Loading...
12-224-015WOOD TRU55E5 24" c/c. MAXIMUM 2 x4 BLOCKING NAILED TO To CHORE) OF TRU55E5 IN AREA OF BLOCKED DIAPHRAGM W/(2)Iod TOE NAILS EACH END I� I A Gr A1'l FOfR NA I L= INS OF: fR00F Sk4EAfi�4INe AT F3LOC{<INe D 1 4fHAN SCAL1=:3/4" = I' -O" a/a" PLYWOOD NAILED TO TRI -155 W/IOd NAILS '-) 4" O/C. 2''x4'' BLOCKING W/(2)1&d NAILS EACH END (TYf-) (4) I%d NAILS a EA CONN. (TYP) PIGGY BACK PLYWOOD 5HEATHINC 12 x 12 OPENING FOR VALLEY VENTILATION. -RT-30 STRAP BY USP WRAP AROUND PIGGY BACK W/ o -d NAILS TO EXISTING TRUSS e 24" O.C. EXI5TING PREFAB WOOD TRUSSES '3 24" O.C. VALLEY TRUSS DETAIL SGALE:3/4"=I'-011 2 x 4 CROSS 2 x 4 CR055 BRACING BRACING i WD. TRUSSE5 a ( N411. 15 UJ/(4)IG d NAILS �, ( PJ a E EACH CONN. 1 24" O.C. T USS FO 2 x 4 CONT. HOIRIZ. RIZ. LATERAL BRACING AGING 1,� 5PACES-2'-0"O.C.=20'-0"(MA�) 2 x 4 BLOCKING NOTES. IOd NAILS �4" I:HORIZONTAL BRACINC; OF IOd NAILS BOTTOM CHORD: PROVIDE ONE A:PROVIDE CROSS BRACING, A5 �D6 kj �0 �u BRACING MEM5EER5 TO BE AT EACH END OF THE BUILDING; <1 AND AT NOT MORE THAN 20'-0" KCS SPACING; IN DIRECTION OF SPLICE LOCATIONS, LAP BRACING; HORIZONTAL BR,4CINC; p 15:5RACING MEMBERS TO BE 2x& TRI -155E5. WOOD MEMBER. E)TAIL OF f;qt -0@.. -0q1 a , co U 1— T 4n � 4 IOd NAILS a 4" c/c. 2 x4 BLOCKING NAILED TO To CHORE) OF TRU55E5 IN AREA OF BLOCKED DIAPHRAGM W/(2)Iod TOE NAILS EACH END I� I A Gr A1'l FOfR NA I L= INS OF: fR00F Sk4EAfi�4INe AT F3LOC{<INe D 1 4fHAN SCAL1=:3/4" = I' -O" a/a" PLYWOOD NAILED TO TRI -155 W/IOd NAILS '-) 4" O/C. 2''x4'' BLOCKING W/(2)1&d NAILS EACH END (TYf-) (4) I%d NAILS a EA CONN. (TYP) PIGGY BACK PLYWOOD 5HEATHINC 12 x 12 OPENING FOR VALLEY VENTILATION. -RT-30 STRAP BY USP WRAP AROUND PIGGY BACK W/ o -d NAILS TO EXISTING TRUSS e 24" O.C. EXI5TING PREFAB WOOD TRUSSES '3 24" O.C. VALLEY TRUSS DETAIL SGALE:3/4"=I'-011 2 x 4 CROSS 2 x 4 CR055 BRACING BRACING i WD. TRUSSE5 a ( N411. 15 UJ/(4)IG d NAILS �, ( PJ a E EACH CONN. 1 24" O.C. T USS FO 2 x 4 CONT. HOIRIZ. RIZ. LATERAL BRACING AGING 1,� 5PACES-2'-0"O.C.=20'-0"(MA�) 2 x 4 BLOCKING NOTES. I:HORIZONTAL BRACINC; OF 2:DIAC;ONAL BRACING: BOTTOM CHORD: PROVIDE ONE A:PROVIDE CROSS BRACING, A5 ROW OF HORIZ. BRACING AS SHOWN SHOWN, AT EACH END ROW OF EVERY 10'-0" OF SPAN OF TRU55 PERMANENT HORIZONAL BRACING, BRACING MEM5EER5 TO BE AT EACH END OF THE BUILDING; CONTINUOS 2"x 4" WOOD MEMBER AND AT NOT MORE THAN 20'-0" WI(2) lrod NAILS AT EACH TRU55. AT SPACING; IN DIRECTION OF SPLICE LOCATIONS, LAP BRACING; HORIZONTAL BR,4CINC; MEMBER OVER AT LEAST TWO 15:5RACING MEMBERS TO BE 2x& TRI -155E5. WOOD MEMBER. E)TAIL OF f;qt FINISH —7 GRADE _ I cv x CONCRETE SLAB, SEE PLAN FOR REINFORCING EL, SEE PLAN 12" 2 #5 CONTINUOUS T"rF10AL THIOND EDGE