Loading...
12-224-004DETA 'ED RUBBER HC WELLINGTON 1/2 t'LON TAPE 211x2"x 2'-0" P.T. PINE OOD STAKE OR "5 RE -BAR 2'-0" LONG M TYPICAL TREE GUYING DETAIL DISTANCE BETWEEN PLANTS SHOULD BE FAR ENOUGH TO ALLOW PLANTS TO REACH MATURE SIZE WITHOUT INTERFERING WITH---- GROWTH ITHGROWTH OF ADJACENT PLANT MATERIALS DISTANCE TO CENTERLINE WILL VARY ACCORDING TO 5PECIE5 AND HABITAT OF GROWTH 50 THAT MATURE PLANTS WILL NOT OVER LAP ONTO SIDEWALK, STRUCTURES, PAVED AREAS, ETC. SIDEWALK JELLINGTON 1/2" LON TAPE WELLINGTON 1/2' 'r'LON TAPE JM 2' x 2" x 2" x 0' P.T. PINE STAKE OR *5 RE -BAR 2'-0" LONG. ION TO SECURELY STABILIZE TREE + + + �- + + + + + + + + + + + + + + + + + + + + + + + + + + \ SPACING OF PLANTS TYPICAL CURB AND GUTTER//A5 INDICATED ON PLANTING PLAN TYPICAL CONTAINER SPACING LARGE TREE PLANTING DETAIL NOTE: IN MOST CASES, TRIANGULAR SPACING IS PREFERRED. USE SQUARE SPACING ONLY IN SMALL RECTILINEAR AREAS, SQUARE SPACING MULCH EDGING - ALL PLANT BEDS ADJACENT TO SOD AREAS SHALL RECEIVE A 3' DEEP LAYER OF MULCH PLAWM NOTES: LIMIT OF SOD LINE -ALL SOD IS TO BE LAID AS PER DRAWINGS (SEE LANDSCAPE= PLAN) (See plant specification and details for additional standards) —All plant material is to be Florida Number 1 or better pursuant to the Florida Department of Agriculture's Grades and Standards for Nursery Plants —Sod is to be grade "A" weed free. —All areas marked "LAWN" shall be solid sodded with St. Augustine F'I'oratam" solid sod. See limit on plan. All areas marked 'Bahia Grass' shall be solid sodded with Paspalum notatum AII sod is to be laid level, tight, and cut even along planting beds. If —All plants are to be top dressed with a minimum 3 layer of Melaleuca mulch, PLANTING SOIL MIX AS SPECIFIED Eucalyptus mulch or equal. EXCAVATE TO A MIN DEPTH —PlantingOF plans shall take precedence over plant list in case of discrepancies. �' AND BACKFILL WITH PREPARED P P P P PLANTING SOIL —No changes are to be made without the prior consent of the Landscape Architect and Owner. Additions and / or deletions to the plant material must be approved by the project ARCHITECT. —Landscape Contractor is responsible for providing their own square footage takeoffs and field verifications for 100 % sod coverage for all areas specified. — All landscape areas are to be provided with automatic sprinkler system which provide 100% coverage, and 50% overlap. — All trees in lawn areas are to receive a 24" diameter mulched saucer at the base of the trunk. — All lawn located in parking islands is to be set flush with top of curb. Provide adequate soil to within 3" of top of curb. — Trees are to be planted within parking islands after soil is brought up to grade. Deeply set root balls are not acceptable. — Planting soil for topsoil and backfill shall be 50/50 mix, nematode free by Morris Magic soil, Hialeah, Florida. Planting soil for annual beds to be comprised of 50% Canadian peat moss, 25% salt free coarse sand and 25% Aerolite. — Tree and shrub pits will be supplemented with "Agriform Pells", 21 gram size with a 20-10-5 analysis, or substitute application accepted by Landscape Architect. Deliver in manufacturer's standard containers showing weight, analysis