarifications_ and _Interpretations:
9.3 CONSULTANT will issue, with reasonable promptness, such written clarifications or interpretations of
the Contract Documents (in the form of Drawings or otherwise) as it may determine necessary, which
will be consistent with, or reasonably inferable from, the overall intent of the Contract Documents. If
CONTRACTOR seeks an increase in the Contract Price or extension of Contract Time based on a
written clarification and/or interpretation, it will be required to submit a timely claim as provided in
Articles l I and 12. 96 of 112
give all proper notices, must comply with all requirements of such third parties in the performance of his
Work, must permit entrance of such third parties on the Project in order that they may perform their
necessary work, and must pay all charges and fees made by such third parties for their work.
6.37.1 CONTRACTOR'S attention is called to the fact that there may be delays on the Project due to
work to be done by governmental departments, public utilities, and others in repairing or moving
poles, conduits, etc. CONTRACTOR must cooperate with the above parties in every way
possible, so that the construction can be completed in the least possible time.
6.37.2 CONTRACTOR must be familiar with all codes, laws, ordinances, and regulations which in any
manner affect those engaged or employed in the Work, or materials and equipment use in or
upon the Work, or In any way affect the conduct of the Work, and no plea of misunderstanding
will be considered on account of damage or delay caused by his ignorance thereof.
Use Premises:
6.38 CONTRACTOR must confine Its apparatus, storage of materials, and operations of its workmen to the
limits indicated by law, ordinances, permits and directions of CONSULTANT and City Manager, and may
not unnecessarily encumber any part of the site or any areas off site.
6.38.1 CONTRACTOR nay not overload or permit any part of any structure to be loaded with such
weight as will endanger its safety, nor may it subject any work to stresses or pressures that will
endanger it.
6.38.2 CONTRACTOR must enforce the rules and regulation promulgated by CONSULTANT and
OWNER as well as their instructions with regard to signs, advertisements, fires and smoking.
6.38.3 CONTRACTOR must arrange and cooperate with the City Manager in routing and parking of
automobiles of its employees, subcontractors and other personnel, as well as that of the material
delivery trucks and other vehicles that come to the Project site.
6.38.4 The City Manager will designate specific areas on the site for storage, parking, etc. and the job site
must be fenced to protect the job site and the general public.
6.38.5 CONTRACTOR must furnish, install and maintain adequate construction office facilities for all
workers employed by it or by its Subcontractors. Temporary offices must be provided and
located where directed and approved by CONSULTANT. All such facilities must be furnished in
strict accordance with existing governing regulations. Field offices must include telephone
facilities.
Protection of Existing Pro RnM Improvements:
6.38 Any existing surface or subsurface Improvements, such as pavements, curbs, sidewalks, pipes or utilities,
footings, or structures (including portions thereof), trees and shrubbery, not indicated on the Drawings or noted
in the Specifications as being removed or altered must be protected from damage during construction of the
Project. Any such improvements damaged during construction of the Project must be restored at the expense
of CONTRACTOR to a condition equal to that existing at the time of award of Contract
ARTICLE 7 - WORK BY OTHERS.
7.1 OWNER may perform additional Work related to the Project or may let other direct contracts therefor
which must contain General Conditions similar to these. CONTRACTOR must afford the other
contractors who are parties to such direct contracts (or OWNER, if it is performing the additional Work
itself), reasonable opportunity for the introduction and storage of materials and equipment and the
execution of Work, and must properly connect and coordinate its Work with theirs.
7.2 If any part of CONTRACTOR'S Work depends upon proper execution or results of the Work of any
other contractor or OWNER, CONTRACTOR must promptly report to CONSULTANT in writing any
defects or deficiencies in such Work that render it unsuitable for CONTRACTOR's Work
7.3 CONTRACTOR must do all cutting, fitting and patching of the Work that may be required to make its
several parts come together properly and fit to receive or be received by such other
Work CONTRACTOR may not endanger any Work of others by cutting, excavating or otherwise
altering their Work and may only cut or alter their Work with the written consent of CONSULTANT
and of the other contractor whose work will be affected.
7.4 If the performance of additional Work by other contractors or OWNER is not noted in the Contract
Documents prior to the execution of the Contract, written notice thereof will be given to
CONTRACTOR prior to starting any such additional Work If CONTRACTOR believes that the
performance of such additional Work by OWNER or others will cause CONTRACTOR additional
expense or entitles him to an extension of the Contract Time, he may make a claim therefore as provided
in Articles I I and 12.
7.5 Where practicable, CONTRACTOR must build around the work of other separate contractors or must
leave chases, slots and holes as required to receive and to conceal within the general construction Work
the work of such other separate contractors as directed by them. Where such chases, slots, etc., are
impracticable, the Work will require specific%P&Q1 of CONSULTANT.
operation and local conditions. "Street Closed" signs must be placed immediately adjacent to the Work,
in a conspicuous position, at such locations as traffic demands. At any time that streets are required to be
closed, CONTRACTOR must notify law enforcement agencies and In particular, the City of South Miami
Police Department, before the street is closed and again as soon as It is opened. Access to fire hydrants
and other fire extinguishing equipment must be provided and maintained at all times.
Sanimaovision
6.3 I CONTRACTOR must provide on -site office, and necessary toilet facilities, secluded from public
observation, for use of all personnel on the Work Site, whether or not in his employ. They must be kept
in a clean and sanitary condition and must comply with the requirements and regulations of the Public
Authorities having jurisdiction. They may not commit a public nuisance. Temporary field office and
sanitary facilities must be removed upon completion of the Work and the premises must be left clean.
Indemni cation•
6.32 Contractor must comply with the Indemnification requirements set forth in the RFP and in EXHIBIT 2
of the Supplementary Conditions (Insurance and indemnification requirements).
6.33 In the event that any action or proceeding is brought against OWNER or CONSULTANT by reason of
any such claim or demand, CONTRACTOR, upon written notice from the City Manager, must defend
such action or proceeding by counsel satisfactory to the City Manager. The indemnification provided
above obligates CONTRACTOR to defend at its own expense or to provide for such defense, at
OWNER'S option, any and all claims of liability and all suits and actions of every name and description
that may be brought against OWNER or CONSULTANT, excluding only those claims that allege that the
injuries arose out of the sole negligence of OWNER or CONSULTANT.
6.34 The obligations of CONTRACTOR under paragraph 6.33 will not extend to the liability of
CONSULTANT, its agents or employees arising out of (a) the preparation or approval of maps, drawings,
opinions, reports, surveys, Change Orders, designs or specifications or (b) the giving of or the failure to
give directions or instructions by CONSULTANT, its agents or employees provided such act or omission
is the primary cause of injury or damage.
6.34A All of the forgoing indemnification provisions will survive the term of the Contract to which these
General Conditions are a part. Indemnification may not exceed an amount equal to the total value of all
insurance coverage required by Section 5.1 of this document Indemnification is limited to damages caused
in whole or in part by any act, omission, or default of CONTRACTOR, CONTRACTOR's
subcontractors, sub -subcontractors, materialmen, or agents of any tier or their respective employees to
the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the indemnifying
party and persons employed or utilized by the indemnifying party in the performance of the construction
contract.
Rjes ibili for Connecdo Existing Wo
6.35 CONTRACTOR must connect its Work to each part of the existing Work, existing building or structure
or Work previously installed as required by the Drawings and Specifications to provide a complete
installation.
6.36 Excavations, grading, fill, storm drainage, paving and any other construction or installations in rights -of -
ways of streets, highways, public carrier lines, utility lines, either aerial, surface or subsurface, etc., must
be done in accordance with requirements of the special conditions. OWNER will be responsible for
obtaining all permits necessary for the Work described In this paragraph 6.36. Upon completion of the
Work, CONTRACTOR must present to CONSULTANT certificates, in triplicate, from the proper
authorities, stating that the Work has been done in accordance with their requirements.
6.36.1 OWNER will cooperate with CONTRACTOR in obtaining action from any utilities or public
authorities involved in the above requirements.
6.36.2 CONSULTANT is responsible for obtaining elevations of curbs and gutters, pavement, storm
drainage structures, and other items which must be established by governmental departments as
soon as grading operations are begun on the site and, in any case, sufficiently early in the
construction period to prevent any adverse effect on the Project
Cam.
operation with Governmental Departments: Public Utilities. etc.:
6.37 CONTRACTOR is responsible for making all necessary arrangements with governmental departments,
public utilities, public carriers, service companies and corporations (hereinafter referred to as "third
parties'l owning or controlling roadways, railways, water, sewer, gas, electrical conduits, telephone, and
telegraph facilities such as pavements, tracks, piping, wires, cables, conduits, poles, guys, etc., including
incidental structures connected therewith, that are encountered in the Work in order that such items are
properly shored, supported and protected, that their location is identified and to obtain authority from
these third parties for relocation if CONTRAM19desires to relocate the item. CONTRACTOR must
Manager's Emergency Management powers set forth in Ch. 14 of the City's Code of Ordinances. In such
event, the CONTRACTOR is only be entitled to be paid for the reasonable value of the work performed
and any costs advanced that cannot be mitigated by CONTRACTOR.
Shop Orawingi -and Samples:
6.22 After checking and verifying all field measurements, CONTRACTOR must submit to CONSULTANT for
review, in accordance with the accepted schedule of shop drawing submissions, six (6) copies (or at
CONSULTANT option, one reproducible copy) of all Shop Drawings, which must have been checked by
and stamped with the approval of CONTRACTOR. The Shop Drawings must be numbered and identified
as CONSULTANT may require. The data shown on the Shop Drawings must be complete with respect
to dimensions, design criteria, materials of construction and the like to enable CONSULTANT to review
the information without any unnecessary investigation.
6.23 CONTRACTOR must also submit to CONSULTANT for review, with such promptness as to cause no
delay in Work, all samples required by the Contract Documents.
All samples must have been checked by and stamped with the approval of CONTRACTOR, identified
clearly as to material, manufacturer, any pertinent catalog numbers and the use for which intended.
6.24 At the time of each submission, CONTRACTOR must notify CONSULTANT, in writing, of any
deviations between the Shop Drawings or samples and the requirements of the Contract Documents.
6.25 CONSULTANT must review with responsible promptness Shop Drawings and Samples, but his review is
only for conformance with the design concept of the Project and for compliance with the information
given in the Contract Documents. The review of a separate item as such will not indicate review of the
assembly in which the items functions. CONTRACTOR must make any corrections required by
CONSULTANT and must return the required number of corrected copies of Shop Drawings and
resubmit new samples until the review is satisfactory to CONSULTANT. CONTRACTOR must notify
CONSULTANT, in writing, of any prior Shop Drawing or revisions to Shop Drawings that are in conflict
with each submission or re -submission. CONTRACTOR'S stamp of approval on any Shop Drawings or
sample will constitute representation to OWNER and CONSULTANT that CONTRACTOR has either
determined and/or verified all quantities, dimension, field construction criteria, materials, catalog numbers
and similar data or they assume full responsibility for doing so, and that they have reviewed or
coordinated each Shop Drawing or sample with the requirements of the Work and the Contract
Documents.
6.26 No Work requiring a submittal of a Shop Drawing or sample may be commenced until the submission has
been reviewed and approved in writing by CONSULTANT. A copy of each Shop Drawing and each
approved sample must be kept in good order, in a book or binder, in chronological order or in such other
order required by CONSULTANT in writing, by CONTRACTOR at the site and must be available to
CONSULTANT.
6.27 CONSULTANT's review of Shop Drawings or samples will not relieve CONTRACTOR from his
responsibility for any deviations from the requirements of the Contract Documents unless
CONTRACTOR has informed CONSULTANT, in writing, to each deviation at the time of submission
and CONSULTANT has given written approval to the specific deviation, nor may any review by
CONSULTANT relieve CONTRACTOR from responsibility for errors or omissions In the Shop
Drawings or samples.
6.27A CONTRACTOR is be liable to OWNER for any additional cost or delay that is caused by its failure to
notify CONSULTANT of any of said deviations or conflicts between Shop Drawings or due to errors in
the Shop Drawings or samples.
Cleaning Up;
6.28 CONTRACTOR must clean up behind the Work as much as is reasonably possible as the Work
progresses. Upon completion of the Work, and before acceptance of final payment for the Project by
OWNER, CONTRACTOR must remove all his surplus and discarded materials, excavated material and
rubbish as well as all other material and equipment that does not form a part of the Work, from the
property, roadways, sidewalks, parking areas, lawn and all adjacent property. In addition,
CONTRACTOR must clean his portion of Work involved in any building under this Contract, so that no
further cleaning by OWNER is necessary prior to its occupancy and he must restore all property, both
public and private, which has been disturbed or damaged during the prosecution of the Work so as to
leave the whole Work and Work Site in a neat and presentable condition.
6.29 If CONTRACTOR does not clean the Work site, OWNER may clean the Work Site of the materials
referred to in paragraph 6.28 and charge the cost to CONTRACTOR.
Public Convenience and Safety:
6.30 CONTRACTOR must, at all times, conduct the Work in such a manner as to ensure the least practicable
obstruction to public travel. The conveniencac4 ft general public and of the residents along and
adjacent to the area of Work must be provided for in a satisfactory manner, consistent with the
6.14 CONTRACTOR is responsible for determining the application of patent and/or royalty rights as to any
materials, appliances, articles or systems prior to bidding. However, he is not responsible for such
determination on systems which do not involve purchase by them of materials, appliances and articles.
Permits:
6.15 CONTRACTOR must secure and pay for all construction permits and licenses and must pay for all
governmental charges and inspection fees necessary for the prosecution of the Work, which are
applicable at the time of his Bid. When such charges are normally made by OWNER and when so stated
In the Special Conditions, there will be no charges to CONTRACTOR. The City Manager will assist
CONTRACTOR, when necessary, in obtaining such permits and licenses. CONTRACTOR must also pay
all public utility charges.
-Electrical Power and Lighting
6.16 Electrical power required during construction must be provided by each prime CONTRACTOR as
required by it. This service must be installed by a qualified electrical Contractor approved by
CONSULTANT. Lighting must be provided by CONTRACTOR in all spaces at all times where necessary
for good and proper workmanship, for inspection or for safety. No temporary power may be used off
temporary lighting lines without specific approval of CONTRACTOR.
Laws and Regulations:
Y
6.17 CONTRACTOR must comply with all notices, laws, ordinances, rules and regulations applicable to the
Work. If CONTRACTOR observes that the Specifications or Drawings are at variance therewith, it must
give CONSULTANT prompt written notice thereof, and any necessary changes must be adjusted by an
appropriate modification. If CONTRACTOR performs any Work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to CONSULTANT, it must bear all costs
arising there from; however, it will not be Its primary responsibility to make certain that the Drawings and
Specifications are in accordance with such laws, ordinances, rules and regulations.
IDlscrimination•
6.17A No action may be taken by CONTRACTOR with regard to the fulfilment of the terms of the Contract,
including the hiring and retention of employees for the performance of Work that would discriminate
against any person on the basis of race, color, creed, religion, national origin, sex, age, sexual orientation,
familial status or disability.
Taxes;
6.18 Cost of all applicable sales, consumer use, and other taxes for which CONTRACTOR is liable under the
Contract must be included in the Contract Price stated by CONTRACTOR.
Wmt wd Promeation:
6.19 CONTRACTOR is be responsible for initiating, maintaining and supervising all safety precautions and
programs in connection with the Work. They must take all necessary precautions for the safety of, and
must provide the necessary protection to prevent damage, injury or loss to:
6.19.1 All employees and other persons, who may be affected thereby,
6.19.2 All the Work and all materials or equipment to be Incorporated therein, whether in storage on or
off the site, and
6.19.3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements,
roadways, structures and utilities not designated for removal, relocation or replacement in the
course of construction.
6.20 CONTRACTOR must designate a responsible member of their organization at the site whose duty must
be the prevention of accidents. This person must be CONTRACTOR'S Superintendent unless otherwise
designated in writing by CONTRACTOR to the City Manager.
Emergenclese
6.21 In emergencies affecting the safety of persons or the Work or property at the site or adjacent thereto,
CONTRACTOR, without special instruction or authorization from CONSULTANT or City Manager, is
obligated to act, at his discretion, to prevent threatened damage, injury or loss. He must give
CONSULTANT prompt written notice of any significant changes in the Work or deviations from the
Contract Documents caused thereby. If CONTRACTOR believes that additional Work done by him in an
emergency which arose from causes beyond his control entitles him to an increase in the Contract Price
or an extension of the Contract Time, he may make a claim therefore as provided in Articles I I and 12.
The City Manager reserves the right, in the City Manager's sole and absolute discretion and when in the
best interest of the City, to suspend the work or services or cancel this contract in the event of an
emergency that effects the City of South Mi;gBb#iMyesidents or businesses and that has been declared an
emergency by the Governor, Mayor of Miami -Dade County or by the City Manager pursuant to the City
plans and drawings. Upon written notification of rejection, items must be removed or uninstalled
within five (5) business days by CONTRACTOR at his own expense and redelivered and/or
reinstalled at his expense. Rejected goods left longer than thirty (30) calendar days will be
regarded as abandoned and OWNER will have the right to dispose of them as its own property
and CONTRACTOR thereby waives any claim to the good or to compensation of any kind for
said goods. Rejection for non-conformance or failure to meet delivery schedules may result in
CONTRACTOR being found in default.
6.6.7 In case of default by CONTRACTOR, the City of South Miami may procure the articles or
services from other sources and hold CONTRACTOR responsible for any excess costs
occasioned or incurred thereby.
6.6.8 OWNER reserves the right, in the event CONTRACTOR cannot provide an item(s) or service(s)
in a timely manner as requested, to obtain the good and/or services from other sources and
deducting the cost from the Contract Price without violating the intent of the Contract.
Concerning Subcontractors:
6.7 CONTRACTOR may not employ any Subcontractor, against whom the City Manager or CONSULTANT
may have reasonable objection, nor will CONTRACTOR be required to employ any Subcontractor who
has been accepted by the City Manager and CONSULTANT, unless CONSULTANT determines that
there is good cause for doing so.
6.8 CONTRACTOR is be fully responsible for all acts and omissions of its Subcontractors and of persons and
organizations directly or indirectly employed by it and of persons and organizations for whose acts any of
them may be liable to the same extent that they are responsible for the acts and omissions of persons
directly employed by them. Nothing in the Contract Documents create any contractual relationship
between OWNER or CONSULTANT and any Subcontractor or other person or organization having a
direct contract with CONTRACTOR, nor may it create any obligation on the part of OWNER or
CONSULTANT to pay or to see to payment of any subcontractor or other person or organization,
except as may otherwise be required by law. City Manager or CONSULTANT may furnish to any
Subcontractor or other person or organization, to the extent practicable, evidence of amounts paid to
CONTRACTOR on account of specified Work done in accordance with the schedule values.
6.9 The divisions and sections of the Specifications and the identifications of any Drawings does not control
CONTRACTOR in dividing the Work among Subcontractors or delineating the Work performed by any
specific trade.
6.10 CONTRACTOR agrees to bind specifically every Subcontractor to the applicable terms and conditions of
the Contract Documents for the benefit of OWNER.
6.11 All Work performed for CONTRACTOR by a Subcontractor must be pursuant to an appropriate
agreement between CONTRACTOR and the Subcontractor.
6.12 CONTRACTOR is be responsible for the coordination of the trades, Subcontractors material and men
engaged upon their Work.
6.12.1 CONTRACTOR must inserted In all subcontracts relative to the Work appropriate provisions to
bind Subcontractors to CONTRACTOR by the terms of these General Conditions and other
Contract Documents insofar as applicable to the Work of Subcontractors, and give
CONTRACTOR the same power as regards to terminating any subcontract that City Manager
may exercise over CONTRACTOR under any provisions of the Contract Documents.
6.12.2 The City Manager or CONSULTANT will not undertake to settle any differences between
CONTRACTOR and their Subcontractors or between Subcontractors.
6.12.3 If in the opinion of CONSULTANT, any Subcontractor on the Project proves to be incompetent
or otherwise unsatisfactory, they must be promptly replaced by CONTRACTOR when directed
by CONSULTANT in writing.
6.12A Discrimination: No action may be taken by the any subcontractor with regard to the fulfilment of the
terms of the subcontract, including the hiring and retention of employees for the performance of Work
that would discriminate against any person on the basis of race, color, creed, religion, national origin, sex,
age, sexual orientation, familial status or disability. This paragraph must be made a part of the
subcontractor's contract with CONTRACTOR.
Patent Fees and Ro lya des:
6.13 CONTRACTOR must pay all license fees and royalties and assume all costs incident to the use of any
invention, design, process or device which is the subject of patent rights or copyrights held by
others. CONTRACTOR must indemnify and hold harmless OWNER and CONSULTANT and anyone
directly or indirectly employed by either of them from against all claims, damages, losses and expenses
(including attorney's fees) arising out of any infringement of such rights during or after the completion of
the Work, and must defend all such claims in connection with any alleged infringement of such rights.
91 of 112
Work and within the time required by the Contract, as CONTRACTOR'S representative at the site. The
Supervisor or the person designated will have full authority to act on behalf of CONTRACTOR and all
communications given to the Supervisor will be as binding as If given to CONTRACTOR. The
Supervisor(s) will always be present at each site as required to perform adequate supervision and
coordination of the Work. (Copies of written communications given to the Supervisor will be mailed to
CONTRACTOR'S home office).