DETAIL SCALE: 3/4"=1'-0" 2' — /7111 G u CONCRETE 5LAB, SEE PLAN FOR THICKNESS JOINT J-2 AND REINFORCING I#5 EL. 5EE PLAN EL. SEE PLAN --+— + VAPOR BARRIER WELL COMPACTED FILL I ° J11 EL, SEE PLAN 8" BLOCK WALL WALL FOOTING, SEE PLAN AND SCHEDULE FOR SIZE AND REINF, 3" CLEAR TYP. T�4 I O NF) EDG;E AT DCOR DETAIL SCALE: 3/4"=l'-011 BEAN/TIE BEAM PizOVIDE #3 TIES e 12" O.C. OVER OPENINGS UNDER &'-0" SEE PLANS AND 4 113 TIES 511 O.G, OVER 6' -tall. SCHEDULESZ: d a 4 oI q � a �d d O d q d a y —L M�N APP 2 #5 BOTTOM AND AT EACH FACE FOR EACH 12" TB DROP, IOPENINCz DOOR OR WINDOW OPENING, I T5 EDSOF [DETAIL -,AT OFEN INGS SCALE: 3/4"=l'-011 RAKE BEAM 5EE SCHEDULE FOR SIZE 4 REINFORCEMENT, TIE BEAM OR BEAM 5EE SCHEDULE FOR SIZE 4 REINFORCEMENT. C_M.U. WALL COL, OR COLUMN SCHEDULE FOR E 4 REINFORCEMENT, 1RA<D 5A1l CONNECTION [DETAIL SCALE: 3/4"=1'-0" cot ocl�icn�i �MENT TO BE 1 FOOTER TO TIE WALL. PROVIDE �)P TIE BEAM OR eEQ'D i SHEET) 0 SILL W/ 205'5 <TEND 5" =YOND OF47NNr-� NOTE: ALL MASONRY WALLS TO BE IN PLACE BEFORE BEAMS AND COLUMNS ARE POURED. T" 'FICAL UJ1N[DOW OFEN f O �DTAI L SGALE: 3/4"=1'-0` 5EE PLAN T0F_ LJALL FOOTING OORN F� DETAIL TIE BEAM OR BEAM ENT. TIS SEAM 0TF [DETAIL SCALE: 3/411=11-011 /4"=1'-011 " 1rr,t-,l-rair.�T TO BE )OTER TO WALL. 0" C.M.U. UJALL CONCRETE SLAB, SEE PLAN FOR THICKNESS AND REINPORGING z Q 1 IL x 1i1 � N TIE COL. OR COLUMN 5EE SCHEDULE FOR SIZE 4 REINFORCEMENT. 1/5 " 5AW-CUT JOINT FILL WITH JOINT MATERIAL —X—X CONTROL JOINS DETAIL (C.J.) CONCRETE SLAB, SEE PLAN FOR THICKNESS KEYED METAL AND REINFORCING SEPARATOR Xx —X ----X 2 OON5T F IUCT I ON JOINT 14 (ALT`NATE SCALE: 3/4"=I' -O" e10"xIO''Aa HEAVY HEX ANp- 3/a" PLATE U145HER ISOLATION JOINT—� ro" PROJECTION ACK NUT SND UJA5HE 2 #3 TIES 2 NDN -SHRINK TOP OF 5LAB T 5EE PLAN C-sROU� IF, TOP OF FOOTING; il5EE HLAN TUE3E COLUMN / FOOTING [DETAIL SCALE: 3/4"-1'-0" REBAR, FILL GELL5 LJ/— EXTEND JOINT REINFORCING 3000 P51 GROUT &" INTO COLUMN. Cid ❑yC� D Q' 4 g• 0 172" C�(2 COVE12 13 GA. GALVANIZED HORI SEE PLAN JOINT REINFORCING e16" O.C. VERT. T� FICAL FALL TI Collll IN DETAIL 5EE PLAN q a El d BUILOINI('a DEPT. d z FILL THREE CELLS FILL TWO CELLS BLOCK d OF SOl!jp�UJ/A)_l tit 0' COURSES (TYP.) aV '>")VIEO �3'/. INTERLOCK _,. C0FNER DETAIL WALL INTE1;�5ECTION - CD .� z uo M� N 4 � a , co U 1— T 4n � 4 0 SILL W/ 205'5 <TEND 5" =YOND OF47NNr-� NOTE: ALL MASONRY WALLS TO BE IN PLACE BEFORE BEAMS AND COLUMNS ARE POURED. T" 'FICAL UJ1N[DOW OFEN f O �DTAI L SGALE: 3/4"=1'-0` 5EE PLAN T0F_ LJALL FOOTING OORN F� DETAIL TIE BEAM OR BEAM ENT. TIS SEAM 0TF [DETAIL SCALE: 3/411=11-011 /4"=1'-011 " 1rr,t-,l-rair.