Loading...
5815 SW 68 ST_EB-92-043 �� - C=TY OF SOUTH •wM=AM 2 BUILDING AND ZONING ENVIRONMENTAL REVIEW AND PRESERVATION BOARD APPLICATION (ERPB) OWNER 7 /Sli(l/!J l�� TEL NO. �coz' tic 21Z O MAIL ADDRESS l 6G�/7 - /f7� /V�� CITY, STATE, ZIP REPRESENTED BY � I�-- TEL NO. MAIL ADDRESS CITY, STATE, ZIP ARCHITECT TEL NO. ENGINEER / TEL NO. STREET ADDRESS OF JOB—55/-S ( �� LOT(S) BLK NO. SUBDIVISION PRESENT USE Di �C� � PROPOSED USE ESTIMATED VALUE OF JOB PROPERTY VALUE ZONING INFORMATION FOR THE PROPOSED JOB ARE: NET LOT AREA LOT FRONTAGE EASEMENTS FRONT SETBACK REAR SETBACK SIDE SETBACK SIDE (CORNER) SETBACK BUILDING GROSS FLOOR AREA BUILDING COVERAGE BUILDING HEIGHT NONRESIDENTIAL F.A.R. IMPERVIOUS COVERAGE NUMBER OF PARKINGS SIGN DIMENSIONS FENCE DIMENSIONS I HEREBY MAKE APPLICATION FOR TH FOLLOWI G (BE SPECIFIC SI N UR DATE OFFICE USE ONLY CONDITIONS: DATE OF THE MEETING SIGNATURE OF THE BOARD'S CHAIRMAN C I T Y O F S OUTH M=AM= BUILDING AND ZONING DEPARTMENT IF YOUR PROJECT REQUIRES APPROVAL FROM THE. ENVIRONMENTAL REVIEW AND PRESERVATION BOARD AND YOU RECEIVE THAT APPROVAL, BE SURE YOU DO NOT BEGIN WORK UNTIL YOU HAVE APPLIED TO THE CITY FOR ALL OF THE NECESSARY PERMITS ! DO NOT BEGIN ANY WORK UNTIL YOU HAVE RECEIVED YOUR VALIDATED PERMIT AND A PERMIT CARD! CONTRACTORS WHO BEGIN WORK WITHOUT A PERMIT WILL BE SUBJECT TO A QUADRUPLE FEE PLUS A 5500 FINE OWNER/BUILDERS WHO BEGIN WORK WITHOUT A PERMIT WILL BE SUBJECT TO A QUADRUPLE FINE PLUS A $100 FINE! UNDERSTAND THAT APPLYING FOR A PERMIT DOES NOT GRANT THE RIGHT TO BEGIN CONSTRUCTION. SIGNA E TITLE WITNESS DATE DATE y I� _ _,�,o�7.h��3U/L,ZD/•J�G.�IL�_�.f_�i��f,�T��?t./��,���T_•��lid/_- _ �._..�_ �7✓_O�L�ae�..����.�•�,��o�7��_r3�//1��,��Gil/!�_ OC/Tli,� - 8 R�i�,�� .rev! ?p a f : !�I t MATER=AL S T O E3 1E SUBM 2 TT E D NEW DEVELOPMENTS, ADDITIONS AND EXTERIOR RENOVATIONS Submit Items: 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 17, and 18. SIGNS Submit Items: 1, 2, 6, 8, 10, 13, 14, 15, 16, and 18. FENCES Submit Items: 1, 2, 7, 8, 13, 14, and 18. EXTERIOR PAINTING Submit Items: 1, 6, 13, 14, and 18. PARKING, DRIVEWAY, LANDSCAPING, ETC. Submit Items: 1, 2, 3, 4, 8, 13, 14 and 18. ALL DRAWINGS AND MODELS SUBMITTED MUST BE TITLED, INDICATE ORIENTATION, AND BE AT AN ACCEPTABLE SCALE: ELEVATIONS AND FLOOR PLANS TO BE 1/4" = 1'-011, UNLESS OTHERWISE ALLOWED; CONSTRUCTION DETAILS AND BUILDING SECTIONS TO BE AT 3/4" = 1'-011; ALL SUBMISSIONS FOR FINAL APPROVAL MUST INCLUDE COMPLETED, FULL WORKING DRAWINGS AS REQUIRED FOR PERMITS FOR THE BOARD TO REVIEW. T '='HI2EE ( 3 ) COP=ES EACH OF THE. FOLLOW=NG . V/0 Brief, written description of the project on standard letter-size paper. 2. Current, official survey (dated within three years of application date) ; Each copy must be signed and sealed by a Registered Surveyor. a 3. Site plan indicating topographical features and the Florida State required finished floor elevations above sea level. 4. Landscape plan proposal and a certified, existing tree survey per the Dade County Tree Ordinance, signed and sealed by a Registered Surveyor. 5• Floor plans, including existing floor plans for additions & renovations. All elevations (facades) of the entire building & any proposed changes. 7. Elevations of the proposed fence including gate details and connections. S. Structural and construction details drawn to an acceptable scale. 9. Energy computations. 10. Electrical plans and data. 11. Plumbing plans and data. 12. Mechanical plans and data. 13 Color samples, materials samples, and other samples (brochures, etc. ) . Clear, color photographs of the entire building site or development, and photographs of all adjacent and surrounding properties must be included; A MINIMUM OF THREE SEPARATE PHOTOGRAPHS IS REQUIRED, E SETS O -- 15. Illumination details and mounting methods. 16. Dimensions and style of signs and letters. SUBMIT ONLY ONE OF THE FOLLOWING: 17 Finished model at a scale not less than of 1" = 20' is required for nonresidential development of 5000 sq ft or more only; all preliminary applications for such projects must include a block-out, study model. 18 Completed ERPB application and receipt for payment of application fee: Single Family Residential, each appearance before the Board $25.010 All other applications for new construction and renovation: First 1,000 square feet $50.00 c Each additional 1,000 square feet or fraction thereof $ 2.50 ,( S` Signs, fences, walls, etc. $50.00 �Q For each additional appearance before the Board $50.00 INSTRUCTIONS TO ERPB APPLICANTS, SUBNISSION REQUIREKENTS AND GUIDELINES 1. All construction and improvements visible from any public or private street must be approved by the environmental review and preservation board (ERPB) . 