6.1.1 CONTRACTOR must keep one record copy of all Specifications, Drawings, Addenda,
Modifications and Shop Drawings at the site at all times and In good order and annotated to show
all changes made during the construction process. These must be available to CONSULTANT
and any OWNER Representative at all reasonable times. A set of "As -Built" drawings, as well as
the original Specifications, Drawings, Addenda, Modifications and Shop Drawings with annotations,
will be made available to City Manager at all times and it must be delivered to the City Manager
upon completion of the Project.
Labor. Materials and Equipment:
6.2 CONTRACTOR must provide competent, suitably qualified personnel to lay out the Work and perform
construction as required by the Contract Documents. It must always maintain good discipline and order
at the site.
6.3 CONTRACTOR must furnish all materials, equipment, labor, transportation, construction equipment and
machinery, tools, appliances, fuel, power, light, heat, local telephone, water and sanitary facilities and all
other facilities and incidentals necessary for the execution, testing, initial operation and completion of the
Work
6.4 All materials and equipment must be new, except as otherwise provided In the Contract
Documents. When special makes or grades of material which are normally packaged by the supplier or
manufacturer are specified or approved, such materials must be delivered to the site in their original
packages or containers with seals unbroken and labels intact.
6.5 All materials and equipment must be applied, installed, connected, erected, used, cleaned and conditioned
in accordance with the instructions of the applicable manufacturer, fabricator, or processors, except as
otherwise provided in the Contract Documents.
Work, Materials Equipment. Products and Substitutions•
6.6 Materials, equipment and products incorporated in the Work must be approved for use before being
purchased by CONTRACTOR. CONTRACTOR must submit to CONSULTANT a list of proposed
materials, equipment or products, together with such samples as may be necessary for them to determine
their acceptability and obtain their approval, within ninety (90) calendar days after award of Contract
unless otherwise stipulated in the Special Conditions. No request for payment for "or equal" equipment
will be approved until this list has been received and approved by CONSULTANT.
6.6.1 Whenever a material, article or piece of equipment is identified on the Drawings or Specifications
by reference to brand name or catalog number, it is understood that this is referenced for the
purpose of defining the performance or other salient requirements and that other products of
equal capacities, quality and function must be considered. CONTRACTOR may recommend the
substitution of a material, article, or piece of equipment of equal substance and function for those
referred to in the Contract Documents by reference to brand name or catalog number, and If, in
the opinion of CONSULTANT, such material, article, or piece of equipment is of equal substance
and function to that specified, CONSULTANT may approve its substitution and use by
CONTRACTOR. Incidental changes or extra component parts required to accommodate the
substitute will be made by CONTRACTOR without a change in the Contract Price or the
Contract Time.
6.6.2 No substitute may be ordered or installed without the written approval of CONSULTANT who
will be the judge of quality.
6.6.3 Delay caused by obtaining approvals for substitute materials will not be considered justifiable
grounds for an extension of construction time.
6.6A Should any Work or materials, equipment or products not conform to requirements of the
Drawings and Specifications or become damaged during the progress of the Work, such Work or
materials must be removed and replaced, together with any Work disarranged by such alterations,
at any time before completion and acceptance of the Project All such Work must be done at the
expense of CONTRACTOR.
6.6.5 No materials or supplies for the Work may be purchased by CONTRACTOR or any
Subcontractor that are subject to any chattel mortgage or under a conditional sale or other
agreement by which an interest is retained by the Seller. CONTRACTOR warrants that they
have good title to all materials and supplies used by them in the Work.
6.6.6 Non -conforming Work: The City of f"*kliami may withhold acceptance of, or reject items
which are found upon examination, not to meet the specification requirements or conform to the
(d) Contract with all Exhibits thereto
(e) General Conditions
(f) Written or figured dimensions
(g) Scaled dimensions
(h) Drawings of a larger scale
(i) Drawings of a smaller scale
0) Drawings and Specifications are to be considered complementary to each other
ARTICLE 4 —AVAILABILITY OF LANDS SUBSURFACE CONDITIONS REFERENCE POINTS
Availability of Lands:
4.1 OWNER will furnish, as indicated in the Contract Documents, the lands upon which the Work is to be
done, rights -of -way for access thereto, and such other lands which are designed for the use of
CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities will be
obtained and paid for by OWNER, unless otherwise specked in the Contract Documents. Other access
to such lands or rights -of -way for CONTRACTOR'S convenience will be the responsibility of
CONTRACTOR.
CONTRACTOR must provide for all additional lands and access thereto that may be required for
temporary construction facilities or storage of material and equipment
4.2 The City Manager will, upon request, furnish to the Bidders, copies of all available boundary surveys and
subsurface tests at no cost
Subsurface Conditions:
4.3 CONTRACTOR acknowledges that he has investigated prior to bidding and satisfied himself as to the
conditions affecting the Work, including but not limited to those bearing upon transportation, disposal,
handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of
weather, river stages, tides, water tables or similar physical conditions at the site, the conformation and
conditions of the ground, the character of equipment and facilities needed preliminary to and during
prosecution of the Work. CONTRACTOR further acknowledges that he has satisfied himself as to the
character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar
as this information is reasonably ascertainable from an inspection of the site, including all exploratory
work done by OWNER/ CONSULTANT on the site or any contiguous site, as well as from information
presented by the Drawings and Specifications made part of this Contract, or any other information made
available to it prior to receipt of bids. Any failure by CONTRACTOR to acquaint itself with the available
information will not relieve it from responsibility for estimating properly the difficulty or cost of
successfully performing Work. OWNER assumes no responsibility for any conclusions or Interpretations
made by CONTRACTOR on the basis of the information made available by OWNER/ CONSULTANT.
D-iering Site Conditions:
4.4 CONTRACTOR must within forty-eight (48) hours of its discovery, and before such conditions are
disturbed, notify the City Manager in writing, of:
4.4.1 Subsurface or latent physical conditions at the site differing materially from those indicated in the
Contract Documents, and
4.4.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those
ordinarily encountered and generally inherent in Work of the character provided for in this
Contract The City Manager will promptly investigate the conditions, and if it finds that such
conditions do materially differ to the extent as to cause an increase or decrease in
CONTRACTOR'S cost of, or the time required for, performance of any part of the Work under
this Contract, an equitable adjustment will be made and the Contract modified in writing
accordingly.
4.5 No claim of CONTRACTOR under this clause will be allowed unless CONTRACTOR has given the
notice required in 4.4 above; provided, however, the time prescribed therefore may be extended by the
City Manager, but only if done in writing signed by the City Manager or CONSULTANT.
ARTICLE S — INSURANCE Contractor must comply with the insurance requirements set forth in the
Supplementary Conditions to the Contract
ARTiCLE 6 - CONTRACTOR'S RESPONSIBILITIES
Supervision and Superintendence:
6.1 CONTRACTOR must supervise and direct the Work. It will be solely responsible for the means,
methods, techniques, sequences and procedures of construction. CONTRACTOR must employ and
maintain a qualified supervisor or superintend n reinafter referred to as "Supervisor" at the Work
site who must be designated in writing by C OR, before CONTRACTOR commences the
meaning that only best practices are to prevail and only materials and workmanship of the best quality are
to be used in the performance of the Work.
ARTICLE 3—CORRELATI0N. INTERPRETATION AND INTENT OF CONTRACT DOCUMENTS
3.1 It is the intent of the Specifications and Drawings to describe a complete Project to be constructed In
accordance with the Contract Documents. The Contract Documents comprise the entire Contract
between OWNER and CONTRACTOR. They may be altered only by a modification as defined in Article
3.2 The Contract Documents are complementary; what is called for by one is as binding as If called for by all
the documents. If CONTRACTOR finds a conflict, error or discrepancy in the Contract Documents, it
must, before proceeding with the Work affected thereby, immediately call it to CONSULTANrs
attention in writing. The various Contract Documents are complementary; in case of conflict, error or
discrepancy, the more stringent interpretation and requirement that will provide the maximum benefit to
OWNER will apply
3.3 The words "furnish" and 'furnish and install", "install", and "provide" or words with similar meaning will
be interpreted, unless otherwise specifically stated to mean "furnish and install complete in place and
ready for service".
3.4 Miscellaneous items and accessories which are not specifically mentioned, but which are essential to
produce a complete and properly operating installation, or usable structure, providing the indicated
functions, must be furnished and installed without change in the Contract Price. Such miscellaneous items
and accessories must be of the same quality standards, including material, style, finish, strength, class,
weight and other applicable characteristics, as specified for the major component of which the
miscellaneous item or accessory is an essential part, and will be approved by CONSULTANT before
Installation. The above requirement is not intended to include major components not covered by or
inferable from the Drawings and Specifications.
3.5 The Work of all trades under this Contract must be coordinated by CONTRACTOR in such a manner as
obtain the best workmanship possible for the entire Project, and all components of the Work must be
installed or erected In accordance with the best practices of the particular trade.
3.6 CONTRACTOR will be responsible for making the construction of habitable structures under this
Contract rain proof, and for making equipment and utility installations properly perform the specified
function. If CONTRACTOR is prevented from complying with this provision due to the Drawings or
Specifications, CONTRACTOR must immediately notify CONSULTANT in writing of such limitations
before proceeding with construction in the area where the problem exists.
3.7 Manufacturer's literature, when referenced, must be dated and numbered and is intended to establish the
minimum requirements acceptable. Whenever reference is given to codes, or standard specifications or
other data published by regulating agencies or accepted organizations, Including but not limited to
National Electrical Code, applicable State Building Code, Florida Building Code, Federal Specifications,
ASTM Specifications, various institute specifications, and the like, it will be understood that such reference
is to the latest edition including addenda in effect on the date of the Bid.
3.8 Brand names where used in the technical specifications, are intended to denote the standard or quality
required for the particular material or product The term "equal" or "equivalent", when used in
connection with brand names, will be interpreted to mean a material or product that is similar and equal
in type, quality, size, capacity, composition, finish, color and other applicable characteristics to the material
or product specified by trade name, and that is suitable for the same use capable of performing the same
function, in the opinion of CONSULTANT, as the material or product so specified. Proposed equivalent
items must be approved by CONSULTANT before they are purchased or incorporated in the Work.
(When a brand name, catalog number, model number, or other identification, is used without the phrase
"or equal", CONTRACTOR must use the brand, make and model specified).
3.9 Throughout this agreement the male pronoun may be substituted for female and neuter and vice versa
and the singular words substituted for plural and plural words substituted for singular wherever
applicable.
3.10 All technical interpretations will be made by CONSULTANT as set forth in Section 9.3 below.
3.11 CONTRACTOR must advise CONSULTANT, prior to performing any work involving a conflict in the
Contract Documents and CONSULTANT will make the final decision as to which of the documents will
take precedence. If there is a conflict between or among the Contract Documents, only the latest
version will apply and the latest version of the Contract Documents. CONSULTANT must use the
following list of Contract Documents as a guide. These documents are set forth below in the order of
their precedence so that all the documents listed above a given document should have precedence over
all the documents listed below it
(a) Change Orders
(b) Amendments/addenda to Contract
(c) Supplementary Conditions, if any 88 of 112
2.4 CONTRACTOR represents that it has familiarized itself with, and assumes full responsibility for having
familiarized itself with the nature and extent of the Contract Documents, Work, locality, and with all local
conditions and federal, state and local laws, ordinance, rules and regulations that may in any manner affect
performance of the Work, and represents that it has correlated its study and observations with the
requirements of the Contract Documents. CONTRACTOR also represents that it has studied all surveys
and investigations, reports of subsurface and latent physical conditions referred to In the specifications
and made such additional surveys and investigations as it deems necessary for the performance of the
Work reflected in the Contract Documents and that he has correlated the results of all such data with
the requirements of the Contract Documents.
Commencement of Contract Time:
2.5 The Contract Time will commence to run on the date stated in the Notice to Proceed.
Starting the Project:
2.6 CONTRACTOR must start to perform its obligations under the Contract Documents on the date the
Contract Time commences to run. No Work may be done at the site (as defined in Article 1), prior to
the date on which the Contract Time commences to run, except with the written consent of the City
Manager.
Before Starting Construction:
2.7 Before undertaking each part of the Work, CONTRACTOR must carefully study and compare the
Contract Documents and check and verify pertinent figures shown thereon and all applicable field
measurements and conditions. It must at once report in writing to CONSULTANT any conflict, error, or
discrepancy which it may discover. Neither OWNER nor CONSULTANT will be liable for any harm,
damage or loss suffered by CONTRACTOR as a result of its failure to discover any conflict, error, or
discrepancy in the Drawings or Specifications nor will CONTRACTOR be entitled to any compensation
for any harm, damage or loss suffered by CONTRACTOR due to any conflict, error, or discrepancy in
the Contract Documents.
Schedule of Corn lep tion:
2.8 Within Five (5) business days after delivery of the Notice to Proceed by City Manager to
CONTRACTOR, CONTRACTOR must submit to CONSULTANT for approval, an estimated
construction schedule indicating the starting and completion dates of the various stages of the Work, and
a preliminary schedule of Shop Drawing submissions. CONSULTANT will approve this schedule or
require revisions thereto within seven (7) calendar days of its submittal. If there is more than one
CONTRACTOR involved in the Project, the responsibility for coordinating the Work of all
CONTRACTORS will be provided in the Special Conditions.
2.9 Within five (5) business days after delivery of the executed Contract by City Manager to
CONTRACTOR, but before starting the Work at the site, a pre -construction conference will be held to
review the above schedules, to establish procedures for handling Shop Drawings and other submissions,
and for processing Applications for Payment, and to establish a working understanding between the
parties as to the Project Present at the conference will be OWNER'S representative, CONSULTANT,
Resident Project Representatives, CONTRACTOR and its Superintendent
aalifications of Subcontractors. Material men and Suppliers-:
iers:
2.10 Within five (5) business days after bid opening, the apparent lowest responsive and responsible Bidder
must submit to the City Manager and CONSULTANT for acceptance a list of the names of
Subcontractors and such other persons and organizations (including those who are to furnish principal
items of materials or equipment) proposed for those portions of the Work as to which the identity of
Subcontractors and other persons and organizations must be submitted as specified in the Contract
Documents. Within thirty (30) calendar days after receiving the list, CONSULTANT will notify
CONTRACTOR in writing if either the City Manager or CONSULTANT has reasonable objection to any
Subcontractor, person, or organization on such list. The failure of the City Manager or CONSULTANT
to make objection to any Subcontractor, person, or organization on the list within thirty (30) calendar
days of the receipt will constitute an acceptance of such Subcontractor, person or
organization. Acceptance of any such Subcontractor, person or organization will not constitute a waiver
of any right of OWNER or CONSULTANT to reject defective Work, material or equipment, or any
Work, material or equipment not in conformance with the requirements of the Contract Documents.
2.11 If, prior to the Notice of Award, the City Manager or CONSULTANT has reasonable objection to any
Subcontractor, person or organization listed, the apparent low Bidder may, prior to Notice of Award,
submit an acceptable substitute without an increase in its bid price.
2.12 The apparent silence of the Contract DocumWV %2to any detail, or the apparent omission from them of
a detailed description concerning any Work to be done and materials to be furnished, will be regarded as
Work: Any and all obligations, duties and responsibilities necessary for the successful performance and completion
of the Contract
Notice: The term "Notice" as used herein means and includes all written notices, demands, instructions, claims,
approvals and disapprovals required to obtain compliance with Contract requirements. Written notice will be
deemed to have been duly served If delivered in person to the Individual or to a member of the firm or to an
officer of the corporation for whom it is intended, or to an authorized representative of such individual, firm, or
corporation, or if delivered at or sent by registered mail to the last known business address. Unless otherwise
stated in writing, any notice to or demand upon OWNER under this Contract must be delivered to City Manager
and CONSULTANT.
.A,RTiCI+E 2 — PRELIMINARY MATTERS
Award:
2.1 The City Manager reserves the right to reject any and all Bids, at its sole discretion. Bids will be
awarded by OWNER to the lowest responsive and responsible Bidder. No Notice of Award will be given
until the City Manager has concluded its investigation, as it deems necessary, to establish, to the
satisfaction of the City Manager, which Bidder is the most responsive and responsible of all the Bidders to
complete the Work within the time prescribed and in accordance with the Contract Documents. The
City Manager reserves the right to reject the Bid of any Bidder who is not believed to be, In the sole
discretion and satisfaction of City Manager, to be sufficiently responsible, qualified and financial able to
perform the work In analyzing a Bid, the City Manager may also take into consideration alternate and unit
prices, if requested by the Bid forms. If the Contract is awarded, the City Manager will issue the Notice of
Award and give the successful Bidder a Contract for execution within ninety (90) day after opening of
Bids.
Ecution of Contract:
2.2 At least four counterparts of the Contract, the Performance and Payment Bond, the Certificates of
Insurance, the Binder of Insurance if issued, the Insurance Declaration Page if not included in the Policy of
Insurance, the Policy of Insurance required by the Contract Documents, the written notice of designated
supervisor or superintendent as provided In Section 6.1 of the General Conditions and such other
Documents as required by the Contract Documents must be executed and delivered by CONTRACTOR
to the City Manager within ten (10) calendar days of receipt of the Notice of Award. A Contract
Document that requires the signature of a party may be executed in counterparts separately by each of
the parties and, in such event, each counterpart separately executed will, without proof or accounting for
the other counterpart be deemed an original Contract Document
Forfeiture of Bid SecuriWPerformance and Payment Bond if any are reg uir by the applicabie REP:
2.3 Within ten (10) calendar days of being notified of the Award. CONTRACTOR must furnish a
Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and
Payment Bond attached.
2.3.1 Each Bond must be in the amount of one hundred percent (100%) of the Contract Price
guaranteeing to OWNER the completion and performance of the Work covered in such Contract
as well as full payment of all suppliers, material man, laborers, or Subcontractor employed pursuant
to this Project Each Bond must be with a Surety company whose qualifications meet the
requirements of Sections 2.3A, 2.3.5, and 2.3.6.
2.3.2 Each Bond must continue in effect for five years after final completion and acceptance of the Work
with the liability equal to one hundred percent (100%) of the Contract Sum.
2.3.3 Pursuant to the requirements of Section 255.05(I), Florida Statutes, CONTRACTOR must ensure
that the Bond(s) referenced above are recorded in the public records of Miami -Dade County and
provide City Manager with evidence of such recording.
2.3.4 Each Bond must be executed by a surety company authorized to do business in the State of Florida
as a surety, having a resident agent in the State of Florida and having been in business with a record
of successful continuous operation for a least five (5) years.
2.3.5 The surety company must hold a current certificate of authority as acceptable surety on federal
bonds in accordance with the United States Department of Treasury Circular 570, current
revisions.
2.3.6 OWNER will only be required to accept a surety bond from a company with a rating A. VII or
better.
2.3.7 Failure of the successful Bidder to execute and deliver the Contract and deliver the required bonds
and Insurance documents will be cause for the City Manager to annul the Notice of Award and
declare the Bid and any security therefore forfeited.
Contra is Pre -Start Representation: 86 of 112
Sunday or legal holiday, in which event the period will run until the end of the next business day that is not a
Saturday, Sunday or legal holiday.
Def ' e Work: Work that is unsatisfactory, faulty, or deficient in that it does not conform to the Contract
Documents, or does not meet the requirements of any applicable inspection, reference standard, test, or approval
referred to in the Contract Documents, or has been damaged prior to CONSULTANTS recommendation of final
payment (unless responsibility for the protection thereof has been delegated to OWNER); substitutions that are
not properly approved and authorized, any deficiency in the Work, materials and equipment; materials and
equipment furnished under the Contract that are not good quality and new unless otherwise required or
permitted by the Contract Documents.
Drawings: The drawings which show the character and Scope of the Work to be performed and which have been
prepared or approved by CONSULTANT, or if none, then by an architect or engineer hired by City Manager and
are referred to in the Contract Documents.
field Order: A written order issued by CONSULTANT which clarifies or interprets the Contract Documents in
accordance with Paragraph 9.3 or orders minor changes in the Work in accordance with paragraph 10.2.
Modification: (a) A written amendment of the Contract Documents signed by both parties, (b) a Change Order
signed by both parties, (c) a written clarification or interpretation if Issued by CONSULTANT in accordance with
paragraph 9.3 or (d) a written order for minor change or alteration in the Work issued by CONSULTANT
pursuant to Paragraph 10.2. A modification may only be issued after execution of the Contract, it must be in
writing and signed by the party against whom the modification is sought to be enforced.
Non -conforming Work means work that does not conform to the Contract Documents and includes work that is
unsatisfactory, faulty, or deficient or that does not meet the requirements of any applicable inspection, reference
standard, test, or that does not meet any approval required by, or referred to in, the Contract Documents, or
work that has been damaged prior to CONSULTANT's recommendation of final payment (unless responsibility for
the protection thereof has been assumed in writing by OWNER).
Notice of Award: The written notice by City Manager to the apparent successful Bidder stating that upon
compliance with the conditions precedent to be fulfilled by it within the time specified, City Manager will execute
and deliver the Contract to him.
Notice to Proceed: A written notice given by City Manager to CONTRACTOR (with copy to CONSULTANT)
fixing the date on which the Contract Time will commence to run and on which CONTRACTOR must start to
perform Its obligations under the Contract Documents.
Owner. The City of South Miami.
Person: An individual or legal entity.