�T TO BE )OTER TO WALL. 0" C.M.U. UJALL CONCRETE SLAB, SEE PLAN FOR THICKNESS AND REINPORGING z Q 1 IL x 1i1 � N TIE COL. OR COLUMN 5EE SCHEDULE FOR SIZE 4 REINFORCEMENT. 1/5 " 5AW-CUT JOINT FILL WITH JOINT MATERIAL —X—X CONTROL JOINS DETAIL (C.J.) CONCRETE SLAB, SEE PLAN FOR THICKNESS KEYED METAL AND REINFORCING SEPARATOR Xx —X ----X 2 OON5T F IUCT I ON JOINT 14 (ALT`NATE SCALE: 3/4"=I' -O" e10"xIO''Aa HEAVY HEX ANp- 3/a" PLATE U145HER ISOLATION JOINT—� ro" PROJECTION ACK NUT SND UJA5HE 2 #3 TIES 2 NDN -SHRINK TOP OF 5LAB T 5EE PLAN C-sROU� IF, TOP OF FOOTING; il5EE HLAN TUE3E COLUMN / FOOTING [DETAIL SCALE: 3/4"-1'-0" REBAR, FILL GELL5 LJ/— EXTEND JOINT REINFORCING 3000 P51 GROUT &" INTO COLUMN. Cid ❑yC� D Q' 4 g• 0 172" C�(2 COVE12 13 GA. GALVANIZED HORI SEE PLAN JOINT REINFORCING e16" O.C. VERT. T� FICAL FALL TI Collll IN DETAIL 5EE PLAN q a El d BUILOINI('a DEPT. d z FILL THREE CELLS FILL TWO CELLS BLOCK d OF SOl!jp�UJ/A)_l tit 0' COURSES (TYP.) aV '>")VIEO �3'/. INTERLOCK _,. C0FNER DETAIL WALL INTE1;�5ECTION - SEAL REVISIONS L- 2.- 3,- 4�- 5.- 6.- REINF, UJ/ #5 VERT. 2 CELLS ADJACENT t- --- 5EE'PLAN DACE FEBRUARY, 2012 TO WALL Of ENING SCALE: AS NOTED 11 DRAWN Y. SOSA no ❑ II DESIGN SI' PAM DOOR OR 1111NDOW OPENING q1 5EE ARCH. WALL OENING FILL TWO END GELL5 FOUNDATION WALL OR CONCRETE BEAM NOT -•--DOWELS 1 -ER PLANS - PROVIDE #9 GA. LADER TYPE HORIZ, REINF. AT )roll O.G. MAX. LAP WALL INTERSECTION WITH "T" AN[:-,) "L" CORNIER SECTIONS, SEE STRUCTURAL NOTH5 FOR ADDITIONAL INFORMATION. - DETAILS APPLY TO 0" AND 12" THICK CMU WALLS T �r f= L E CCE OF N I NS [DETAIL T"'rFICAL IRE INFFORC D MASONRY D TA f O SCALE: 3/4'' 1P-0" JOB N09 PmmCONSULTING ,ENGINEERS STRUCTUFA, ENGINE RING 7168 SW 4 ST;.S�11TEc6!4", MIAMI„FL `< 33155v',Q' PH:(05) 9tae� FX: L305) 67 - 3 ° ,a 5-1 A -a. 1” E O F ®4t,7 ; PAULA. I /kZT�I FLORIDA REG. Y 42650M A��� PMMCE JOB # 11019 CD .� z uo M� N L w � co U 1— T 4n � w Q SEAL REVISIONS L- 2.- 3,- 4�- 5.- 6.- REINF, UJ/ #5 VERT. 2 CELLS ADJACENT t- --- 5EE'PLAN DACE FEBRUARY, 2012 TO WALL Of ENING SCALE: AS NOTED 11 DRAWN Y. SOSA no ❑ II DESIGN SI' PAM DOOR OR 1111NDOW OPENING q1 5EE ARCH. WALL OENING FILL TWO END GELL5 FOUNDATION WALL OR CONCRETE BEAM NOT -•--DOWELS 1 -ER PLANS - PROVIDE #9 GA. LADER TYPE HORIZ, REINF. AT )roll O.G. MAX. LAP WALL INTERSECTION WITH "T" AN[:-,) "L" CORNIER SECTIONS, SEE STRUCTURAL NOTH5 FOR ADDITIONAL INFORMATION. - DETAILS APPLY TO 0" AND 12" THICK CMU WALLS T �r f= L E CCE OF N I NS [DETAIL T"'rFICAL IRE INFFORC D MASONRY D TA f O SCALE: 3/4'' 1P-0" JOB N09 PmmCONSULTING ,ENGINEERS STRUCTUFA, ENGINE RING 7168 SW 4 ST;.S�11TEc6!4", MIAMI„FL `< 33155v',Q' PH:(05) 9tae� FX: L305) 67 - 3 ° ,a 5-1 A -a. 1” E O F ®4t,7 ; PAULA. I /kZT�I FLORIDA REG. Y 42650M A��� PMMCE JOB # 11019