12-224-004DETA
'ED RUBBER HC
WELLINGTON 1/2
t'LON TAPE
211x2"x 2'-0" P.T. PINE
OOD STAKE OR "5
RE -BAR 2'-0" LONG
M
TYPICAL TREE GUYING DETAIL
DISTANCE BETWEEN PLANTS SHOULD BE
FAR ENOUGH TO ALLOW PLANTS TO REACH
MATURE SIZE WITHOUT INTERFERING WITH----
GROWTH
ITHGROWTH OF ADJACENT PLANT MATERIALS
DISTANCE TO CENTERLINE WILL VARY ACCORDING TO
5PECIE5 AND HABITAT OF GROWTH 50 THAT
MATURE PLANTS WILL NOT OVER LAP ONTO SIDEWALK,
STRUCTURES, PAVED AREAS, ETC.
SIDEWALK
JELLINGTON 1/2"
LON TAPE
WELLINGTON 1/2'
'r'LON TAPE
JM 2' x 2" x 2" x 0' P.T. PINE
STAKE OR *5 RE -BAR 2'-0" LONG.
ION TO SECURELY STABILIZE TREE
+ + + �-
+ + + + +
+ + + + + +
+ + + + + + +
+ + + + + + + +
\ SPACING OF PLANTS
TYPICAL CURB AND GUTTER//A5 INDICATED ON
PLANTING PLAN
TYPICAL CONTAINER SPACING
LARGE TREE PLANTING DETAIL
NOTE: IN MOST CASES, TRIANGULAR
SPACING IS PREFERRED. USE SQUARE
SPACING ONLY IN SMALL
RECTILINEAR AREAS,
SQUARE SPACING
MULCH EDGING - ALL PLANT
BEDS ADJACENT TO SOD AREAS SHALL
RECEIVE A 3' DEEP
LAYER OF MULCH
PLAWM NOTES: LIMIT OF SOD LINE -ALL
SOD IS TO BE LAID AS PER DRAWINGS
(SEE LANDSCAPE= PLAN)
(See plant specification and details for additional standards)
—All plant material is to be Florida Number 1 or better pursuant to the Florida Department
of Agriculture's Grades and Standards for Nursery Plants
—Sod is to be grade "A" weed free.
—All areas marked "LAWN" shall be solid sodded with St. Augustine F'I'oratam" solid sod.
See limit on plan. All areas marked 'Bahia Grass' shall be solid sodded with Paspalum
notatum AII sod is to be laid level, tight, and cut even along planting beds.
If
—All plants are to be top dressed with a minimum 3 layer of Melaleuca mulch, PLANTING SOIL MIX AS SPECIFIED
Eucalyptus mulch or equal. EXCAVATE TO A MIN DEPTH
—PlantingOF plans shall take precedence over plant list in case of discrepancies. �' AND BACKFILL WITH PREPARED
P P P P PLANTING SOIL
—No changes are to be made without the prior consent of the Landscape Architect and
Owner. Additions and / or deletions to the plant material must be approved by the project
ARCHITECT.
—Landscape Contractor is responsible for providing their own square footage takeoffs and
field verifications for 100 % sod coverage for all areas specified.
— All landscape areas are to be provided with automatic sprinkler system which provide
100% coverage, and 50% overlap.
— All trees in lawn areas are to receive a 24" diameter mulched saucer at the base of the trunk.
— All lawn located in parking islands is to be set flush with top of curb. Provide adequate soil
to within 3" of top of curb.
— Trees are to be planted within parking islands after soil is brought up to grade. Deeply set
root balls are not acceptable.
— Planting soil for topsoil and backfill shall be 50/50 mix, nematode free by Morris Magic
soil, Hialeah, Florida. Planting soil for annual beds to be comprised of 50% Canadian
peat moss, 25% salt free coarse sand and 25% Aerolite.
— Tree and shrub pits will be supplemented with "Agriform Pells", 21 gram size
with a 20-10-5 analysis, or substitute application accepted by Landscape
Architect. Deliver in manufacturer's standard containers showing weight,
analysis and name of manufacturer.
CUT CENTRAL LEADER
4NCHES BY 25% - RETAIN NATURAL
DF PLANT. PAINT ALL CUTS OVER
1ETER WITH TREE PAINT
TRIANGULAR SPACING
PLANT MATERIAL SHALL NOT BE PRUNED
PRIOR TO INSTALLATION -
AFTER PLANT HAVE BEEN INSTALLED,
EACH PLANT SHALL BE PRUNED FOR UNIFORMITY
3" MULCH AS SPECIFIED
OVER ALL PLANTING BEDS
LIMIT OF SOD LINE - ALL SOD
TO BE LAID AS PER DRAWINGS
(SEE LANDSCAPE PLAN)
EXISTING 5UB6OIL-`
MULCH EDGING - ALL PLANTING BEDS
ADJACENT TO SOD AREAS SHALL PLANTING SOIL
RECEIVE A 4'-6" DEEP LAYER OF MULCH
SPACING AS
PER PLANS
TYPICAL GROUND COVER PLANTING DETAIL
SMALL TREE PLANTING DETAIL
SPACING AS
;==ZD PI ntJG,
TYPICAL SHRUB PLANTING DETAIL
TOP OF MULCH SHALL BE
12" BELOW PAVEMENT
PAVED WALK
IN -1111M
IIB1111=1111
GENERAL NOTES
—The Landscape Contractor is to locate and verify all underground and overhead utilities
prior to beginning work. Contact proper utility companies and / or General Contractor prior
to digging for field verification. The Owner and the Landscape Architect shall not be
responsible for any damages to utility or irrigation lines (see Roadway Plans for more
utility notes).