Project: The entire construction operation being performed as delineated in the Contract Documents.
Po_ lick The term "policy" as used in the Contract Documents means the insurance binder, if it is issued, the
declaration page of the policy and the body of the policy, including all endorsements.
RED Request for Proposal.
Scone of Services. This phrase refers to the scope of the services or work to be performed and it has the same
meaning as Scope of the Work unless the context in which the phase is used clearly means otherwise.
Sip Drawings: All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by
CONTRACTOR, a Subcontractor, manufacturer, supplier, or distributor, and which illustrate the equipment,
material or some portion of the work and as required by the Contract Documents.
Sam lames, Physical examples which illustrate materials, equipment or workmanship and establish standards by which
the Work will be judged.
Specifications: Those portions of the Contract Documents consisting of written technical descriptions of
materials, equipment, construction systems, standards and workmanship as applied to the Work.
Subcontractor, An individual, firm or corporation having a direct contract with CONTRACTOR or with any
other Subcontractor for the performance of a part of the Work at the construction site.
Substantial Completion: The date, as certified by CONSULTANT, when the construction of the Project or a
certified part thereof is sufficiently completed, in accordance with the Contract Documents, so that the Project, or
a substantial part, can be utilized for the purposes for which it was intended without restriction or limitation to
any degree, other than for the repair of minor "punch list" items; or if there be no such certification, the date
when final payment is due in accordance with paragraph 14.9. However, in no event will the project or portion
thereof, be deemed to be substantially completed until a certificate of occupancy or certificate of use is lawfully
issued by the applicable governmental agency. A certificate of Substantial Completion, issued by CONSULTANT,
will be null and void if it is based on false, misleading or inaccurate information, from any source, or when it would
not have been issue but for the consideration of Work that is thereafter found to be defective to a degree greater
than that which would normally to be considered by City Manager to be minor "punch list" work.
Supplier, Any person or organization who supplies materials or equipment for the Work, including the fabrication
of an item, but who does not perform labor at the site of the Work.
S-ureM. The individual or entity who is an obligor on a Bond and who is bound with CONTRACTOR for the full
and faithful performance of the Contract and for the payment of all labor, services and materials used on the
project 85 of 112
EXHIBIT 5
CONSTRUCTION CONTRACT
GENERAL CONDITIONS
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
ARTICLE I —DEFINITIONS
Whenever used in these General Conditions or in the other Contract Documents, the following terms have the
meaning indicated. These definitions always apply when the section of the Contract specifically refers to this
Article for the purpose of interpreting a word or group of words in that section of the Contract Document.
However, when the section of the Contract, where the word to be defined is used, does not specifically refers to
this Article to define the word or group of words, the definitions contained in this Article will not apply unless the
word or group of words, in the context of it or their use in the Contract Document in question, is/are ambiguous
and open for interpretation. In addition, these definitions do not apply to interpret terms in a specific provision of
a Contract Document if that specific provision contains a definition of the term in question:
Addenda: Written or graphic documents issued prior to the Bid Opening which modify or interpret the Contract
Documents, Drawings and Specifications, by addition, deletions, clarifications, or correction.
Application for Payment A form approved by the City's consultant (CONSULTANT), if any, or the City Manager
which is to be used by CONTRACTOR in requesting progress payments.
Bid: The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices and other
terms for the Work to be performed.
Bidder. Any person, firm or corporation submitting a response to OWNER's solicitation for proposals or bids for
Work.
Bid Documents: The solicitation for bids or proposals and all documents that make up the solicitation including
the instructions, form of documents and affidavits.
Bonds: Bid bond, performance and payment bonds and other instruments of security, furnished by
CONTRACTOR and its surecy in accordance with the Contract Documents and in accordance with the laws of
the State of Florida.
Change Order, A written order to CONTRACTOR signed by the City Manager authorizing an addition, deletion
or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued after execution of
the Contract
Work Order Proposals: Written proposals from CONTRACTOR in response to orders or request for work
based on the Scope of the Work provided by OWNER to CONTRACTOR. The proposal includes line item
pricing, where there are multiple locations, and the timeframe for completing the work
Ct)L The City Manager for the City of South Miami, 6130 Sunset Drive, South Miami, FL 33143, or manager's
designee, unless the context wherein the word is used should more appropriately mean the City of South Miami.
Cil;X Manager. Includes the City Manager's designee.
Construction Observer: An authorized representative of CONSULTANT, if any, or otherwise a representative of
OWNER assigned to observe the Work performed and materials furnished by CONTRACTOR. CONTRACTOR
will be notified in writing of the identity of this representative.
Contract Documents: The Contract Documents include the Contract between OWNER and CONTRACTOR,
other documents listed in the Contract and modifications issued after execution of the Contract as well as all Bid
Documents including but not limited to the solicitation for Bid, CONTRACTOR'S Bid, the Bonds, Insurance
endorsements, Insurance Certificates and policies, the Notice of Award, the Notice to Proceed, the General
Conditions, Special Conditions, if any, any Supplementary Conditions, the Technical Specifications, Drawings,
including any incorporated specifications, addenda to the drawings issued prior to execution of the Contract,
Change Orders, Construction Change Directives and any written order for a minor change in the Work and
written modifications to any of the Contract Documents.
Contract Price: The total moneys payable to CONTRACTOR pursuant to the terms of the Contract Documents.
Contract Time: The number of calendar days stated in the Contract for the completion of the Work -
Contracting Officer: The individual who is authorized to sign the contract documents on behalf of OWNER.
CONTRACTOR: The person, firm or corporation with whom OWNER has executed the Contract
CONSULTANT: The person identified as CONSULTANT in the Supplementary Conditions or, if none, then
OWNER's designated representative as identified in the Supplementary Conditions.
Dav: A period of twenty-four hours measured from the beginning of the day at 12:01 a.m. and it will be presumed
to be a calendar day unless specifically designated as a business day.
D s: The number of twenty-four (24) hour periods following the event to which the word "days" refers
commencing at 12:01 a.m. at the start of the next day. Therefore, in computing any period of time prescribed or
allowed by the Contract Documents, the day of the act, event or default from which the designated period of time
begins to run will not be included. The last day of theBpeifimtilso computed will be included unless it is a Saturday,
10. No additional Work or extras may be done unless the same is duly authorized in writing, and in advance
of the work by appropriate action by the City and in accordance with the Contract Documents.
I I. The date that this contract was "made and entered into" and its effective date is the date that the contract is the
signed by the City or, if the contract is required to be approved by resolution of the City Commission, then the
Effective Date is the date of the resolution approving the Contract whichever is the later date.
12.All provisions, conditions and restrictions contained in the bid document entitled Instructions to
Respondents are made a part of this agreement by reference. Any conflict between that document and
this contract or the exhibits to this contract are to be resolved by the City Manager in the managers sole
and absolute discretion.
IN WITNESS WHEREOF, the patties hereto have executed this Contract on the day and date set
forth next to their name below and may be signed in one or more counterparts, each of which will, without proof
or accounting for the other counterpart, be deemed an original Contract.
LEADEX CORPORATION
CONTRACTOR:
Signature:
Print Signatory's Name FRANK J FONSECA, P.E.
Tide of Signatory:
ATTESTED: 1
Signature: 'V
Nken . Payne
City Cle k
Read and Approved as to Form, Language,
Legality, and Execution Thereof:
Signat re:
City Attorney
PRESIDENT
OWNER: CITI OF SOI T MIAMI
Signature.
Shari Kama i
City Manager
83 of 112
EXHIBIT 4
CONSTRUCTION CONTRACT
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
THIS red into on this �J day of DCTOBL-"7Z . 20 2/ ,
by and between Leader COrpOration (hereafter referred to as
"Contractor ), and of South Miami ere ifter referred to as "Owner"), through its City Manager (hereafter
referred to as "City").
Contractor, for the consideration set forth herein, hereby agrees with Owner as follows:
I. Contractor must furnish all labor, materials, equipment, machinery, tools, apparatus, transportation and any
other items necessary to perform all of the work shown on and described in the Contract Documents and
must do everything required by this Contract and the other Contract Documents hereinafter referred to
as the Work
2. The Contract Documents must include this Contract, General Conditions to the Contract, if any, the
drawings, plans, specifications and project manual, if any, any supplementary or special conditions, other
documents referring to this contract and signed by the parties, the solicitation documents ("hereinafter
referred to as "Bid Documents") and any documents to which those documents refer which are used by
Owner as well as any attachments or exhibits that are made a part of any of the documents described
herein.
3. Contractor must commence the Work to be performed under this Contract on a date to be specified in a
Notice to Proceed and must complete all Work hereunder within the length of time set forth in the
Contract Documents.
4. Owner hereby agrees to pay to Contractor for the faithful performance of this Contract, subject to additions
and deductions as provided in the Contract Documents and any properly approved, written chang orders, ,
in lawful money of
the /UTnited,/pS.tates,, the Lump Sum amo nt of. �y��1 __ 4.. �U('lQµ S
X! n t F/i / T// S!>(�iu?�/a rs �i
/ji/iEG /t(tlJd'/'n fy- wo Dyson Dollars($ 3�af66"L .y
("Contract Price").
5. The expenses of performing Work after regular working hours, and on Sunday and legal holidays must be /
included in the Contract Price. The City may demand, at any point in time, that any part, or all, of the Work
be performed after regular working hours. In such event, the Respondent will have no right to additional
compensation for such work. However, nothing contained herein authorizes work on days and during hours
that are otherwise prohibited by ordinance unless specifically authorized or instructed in writing by the City.
6. If the Work is expected to require more than one month, Owner will make monthly partial payments to
Contractor an the basis of a duly certified and approved schedule of values for the Work performed
during each calendar month by Contractor, less the reainage (all as provided for in the Contract
Documents), which is to be withheld by Owner until completion and acceptance of the complete project in
accordance with this Contract and the other Contract Documents and until such Work has been accepted
by the City.
7. Upon submission by Contractor of evidence satisfactory to Owner that all labor, material, and other costs
incurred by Contractor in connection with the construction of the Work have been paid in full, and after
compliance with the terms for payment provided for in the Contract Documents, final payment on account
of this Contract must be made within sixty (60) calendar days after the completion by Contractor of all
Work covered by this Contract and the acceptance of such Work by Owner.
B. The Work must be completed in 75 calendar days. In the event that Contractor fails to complete the
Work within the time limit stipulated in the Contract Documents, or the extended time limit agreed upon,
in accordance with the procedure as more particularly set forth in the Contract Documents, liquidated
damages must be paid by Contractor at the rate of $4 000.00 dollars per day
9. It is further mutually agreed between the parties hereto that if a Payment and/or Performance Bond ("Bond")
is required and if, at any time after the execution of this Contract and the Bond for its faithful performance
and payment, the City deems the Surety or Sureties upon such bond(s) to be unsatisfactory, or if, for any
reason such bond ceases to be adequate to cover the performance of the Work or payment to
subcontractors and suppliers, Contractor must, at its expense within five (5) business days after the receipt
of notice from the City so to do, furnish an additional bond or bonds in such form and amount and with
such Surety or Sureties as are satisfactory to the City. In such event, no further payment to Contractor
will be deemed to be due under this Contract until such new or additional security for the faithful
performance of the Work is furnished in theOWIH14¢ and in the form satisfactory to the City.
Work activity is limited to the hours from 7:00 a.m. through 5:00 p.m., on weekdays,
Monday through Friday— Section 7-15 and 7-16 of the City's Code of Ordinances.
IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE
ADDENDUMS THAT MAY BE ISSUED FOR A SPECIFIC SOLICITATION.
II. SPECIFIC REQUIREMENTS:
The City is soliciting proposals from highly qualified firms for i.) demo and removal of the
existing rock -in pool and surrounding support facilities ii.) furnish and installation of new
playground and fitness structures and support facilities as outlined in the construction
plans at South Miami Park, located at 4300 SW 58 Avenue, South Miami, FL 33143.
All work shall be completed as per the specifications, engineering construction drawings,
and in accordance with the terms and conditions described in Exhibit 1, Scope of
Services, Attachment A, B, C & D. Respondents shall review enclosed specifications,
engineering construction plan documents, tree survey details. Respondents are required
to follow all federal, state and local codes as well as all rule compliance and guidelines with
Americans with Disabilities Act (ADA).
III. SITE LOCATION:
The construction project will be held at the City of South Miami's South Miami Park,
located at 4300 SW 58 avenue, South Miami, FL, 33143.
IV. DESIGN PLANS & SPECIFICATIONS:
"South Miami Park Playground and Park Improvement Design & Construction
Plans" for this project are included as Exhibit 1, Scope of Services, Attachment B,
including "Tree Disposition Plan."
A copy of the geotechnical studies report is also included as Exhibit C, Attachment
C, "Geotechnical Studies Report."
V. PRICING - LUMP SUM PRICING:
Proposal pricing must be submitted in a "Lump Sum" by completing Exhibit 3
"Respondents Bid Form" and shall include all cost associated with completing this
project as outlined in the scope of services and associated design construction plans. It is
the City's intention to award this project to a single Contractor.
SCHEDULE OF VALUES:
RESPONDENTS ARE TO COMPLETE THE "SCHEDULE OF VALUES FORM.
EXHIBIT D."
WHEN SUBMITTING THE BID PACKAGE, THE RESPONDENT IS TO
PROVIDE A LUMP SUM PRICE PER THE SCHEDULE OF VALUES, EXHIBIT
1, SCOPE OF SERVICES, ATTACHMENT D.
WHEN PREPARING AND SUBMITTING THE COMPLETED "SCHEDULE
OF VALUES FORM," THE RESPONDENT MUST CARRY THE TREE
MITIGATION ALLOTMENT AS WELL AS THE CONTINGENCY IN THEIR
TOTAL BASE BID. 40 of 112
RESPONDENT MUST PROVIDE PRICING FOR THE ADD ALTERNATES
LISTED ON THE PAY ITEMS, IF ANY.
THE CITY WILL AWARD THE ENTIRE PROJECT TO A SINGLE
RESPONDENT BASED ON THE LUMP SUM AMOUNT SUBMITTED.
VL PROJECT DURATION:
After permit(s) have been secured/approved, the Respondent is responsible for
completing this project within seventy-five (75) calendar days from issuance of Notice
to Proceed/Purchase Order/Email Notification from the City's Project Manager.
VII''. Warranty:
Respondent/Contractor should include the following with their E-bid:
Applicable warranty and/or guarantees of all material and labor, including:
• any conditions; and
• guaranteed response time for repair; and
• guaranteed replacement during the warranty period; and
• life expectancy of LED lighting under normal use; and
• Failures during the warranty period must be repaired or replaced to the
satisfaction of the City; and
• the term of the warranty.
At a minimum, Respondent/Contractor must warrant their Work to be free of significant
defects in workmanship and materials for a period of one (1) year.
If equipment is being provided, the standard manufacturer's warranty information must
be provided in writing for all equipment being proposed and, if required by the warranty,
such equipment must be installed by an authorized installer before final payment is made.
If the manufacturer's warranty is issued to the respondent/contractor,
Respondent/Contractor must assign it to the City.
SPECIAL NOTE
A PERFORMANCE AND PAYMENT BOND IS NOT REQUIRED FOR THIS
PROJECT.
END OF SECTION
41 of 112
EXHIBIT I
SCOPE OF SERVICES
ATTACHMENT B
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
"South Miami Park Playground and Park Improvement Design &
Construction Plans"
"Tree Disposition Plan"
Prepared by:
SRS ENGINEERING, INC.
42 of 112
VI N Pri 4 L
1N3W-/\Nd IlVPdSV
Kol
0
J
Y
Z
J
_Z
Q
S
C)
S
CD
Ili
I W
SVV 83d
36 Ol 3Sd8
401Hl .2
S1NIOf' >IlVM301S A0 3-l8b'1
NVIJ
1NIOf„d„ 3dJd
>I-ldM=
� ONIl�
I ow- d
c
a l3 >i-lvm3aIS M3N
c
1NIC'"
'0'd
('d)a)
3N1-1 M/dbl ;
1N10f
>I-IdM3aIS 301M „9-,O L ?J03 „V-,6 A�13A3 IV
d '>IIVM3aIS 301M ,8 803 ,8 ,A?DA3 IV
d AlVM3aIS 301M ,S �103 ,S ,k83A3 IV
1) :(338dOl3ddd 3d3HM)
3 38 7VHS SlNIOf a3M`dS/-108iNOO
„8„ 3 dJll
N
S � ,
v
p
—3b1831dW
NOISNddX3 ---)
)IN38d „Z/ l .,S/ L
„d„ 3d�ll
(S1NIOf 3d ki N3dO)
„d„ 3dAi
II
0 U
z�_
Frd
�UF
w J
w
z�
X
X
X
z
O
+
w
w
U
W>
/
LLU
no
WF
CLWrn
aLL
&z
LU3
m
aSa
0
L X
X/I
M
1,
AWN
1
PROPOSED SWING
FEN E SET AREA
REFER TO CIVIL PLANS
( ) 2-BELT SEATS
- X
1-BUCKET SEAT
1-EX RESSION SWING
CON RETE BAND (REF R TO SHEET L-2.1
x
(REFER TO IVIL PLANS) FOR DETAILS)
"34AFETY ZONE
PROPOSED
,�,�; ' /. CANOPY
oA PROPOSED 2- YEAR OLD TREE TYP.
( )
> PLAYGROUND EQUIPMENT (SEE
REFER TO SHEET L-2.1 LANDSCAPE ( N SCAPE
FOR DETAILS
) PLANS)
i I` ,'�`
� 51�h
IN
Ihi
�
U)
}
LO
N
LLJ
Of
U
li
CO
V )
Q
Z
Q
Of
NW
LL
U �
Q
Q
2E U
o
W J
a o
o W
w
J N
J
C I �
(n W
z � W
coLU
Q �
W
U
W
H * C/)
T—
S
i
LANDSCAPE SPECIFICATIONS
1. GENERAL
1.01 The contractor shall obtain and pay for all permits related to this section of work unless previously excluded.
1.02 Before changes or substitutions can be made du to unavailability of plant material, submit evidence of having undertaken
Landscape Architect.
of locating plant material that is acceptabl
1.03 In the case of discrepancy in the plant quantities etween the plan drawings, plant call outs, plant list or plant schedule, the r�i�mber of plants or square footage of the planting
drawn on the plan drawings shall be deemed, a prevail.
1.04 Evidence of inadequate protection following diggit ig, carelessness in transit, or improper storage or handling shall be cause r rejection.
1.05 Submittals: Contractor to submit all product subm ttals 8 weeks prior to installation of plantings.
a) Product Data: submit manufacturer product data an( literature describing all products required by this section to the Landscape Architect for approval.
b) Samples: submit samples of each product and mat 'al where required, to the Landscape Architect for approval. Label sample to indicate product, characteristics and locations
Samples will be reviewed for appearance only. Com Hance with other requirements is the responsibility of the Contractor.
c) Plant sources: submit sources of plants to the Land cape Architect for approval.
1.06 Pre -Construction Conference: Contractor shall s+edule a pre -construction conference with the Landscape Architect at leas{ seven (7) days before beginning the work, to rev
questions the Contractor may have regarding the work, Odministrative procedures during construction and project work schedule.
1.07 The Landscape Architect shall be informed of the progress of the work so that the work may be observed at the following kel times in the construction process.
a) Site Conditions Prior to Start of Planting - to review oil and drainage conditions
b) Completion of Plant layout staking- review of plant IE yout
c) Plant Quality- Review of plant quality at time of deliv ary and prior to installation. The Landscape Architect reserves the right to E elect and observe all plants at the nursery prior t(
a particular defect or substandard element can be rrected at the nursery as determined by the landscape architect, the agreed upon remedy may be applied by the nursery or
provided that the correction allows the plant to meet the requirements stipulated in this section. Any work to correct defects sh ill be at the contractor's expense.
The landscape architect may choose to attach their seal to each plant or a representative sample. Viewing or sealing of plants by the Owner's representative at the nursery doe
preclude the landscape architect to reject the plant aterial while on site.
d) Completion of the Planting- review the completed p! nting.
1.08 The Landscape Architect shall inspect all work for Sub 3tantial Completion upon notice of completion. Upon completion and re-il
of the Landscape Architect, the Landscape Architect wil recommend to the Owner the Acceptance of the work.
1.09 Following Acceptance, maintenance of the plant mate ial shall become the Owners responsibility. The Contractor shall provide
program at the time of Acceptance. Make periodic inspections of the Owners maintenance during the guarantee period. Submit writ
keep the guarantee valid.
1.10 It is the responsibility of the contractor to be aware of Oil surface and subsurface conditions, and to notify the Landscape
the health of plantings. Do not proceed with work until sati factory conditions have been corrected.
1.11 All plant material shall be guaranteed for a period ogone (1) year from the time of Acceptance.
of all repairs or renewals necessary in tho
Owner with a typewritten recommended maint4
report to the Owner of any corrective measures
in writing of any circumstances that would nega
1.12 Sod shall be guaranteed for a period of 90 days from the time of Acceptance. Replacement sod under this guarantee shall beguaranteed for an additional 90 days from the date
installation. Repair any damage caused by sod replacemen at no cost to the Owner.
1.13 Plants shall be healthy, free of pests and disease, anc in flourishing condition at the end of the guarantee period. Plants shall be free of dead and dying branches and branch tips,
bear foliage of normal density, size and color.