2. Each sheet of plans for any improvement estimated at $15,000 or greater, including labor, materials and services, shall bear the date and the impress seal and. signature of a licensed, professional architect or engineer, in accordance with the South Florida Building Code. 3. All applications are reviewed for accuracy, completeness and compliance with City of South Miami's Land Development Code . If a problem is found with an application, the applicant will be notified as soon as ..possible. Problems that are not resolved before the noon application deadline will result in the exclusion of that application from the upcoming agenda. 4. Neither applicants nor their representatives are REQUIRED to attend the ERPB meeting. However, the chances of receiving approval are much greater if someone is present at the meeting to answer questions about the project and is authorized to make corrections or modifications to the plans. It is RECOMMENDED that architects and engineers present their projects in person before the Board and be adequately prepared. 5. Approval by the ERPB is not authorization to begin construction. You must obtain a valid Building Permit after receiving approval from ERPB. Applications for Building Permits for single-family residential projects will be processed and issued as soon as possible after ERPB approval-. All other permit applications must observe a fifteen (15) day appeal period before such permits can be issued. 6. In order to allow the entire process to proceed as quickly as possible, you must submit a completed Building Permit Application when you apply to appear before the ERPB. Those plans submitted without complete Building Permit Applications will be disposed of sixty (60) days after being reviewed by the ERPB. 7. Final approval by the.ERPB shall elapse after six (6) months if no permit is issued, except as may be extended by the ERPB for a period of not to exceed six (6) months. 8. Development orders shall. not be issued by the City unless public facilities and services which meet or exceed the level of service standards established in the City's adopted Comprehensive Plan are available concurrent with the impacts of the proposed development. Proof of adequacy is and shall be the responsibility of the applicant. DEADLINE MON. @ NOON MEETING TUE. @ 9:OOAM Apr Oe --------------------- 16 Apr 29-., -------------------- NeY 07 . Kay 3 .___________________ NeY 21 May Y 24-------------------- Jun O{ Jun 10 ------------------- ----- Jun 18 Jun 24 __ ______________ _______ Jul 02 . Jul 08 ----- --------- --------- Jul 16 Jul 29 ------ ----- ------------ Aug 06 Aug 12 --------- - -------------- Aug 20 - Aug 26 --------- - -------------- Sep 03 Sep 09 ------- ---' ------------ Sep 17 Sep 23 ----- -------- ----------- Oct 01 Oct 0ZZ-------- - --------- Oct 1Oct 2 ----------' ------- Nov OS Nov} --------------- ----- Nov 19 Nov ---------------- ---- Dec 03 ,.De 09 ----------------------- -- Dee 17 30 ------------------------- J"07 City of South Miami 11i ­:nsec :�ourn Miami. Florca 33143 April 8, 1992 Dennis Jenkins 5815 SW 68 Street South Miami, FL 33143 Dear Applicant: This letter is to inform you that your request for the approval of Commercial Painting was presented to the Environmental Review and Preservation Board (ERPB) at their regularly scheduled meeting on April 7, 1992, and was APPROVED 5f0 based on the following conditions(s) : Addition of a "bowl" sculpture to be placed atop the Redestal at the front entrance as presented by the applicant in p-hotg=aphs In Addition: X Final approval by the ERPB is not authorization to begin construction. You must receive a valid Building Permit after approval by the ERPB. Applications for Building Permits for single-family residential projects will be processed and issued as soon as possible after ERPB final approval. All other permit applications must observe a fifteen (15) day ERPB appeal period before such permits can be issued. K -seised drawings for final approval must be submitted. All submissions must be received in the Building & Zoning Department before 12:00 Noon on 04f13/92 , in order to be placed on the agenda for the ERPB Meeting of 04 f 21f 92 . Separate filing fees are required for every submission and for each meeting. Revised drawings for Chairman's signature must be submitted. All submissions must be received in the Building & Zoning Department. Final decision by the ERPB may be appealed to the City Commission by written request to the City Clerk within fifteen (15) days of said decision. Final approval by the ERPB shall elapse after six (6) months if no permit is issued, except as may be extended by the ERPB for a period of not to exceed six (6) months. If you have any questions concerning this matter, please, contact me between the hours of 8:00 AM and 5:00 PM, Monday through Friday, at 663-6325. Please refer to file # EB-92-043. Sincerely, Bill Mackey Planner