—Landscape Contractor is to verify all current drawings and check for discrepancies and
bring to the attention of the Architect prior to commencing with the work.
—All unattended and unplanted tree pits are to be properly barricaded and flagged during
installation.
—All planting plans are issued as directives for site layout. Any deviations, site changes, et
cetera are to be brought to the attention of the Architect for clarification prior to
installation.
15TING SUBSOIL
MIAMI
rjulLt)i G sp-c n0iii
raS'Fy$ Q V E 0 6
FINISH
GRADE
LOT 17
THIN BRANCHES BY 2E 9% - RE
N'A'TURAL SHAPE OF PL,,
UELLINGTON I/2" WIDE NYLON TAPE PAINT ALL CUTS OVER 4"
�M
WITH TREE= PAINT - DC
CUT CENTRAL LE,�
BURLAP FROM TOP OF ROOT BALL
L6
TREES OF SAME SPE=CIE
:H LAYER, GRADE 'A"
BE MATCHED IN GROWTH CHAR4
R OF NEW TOPSOIL GUY WIRE - 012 DOUBLE 5TRAND TWI5
WRAP TWICE= AROUND
-I BERM
TRUNK WITH TWO-PLY RUBBER HO
coo 0
ALL POINTS OF GOP
- ATTACH WIRE TO ST
2' x 2" x 2" x 0" P.T. PINE
TAKE OR *5 RE -BAR 2'-0" LONG.
MINIMUM 2" x 2" x 6" P. T.
4 TO SECURELY STABILIZE TREE
WOOD STAKES OR *5 RE
L
- TWO PER TI
r
�
POSITION TO SECURELY 5TA51LIZE
TING SUBSOIL
4" EARTH I
a
3' MULCH LA
GRAD 3
W
2' LAYER OF NEW TOF
a
BACKF I L L
Q
EXISTING SUE
Z0
REMOVE BURLAP FF
OF RO
TRIANGULAR SPACING
PLANT MATERIAL SHALL NOT BE PRUNED
PRIOR TO INSTALLATION -
AFTER PLANT HAVE BEEN INSTALLED,
EACH PLANT SHALL BE PRUNED FOR UNIFORMITY
3" MULCH AS SPECIFIED
OVER ALL PLANTING BEDS
LIMIT OF SOD LINE - ALL SOD
TO BE LAID AS PER DRAWINGS
(SEE LANDSCAPE PLAN)
EXISTING 5UB6OIL-`
MULCH EDGING - ALL PLANTING BEDS
ADJACENT TO SOD AREAS SHALL PLANTING SOIL
RECEIVE A 4'-6" DEEP LAYER OF MULCH
SPACING AS
PER PLANS
TYPICAL GROUND COVER PLANTING DETAIL
SMALL TREE PLANTING DETAIL
SPACING AS
;==ZD PI ntJG,
TYPICAL SHRUB PLANTING DETAIL
TOP OF MULCH SHALL BE
12" BELOW PAVEMENT
PAVED WALK
IN -1111M
IIB1111=1111
GENERAL NOTES
—The Landscape Contractor is to locate and verify all underground and overhead utilities
prior to beginning work. Contact proper utility companies and / or General Contractor prior
to digging for field verification. The Owner and the Landscape Architect shall not be
responsible for any damages to utility or irrigation lines (see Roadway Plans for more
utility notes).
—Landscape Contractor is to verify all current drawings and check for discrepancies and
bring to the attention of the Architect prior to commencing with the work.
—All unattended and unplanted tree pits are to be properly barricaded and flagged during
installation.
—All planting plans are issued as directives for site layout. Any deviations, site changes, et
cetera are to be brought to the attention of the Architect for clarification prior to
installation.
15TING SUBSOIL
MIAMI
rjulLt)i G sp-c n0iii
raS'Fy$ Q V E 0 6
FINISH
GRADE
LOT 17
DATE :NOVEMBER, 2011
SCALE' SHOWN
DRAWN. M. CASTELLON
DESIGN BY' JR
Jos NO=
L-2
O N2
�M
O
M
L6
J
W
Z
W
a
coo 0
W
J
0
r
�
a
L6
Z
W
a
J
Q
Z0
Z
U
a
W
U)
Z
o�
M
di
1
U
<C)
DATE :NOVEMBER, 2011
SCALE' SHOWN
DRAWN. M. CASTELLON
DESIGN BY' JR
Jos NO=
L-2
�M
O
M
L6
J
W
Z
W
a
W
J
0
r
�
a
L6
Z
W
a
J
V
Z0
Z
U
a
W
U)
Z
o�
M
DATE :NOVEMBER, 2011
SCALE' SHOWN
DRAWN. M. CASTELLON
DESIGN BY' JR
Jos NO=
L-2