1.14 Replace dead plants and all plants not in a vigorous, t iriving condition, as determined by the Landscape Architect, during and at the end of the guarantee period, without cost to C
soon as weather conditions permit and within the specified lanting period.
a. Replacements shall closely match adjacent specim 3ns of the same species. Replacements shall be subject to all requirements stated in these specifications.
b. Make all necessary repairs caused by plant replacement activities.
c. The guarantee of all replacement plants shall extend for an additional one year period from the date of their acceptance after replacement. In the event that a replacement plant
acceptable during or at the end of the said extended guarantee period, the Owner may elect either one more replacement, with ut guarantee, or credit for each item.
1.15 At the end of the guarantee period, the Landscape Ar hitect will inspect the work for Final Acceptance. Upon completion of all repairs or replacements necessary, in the judgeme
Landscape Architect, the work will be recommended for Fin I Acceptance by the Owner.
EXHIBIT I
SCOPE OF SERVICES
ATTACHMENT C
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
"GEOTECHNICAL STUDIES REPORT"
Prepared for:
SRS Engineering, Inc
By:
Nelco Testing & Engineering Services, Inc.
56 of 112
REPORT OF SUBSURFACE SOIL EXPLORATION
GEOTECHNICAL EVALUATION AND RECOMMENDATIONS
SOUTH MIAMI PARK
4300 SW 58" AVENUE
SOUTH MIAMI, FLORIDA
OCTOBE112020
Prepared for:
SRS ENGINEERING, INC.
5001 SW 741h COURT, SUITE 201
MIAMI, FLORIDA 33155
NELCO TESTING AND ENGINEERING SERVICES, INC.
13370 SW 131' Street, Suite 105
Miami, Florida 33186
57 of 112
H1dEq,'
O 1 c NELED
m`s II zaW
4 TESTING & ENGINEERING SERVICES. INC.
October 12'h, 2020
SRS Engineering, Inc.
5001 SW 70 Court, Suite 201
Miami, Florida 33155
Reference: Report of Subsurface Soil Exploration and Recommendations
Evaluation of Subsurface Conditions
For the Proposed Construction:
South Miami Park
4300 SW 581h Avenue
South Miami, Florida
NTES Project Number: B-201079
Dear Sirs,
Following please find the report of subsurface soil explorations and geotechnical evaluation
for the above referenced property. Test Borings and soil sampling took place on September 30'h,
2020 using procedures in general accordance with ASTM D-1586, the Standard Penetration Test.
This report presents our findings, data, and recommendations.
We appreciate this opportunity to assist you in this project. If you have any questions or
comments, please call us at (305) 259-9779.
Respectfully Submitted,
NELCO Testinpnd'Pff&,eering Services, Inc.
wZ G
V Ve test a ,
k!s6 ssioral ngin$pK 4i C3107
�ta�rof 1?lor4a
.`
% N A
13370 SW 131s' Street, Suite 105, Miami, FL. 33186 (305) 259-9779
58 of 112
NELCO
TESTING AND ENGINEERING SERVICES
TABLE OF CONTENTS
Page
Introduction........................................................................................2
Project Information............................................................................... 2
Testing Program and Subsurface Conditions...................................................2
Evaluations and Recommendations
Foundation Support & Recommendations
• Soil Improvement / Foundation Recommendations ................................. 3
• Soil Bearing Capacity/Lateral Sliding Resistance for Foundations ................4
• Anticipated Settlement...................................................................4
• Soil Erosion................................................................................5
• Summary of Stratigraphy/Engineering Design Parameters ............................ 6
REPORT LIMITATIONS........................................................................ 7
APPENDICES
Appendix
ProjectLocation Map.............................................................................A
Test Boring Location Sketch...................................................................... A
Standard Penetration Test Boring Logs ......................................................... B
13370 SW 131 S` Street, Suite 105, Miami, FL. 33186 (305) 259-9779
59 of 112
NELCO
TESTING AND ENGINEERING SERVICES
Subsurface Soil Exploration and Recommendations
For
South Miami Park
4300 SW 5811 Avenue
South Miami, Florida
INTRODUCTION
The purpose of this sub -surface exploration was to obtain data in order to provide an
evaluation of the sub -surface conditions and recommendations for foundation design for support
of the proposed construction.
PROJECT INFORMATION
Site survey, location, and construction information was provided by Mr. Ignacio Serralta, P.E.
of SRS Engineering, Inc.
At the time of testing, the subject property was observed to be an existing City of South Miami
Park facility. Proposed construction consists of various improvements to the existing park
facility including a proposed shade structure addition.
TESTING PROGRAMISUB-SURFACE CONDITIONS
Sub -surface exploration consisted of two (2) Standard Penetration Test Boring conducted
conforming to the guidelines as set forth in ASTM D-1586.
Testing was performed on September 301", 2020. A review of the Test Boring Report
generally indicates that the site is mantled by approximately 3.5 to 4.0 feet of topsoil (0.5 feet)
and sand with gravel. Beneath, soft to medium dense sandy limestone bedrock was encountered
throughout the maximum explored depth of fifteen (15) feet below existing grade.
Groundwater at the time of testing was encountered between approximate depths of 3.5 and
4.0 feet below existing grade.
Please refer to the enclosed appendices for location, classification, and stratification
information.
13370 SW 131" Street, Suite 105, Miami, FL. 33186 (305) 259-9779
60 of 112
NELCO
TESTING AND ENGINEERING SERVICES
SOIL IMPROVEMENT / FOUNDATION RECOMMENDATIONS
1. Remove any surface vegetation, topsoil, and organic material within building areas plus five
(5) feet outside the building footprint. The area under footings, foundations, and concrete
slabs on grade shall have all vegetation, stumps, roots, and foreign materials removed prior to
placement of fill.
2_ Compact the cleared area to a minimum compaction of 95 percent of the dry soil density as
determined by the Modified Proctor Test — ASTM D-1557.
3. If any fill material is necessary, fill and compact the cleared areas in lifts not greater than 12
inches of compacted thickness to elevate to the required grade. Fill material for areas in
support of footings is to be a mixture of limerock and sand (minimum LBR 40) free of
vegetation, organic material, construction debris, and large rocks. Fill material for slab on
grade areas may be clean sand, filled and compacted in lifts not greater than 12 inches of
loose material. The maximum size of fill material (rocks) within 12 inches below the floor
slab shall be no more than 3 inches in diameter.
Notes on site improvement operations and materials encountered:
a. The anticipated depth of soil that is expected to be removed is approximately 0.5
feet in order to clear any surface vegetation and organic material. Deeper depths
are not expected, however may be required.
b. Concrete pavement, building rubble, concrete foundations and any other debris
encountered at or below the existing ground surface should be removed as part of
the site preparation process for the proposed construction area. Vegetation,
topsoil, roots and other deleterious materials (typically 4 to 6 inches), deemed
unsuitable shall be removed from the proposed construction areas, and replaced
with controlled fill as outlined herein.
c. Any existing utility lines, tanks, and wells should be relocated or properly
abandoned or plugged, as these may provide a conduit for the erosional effects of
storm water on soils in support of proposed new building foundations.
d. Should any material be found to contain questionable amounts of organic content
(or be deemed unsuitable) during site clearing operations, the geotechnical
engineer must be notified immediately in order to reevaluate the
recommendations enclosed herein.
4. All fill material shall be inorganic containing no more than 5% by weight organic material.
Silt -size fine particulates (material passing the No. 200 Sieve) in fill material shall be limited
to less than 10% by weight.
13370 SW 131" Street, Suite 105, Miami, FL. 33186 (305) 259-9779
61 of 112
NELCO
TESTING AND ENGINEERING SERVICES
5. Embed foundation/footings to depths as required per structural engineer, based on vertical
and lateral soil bearing criteria, and soil engineering parameters, herein.
6. Compact each lift of fill material and excavated footings to a minimum compaction of 95
percent of the dry soil density as determined by the Modified Proctor Test — ASTM D-1557
prior to placement of any additional fill required. Prior to compaction, the moisture content
of each lift of fill material shall be adjusted to within plus/minus 2 percent of the optimum
moisture as determined by the Modified Proctor Test — ASTM D-1557.
7. Compaction of building site (if so required) shall be verified by means of one Field Density
Test for each 2500 square feet or fraction thereof for each lift of compacted soil for building
pad or slab area. Field density tests shall be performed as per ASTM D-2922.
8. All Geotechnical work must be performed under the supervision of our geotechnical engineer
or one of his representatives, in order to verify compliance with our specifications.
SOIL BEARING CAPACITIES AND LATERAL SLIDING RESISTANCE
FOR FOUNDATIONS
Our observations, exploration, and evaluation, supplemented by a review of sub -soil profile
developed from the soil engineering Standard Penetration Test, indicate that the soils found, after
improvements as specified, will be suitable for supporting foundations proportioned for a
maximum allowable vertical bearing stress of 3000 pounds per square foot, based on total load.
Lateral bearing capacity may be proportioned for an allowable lateral capacity of 150 PSF/ft. in
gravelly sands, 400 PSF/ft in limestone bedrock
Lateral sliding resistance may be calculated using a coefficient of friction of 0.25.
ANTICIPATED SETTLEMENT
Provided that foundations and soils (existing and fill material), are engineered and constructed
in accordance with our recommendations and specifications the maximum total foundation
settlement is expected to be less than 1 inch. Differential settlement between adjacent
foundations is expected to be '/z of total settlement.
13370 SW 131 S` Street, Suite 105, Miami, FL. 33186 (305) 259-9779 4
62 of 112
NELCO
TESTING AND ENGINEERING SERVICES
SOIL EROSION
The possibility exists for erosion to occur on soils providing structural support for any
proposed or existing footings/foundations. This should be considered and addressed during the
design and construction process for both existing soil and structurally placed fill material in
support of any footings/foundations.
The site should be graded to provide positive drainage to reduce storm water infiltration.
A minimum gradient of one percent for asphalt areas should be maintained. A three percent
gradient should be maintained for landscaped areas immediately adjacent (within 5 feet) to the
building. In general, water should not be allowed to collect near the surface of the foundation or
floor slab areas of the structures during or after construction. If water were allowed to
accumulate next to the foundation, it would provide an available source of free water to soils
underlying the foundation. Similarly, surface water drainage patterns or swales must not be
altered so that runoff is allowed to collect next to the foundation.
Temporary drainage provisions should be established, as necessary, to minimize water
runoff into construction areas. Since soils generally tend to soften when exposed to free water,
provisions should be made to remove seepage water from excavations, should it occur. Also,
undercut or excavated areas should be sloped toward one corner to facilitate the collection and
removal of rainwater or surface runoff. Adequate protection against sloughing of soils should be
provided for workers and inspectors entering the excavations. This protection should meet
O.S.H.A. and other applicable building codes.
Completed foundation elements should also be protected through vegetation and/or
asphalt/concrete cover.
13370 SW 131" Street, Suite 105, Miami, FL. 33186 (305) 259-9779
63 of 112
NELCO
TESTING AND ENGINEERING SERVICES
Summary of Stratigraohy and Engineering Design Parameters
Soil data obtained during this subsurface exploration has been used to establish shearing strength
and deformation characteristics for the various soil layers encountered at the site. These parameters
may be used as guidelines for foundation system design. The engineering analysis based on these
parameters was performed in accordance with generally accepted engineering principles and
practices.
Design Soil Parameters
Internal
E5o
Moist Unit
Subgrade
Angle of
Cohesion
50%
Soil Type
Weight
Modulus
Friction
(psf)
Strain
(Pcfl
(Pei)
(Degrees)
Value
SANDS AND
31
0
110
140
---
GRAVELLY SANDS
SANDY LIMESTONE
35
3000
130
350
0.005
Angle of External Friction, Coefficient of Earth Pressure:
Please refer to the following table for 6, K°, Ka, and Kf, values.
S, Angle of
@ Rest, K.
Active, K�
Passive, Kp
External Friction
SANDS AND
20.670
0.485
0.320
3.124
GRAVELLY SANDS
SANDY
23.330
0.426
0.271
3.690
LIMESTONE
13370 SW 13151 Street, Suite 105, Miami, FL. 33186 (305) 259-9779 6
64 of 112
NELCO
TESTING AND ENGINEERING SERVICES
REPORT LIMITATIONS
The recommendations submitted are based on the available subsurface information obtained
by Nelco Testing and Engineering Services, Inc. (NTES) and design details provided by SRS
Engineering, Inc. for the proposed project. If there are any revisions to the nature, design or
location of proposed structures, NTES should be notified immediately to determine if changes in
recommendations are required. If NTES is not retained to perform these functions, NTES will
not be responsible for the impact of those conditions of the project.
The geotechnical engineer warrants that the findings, recommendations, specifications, or
professional advice contained herein have been made in accordance with ASTM specifications,
and generally accepted professional geotechnical engineering practices in the local area. No
ether warranties are implied or expressed. Evaluations expressed in this report are based on field
observations and data collected during exploration. Variations throughout the sub -surface profile
may exist between designated boring locations, and in inaccessible areas with existing structures.
These may not become evident until construction operations have commenced. Should any
variations become evident, NELCO Testing and Engineering Services, Inc. must be notified. A
reevaluation of the information and professional opinions expressed in this report may be
necessary. NELCO Testing and Engineering Services, Inc. does not guarantee any existing
subsurface condition between test locations.
Please note analysis and recommendations mentioned in this report are obtained from the
borings performed at the indicated locations on the "Soil Boring Test Location Sketch" included
in this report. Local variations outside of the vertical reach of the boring locations may be
encountered. Descriptions represent our interpretation of the subsurface data and observations at
the specific boring locations, on the date tested.
This geotechnical report has been prepared by NTES for the intended use of SRS
Engineering, Inc. and the specific application to the named project as described. This report does
not evaluate or address any environmental criteria — this information should be obtained through
a Phase I Environmental Site Assessment (ESA) if so required. Any third -party use of this report
should be conducted with the expressed written permission of NTES.
13370 SW 131" Street, Suite 105, Miami, FL. 33186 (305) 259-9779
65 of 112
NELCO
TESTING AND ENGINEERING SERVICES
APPENDIXA
• Project Location Map
• Standard Penetration Test Location Sketch
13370 SW 131 s' Street, Suite 105, Miami, FL. 33186 (305) 259-9779
66 of 112
SO
w .a:.[•'.��t^ ��1 psi tS µ --�-�.... _`-
71
.�„ aI rw i. 71--`' 6 M " SW .41 ST ST AnL- n'v1"AtfG AitO
111411 �_
'� •(•q .� _ �; r r, : i Ili ,.
IV-
•�. »�r' r na 1 •a ;>1, q,a. cW ;4ZND SrAN TO(ptIA1N11,VE
•1.-if\`—_-w +' r ,�i1 4 �lr.. yr Y�:i
p 1
h1, -.;A iu'r-.N _���.�; _'w�.... • SW 4-2ND i.'.ER
`�j
y, , 17.
�If j 10 24
th
.. fi � " .f � ;� rl � ..� ._ _ �'qr'—,• � /+yam 'C�'c}�r.
_ .CW'.44TH, TER1.4
Yr `' iY�Q.�,
�2A
-i
?V yr i v M 9*M`4'WHI+TO .r...� _
_.�^,�.���t5•.W�46TH ST,- Not ga's
a di
1 r�x o 1 7,SW 46TH T.ER•.''��+' , �'�' i '�, yr �M-
47TH STs *�
v " a l.Li' L t .. -. i x. `� Ml �I fl `Di `� ..I M j. •— i�a.1- ]- . I I
1 'I
G'A
SA
..c
9
NELCO
TESTING AND ENGINEERING SERVICES
Soil Boring Test Location Sketch
I. R
® Soil Boring Test Location
13370 SW 131s` Street, Suite 105, Miami, FL. 33186 (305) 259-9779
E
u
0
68 of 112
NELCO
TESTING AND ENGINEERING SERVICES
APPENDIX B
• Standard Penetration Test Boring Logs
13370 SW 131" Street, Suite 105, Miami, FL. 33186 (305) 259-9779 11
69 of 112
STANDARD PENETRATION TEST BORING LOG
N Nelco Testing & Engineering Services, Inc.
TESTING E ENGINEERING SERVICES. INC 13370 SW 131 Street, Suite 105
Miami, Florida 33186
Client: SRS Engineering, Inc.
Project: South Miami Park
Project Location: 4300 SW 58 Avenue, South Miami, Florida
lLStrata
Name Description
0
o
Topsoil Dark hrnRn
1
o
M
Limestone gravel N ith some grrrish hrmen
Gravel with some sand a,,,p
7
s
3
a
4
Sandy limestone Tan. sandy, sn( in medium dense
5
6
7
8
9
10
11
12
13
14
15
End of Boring
16
17
18
19
20
Per ASTM
- D 1596. Standard Penetration Test
Date: September 30, 2020
Job Number: B-201079
Test Boring Number: 1
SAMPLE Standard
Blow Penetration Test
Court 2 N-value
a Blows/ft
E 6" 6" > 10 30 50 70 90
z z _
6
,4
1
56
22
15
16
13
2
20
7
9
18
16
3
39
22
20
17
14
4
26
12
10
10
13
5
II
II
24
10
9
6
11 '
4
3
3
3
{I+
7
61
3
8
X
Sheet I of 1
70 of 112
STANDARD PENETRATION TEST BORING LOG ��LE®
Nelco Testing & Engineering Services, Inc.
WE W 6 ENGINEERING SERVICES INC 13370 SW 131 Street, Suite 105
Miami, Florida 33186
Client: SRS Engineering, Inc. Date: September 30, 2020
Project: South Miami Park Job Number: B-201079
Project Location: 4300 SW 58 Avenue, South Miami, Florida Test Boring Number: 2
SAMPLE Standard
Blow Penetration Test
-1 o Count N-value
Strata Name Description -
,.9.- Blows/a
= 6" 6" 10 30 50 70 90
Z Z
Topsoil Dark hrnwn 4
] Sand with some gravel Dark bromi faith .son, elimestole,c,,iI, /I 1 1
10 16
2
F 8 10
3 2 — i
13 41
4 - Sandy limestone Tan. sandy, soft to medium dense
27 29
5 3 45
16 15
6
12 Io
7 4 - 1g
8 5
24
9 16
r 6
10 k
9 (,
11 6 8 '
17 ;
4
13 7 - - — 7
3 3
14
2 2
15 - - 8 - X
End of Boring
16
17
18
19
20
Per ASTM - D 1586, Standard Penetration Test Sheet I of 1
rf[7ifi%
Southkiami
Tnt ❑TV Of PLEASANT Lk ING
ADDENDUM No. #1
Project Name: NEW PLAYGROUND
IMPROVEMENTS
RFP NO. PR2021-35
Date: April 21, 2021
Sent: Fax/E-mail/webpage
& FITNESS STRUCTURE
This addendum submission is issued to clarify, supplement and/or modify the previously issued
Solicitation, and is hereby made part of the Documents. All requirements of the Documents
not modified herein shall remain in full force and effect as originally set forth. It shall be the sole
responsibility of the bidder to secure Addendums that may be issued for a specific solicitation.
NOTE:
PLANS ATTACHED TO ADDENDUM NO.I REFERRED TO AS EXHIBIT I,
SCOPE OF SERVICES, ATTACHMENT B "SOUTH MIAMI PARK PLAYGROUND
& PARK IMPROVEMENT DESIGN & CONSTRUCTION PLANS," AND "TREE
DISPOSITION PLAN" SHALL REPLACE EXHIBIT I, SCOPE OF SERVICES,
ATTACHMENT B AND SHALL BE A PART OF THE RFP BY WAY OF
REFERENCE.
OUESTION #I
Are you willing to accept Play & Park Structures as an alternate to LSI?
RESPONSE:
The City is open to reviewing at, at a minimum, equal substitutes as long as the overall design, concrete
band and safety/use zones do not increase, and the proposed recognized playground play types do not
reduce.
QUESTION #2
Are you willing to accept Action Fit as an alternate to Greenfield?
RESPONSE:
The City is open to reviewing, at a minimum, equal substitutes as long as the overall design, concrete
band and safety/use zones do not increase, and the proposed fitness structure selection/types do not
change.
T of 16
QUESTION #3:
Are you willing to accept Ultra Site as an alternate to DuMor?
RESPONSE:
Yes, we are open to reviewing, at a minimum, equal substitutes.
QUESTION #4:
Does the prospective bidder have to be a unionized contractor to bid on the project in the subject line?
RESPONSE:
There is no requirement for a prospective bidder to be a unionized contractor.
QUESTION #5:
What is the estimated price value for this project?
RESPONSE:
The City budgeted $200,000 (includes grant funding) in its 5-year Capital Improvement Program Plan.
QUESTION #b:
Are you maintaining a plan holders list?
RESPONSE:
A Plan Holders list is maintained by Demand Star.com and will be available upon request after the bid
closing.
IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE
ADDENDUMS THAT MAY BE ISSUED FOR A SPECIFIC SOLICITATION.
2 of 16
ADDENDUM NO. I
April 21, 2021
EXHIBIT I
SCOPE OF SERVICES
ATTACHMENT B
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
"South Miami Park Playground and Park Improvement Design &
Construction Plans"
"Tree Disposition Plan"
Prepared by:
SRS ENGINEERING, INC.
3of16
VI N
U�
i
\-
L7J
co
m
2
N
F w
N In
X O
w �--
1N3AIAVd i�VHds;'
Y
_Z
J
Z_
Q
S
U
S
0
sir
m X
C.�
O
cD
O
U U
� U J
X J �
W w �
lam°
FiN
U)
Y
3
U)
z
0
N Q
O Oi
00 V)
LO
CD
= z w o
_c)Ln
QXry00
:2wCD+I
S`dd 83d
36 Ol 3Sd8 SiNior >II`dM301S 30 318`dl
4 O I Hl 9498
1NIOf„d„ 3d ki
Nlvm=
0NII'
OIS >IldM301S M3N
IX3
f
3NIl M/ 7
>I-1dM301S 301M „9—,O L 803 „-V—,6 ,k83A3 IV
d `>I-lVM301S 30IM ,8 803 ,8 Jl OA3 IV
d >I-ldM301S 30IM ,S 803 ,S A83n3 IV
1) :(318VOl-lddd 383HM)
3 38 T3dHS S1N10f 03M`dS/-108iNOO
„8„ 3dAi
N v `
D
r
D
—d1�DiVW
NOISNddX3
) hM d «Z/ l «g/ l
NV Id
rTs i mmml
PRO
'Ord
('d)d)
,
,
1NIOr
„d„ 3 dill
(S1NIOf 3dJll N3dO)
„` ,, 3d ki
• r
o •
D
r
v Y '
• «Z/ L =d
x
X FEN E
(REFER TO CIVIL PLANS)
x
CON RETE BAND
(REFER TO IVIL PLANS)
AFETY ZONE
x (TYP.) , -
i'
PROPOSED 2- 3 YEAR OLD J
PLAYGROUND EQUIPMENT
(REFER TO SHEET L-2.1
F R DETAILS)
X
WN
PROPOSED SWING
SET AREA
2-BELT SEATS
1-BUCKET SEAT
1-EXPRESSION SWING
(REF R TO SHEET L-2.1
FOR DETAILS)
PROPOSED
CANOPY
TREE (TYP.)
(SEE
LANDSCAPE
PLANS)
r
zo
k
r
l
9a9
919ygy�gyy9[93�5p15
322�!
u_-'
ry
LO
r
m
rl-
0
c
m
�.
m
a
0'
W
a i
t
L1J
Lo
Lod'
c
o
=�
L
r
Z
Q Q
0
Oir
AQi, 0
W�
0_
0 a o
QW
LL
�
U)
�
U)
Z
�w
cs w
T—
Cn
z
Q
\ z J
w _>
LLU
00
w
cn
O�
CLw
Ow
ww
C�
x-x
I�IlM
ONE MM 01111010
01100010 SEE M ONE M M SEE SEE M M 0101 ONE ONE ONE M ONE ME
i
i
X
U U
Z F
Ln U J
X J ~
LLJ W
Y
Z
J
4)�
t
z
0
CD
2 z W 0
Ln 0 Ln
Q X f-V- Od
:21 w CD +I
S` V 213d
36 Ol 3S`d8
4:D l Hl 998
1NIOr „d„ 3dJll
>IIVM3(
I ONl1Sf
I I
S1NIOf` >Ilb'M341S JO 318`dl
NV id
1NICA n -1 J i i
•O'd
-- I
is
I
C3 i >I-IbM3(J1S M3N
I iL
I
- - - - - J
(•dill)
3N1'l M/ ,
•1'd
1NIOr „d„ 3dAi
AIVM301S 301M „9—,O L 803 „-V—,6 k83A3 iV
d `A- VM3G1S 30IM ,8 803 ,8 )l83n3 ld
d >i-I`dM301S 301M ,S 803 ,S k83A3 lb
►) :(318`dOl3ddd 3a3HM)
3 38 Tad HS Sl N IOr 03MdS/30a1 NOO
„8„ 3d,,U
N D
. D
V.
I ♦ r
D
—` W31dW
NOISN`ddX3 --�
)W3W 993/ l
(S1NIOr 3d)U N3dO)
„d„ 3dAi
ADDENDUM No. 5, DATE
5001 S.W. 74 Court Suite 2
Miami =lorida 33155
Tel: (3C5) 662-8887
Fax: (305) 662-8858
SCHEDULE OF V/
SOUTH MIAMI P
PLAYGROUND AND PARK I
CITY OF SOUTH t
PAY ITEM
DESCRIPTION
GENERAL SITE WORK
1.1
PERMIT FEES
1.2
MOBILIZATION
1.3
DEMOLITION (CURB)
1.4
EARTHWORK, NET FILL (FACTOR 1.0)
1.5
FILLED POOL EXCAVATION
1.6
MATERIAL DISPOSAL
1.7
SOD RESTORATION (MATCH EXISTING)
1.8
SILT FENCE
1.9
INLET PROTECTION SYSTEM
PLAYGROUND AND SIDEWALK IMPROVEME
2.1
CONCRETE SIDEWALK (4" THICK)
2.2
CONCRETE CURB (TYPE "D")
2.3
CONCRETE TRANSITION CURB
5001 S.W. 74 Court Suite 2
Miami, Florida 33155
Tel: (305) 662-8887
Fax: (305) 662-8858
SCHEDULE OF V/
SOUTH MIAMI P
PLAYGROUND AND PARK
CITY OF SOUTH I
PAY ITEM
DESCRIPTION
LANDSCAPING
3.1
TREE REMOVAL WITH STUMP
3.2
CANOPY TREE (16' HT, 4" DBH, 9' SPREAD, FIELD GROWN)
3.3
PLAYGROUND EQUIPMENT (2-5) WITH SWING(S)
3.4
PLAYGROUND EQUIPMENT (5-12) WITH SWING(S)
3.8
EXPRESSION SWING (TODDLER) 5" TOPRAIL
3.9
EXERCISE EQUIPMENT
3.16
SITE FURNITURE: DUMOR 6' BENCH 'WALNUT' RECYCLED PLASTIC - 88SER PL-3AR
3.17
SITE FURNITURE: END/CENTER ARMREST FOR BENCH SERIES 88
3.18
SITE FURNITURE: DUMOR 40 GAL. TRASH RECEPTACLE 'WALNUT' RECYCLED PLASTIC -
44-40PL-0001 W/ CVR-30-RC-0195
3.19
AS -BUILD DRAWINGS (CAD & PDF FILES)
TOTAL GENERAL SITE WORK, PLAYGRI
4.1
CONSTRUCTION CONTINGENCY COST- 10%
EXHIBIT 2
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
Insurance & Indemnification Requirements
Insurance
A. Without limiting its liability, the contractor, consultant or consulting firm (hereinafter referred
to as "FIRM" with regard to Insurance and Indemnification requirements) must procure and
maintain at its own expense during the life of the Contract, insurance of the types and in the
minimum amounts stated below as will protect the FIRM, from claims which may arise out of or
result from the contract or the performance of the contract with the City of South Miami,
whether such claim is against the FIRM or any sub-contractor/sub-consultant, or by anyone
directly or indirectly employed by any of them or by anyone for whose acts any of them may be
liable.
B. No insurance required by the CITY may be issued or written by a surplus lines carrier unless
authorized in writing by the CITY and such authorization is at the CITY's sole and absolute
discretion. The FIRM must purchase insurance from and must maintain the insurance with a
company or companies lawfully authorized to sell insurance in the State of Florida, on forms
approved by the State of Florida, as will protect the FIRM, at a minimum, from all claims as set
forth below which may arise out of or result from the FIRM's operations under the Contract
and for which the FIRM may be legally liable, whether such operations be by the FIRM or by a
Sub-contractor/sub-consultant or by anyone directly or indirectly employed by any of them, or
by anyone for whose acts any of them may be liable: (a) claims under workers' compensation,
disability benefit and other similar employee benefit acts which are applicable to the Work to be
performed; (b) claims for damages because of bodily injury, occupational sickness or disease, or
death of the FIRM's employees; (c) claims for damages because of bodily injury, sickness or
disease, or death of any person other than the FIRM's employees; (d) claims for damages
insured by usual personal injury liability coverage; (e) claims for damages, other than to the
Work itself, because of injury to or destruction of tangible property, including loss of use
resulting there from; (f) claims for damages because of bodily injury, death of a person or
property damage arising out of ownership, maintenance or use of a motor vehicle; (g) claims.for
bodily injury or property damage arising out of completed operations; and (h) claims involving
contractual liability insurance applicable to the FIRM's obligations under the Contract.
Firm's Insurance Generally. The FIRM must provide and maintain in force and effect until all the
Work to be performed under this Contract has been completed and accepted by CITY (or for such
duration as is otherwise specified hereinafter), the insurance coverage written on Florida approved
forms and as set forth below:
Workers' Compensation Insurance at the statutory amount as to all employees in compliance with
the "Workers' Compensation Law" of the State of Florida including Chapter 440, Florida Statutes, as
presently written or hereafter amended, and all applicable federal laws. In addition, the policy (ies) must
include: Employers' Liability at the statutory coverage amount. The FIRM must further ensure that all of
its Sub-contractor/sub-consultants maintain appropriate levels of Worker's Compensation Insurance.
Commercial Comprehensive General Liability insurance with broad form endorsement, as well
as automobile liability, completed operations and products liability, contractual liability, severability of
interest with cross liability provision, and personal injury and property damage liability with limits of
31,000,000 combined single limit per occurrence and $2,000,000 aggregate, including:
- Personal Injury: $1,000,000;
- Medical Insurance: $5,000 per person;
- Property Damage: $500,000 each occum5MM2
Umbrella Commercial Comprehensive General Liability insurance must be written on a Florida
approved form with the same coverage as the primary insurance policy but in the amount of $1,000,000
per claim and $2,000,000 Annual Aggregate. Coverage must be afforded on a form no more restrictive
than the latest edition of the Comprehensive General Liability policy, without restrictive endorsements,
as filed by the Insurance Services Office, and must include:
• Premises and Operation
• Independent Contractors
• Products and/or Completed Operations Hazard
• Explosion, Collapse and Underground Hazard Coverage
• Broad Form Property Damage
• Broad Form Contractual Coverage applicable to this specific Contract, including any hold
harmless and/or indemnification agreement.
• Personal Injury Coverage with Employee and Contractual Exclusions removed, with minimum
limits of coverage equal to those required for Bodily Injury Liability and Property Damage
Liability.
Business Automobile Liability with minimum limits of One Million Dollars ($1,000,000.00) plus an
additional One Million Dollar ($1,000,000.00) umbrella per occurrence combined single limit for Bodily
Injury Liability and Property Damage Liability. Umbrella coverage must be afforded on a form no more
restrictive than the latest edition of the Business Automobile Liability policy, without restrictive
endorsements, as filed by with the state of Florida, and must include:
• Owned Vehicles.
• Hired and Non -Owned Vehicles
• Employers' Non -Ownership
Subcontracts: The FIRM agrees that if any part of the Work under the Contract is sublet, the
subcontract must contain the same insurance provision as set forth in these insurance and
indemnification requirements, other than the Fire and Extended Coverage Insurance and substituting the
word Sub-contractor/sub-consultant for the word FIRM where applicable.
Fire and Extended Coverage Insurance (Builders' Risk), IF APPLICABLE:
A. In the event that this contract involves the construction of a structure, FIRM must maintain,
with an Insurance Company or Insurance Companies acceptable to the CITY, "Broad" form/All
Risk Insurance on buildings and structures, including Vandalism & Malicious Mischief coverage,
while in the course of construction, including foundations, additions, attachments and all
permanent fixtures belonging to and constituting a part of said buildings or structures. The
policy or policies must also cover machinery, if the cost of machinery is included in the
Contract, or if the machinery is located in a building that is being renovated by reason of this
contract. The amount of insurance must, at all times, be at least equal to the replacement and
actual cash value of the insured property. The policy must be in the name of the CITY and the
CONTRACTOR, as their interest may appear, and must also cover the interests of all Sub-
contractor/sub-consultants performing Work.
B. All of the provisions set forth in the Miscellaneous section below apply to this coverage unless it
would be clearly not applicable.
Miscellaneous:
A. If any notice of cancellation of insurance or change in coverage is issued by the insurance
company or should any insurance have an expiration date that will occur during the period of
this contract, the FIRM Is responsible for securing other acceptable insurance prior to such
cancellation, change, or expiration so as7E prpvide continuous coverage as specified in this
section and so as to maintain coverage during the life of this Contract.
B. All deductibles must be declared by the FIRM and must be approved by the CITY. At the
option of the CITY, either the FIRM must eliminate or reduce such deductible or the FIRM
must procure a Bond, in a form satisfactory to the CITY covering the same.
C. The policies must contain waiver of subrogation against CITY where applicable, must expressly
provide that such policy or policies are primary over any other collectible insurance that CITY
may have. The CITY reserves the right at any time to request a copy of the required policies
for review. All policies must contain a "severability of interest" or "cross liability" clause
without obligation for premium payment of the CITY as well as contractual liability provision
covering FIRM's duty to indemnify the City as provided in this Agreement.
D. Before starting the Work, the FIRM must deliver to the CITY and CONSULTANT certificates
of such insurance, acceptable to the CITY, as well as the insurance binder, if one is issued, the
insurance policy, including the declaration page and all applicable endorsements and provide the
name, address and telephone number of the insurance agent or broker through whom the
policy was obtained. The insurer must be rated A.VII or better per A.M. Best's Key Rating
Guide, latest edition and authorized to issue insurance in the State of Florida. All insurance
policies must be written on forms approved by the State of Florida and they must remain in full
force and effect for the duration of the contract period with the CITY. The FIRM may be
required by the CITY, at its sole discretion, to provide a "certified copy" of the Policy (as
defined in Article I of this document) which must include the declaration page and all required
endorsements. In addition, the FIRM must deliver, at the time of delivery of the insurance
certificate, the following endorsements:
(1) a policy provision or an endorsement with substantially similar provisions as follows:
"The City of South Miami is an additional insured. The insurer must pay all sums that
the City of South Miami becomes legally obligated to pay as damages because of `bodily
injury", 'property damage', or "personal and advertising injury" and it will provide to the
City all of the coverage that is typically provided under the standard Florida approved
forms for commercial general liability coverage A and coverage B";
(2) a policy provision or an endorsement with substantially similar provisions as follows:
"This policy must not be cancelled (including cancellation for non-payment of premium),
terminated or materially modified without first giving the City of South Miami ten (10)
days advanced written notice of the intent to materially modify the policy or to cancel
or terminate the policy for any reason. The notification must be delivered to the City by
certified mail, with proof of delivery to the City."
If the FIRM is providing professional services, such as would be provided by an architect,
engineer, attorney, or accountant, to name a few, then in such event and in addition to the
above requirements, the FIRM must also provide Professional Liability Insurance on a Florida
approved form in the amount of $1,000,000 with deductible per claim if any, not to exceed 5%
of the limit of liability providing for all sums which the FIRM becomes legally obligated to pay as
damages for claims arising out of the services or work performed by the FIRM its agents,
representatives, Sub Contractors or assigns, or by any person employed or retained by him in
connection with this Agreement. This insurance must be maintained for four years after
completion of the construction and acceptance of any Project covered by this Agreement.
However, the FIRM may purchase Specific Project Professional Liability Insurance, in the
amount and under the terms specified above, which is also acceptable. No insurance may be
issued by a surplus lines carrier unless authorized in writing by the city at the city's sole,
absolute and unfettered discretion.
Indemnification Requirement
A. FIRM accepts and voluntarily incurs all risks of any injuries, damages, or harm which might
arise during the work or event that is occurring on the CITY's property due to the negligence or other
fault of FIRM or anyone acting through or on behalf of FIRM.
B. FIRM must indemnify, defend, save and hold CITY, its officers, affiliates, employees,
successors and assigns, harmless from any and alffd8W&s, claims, liability, losses, claims, demands, suits,
fines, judgments or cost and expenses, including reasonable attorney's fees, paralegal fees and
investigative costs incidental there to and incurred prior to, during or following any litigation, mediation,
arbitration and at all appellate levels, which may be suffered by, or accrued against, charged to or
recoverable from the City of South Miami, its officers, affiliates, employees, successors and assigns, by
reason of any causes of actions or claim of any kind or nature, including claims for injury to, or death of
any person or persons and for the loss or damage to any property arising out of a negligent error,
omission, misconduct, or any gross negligence, intentional act or harmful conduct of FIRM, its
contractor/sub-contractor/sub-consultant or any of their officers, directors, agents, representatives,
employees, or assigns, or anyone acting through or on behalf of any of them, arising out of this
Agreement, incident to it, or resulting from the performance or non-performance of FIRM's obligations
under this AGREEMENT.
C. FIRM must pay all claims, losses and expenses of any kind or nature whatsoever, in
connection therewith, including the expense or loss of the CITY and/or its affected officers, affiliates,
employees, successors and assigns, including their attorney's fees, in the defense of any action in law or
equity brought against them and arising from the negligent error, omission, or act of FIRM, its Sub-
contractor/sub-consultant or any of their agents, representatives, employees, or assigns, and/or arising
out of, or incident to, this Agreement, or incident to or resulting from the performance or non-
performance of FIRM's obligations under this AGREEMENT.
D. FIRM agrees and recognizes that neither the CITY nor its officers, affiliates, employees,
successors and assigns are to be held liable or responsible for any claims, including the costs and
expenses of defending such claims which may result from or arise out of actions or omissions of FIRM,
its contractor/sub-contractor/sub-consultant or any of their agents, representatives, employees, or
assigns, or anyone acting through or on behalf of the them, and arising out of or concerning the work or
event that is occurring on the CITY's property. In reviewing, approving or rejecting any submissions or
acts of FIRM, CITY in no way assumes or shares responsibility or liability for the acts or omissions of
FIRM, its contractor/sub-contractor/sub-consultant or any of their agents, representatives, employees,
or assigns, or anyone acting through or on behalf of them.
E. FIRM has the duty to provide a defense with an attorney or law firm approved by the City
of South Miami, which approval will not be unreasonably withheld.
F. However, as to design professional contracts, and pursuant to Section 725.08 (1), Florida
Statutes, none of the provisions set forth herein above that are in conflict with this subparagraph must
apply and this subparagraph must set forth the sole responsibility of the design professional concerning
indemnification. Thus, the design professional's obligations as to the City and its agencies, as well as to
its officers and employees, is to indemnify and hold them harmless from liabilities, damages, losses, and
costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence,
recklessness, or intentionally wrongful conduct of the design professional and other persons employed
or utilized by the design professional in the performance of the contract.
78 of 112
EXHIBIT 3
NEW PLAYGROUND & FITNESS STRUCTURE IMPROVEMENTS AT SOUTH MIAMI PARK
RFP #PR2021-35
RESPONDENTS
BID FORM
THIS PROPOSAL IS SUBMITTED TO:
Shari Kamali
City Manager
City of South Miami
6130 Sunset Drive
South Miami, FL 33143
I . If this Proposal is accepted, the undersigned Respondent agrees to enter into a Contract with the City of
South Miami in the form included in this Solicitation Package and to perform and furnish all work as specified
or indicated in this Solicitation, Including as set forth in Exhibit 1 (Scope of Services, Attachment A, %
C & D) for the Proposed Price as set forth below, within the Contract Time and in accordance with the
other terms and conditions of the Solicitation Package.
2. Respondent accepts all of the terms and conditions of the Solicitation and Instructions to Respondents,
including without limitation those dealing with the disposition of Proposal/Bid Bond, If required. This
Proposal will remain subject to acceptance for 180 calendar days after the day of the Proposal Opening.
The Respondent, by signing and submitting this proposal, agrees to all of the terms and conditions of the
form of contract that is a part of the Solicitation package with appropriate changes to conform to the
information contained in this Bid Form. Respondent agrees to sign and submit the Bonds, if required by
this Solicitation. required insurance documents, and other documents required by the Solicitation,
including the Contract 9 not already submitted, within ten (10) calendar days after the date of the City's
Notice of Award.
3. In submitting this Proposal, Respondent represents that
a. Respondent has examined copies of all the Solicitation Documents and of the following Addenda, if any
(receipt of all which is hereby acknowledged.)
Addendum No. 1,2,3,4,5 & 6 Dated: 04/21,04/30,5/ 10,5/ 12,05/ 17 & 05/ 19/2021
b. Respondent has familiarized himself with the nature and extent of the Contract Documents, the proposed
work, site, locality, and all local conditions and laws and regulations that in any manner may affect cost,
progress, performance or furnishing of the Work.
c. Subsurface conditions: If applicable to this Solicitation, the Respondent represents that
1. Respondent has studied carefully all reports and drawings, if applicable, of subsurface conditions and
drawings of physical conditions.
ii. Respondent has obtained and carefully studied (or assumes responsibility for obtaining and carefully
studying) all such examinations, investigations, explorations, tests and studies in addition to or to
supplement those referred to in this paragraph which pertain to the subsurface or physical conditions
at the site or otherwise may affect the cost, progress, performance, or the furnishing of the Work at
the Contract Price, within the Contract Time and in accordance with the other terms and conditions
of the Contract Documents. The Respondent hereby acknowledges that no additional examinations,
investigations, explorations, tests, reports or similar information or data are, or will, be required by
Respondent for any reason in connection with the Proposal. The failure of the Respondent to request
a pre -bid marking of the construction site by any or all utility companies will create an irrefutable
presumption that the Respondent's bid. or proposal price, has taken into consideration all possible
underground conditions and Respondent, If awarded the contract, will not be entitled to a change order
for any such condition discovered thereafter.
Ill. Respondent has correlated the results of all such observations, examinations, investigations,
explorations, tests, reports and studies with the terms and conditions of the Contract Documents.
iv. Respondent has reviewed and checked all information and data shown or indicated in the Solicitation
Package or in the Contract Documents with respect to existing Underground Facilities or conditions
at or contiguous to the site and assume'9i4sVdAnsibility for the accurate location of all Underground
Facilities and conditions that may affect the Work. No additional examinations, investigations,
explorations, tests, reports or similar information or data in respect to any Underground Facilities or
conditions are, or will be, required by Respondent in order to perform and furnish the Work at the
Contract Price, within the Contract Time and in accordance with the other terms and conditions of
the Contract Documents unless the Proposal specifically states that the contract price is subject to
adjustment for future discovery of underground facilities and/or conditions that affect the cost of the
Work and unless the respondent makes a written request to the City for additional information prior
to submitting the bid or proposal as required in subsection ii above,
d. Respondent has given the City written notice of all conflicts, errors or discrepancies that it has discovered
in the Contract Documents and, if any conflicts, errors or discrepancies have been found and notice
given, the Respondent represents, by submitting its proposal to the City, that the Respondent has
received sufficient notice of the resolution thereof from the City, that such resolution is acceptable to
Respondent and that the Respondent waives any claim regarding the conflicts, errors or discrepancies.
e. This Proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or
corporation and is not submitted pursuant to any agreement or rules of any group, association,
organization, or corporation; Respondent has not directly or indirectly induced or solicited any other
Respondent to submit a false or sham Proposal; Respondent has not solicited or induced any person, firm
or corporation to refrain from responding; and Respondent has not sought by collusion or otherwise to
obtain for itself any advantage over any other Respondent or over the CITY.
4. Respondent understands and agrees that the Contract Price is the amount that it needs to furnish and install
all the Work complete and in place. The Schedule of Values, if required, is provided for the purpose of
Proposal Evaluation and when initiated by the CITY, it will form the basis for calculating the pricing of change
orders. The Contract Price may not be adjusted in any way to result in a deviation from the Schedule of
Values, except to the extent that the CITY changes the Scope of the Work after the Contract Date. As
such, the Respondent must furnish all labor, materials, equipment, tools, superintendence, and services
necessary to provide a complete, in place, Project for the Proposal Price. If this Solicitation requires the
completion of a Respondent Cost and Technical Proposal, as may be set forth in an exhibit to this
Solicitation, such proposal must be attached to this Bid Form and will take the place of the Lump Sum Price,
otherwise, the Contract Price for the completed work is as follows:
LUMP SUM BASE PRICE:-H Z ,' r0S / dollars and S�
Alternates: #1389i72 Z6#z
A fee breakdown for each task included in the lump sum contract price, if applicable, must be provided.
Failure to provide this information will render the proposal non -responsive.
5. The ENTIRE WORK for project in accordance with Exhibit I, Scope of Services, Attachment A, B &
C shall be completed, in full, within 75 calendar days from the commencement date set forth in the
NOTICE TO PROCEED. Failure to complete the entire work during the described time will result in the
assessment of liquidated damages as may be set forth in the Contract.
6. Insert the following information for future communication with you concerning this Proposal:
RESPONDENT:
Address:
Telephone:
Facsimile:
Contact Person
LEADEX CORPORATION
305-264-5350
Frank T Fonseca, P. E cell:
7. The terms used in this Proposal which are defined in the Contract have the same meaning as is assigned to
them in the Contract Documents, unless specifically defined in this Solicitation Package.
8. If a Respondent's Cost & Technical Proposal is required by the Solicitation, Respondent hereby certifies that
all of the facts and responses to the questions posed in the Cost & Technical Proposal, if such an exhibit is
made a part of the Solicitation, are true and correct and are hereby adopted as part of this Respondents Bid
Form, and are made a part of this proposal, by reference.
80 of 112
9. By submitting this proposal, I, on behalf of the business that I represent, hereby agree to the terms of the
form of contract contained in the Solicitation package and I agree to be bound by those terms, with any
appropriate blank boxes, if any, checked and any blank lines filled in with the appropriate information
contained in the Solicitation Documents and this Proposal, or such information that the City and I have
agreed upon in the course of contract negotiations and which have been confirmed by the City in writing,
including e-mail confirmation, if any. I hereby certify under penalties of perjury that I am the lawful
representative of the business entity referenced in this Bid Form, that I have authority to bid for that entity,
that I have authority to sign contracts for that entity and bind it to those contract terms and that all of the
information and representations contained herein are true and correct
SUBMITTED THIS 20th DAY OF May 2021
PROPOSAL SUBMITTED BY:
LEADEX CORPORATION 305-266-2028
Company Telephone Number
Frank I Fonseca, P. E. 305-264-5350
Name of Person Aurhojiy d Ro Submit Proposal Fax Number
frank@leadexcorp.com
Signature Email Address
END OF SECTION
81 of 112
C'•
0
ENGINEERING.INC.
5001 S.W. 74 Court Suite 2
Miami, Florida 33155
Tel: (305) 66248887
Fax: (3O5) 662-8858
ADDENDUM No. 5, DATED May 17. 2021
SOUTH MIAMI PARK
PLAYGROUND AND PARK IMPROVEMENTS
CITY OF SOUTH MIAMI
ALTERNATE
BCI BURKE PLAYGROUND EQUIPMENT
GREENFIELD OUTDOOR FITNESS EQUIPMENT
DATE 5//4l2021
PAY ITEM
DESCRIPTION
UNIT
TOTALwANNTY
I UNITPWCE
TOTAL
GENERAL SITE WORK
1.1
PERMTTFEES
IS.
1.00
$1,650.00
$1,650.00
1.2
MOBILIZATION
L.S.
1.00
$8,188.00
$8.188.00
1.3
DEMOLITION (CURB)
LF.
35
$16.50
$57Z5O
1.4
EARTHWORK NET FILL (FACTOR 1.0)
C.Y.
300
$38.72
$11,616
1.5
FILLED POOL EXCAVATION
C.Y.
450
$19.80
$8,910.00
1.6
MATERIAL DISPOSAL
C.Y.
750
$3.05
$2.287.50
1.7
SOD RESTORATION (MATCH EXISTING)
S.Y.
250
$17.76
$4,440.00
1.8
SILT FENCE
LF.
900
$1 25
$1,125.00
1.9
INLET PROTECTION SYSTEM
EA.
3
$120.00
$360.00
SIBTOTAL GENERAL SITE WORK
$39.154.00
PLAYGROUND AND SIDEWALK IMPROVEMENTS
2.1
CONCRETE SIDEWALK (4- THICK)
S.Y.
310
$84.60
$26,226.00
2.2
CONCRETE CURB (TYPE -D-)
LF.
79
528AO
$2,243.60
2.3
CONCRETE TRANSITION CURB
LF.
33
$21.80
$719.40
2.4
CONCRETE SLAB (6• THICK)
C.Y.
18
$453.62
$8.165.16
2.5
CONCRETE BAND (12- THICK)
LF.
490
S3O.G4
$14.719.60
L6
DETECTABLE WARNING SURFACE
S.F.
55
523.O0
51,265.00
2.7
PAINTED PAVEMENT MARKING (STANDARD) (WHITE) (SOLD) (4)
LF.
305
$2.88
$878AO
2.8
PAINTED PAVEMENT MARKING (STANDARD) (WHITE) (SOLD) IS-)
LF.
200
$3.00
$600 GO
L9
COMPACTED AGGREGATE - 4' OF 3/4' MINUS IRREGULAR STONE WITH FINES
COMPACTED TO SS% IN 2' WATERED LIFTS
S.Y.
373
516.65
56,21O.45
LiO
W THICK LIMEROCK BASE COURSE COMPACTED TO MIN. 98% (MODIFIED PROCTOR)
MIN. LBR=100 PER AASHTO T-180
S.Y.
418
$44.16
$18,458.88
2.11
POURED -IN -PLACE RUBBER SURFACE (4- THICK - 50%COLOR / 50% BLACK)
S.F.
3.353
$14.37
$48,182.61
2.12
CHAIN LINK FENCE. TYPE 'ET. C H1G1
LF.
173
$60.00
$10.380.00
2.13
FENCE GATE. TYPE'W, DOUBLE, 12' OPENING
EA
2
51.437.5O
$2,875.00
SUB -TOTAL PLAYGROUND AND SIDEWALK IMPROVEMENTS
$140,924.10
2 EAA-4- �J- i
5001 S.W. 74 Court Suite 2
Miami. Florida 33155
Tel: (305) 662-8887
Far (305) 662-BSSS
ALTERNATEI
BCI BURKE PLAYGROUND EQUIPMENT
GREENFIELD OUTDOOR FITNESS EQUIPMENT
SCHEDULE OF VALUES
L
SCNJUI MIAMI PARR
PLAYGROUND AND PARK IMPROVEM(3NTS
CITY OF SIXITH MIAMI
DATE 5/14/2021
PAY ITEM
DESCRIPnON
UNIT
TOTAL QUANTITY
UNIT PRICE
TOTAL
LANDSCAPING
3. t
TREE REMOVAL WITH STUMP
EA
14
$287.50
$4.025.00
32
CANOPY TREE (I& HT. 4• DEN, 9' SPREAD, FIELD GROWN)
EA
12
$1.530.00
$18,360.00
33
PLAYGROUND EQUIPMENT (2-5) WITH SWWG(5)
EA
1
$51,242.52
$51,242.52
3.4
PLAYGROUND EQUIPMENT (5-12) WITH SWING(S)
EA
i
$40,098.00
$40,898.00
3A
EXPRESSION SWING (TODDLER) 5- TOPRAIL
EA
i
52,034.00
$2,034.00
3.9
EXERCISE EQUIPMENT
EA
5
$7.433.14
$37,165.70
3AS
SITE FURNITURE DUMOR V BENCH WAUNUf RECYCLED PLASM - 885ER PL-3AR
EA
4
$2.521.32
$10,09528
3.17
SITE FURNITURE END/CENTER ARMREST FOR BENCH SERIES 88
EA
12
$227.D3
$2,724.36
3.18
SITE FURNITURE DUMOR 40 GAL TRASH RECEPTACLE WALNUT RECYCLED PLASM -
44.40PL-0001 W/ CVR-30-RC-0195
EA
0
$3,150.00
$0.00
3.19
AS -BUILD DRAWINGS (CAD 6 PDF FILES)
L.S.
1
$6,050.00
$6.050.00
SIB -TOTAL LANDSCAPING
$172.584,86
TOTAL GENERAL SITE WORK, PLAYGROUND AND SIDEWALK IMPROVEMENTS, LANDSCAPING
$352,662.96
0 1
CONSTRUCTION CONTINGENCY COST- 10%
LS.
CAD
$35,266.30
GRAND TOTAL CIVIL OFFSITE COST.
$387,92926
South Miami Park
City of South Miami
May 17, 2021
Director Quentin Pough
City of South Miami
5800 SW 66th Street
South Miami, FL 33143
Dear Director Quentin Pough:
Leadex Corporation is delighted to provide City of South Miami with this playground equipment proposal.
This design was developed with your specific needs in mind, and we look forward to discussing this project further
with you to ensure your complete satisfaction. Leadex Corporation is confident that this proposal will satisfy City
of South Miami's functional, environmental, and safety requirements - and most importantly, bring joy and
excitement to the children and families directly benefiting from your new playground.
You have our personal commitment to support this project and your organization in every manner possible. We
look forward to continuing to develop a long-standing relationship with City of South Miami. We appreciate your
consideration and value this opportunity to earn your business.
Sincerely,
Nelson Fonseca
Leadex Corporation
1581 N W 88 Ave
Doral, FL 33172
BC{BUIZO.COM Burke. 800.266.1250
Not included.
Providing
Greenfield Outdoor
Fitness Equipment
At Burke, movement is our mantra. It drives our purpose and ignites our passion to bring the best In playground design and the most
innovative, developmentally rich play, outdoor fitness and recreation products. Our research and testing push us to create new and unique
ways to challenge children, families, schools, communities, teams and individuals to move, to grow and to play. Play fosters opportunities for
connection between generations and with our peers, provides growth and togetherness and moves us in so many ways. Join Our Movement®
and experience the many ways play can move you.
PLAY FOR HEALTH
Movement is life and is one of the most important aspects in overall health and wellness for people of all ages and abilities. Burke has
playground and fitness offerings that engage everyone in all stages of life to move. Our Nucleus® and Intensity® playgrounds feature a fusion
of play that helps children engage in active play throughout the day for enhanced growth and developmental opportunities. ELEVATE® Fitness
Course brings obstacle course fitness to a whole new level and is poised to engage children 5-12, teenagers and adults. ACTIVATE® Fitness
Circuit and INVIGORATE® Dynamic Fitness are a great way to add events to a fitness trail or create a space for outdoor exercise. Our variety of
fitness equipment will meet you where you are in your fitness journey and challenge you to be more.
PLAY FOR YOUR MIND
Playful experiences are learning experiences and children at play are developing a wide -variety of skills that range from problem solving
and cognitive planning to memory and self -regulation. Each and every time a child plays they are contributing positively to their cognitive
development and setting themselves up for future success.
PLAY FOR CONNECTION
Play provides us with common experiences, shared laughter and true connection. It brings communities together and helps us return to
the simplicity of basic human connection and kindness. Parks and recreation spaces are critical because they lay the groundwork for the
intergenerational engagement, interaction and development we all seek. Products such as Novoe Playful Furniture, with interesting pieces that
can be used in a variety of ways, foster those opportunities by creating a space where everyone can interact and play together in their own
way. The Konnectione Swing revolutionizes connection by promoting face-to-face connections and playing together. Every person of every
age and ability brings their own unique experiences that enhance the collective and moves us all through play.
PLAY FOR MOTION
Motion play creates a childhood experience like no other by creating movement for children of all abilities and providing developmental
benefits, including increased spatial awareness, inner ear stimulation and balance. Motion can be a source of calm for children with sensory
processing differences while providing delight and excitement for children of all ages.
PLAY FOR DEVELOPMENT
Play is the work of childhood and helps children express themselves, monitor their emotions and develop a sense of identity that fuels their
self-esteem and shapes their world view. Creating environments that foster this growth is at the heart of what we do at Burke and helps to
teach resiliency and perseverance, all skills that transcend the playground and help children to develop into successful and healthy adults.
BOBUP14E.COM BurKe 800.2GG.1250
Our miss on is simple — to bring Play That Moves You@ to communities around the world. This mission drives us each and every day to innovate
the best in play, playgrounds, recreation and outdoor fitness equipment that help everyone find the best of themselves through play. We are
passionate about our legacy of customer service and craftsmanship while looking to the future and always striving to be better.
At Burke, play inspires us to create a community of people that are invested in growth, aren't afraid to commit to positive change and seek to
enrich and enhance the lives of the people in communities where we serve and live. Researching, innovating and creating products that help
commur ties and people grow and thrive is the core of our purpose. In our own community, we partner with organizations such as the YMCA
and Boys and Girls Club of fond du Lac and we support, on a larger scale, organizations, municipalities, schools, churches and associations to
Join Our Movement® and help let play lead the way for change. This is work that moves us and we hope the results move you.
HANDCRAFTED IN AMERICA'S HEARTLAND
Walk through our Fond du Lac, WI manufacturing facility and you will see playgrounds coming to life through the hands of our people. In the
age of assembly lines, we work to combine efficiency with a personal touch that makes every playground special. Bringing quality playgrounds
to communities like yours is Work That Moves Us, and we hope the playgrounds we make move you too.
SUPERIOR SERVICE
Custome Service is a hallmark of Burke and we take pride in the fact that when you call, we answer. We have factory -direct customer service
represer.atives that are available to answer questions, help with replacement parts or field inquiries about installations.
YOUR BURKE REPRESENTATIVE
We as Burke Representatives are passionate about bringing play to your community and helping you design your perfect play environment! We
are knowledgeable and experienced about the entire playground process from site evaluation to design to maintenance and will work with
you beyond installation to make sure your playground is, and remains, all you dreamed!
BCIBURKE.COM Burke 800.266.1250
r
MORE THAN A CENTURY OF PLAY
Guided by our legacy of innovation, customer service and creativity, we are making the very best and most innovative playground,
outdoor fitness and recreation products in our history! Our founder J.E. Burke set the course more than a century ago and we're taking his
vision and making it even bigger! Through research, analysis and continuous improvement, we're designing products and playspaces that
bring Play That Moves You*'to communities for more fun, movement, engagement and development! Play is our passion, our mission and
our business and we can't wait for you to Join Our Movement.
BCIBURKE.COM Su\ Ke 500.266.1250
Discover the value of investing in a Burke Playground:
KOREKONNECT® DIRECT -BOLT CLAMP SYSTEM:
Nucleus` features our Industry -leading KoreKonnect direct -bolt clamp system resulting in the strongest
and most accurate connection system ever. Factory located connection points make for easy, precise
installation and an error -free fit. Best of all, KoreKonnect is covered for 100 years under our
non -prorated Generations Warranty'.
DIRECT -BOLT CONNECTION SYSTEM:
Intensity', ELEVATE® Fitness Course, ACTIVATE® Fitness Circuit and Synergym feature Burke's trusted
direct -bolt connection that uses a durable, straightforward direct -bolt system to ensure a trouble -free
installation and provide the necessary strength to accommodate the demands of playing children. Like our
KoreKonnect system, Direct -Bolt connections are covered for 100 years under our Generations Warranty.
EZKONNECT® DECK MOUNTING SYSTEM -
Our exclusive self -leveling deck attachment and factory CNC construction allows for faster and more
precise location of decks during installation. The 2-bolt per comer deck attachment increases overall
structure strength and stability.
PLAT FORMS-
Burke's oversized non -slip platforms are constructed of heavy-duty punched steel that can support more
than 2 tons. Our vinyl coating is California compliant, free of lead and other hazardous heavy metals.
TAMPER -RESISTANT STAINLESS STEEL HARDWARE-
All hardware is covered for 100 years under our Generations Warranty.
PREMIUM POWDER COATINGS -
Our industry -leading powder coatings and finishes prevent fading, last longer and deter rust. We also
offer a'coastal package" powder coat system. This special powder coat system for metal components
and upright posts will provide additional corrosion and chemical protection along with added longevity
to the co or and gloss retention of the powder coated parts. Contact your Burke Representative for more
information on colors, price and warranty.
COMPOUND PLASTICS WIT14 UV-20-
You'll get long wear and bright, vibrant colors that hold up for years thanks to our thick, durable
rotomc loed plastics with UV--20 protection. This is why we can cover them for 15 years under our
non -prorated Generations Warranty.
CLIMBING CABLES -
Our dimming cables are flexible enough to provide movement, yet strong enough to last. Our ropes are
made frcm 6 polyester cords with steel reinforcement wrapped around a synthetic fiber core. Each cord
contains 8 galvanized steel strands tightly covered with polyester multi -fibers. Our RopeVenture® cables
consist of 6 strands, each containing 24 stainless steel reinforcing strands within a nylon sleeve, wrapped
around a solid nylon core.
ALUMINUM CONNECTORS -
Swivel connectors at the end of our ropes allow assembly at any angle with no unwanted twists in the net.
The aluminum fittings used to secure thejoints are swaged in place to prevent any movement between the
rope anc fittings that could cause wear.
1308URI4E.COM Bunke 800.2GG.1250
NPPS SAFETY KIT
Burke truly gives you the most value for your money. As part of our Total Cost of Ownership Package, we offer value-added resources FREE with
every playground structure purchase. The National Program for Playground Safety (NPPS) Playground Supervision Safety Kit helps supervisors
and educators be prepared on the playground. Learn more at bciburke.com/safety.
CUSTOM MAINTENANCE KIT
To help maintain a safe, functioning playground we include a custom maintenance schedule, touch-up paint, graffiti remover and carrying case
FREE with every playground structure purchase.
PLANNING & FUNDING TOOLS
We provide you with FREE tools to plan your playground from fundraising and design to installing a community build playground. At Burke,
we understand the dedication and hard work it takes to raise the funds for playground equipment. That's why we created Funds for Fun, a
direct donation fundraising program to help your organization raise the funds it needs for your new playground. We've also partnered with The
School Funding Center to provide up-to-date grant information along with expert grant writing services. Learn more at bciburke.com/funding.
FREE WITH EVERY BURVE
PLAY STRUCTURE PURCHASE
FREE FUNDRAISING TOOLS!
BCIBUPVE.COM Bunke 800.266.1250
ADD MORE PLAY MOVEMENT AND FUN
Biba brings more engagement, more fun and more people to play. It's another way to view and expand Play That Moves You. Biba on a
playground brings games to kids, families and communities that meet them where they are and challenges them to spend more time outdoors
moving, playing and developing skills that transcend the playground. At its core, Biba features a variety of games including popular and
recognizable characters that will engage and expand the play value of Burke playgrounds like never before. Biba brings imagination, movement
and fun :hat can't be found anywhere else! All you need is the Biba App, a Burke playground featuring Biba and the readiness for a whole new
kind of playground experience.
PLAY TOGETHER
Engaginc kids and families and creating an experience that fosters social, emotional, physical and cognitive development is part of what Biba
on a Burke playground offers. When everyone is engaged, more time is spent at the playground getting that much -needed movement, building
relationships and having fun outside.
PLAY GAMES
Getting all the latest in playground games from the leader in outdoor mobile gaming is easy —just download the FREE App and find the nearest
Biba playground and start having fun!
PLAYGROUND ENHANCEMENT
Breathing new life into your existing playspace comes from finding fresh, innovative and fun ways to use the space. Enter Biba. Taking an
existing playground and adding Biba expands the play value of your existing environment and enhances the playground experience so that
every adventure is new again.
STATS IN PLAY
Yes, stats in play ... you read that right! With Biba on your playground, you can have statistics at your fingertips. These statistics help parents
follow along with their children's progress, while helping park managers understand their park usage, comparing playground facility usage and
helping provide quantitative data to support future budget requests. Slats and play unite with Biba!
CALL `OUR LOCAL REPRESENTATIVE AT 800.2G8.1250 OR VISIT BCIBURKE.COM/RIBA TO LEARN MORE.
•
oe.xwae. a.
App Store ' �1 Gaogk Play
BCIBURICE.COM Burke 800.2GG.1250
PLAYGROUNDS WITHOUT ALL THE PAPERWORK
Purchasing with contracts may sound intimidating, but getting your community playspace doesn't need to be a painful process of writing
specifications, issuing RFP's and jumping through hoops— it can be simplified — we promise! As you continue planning for your new
commercial playground, review the Purchasing Contracts offered through our partners. Purchasing with one of these contracts simplifies the
process and ensures the design and intent remain the same — serving as a place for your community to gather, grow and thrive.
EQUALIS GROUP
Equalis is an innovative cooperative purchasing organization that believes in the power of partnership and that when you work together
you achieve more. The basic premise of the Equalis cooperative purchasing organization is to leverage the combined buying power of all
members for better pricing and favorable contract terms. Equalis Group uses the lead agency model for competitively bid contracts, provides
our participants the savings they expect and offers efficiencies and peace of mind within the procurement process. It is our mission to
continuously improve the measurable and meaningful impact of cooperative services for everyone throughout the supply chain.
OMNIA PARTNERS
OMNIA Partners, Public Sector (Subsidiary National IPA) is the largest and most experienced organization in purchasing and supply chain
management. Comprised of participants and suppliers in the public sector, we bring together industry -leading buying power and world -class
suppliers to offer an extensive portfolio of competitively solicited and publicly awarded contracts and partnerships. OMNIA Partners is proud
to offer more value and resources to state and local government, higher education, K-12 education and non -profits.
HGACBUY
Purchasing Burke playground equipment through HGACBuy gives your agency access to volume purchasing agreements and discounts,
and there's no need to incur the time and expense of writing specs, issuing RFPs, advertising and evaluating bids. This can shorten your
procurement cycle by months, while ensuring compliance with competitive bidding requirements.
SOURCEWELL
As a leader in cooperative purchasing, Sourcewell is passionate about helping members fulfill their public service missions. Sourcewell builds
strong relationships with members and vendors to develop practical solutions together.
The easiest way to Join Our Movement is to call your local Representative at 800.266.1250 or visit bciburke.com/rep.
Our passion is bringing play to communities like yours and we can't wait to help you get started!
0equalis OMNIA®
GROUP PARTNERS
HGACBu
Sourcewell . Zi
Awarded Contract
BCIBURKE.COM Burke, 500.266.1250
VIPER® SLIDE Verto Climber 3 Freestanding
The Viper Slide can't be tamed, but kids love trying! Burke's unique Verto Climbers have one, two or three
Viper's exciting twisty and fast serpentine action is climbing sections that can be combined in various
guaranteed to generate incredible high-energy fun and configurations for unlimited adventures!
safe, healthy play.
Natureplay Transfer Stump
Help all children get into the heart of the play with the
Burke Transfer Station. At Burke, we take play for all
seriously and want children of all abilities to enjoy the
benefits of playing together.
BCIBURKE.COM Bunke 800.266.9250
Clubhouse Retreat Roof
The ClubHousedesign offers kids and families the
opportunity to reconnect and rediscover the wonders of
nature within a safe and durable environment. A full
collection of C1ubHouse components, including climbers,
panels, enclosures and roofs, cultivate imaginations and
nurture the need for play.
GORATE TM
Arch Swings
Swings help children develop coordination and balance
while providing an engaging sensory experience.
INVIGORATE Dynamic Fitness brings exercise oN
and makes it more fun, more social and more invigor
BCIBURVE.COM Burke 800.2GG.1250
Leadex Corporation is very pleased to present this proposal for consideration for the South Miami Park located in
South Miami. BCl Burke Company, LLC has been providing recreational playground equipment for over 90 years
and has developed the right mix of world -class capabilities to meet the initial and continuing needs of City of South
Miami. We believe our proposal will meet or exceed your project's requirements and will deliver the greatest value
to you.
The following is a summary of some of the key elements of our proposal:
• Project Name: South Miami Park
• Project Number: 103-140286-1
• User Capacity: 93
• Age Groups: Ages 2-5 years, 5-12 years, 13+ years
• Dimensions: 45' 2" x 164' 6"
• Designer Name: Landon Berendsen
Leadex Corporation has developed a custom playground configuration based on the requirements as they have been
presented for the South Miami Park playground project. Our custom design will provide a safe and affordable
playground environment that is aesthetically pleasing, full of fun for all users and uniquely satisfies your specific
requirements. In addition, proposal # 103-140286-1 has been designed with a focus on safety, and is fully
compliant with ASTM F 1487 and CPSC playground safety standards.
We invite you to review this proposal for the South Miami Park playground project and to contact us with any
questions that you may have.
Thank you in advance for giving us the opportunity to make this project a success.
BCBURKE.COM Bunke 800.266.1250
J
� Z 2 Q
W
W °
0 W Q
0
N
ON W ♦-
01
i0 W a S
J
d
lX
° Z ~
y W Z
Q
O j¢ W MZE
p?
N j 9
}}
zZN N
a
c~i m
OfN
N OW ❑
pN
��jjn
YJ
L�l
8=mac
t CoC � qo
V��CLLNLp
i s�S`$
�Ho
E
�9E
E
U
edg8
82 j -E
2
yN
FL Ej
K
s, f Fitness equipment
to be Greenfield
V £ _ Outdoors
7;
:3Fz
6e_=
SERIES: Basics, Fitness, Intensity, Nucleus South Miami Park
SITE PLAN 4300 SW 58th Ave
May 17, 2021
Leadex Corporation
103-140286-1 1
DRAWN BY: Landon Berendsen South Miami, FL 33143
BCI Burke Company, LLC PO Box 549 Fond du Lac, Wisconsin 54936-0549 Telephone 920-921-9220
rv�u
(0 n m
D �Z_I
�770 [0
Z y
N �
C -n
O Z �
7
Q N
m C
o y 7
CD ca
Z
< n
m
n y
S
»
m
T o
o
n W 0
_ =r CD
m C
r-
3
r ID
W D f0
J K'
Q W
7'
to
m
0
0
m
m
m
N_
ro
0
0
r
a
_ m
x
o
'Cl
O� N
0
L
1
274W07
CLUBHOUSE STANCHION
2
2740009
I @'CLOSURE PLATE. ELLIPSE
3
2740130
SQUARE PLATFORM
4
270-0130
SPUT SQUARE PLATFORM
CLUBHOUSE UNITARY ENCL
5
2740192
6
270-0193
1 CLUBHOUSE OFFSET ENCLOSU
7
270-0194
1 CLUBHOUSE OFFSET ENCLOSU
B
2704M
CENTER MOUNT ENCLOSURE
9
27003W
ABSTRACT PLATFORM LADDER
10
370-0016
GRAB BAR ASSEMBLY
11
374W38
CLUBHOUSE ASCEND ROCK CL
12
370470/8
SUDINGPOLE50'-77
13
370-0171
TRANGO CLIMBER CENTER MC
14
3704272
STAGGERED POD WALK 40'
15
3700771
CLUBHOUSE BOARD CUMBER
16
37MO51
VERTOCUMBER 3 FS
17
370-0854
VERTO CUMBER
18
370-1578
NATURE PLAY TRANSFER STU
19
370-1579
NATURE PLAY TRANSFER STUN
20
3741595
PULL-UP
21
370-1596
PUSH-UP
22
370,1601
CORE STATION
23
370-1008
OVISTEP LAUNCH PAD
24
3741SM
LIFT N ROW
25
370-1545
MANITOUCUMBER48'
26
470-0025
CLUBHOUSE RETREAT ROOF
27
470.OBW
ROOM ROLL SUDIE, 40' - 48' W
28
470AB04
SLIDE HOOD LOW SIDE WALL
29
470.OBW
SLIDE HOOD HIGH SIDE WALL
30
470-M2
CSA VIPER R 64-72 W70 HDOD
31
550-OM
TOT SEAT T&@'SINGLE STD
32
S540112
BELT SEAT B PAIR. STD CHAIN
33
550-0135
5'ODARCHSWING
34
W"136
5'OD ARCH SWING ADD -ON
35
550-0191
KONNECTION SWING
36
570-0779
BUBBLE- WINDOW PANEL
-CLUBHOUSE FULL BOARDPAN
37
570-0782
38
570-2555
SIGN, PULL UP
SIGN PUSH UP_
39
570.2050
40
5742859
SIGN CORE STATION
SIGN LIFT N ROW
41
570-2800
421
570-2086
INVIGORATE FITNESS ELLIPTIC)
43
5742667
INVIGORAt L Fi I NESS RECUMB
INVIGORATE FITNESS CHEST P
INVIGORATE FITNESS STRIDER
FS SIGN INVIGORATE STRIDER
FS SIGN INVIGOHA I E cH—E—sTpi
44
570-2690
45
570.2691
46
5742897
47
5742898
48
5742698
F5 SIGN INVIGORATE RECUMB
49
67427W
FS SIGN INVIGORATE ELUPTI
50
580-0104
LITTER CONTAINER RECYC
51
5WO1 W
6 PVC TRADITIONAL BENCH
52
5B41294
FS WELCOME SIGN. AGES &12
53
SM1295
FS WELCOME SIGN AGES 25
,J. L-,tt
14619H XeW
IleJanO
SERIES: Basics, Fitness, Intensity, Nucleus South Miami Park
ELEVATION PLAN 4300 SW 58th Ave
DRAWN BY: Landon Berendsen South Miami, FL 33143
17.2021
Leadex Corporation
103-140286-1
BCI Burke Company, LLC PO Box 549 Fond du Lac, Wisconsin 54936-0549 Telephone 920-921-9220
V-
.MV'
May 17, 2021
SERIES: Basics, Fitness, Intensity, Nucleus South Miami Park Leadex Corporation
ISOMETRIC PLAN 4300 SW 58th Ave 103-140286-1
DRAWN BY: Landon Berendsen South Miami, FL 33143
BCI Burke Company, LLC PO Box 549 Fond du Lac, Wisconsin 54936-0549 Telephone 920-921-9220
Burke
Proposal Prepared for:
Director Quentin Pough
City of South Miami
5800 SW 66th Street
South Miami, FL 33143
Phone: 305-668-3867
Proposal # 103-140286-1
May 17, 2021
2021 Pricing
Project Location:
South Miami Park
4300 SW 58th Ave
South Miami, FL 33143
Proposal Prepared by:
Leadex Corporation
1581 N W 88 Ave
Doral, FL 33172
Phone: 305-266-2028
Fax:305-264-5350
info@leadexcorp.com
Nelson Fonseca
Phone: 305-266-2028
Fax: 305-264-5350
Nelson@Leadexcorp.com
Component No. Description Qty User Cap Ext. User Cap Weight Ext. Weight
Phase One
Intensity
370-1608
OVISTEP LAUNCH PAD
1
1
1
10
10
Nucleus
072-0500-116C
5" OD X 116" CAPPED POST
1
0
0
61
61
072-0500-132C
5" OD X 132" CAPPED POST
1
0
0
69
69
072-0500-136C
5" OD X 136" CAPPED POST
1
0
0
71
71
072-0500-140C
5" OD X 140" CAPPED POST
1
0
0
74
74
072-0500-148C
5" OD X 148" CAPPED POST
1
0
0
78
78
072-0502-180S
5" OD X 180" SWAGED POST
4
0
0
94
376
270-0007
CLUBHOUSE STANCHION
1
0
0
33
33
270-0009
8" CLOSURE PLATE, ELLIPSE
2
0
0
8
16
270-0130
SQUARE PLATFORM
1
6
6
106
106
270-0136
SPLIT SQUARE PLATFORM
2
4
8
103
206
270-0193
CLUBHOUSE OFFSET ENCLOSURE, R...
1
0
0
36
36
270-0194
CLUBHOUSE OFFSET ENCLOSURE, L...
1
0
0
35
35
370-0048
SLIDING POLE 56"-72"
1
1
1
27
27
370-0272
STAGGERED POD WALK 40"
1
4
4
128
128
370-0771
CLUBHOUSE BOARD CLIMBER 72"
1
2
2
92
92
370-0851
VERTO CLIMBER 3 FS
1
3
3
103
103
370-0854
VERTO CLIMBER 1
2
1
2
35
70
370-1579
NATURE PLAY TRANSFER STUMP 40"
1
5
5
555
555
470-0625
CLUBHOUSE RETREAT ROOF
1
0
0
182
182
470-0805
SLIDE HOOD, HIGH SIDE WALL
1
0
0
32
32
470-0852
CSA VIPER R 64-72 W/O HOOD
1
2
2
139
139
570-0782
CLUBHOUSE FULL BOARD PANEL
1
0
0
35
35
600-0104
NPPS SUPERVISION SAFETY KIT
1
0
0
3
3
660-0103
MAINTENANCE KIT, STRUCTURE
1
0
0
7
7
660-0104
INSTALLATION KIT. STRUCTURE
1
0
0
5
5
Phase One User Capacity: 34
Phase One Weight: 2,549 lbs.
Phase One Price:
Phase Two
Proposal # 103-140286-1
May 17, 2021
Burke
2021 Pricing
Intensity
370-0016 GRAB BAR ASSEMBLY 1 0 0 6 6
Nucleus
072-0500-108C
5" OD X 108" CAPPED POST
1
0
0
57
57
072-0500-116C
5" OD X 116" CAPPED POST
3
0
0
61
183
072-0500-140C
5" OD X 140" CAPPED POST
1
0
0
74
74
072-0500-76C
5" OD X 76" CAPPED POST
1
0
0
40
40
072-0502-156S
5" OD X 156" SWAGED POST
4
0
0
82
328
270-0009
8" CLOSURE PLATE, ELLIPSE
2
0
0
8
16
270-0130
SQUARE PLATFORM
4
6
24
106
424
270-0192
CLUBHOUSE UNITARY ENCLOSURE
1
0
0
34
34
270-0266
CENTER MOUNT ENCLOSURE
1
0
0
43
43
270-0300
ABSTRACT PLATFORM LADDER 16"
1
1
1
17
17
370-0038
CLUBHOUSE ASCEND ROCK CLIMBER...
1
2
2
117
117
370-0171
TRANGO CLIMBER, CENTER MOUNT ...
1
5
5
33
33
370-0272
STAGGERED POD WALK 40"
1
4
4
128
128
370-1578
NATURE PLAY TRANSFER STUMP 32"
1
4
4
518
518
370-1645
MANITOU CLIMBER 48"
1
4
4
87
87
470-0625
CLUBHOUSE RETREAT ROOF
1
0
0
182
182
470-0659
ROCK'N ROLL SLIDE, 40" - 48" ...
1
1
1
71
71
470-0804
SLIDE HOOD, LOW SIDE WALL
1
0
0
32
32
570-0779
BUBBLE WINDOW PANEL
1
1
1
40
40
570-0782
CLUBHOUSE FULL BOARD PANEL
1
0
0
35
35
Phase Two User Capacity: 46
Phase Two Weight: 2,465 lbs.
Phase Two Price:
Phase Three
Fitness
072-0500-136C 5" OD X 136" CAPPED POST 2 0 0 71 142
072-0500-80C 5" OD X 80" CAPPED POST 1 0 0 42 42
072-0500-88C 5" OD X 88" CAPPED POST 2 0 0 46 92
Phase Three User Capacity: 8
Phase Three Weight: 1,522 Ibs.
Phase Three Price:
Proposal # 103-140286-1
Burke. May 17, 2021
2021 Pricing
Phase Four
Burke Basics
550-0099
TOT SEAT, T & 8' SINGLE, STD...
1 1
1
12
12
550-0112
BELT SEAT, 8' PAIR, STD CHAIN
1 2
2
20
20
550-0135
5" OD ARCH SWING
1 0
0
366
366
550-0136
5" OD ARCH SWING ADD -ON
1 0
0
223
223
550-0191
KONNECTION SWING
1 2
2
64
64
580-1294
FS WELCOME SIGN, AGES 5-12 BO...
1 0
0
44
44
580-1296
FS WELCOME SIGN, AGES 2-5
1 0
0
44
44
660-0101
BOT... INSTALL KIT, BURKE BASICS -
1 0
0
2
2
P...
Phase Four User Capacity:
5
Phase Four Weight:
1,887 lbs.
Phase Four Price:
Total User Capacity: 93
Total Weight: 8,423 lbs.
Total Price:
Information is relative to the May 17 2021 4:35AM database.
Special Notes:
Prices do not include freight, unloading, material storage, site excavation/preparation, removal of existing equipment,
removal of excess soil from footing holes, site security, safety surfacing, installation, or sales tax (if applicable). Prices
are based on standard colors per CURRENT YEAR BC] Burke Catalog. Custom colors, where available, would be an
extra charge. Pricing is valid for 45 days from the date of this proposal.
Proposal # 103-140286-1
May 17, 2021 Burke
2021 Pricing
Selacted Color List
Color Group
Color
Phase 1
Platform
Blue
Accessory
Yellow
Rotomolded
Blue
Kore Konnect
Red
Post
Red
1 Color Extruded/Flat
Blue
2 Color Extruded/Flat (outer)
Yellow
2 Color Extruded/Flat (inner)
Red
Phase 2
Platform
Blue
Accessory
Yellow
Kore Konnect
Red
Rotomolded
Blue
Post
Red
2 Color Extruded/Flat (outer)
Yellow
2 Color Extruded/Flat (inner)
Red
Phase 3
Accessory
Yellow
Post
Red
1 Color Extruded/Flat
Blue
2 Color Extruded/Flat (outer)
Yellow
2 Color Extruded/Flat (inner)
Red
Platform
Blue
Phase 4
Table/Bench Legs
Red
Table/Bench
Blue
Contemporary Swing Fittings
Red
Accessory
Yellow
Rotomolded
Blue
Post
Red
Overridden Colors
370-1608 OVISTEP LAUNCH PAD
Accessory Blue
1 Color Extruded/Flat Blue
Rotomolded Blue
Proposal # 103-140286-1
Burke. May 17, 2021
2021 Pricing
Konnection SwingT"
Safety Standards & Guidelines - Reference Information
The Konnection Swing was designed to provide an intergenerational play opportunity and offer everyone the
childhood joy of swinging! While researching the use of swings, two trends stood out to us - caregivers
pushing infants in bucket seat swings and adults swinging with children on their lap. Both situations could
be improved with the design of a swing designed to foster connection and increase safety. The Konnection
Swing was developed as a direct result of this. The overall design is focused on fostering true connection in
both eye contact and proximity leading to increased engagement for all users. Hands -free swinging allows
the caregiver to hold, interact and play with the child as they both experience the thrill of swinging together.
The Konnection Swing is IPEMA Certified and meets or exceeds the requirements of ASTM F1487-17,
which is recognized as the standard of care in the playground industry. This ASTM public playground safety
standard is revised every two to three years to remain current with innovation and market trends.
The CPSC Public Playground Safety Handbook hasn't been revised since 2008 and doesn't include new
product categories that have been innovated in recent years. There are a couple of points to note when
deciding to purchase a multi-user swing:
Multi-user swings are innovative and CPSC Public Playground Safety Handbook doesn't have a
standard that specifically covers them.
CPSC 5.3.8.3.1 — CPSC recommends that belt swing seats should be designed to accommodate no
more than one user at any time. While the Konnection Swing is a single axis swing, it is clearly not a
belt seat.
CPSC 2.3.1 — CPSC says that swings intended for more than one user are not recommended
because their greater mass, as compared to single occupancy swings, presents a risk of impact
injury.
o The ASTM safety standard, F1487, was revised in 2011 to add maximum impact
requirements for swings and the Konnection Swing has been tested and is compliant with
ASTM impact requirements.
o CPSC has written a letter stating that "the swing impact test in F1487-11 is a reasonable
approach to address the concerns posed by unoccupied, heavy, multiple occupancy swings."
CPSC has always included an exemption to both recommendations listed above for tire swings,
which are multiple occupancy swings that are suspended from a single pivot and permit swinging in
any direction.
CPSC also emphasizes that their Handbook provides recommendations, not requirements. If a
jurisdiction adopts the Handbook's recommendations as mandatory requirements, that jurisdiction
would need to determine how the requirements should be applied in any particular instance.
"Service, Safety, Quality. Three words I would use to describe the people, business model, and overall organizational
standards that inspires the BCI Burke Company. Every organization has a unique set of challenges and goals when it
comes to building an educational environment - and from our experience, BCI Burke came to the table ready to work with
its as partners to meet those challenges and goals head on.
We chose to work with BCI Burke because we needed a reliable company that would be able to provide nothing less than
the highest quality product with our own time limitations. As with most other businesses, we did not have the hcrwy of
making an investment into a project oj'this magnitude and not feel 100% certain that we had gotten the very best of our
dollar. We also had to assure our stakeholders that we would see that investment last the test of time.
BCI Burke offered us superb and consistent customer service, the ability to achieve our goal on a fast timetable, and the
confidence that our playground is genuinely the very best in design and safety. This is something that we will showcase in
our school for many years to come.
After working with the company. I know personally they are committed to go the extra mile to satisfy your needs. BCI
Burke is a master in their field but also provide the customer with an intuitive understanding ofservice".
Angela H. Brunini
Principal
St. Anthony Catholic School
"I mu wri Ling to tell you how much I enjoyed artd appreciated working a iih your local representative ...Through the years, I
have it urked with a number of playground companies, but never with anyone with the professionalism, commitment and
follow-through of (your Burke Rep). We are all so excited about out- children having the opportunity to play on your
wonderful equipment; of course, we want everything! We are so impressed with the many, many possible designs. Thank
you for the quality of your equipment and your local representatives. "
Nancy Emerson
Director
The Children's Center
Dallas. TX
BCIBURKE.COM Bur 1K— BOO.266.125O
POWDER COAT PAINT SOLIS 14UE TOPPERS ROCKIT
CLIMBERS
'u'pk`jg1k
c
w 3 Granite
Orange ..
Green% - e'�7 6 ,
Sandstone
0 0 PLATFORMS
T j L
NEW!
lull
Blue Brown Gray Recycled
Plastic
Green
Tan Gray
Purple/Gray Red/White Orange/Black
Lime Olive
01
Black Brown Green/Tan Lime/Black Olive/Black
-)c j -
NEW!
Yellow/Black Yellow/Red Tan/Green Gray/Black
NDPE PLASTIC PANELS
Blue Purple Red Orange Yellow
Blue/white Blue/Yellow
Black Gray Brown/Tan
SHADE CANOPIES
Green Aqua Blue Orange Orange Gray
aw, � i•
Sv`'ilVAVAVA
kv
a
Lime Sky Purple Mahogany Yellow Sand
ROTOMOLD PLASTIC
1 C
Green Olive Lime Blue Purple Red Orange Yellow Tan Granite
VISIT BCIBURKE.COM/COLOR TO CUSTOMIZE YOUR PLAYGROUND COLORS!
BCIBURKE.COM Bunke 500.2GG.1250
The Longest and Strongest warranty in the industry
BCI Burke Company, LLC (-Burke') warrants that all standard products are warranted to be free from defects in materials and workmanship, under normal use and service,
for a period of one (1) year from the date of shipment.
We stand behind our products. In addition, the following products are warranted,
under normal use and service from the date of shipment as follows:
• One -Wldred (100) Year Limited Warranty on aluminum and steel upright posts (including Intensity°', Synergy"', Nucleus', Voltage°, Little Buddies®, ELEVATE*, ACTIVATE",
INVIGCIRATE-) against structural failure due to corrosion, deterioration or workmanship.
• One iuldred000)Year Limited Warranty on KontKarri clamps against structural failure due to concision, deterioration a workmanship.
• One -Iu Tdred0D0)Year Limited Warrantycn Hardware (nuts, bolts, washers)
• One -I,ndmd (100)Year Limited Warranty on bolt -through fastening and clamp systems (Synergy^', IntemityO, Nucleus°', Voltage°, Little Buddies•, ELEVATE®).
• Twerty�w(25)Year Limited Warranty on spring assemblies and aluminum cast animals.
• fiftee-, i 15) Year Limited Warranty on structure platforms and decks, metal rook, table tops, bench tops, railings and barriers against structural failure due to materials a
wakmanship.
• Ff eer-i i 15) Year Limited Warranty on all plastic components including StoneBordem against structural failure due to materials a workmanship.
• Ten (10, Year Limited Warranty on ShadePlay Canopies fabric, threads, and cables against degradation, cracking a material breakdown resulting from ultra -violet exposure, natural
deterioration a manufacturing defects. This warranty is limited to the design loads as stated in the specifications.
• Ten (10sYear Limited Warranty on NaturePlay` Boulders and GFRC products against structural failure due to natural deterioration or workmanship. Natural wear, which may occur with
any concrete product with age, is excluded from this warranty
• Ten (' 0) Year Limited Warranty on Full Cola Custom Signage against manufacturing defects that cause delaminavon or degradation of the sign. Full Color Custom Signs also carry a
two (9) year warranty against premature fading of the print and graphics on the signs.
• five (5) year Limited Warranty on Intensity' and RopeVenturea cables and LEVEL X• flex bridge against premature wear due to natural deterioration or manufacturing defects.
Determination of premature wear will be at the manufacturer's discretion.
• Five(5)Year Limited Warranty on moving parts, including swing components, against structural failure due to materials or wokmanship.
• Five(5)vear Limited Warranty on PlayErsemble-cables and mallets against defects in materials and workmanship.
• Throe (3) Year Limited Warranty on electronic panel speakers, sound chips and ci=k boards against electronic failure caused by manufacturing defects.
The warranty stated above is valid only if the equipment is erected in conformity with the layout plan andlor installation instructor fumished by BCI Burke Company, LLC using
approved oarts; have been maintained and inspected in accordance with BCI Burke Company, LLC irstructiors. Burke's liability and your exclusive remedy hereunder will be limited
to repair of replacement of those parts found in Burke's reasonable judgment to be defective. Any claim made within the above stated warranty periods must be made promptly after
discoerycf the defect. A part is covered auy for the original warranty period of the applicable part. Replacement parts carry the applicable warranty from Lire date of shipment of the
replaceme-t from Burke. After the expiration of the warranty period, you must pay for all parts, transportation and service charges.
Burke reserves the right to accept or reject any claim in whole or in part. Burke will not accept the return of any product without its prior written approval. Burke will assume
transponat on charges for shipment of the returned product if it is returned in strict compliance with Burke's written instructions.
THE FOREGOING WARRANTIES ARE EXCLUSIVE AND IN LIEU OF ANY OTHER WARRANTY, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED
TO ANY IMPLIED WARRANTY OR MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. IF THE FOREGOING DISCLAIMER OF ADDITIONAL WARRANTIES IS NOT GIVEN
FULL FORCg AND EFFECT, ANY RESULTING ADDITIONAL WARRANTY SHALL BE LIMITED IN DURATION TO THE EXPRESS WARRANTIES AND BE OTHERWISE SUBJECT TO AND
LIMITED BY THE TERMS OF BURKE'S PRODUCT WARRANTY. SOME STATES DO NOT ALLOW THE EXCLUSION OF CERTAIN IMPLIED WARRANTIES, SO THE ABOVE LIMITATION
MAY NOT APPLY TO YOU.
Warranty Exclusions: The above stared warranties do not cover:'cosmetic' defects, such as scratches, dents, marring, a fading; damage due to incorrect installation, vandalism,
misuse, accident, wear and tear from normal use, exposure to extreme weather; immersion in salt or chlorine water, unauthoized repair a modification, abnormal use, lack of
maintenance, a other cause not within Burke's control; and
Limitation of Remedies: Burke is not liable for consequential or incidental damages, including but not limited to labor costs or lost profits resulting from the use of or inability to use
the proox s or from the products being incapaated in or becoming a component of any other product. If, after a reasonable number of repeated efforts, Burke is unable to repair
or replace a defective a nonconforming product, Burke shall have the option to accept return of the product, a part thereof, if such does nor substantially impair its value, and retum
the pwcYse pace as the buyer's entire and exclusive remedy. Without limiting the generality of the foregoing, Burke will not be responsible for labor costs involved in the removal of
products a the installation of replacement products- Some states do not allow the exclusion of incidental damages, so the above exclusion may not apply to you.
The envaaanent near a saltwater coast can be extremely corrosive. Some corrosion and/or deterioration Is corsidered'narnal wear- in this environment Product installed within
500 yards of a saltwater shoreline wil I only be covered for half the period of the standard product warranty, up to a maximum of five years, for defects caused by corrosion. Products
installed in direct contact with saltwater or that are subjected to salt spray are not covered by the standard warranty for any defects caused by corrosion.
Comae. )ocr local Burke Representative for warranty information regarding Burke Turf" and Burke Tile products.
Terms of Sale
Pricing: lines published in this catalog are in USD, are approximate and do not include shipping 8 handling, surfacing, installation nor applicable taxes. All prices are subject to
change we'qut notice. Contact your Burke representative for current pricing. Payments are to be made in USD.
Weights: Weights are approximate and may vary with actual orders.
Installation: All equipment is shipped unassembled. Fora list of factory -certified installers in your area, please contact your Burke representative.
Speelfkations: Product specification in this catalog were correct at the time of publication. However, product improvements are ongoing at Burke, and we reserve the right to
charge a cuscontinue specifications without notice.
Loss or Damage in Transit A signed bill of lading is our receipt from a caffier Bat our shipment to you was complete and in good condition upon amval. Before you sign, please
check the 611 of lading careful ly when the shipment arrives to make sure nothing is missing and there are no damages. Once the shipment leaves our plant, vm are no longer
responsible for any damage, loss or shortage.
For mort nfonnation regarding the warranty, call Customer Service at 920-991-9220 or 1.800-356-2070. 01 /2021
BCIBURICE.COM Burke 800.266.1250
ACIr ALM
Discover. Connect. Compete
Please Remit 10:
�EACRE11I'IvE
ALM Media, LLC ~�' ` 1 7 Z0
1 j
PO Box 936174 Dai
Atlanta, GA 31193-6174 Lcm
CLE' tZK'S OFFICE j
CITY OF SOUTH MIAMI
Attention To: NKENGA "NIKKI' PAYNE
NKENGAA.PAYNE
6130 SUNSET DR
SOUTH MIAMI, FL 33143
Business Review
Miami Dade
Customer No: 9006479
Invoice #: 1000052465341414
Invoice Date: 041F1412021
Due Date: Due Upon Recelpt
AMOUNT DUE: $145.85
Amoum Revealed
PLEASE RETURN THIS SECTION WITN PAYMENT
i FAA HE3i
Daily Business Review
Miami Dade
Invoice Date: 04/142021 Cuslomertl: 9005479
Invoke a Description Amount
10000524553-0414 PlaceementlPosition: BidsMearn9Weetin9s/Ordinarces0d NOUces & RFPS $145.85
Run Dates: 04/142021
Ad Size: 2 x 6.22 Inches Subtotal S145 85
CITY OF SOUTH MIAMI - RFP NPR2021-35
Total Due S145,85
Visit our online payment portal at httos://www.almoavmentcenter.com to pay via credit card
For Eilllnp Aueetlea , pleeee ereall: ALMcallaetI.Calm.eone.
Adar ALM
Discover. Connect. Compete.
150
R F P -*PR 2021-39
NON -MANDATORY PRE -BID MEETING VIA VIDEO CONFERENCING
A Non -Mandatory Pre -Bid meeting will be conducted through video
conferencing on April 21, 2021 at 10:00 AM using the Zoom platform.
Interested parties who are considering attending the Pre -Bid meeting, must
identify your Company Name in the -Participants I.Ist' on the Zoom
platform. The meeting will be hell regardless of weather conditions. After the
meeting, an email will be sent, confirming your attendance, to the allWtiOr of
Steven P. Kukck, Chief Procurement OfBcerat skulick0souMmiamMl.gov_
Members of the public may mew the meeting via Zoom at https7/zoom.
usrr3056636339, or listen to the meeting on a dedicated phone line by dialing
+1-786-635-1003 Meeting ID: 3056636339.
Nkenga A. Payne, CMC
City Clerk, City of South Miami
21-43/0000524553M
24 Z
152
Lough, Quentin
From: Kulick, Steven P
Sent: Thursday, May 27, 2021 2:46 PM
To: luis@tadeosengineering.com
Cc: Webster, John; Pough, Quentin; Payne, Nkenga
Subject: RE: Vendor Interview: RFP #PR2021-35
Luis,
The RFP under "Instructions for Respondents" section No. 6 "Response Withdrawal" provides
for a proposing firm to withdraw an erroneous Proposal and, while the errors were not
discovered and communicated within twenty-four hours of the bid opening, the errors were
discovered during the Publicly Noticed Vendor Interview Meeting on Wednesday May 26 and,
your withdrawal by evidence of your email below, was communicated withing twenty-four
hours after the Publicly Noticed Vendor Interview Meeting.
The City accepts your Response Withdrawal in accordance with the referenced section in the
RFP and, the clarification of that section described above.
Thank you,
Steven Kulick, C.P.M.
Chief Procurement Officer/Procurement Division
City of South Miami - 6130 Sunset Drive - South Miami, Fl 33143
Ph: 3051663-6339; Fax: 3051663-6346 - Email: skulick@southmiamifl.gov
From: luis@tadeosengineering.com <luis@tadeosengineering.com>
Sent: Thursday, May 27, 20212:03 PM
To: Kulick, Steven P <SKulick@southmiamifl.gov>
Cc: Webster, John <WWebster@southmiamifl.gov>; Pough, Quentin <QPough@southmiamifl.gov>; Payne, Nkenga
<NPayne @southmiamifl.gov>
Subject: RE: Vendor Interview: RFP #PR2021-35
Good Afternoon Mr. Kulick:
Thank you for the opportunity of the vendor interview, it was a pleasure meeting you.
153
After the meeting, we have carefully analyzed our bid and we found that there are mayor issues on it, we are hereby
respectfully requesting to withdraw our bid. Please feel free to contact me at any time if you have any question.
We really apologize for the inconvenience.
Sincerely,
� j�TAD
Luis Oscar de la Hoz Olivera, P.E., C.G.C.
14030 NW 82,d Ave.
Miami Lakes, FL 33016
www.fadeosengineering.com
lujs@tadeosengineering.com
P: 305-560-0120
C:305-903-8816
From: Kulick, Steven P <SKulickCdeouthmiamifl.eov>
Sent: Tuesday, May 25, 20212:53 PM
To: IuistS to d eose ne i ne erine. co m
Cc: Webster, John UWebsterCbDsouthmiamifl.gov>; Pough, Quentin <QPough@southmiamifl.eov>; Payne, Nkenga
<NPayneOsouthm is mifl.eov>
Subject: RE: Vendor Interview: RFP #PR2021-35
Re: Follow-up
Luis,
Please submit the following via email, to my attention, prior to Wednesday's meeting:
• References for listed subcontractors - Municipal and/or County School System related
references: Top Turf Miami, Playground Boss and Torres Acosta Landscaping
• Related work photos: Top Turf Miami playground surfacing projects and Playground
Boss playground structure photos.
• Project cut sheets or shop drawings for proposed playground structures.
Thanks,
Steven Kulick, C.P.M.
Chief Procurement Officer/Procurement Division
City of South Miami - 6130 Sunset Drive - South Miami, FI 33143
Ph: 305/663-6339; Fox: 3051653-6346 - Email: skulick(@southmiamifl.gov
2
154
Property Search Application - Miami -Dade County Page 1 of 7
Address Owner Name Folio
SEARCH:
5901 SW 64 ST
PROPERTY INFORMATION
'�Y7fG7[rkLSrYb�rXLSrY�Y9
Sub -Division:
STORMPROOFSUB
Property Address
5901 SW 64 ST
Owner
DELTA LLC
Mailing Address
6713 NW 109 AVE
DORAL, FL 33178
PA Primary Zone
0800 SGL FAMILY - 1701-1900 SO
Primary Land Use
0081 VACANT RESIDENTIAL: VACANT LAND
Beds / Baths / Half
0/0/0
Floors
0
Living Units
0
Actual Area
0
Living Area
0
Adjusted Area
0
Suite D
https://www.miamidade.gov/Apps/PA/propertysearch/ 10/21 /2021
Property Search Application - Miami -Dade County
Page 2 of 7
Lot Size 7,140 Sq.FI
Year Built 0
Featured Online Tools
Comparable Sales
PA Additional Online Tools
Property Search Help
Report Discrepancies
Special Taxing Districts and Other Non -Ad valorem
Assessments
TRIM Notice
Glossary
Property Record Cards
Property Taxes
Report Homestead Fraud
Tax Comparison
Tax Estimator
Value Adjustment Board
https://www.miamidade.gov/Apps/PA/propertysearch/
10/21 /2021
Property Search Application - Miami -Dade County
Page 3 of 7
ASSESSMENT INFORMATION
Year
Land Value
Building Value
Extra Feature Value
Market Value
2021
2020
$128,520
$128,520
$0
$0
$0
$0
$128,520
$128,520
Assessed Value $86,640
$78,764
2019
$185,640
$0
$0
$185,640
$71,604
TAXABLE VALUE INFORMATION
2021
2020
2019
COUNTY
Exemption Value
$0
$0
$0
Taxable Value
$86,640
$78,764
$71,604
SCHOOL BOARD
Exemption Value
$0
$0
$0
Taxable Value
$128,520
$128,520
$185,640
CITY
E
Exemption Value
$0
$0
$0
Taxable Value
$86,640
$78,764
$71,604
REGIONAL
Exemption Value
$0
$0
$0
Taxable Value
$86,640
$78,764
$71,604
BENEFITS INFORMATION
Benefit Type
2021 2020
2019
Non -Homestead Cap Assessment Reduction
$41,880 $49,756
$114,036
Note: Not all benefits are applicable to all Taxable Values (i.e. County, School Board, City, Regional).
FULL LEGAL DESCRIPTION
https://www.miamidade.gov/Apps/PA/propertysearch/ 10/21 /2021
Property Search Application - Miami -Dade County Page 4 of 7
25 54 40.15 AC
STORMPROOF SUB PB 47-12
LOT 10 BLK 3
LOT SIZE 68.000 X 105
OR 19278-4809 08 2000 4
COC 25092-0993 09 2006 4
SALES INFORMATION
Previous Sale
Price
OR Book -Page
Qualification Description
09/01/2006
$0
25092-0993
Sales which are disqualified as a result of examination of the deed
01/01/2005
$110,000
23049-3034
Sales which are qualified
08/01/2000
$0
19278-4809
Sales which are disqualified as a result of examination of the deed
08/01/2000
$14,500
19251-2689
Sales which are qualified
11/01/1973
$7,000
00000-00000
Sales which are qualified
For more information about the Department of Revenue's Sales Qualification Codes.
2021 2020 2019
LAND INFORMATION
Land Use Muni Zone PA Zone Unit Type Units Calc Value
GENERAL RS-3 0800 - SGL FAMILY - 1701 -1900 SQ Square Ft. 7,140.00 $128,520
BUILDING INFORMATION
Building Number Sub Area Year Built Actual Sq.Ft. Living Sq.Ft. Adj Sq.Ft. Calc Value
EXTRA FEATURES
Description Year Built Units Calc Value
ADDITIONAL INFORMATION
' The information listed below is not derived from the Property Appraiser's Office records. It is provided for convenience and is
derived from other government agencies.
https://www.miamidade.gov/Apps/PA/propertysearch/ 10/21/2021
Property Search Application - Miami -Dade County
Page 5 of 7
LAND USE AND RESTRICTIONS
Community Development District: NONE
Community Redevelopment Area: NONE
Empowerment Zone:
NONE
Enterprise Zone:
NONE
Urban Development:
INSIDE URBAN DEVELOPMENT BOUNDARY
Zoning Code:
RTM-14 -
Existing Land Use:
804 - VACANT, NON -PROTECTED, PRIVATELY -OWNED.
Government Agencies and Community Services
OTHER GOVERNMENTAL JURISDICTIONS
Business Incentives
Childrens Trust
City of South Miami
Environmental Considerations
Florida Inland Navigation District
PA Bulletin Board
Special Taxing District and Other Non -Ad valorem Assessment
School Board
South Florida Water Mgmt District
Tax Collector
The Office of the Property Appraiser is continually editing and updating the tax roll. This website may not reflect the most current
information on record. The Property Appraiser and Miami -Dade County assumes no liability, see full disclaimer and User Agreement at
http://www.miamidade.gov/info/disclaimer.asp
For inquiries and suggestions email us at http://www.miamidade.gov/PAPortaVContactFomVContactFormMain.aspx.
Version: 2.0.3
EXEMPTIONS B BENEFITS
Deployed Military
Disability Exemptions
Homestead
https://www.miamidade.gov/Apps/PA/propertysearch/ 10/21 /2021
Property Search Application - Miami -Dade County Page 6 of 7
Institutional
Senior Citizens
More >
REAL ESTATE
40 Yr Building
Re -Certification
Appealing Your Assessment
Defective Drywall
Folio Numbers
Mortgage Fraud
More >
TANGIBLE PERSONAL PROPERTY
Appealing your Assessment
Assessment Information Search
Exemptions
Extension Requests
Filing Returns
More >
PUBLIC RECORDS
Address Blocking
Change of Name
https://www.miamidade.gov/Apps/PA/propertysearch/ 10/21 /2021
Property Search Application - Miami -Dade County Page 7 of 7
Change of Address
Change of Ownership & Title
Declaration of Condominium
ONLINE TOOLS
Property Search
Property Sales
Tax Estimator
Tax Comparison
Homestead Exemption and Portability
TAX ROIL ADMINISTRATION
Appealing your Assessment
Reports
More >
More >
More >
https://www.miamidade.gov/Apps/PA/propertysearch/ 10/21 /2021