and name of manufacturer. CUT CENTRAL LEADER 4NCHES BY 25% - RETAIN NATURAL DF PLANT. PAINT ALL CUTS OVER 1ETER WITH TREE PAINT TRIANGULAR SPACING PLANT MATERIAL SHALL NOT BE PRUNED PRIOR TO INSTALLATION - AFTER PLANT HAVE BEEN INSTALLED, EACH PLANT SHALL BE PRUNED FOR UNIFORMITY 3" MULCH AS SPECIFIED OVER ALL PLANTING BEDS LIMIT OF SOD LINE - ALL SOD TO BE LAID AS PER DRAWINGS (SEE LANDSCAPE PLAN) EXISTING 5UB6OIL-` MULCH EDGING - ALL PLANTING BEDS ADJACENT TO SOD AREAS SHALL PLANTING SOIL RECEIVE A 4'-6" DEEP LAYER OF MULCH SPACING AS PER PLANS TYPICAL GROUND COVER PLANTING DETAIL SMALL TREE PLANTING DETAIL SPACING AS ;==ZD PI ntJG, TYPICAL SHRUB PLANTING DETAIL TOP OF MULCH SHALL BE 12" BELOW PAVEMENT PAVED WALK IN -1111M IIB1111=1111 GENERAL NOTES —The Landscape Contractor is to locate and verify all underground and overhead utilities prior to beginning work. Contact proper utility companies and / or General Contractor prior to digging for field verification. The Owner and the Landscape Architect shall not be responsible for any damages to utility or irrigation lines (see Roadway Plans for more utility notes). —Landscape Contractor is to verify all current drawings and check for discrepancies and bring to the attention of the Architect prior to commencing with the work. —All unattended and unplanted tree pits are to be properly barricaded and flagged during installation. —All planting plans are issued as directives for site layout. Any deviations, site changes, et cetera are to be brought to the attention of the Architect for clarification prior to installation. 15TING SUBSOIL MIAMI rjulLt)i G sp-c n0iii raS'Fy$ Q V E 0 6 FINISH GRADE LOT 17 THIN BRANCHES BY 2E 9% - RE N'A'TURAL SHAPE OF PL,, UELLINGTON I/2" WIDE NYLON TAPE PAINT ALL CUTS OVER 4" �M WITH TREE= PAINT - DC CUT CENTRAL LE,� BURLAP FROM TOP OF ROOT BALL L6 TREES OF SAME SPE=CIE :H LAYER, GRADE 'A" BE MATCHED IN GROWTH CHAR4 R OF NEW TOPSOIL GUY WIRE - 012 DOUBLE 5TRAND TWI5 WRAP TWICE= AROUND -I BERM TRUNK WITH TWO-PLY RUBBER HO coo 0 ALL POINTS OF GOP - ATTACH WIRE TO ST 2' x 2" x 2" x 0" P.T. PINE TAKE OR *5 RE -BAR 2'-0" LONG. MINIMUM 2" x 2" x 6" P. T. 4 TO SECURELY STABILIZE TREE WOOD STAKES OR *5 RE L - TWO PER TI r � POSITION TO SECURELY 5TA51LIZE TING SUBSOIL 4" EARTH I a 3' MULCH LA GRAD 3 W 2' LAYER OF NEW TOF a BACKF I L L Q EXISTING SUE Z0 REMOVE BURLAP FF OF RO TRIANGULAR SPACING PLANT MATERIAL SHALL NOT BE PRUNED PRIOR TO INSTALLATION - AFTER PLANT HAVE BEEN INSTALLED, EACH PLANT SHALL BE PRUNED FOR UNIFORMITY 3" MULCH AS SPECIFIED OVER ALL PLANTING BEDS LIMIT OF SOD LINE - ALL SOD TO BE LAID AS PER DRAWINGS (SEE LANDSCAPE PLAN) EXISTING 5UB6OIL-` MULCH EDGING - ALL PLANTING BEDS ADJACENT TO SOD AREAS SHALL PLANTING SOIL RECEIVE A 4'-6" DEEP LAYER OF MULCH SPACING AS PER PLANS TYPICAL GROUND COVER PLANTING DETAIL SMALL TREE PLANTING DETAIL SPACING AS ;==ZD PI ntJG, TYPICAL SHRUB PLANTING DETAIL TOP OF MULCH SHALL BE 12" BELOW PAVEMENT PAVED WALK IN -1111M IIB1111=1111 GENERAL NOTES —The Landscape Contractor is to locate and verify all underground and overhead utilities prior to beginning work. Contact proper utility companies and / or General Contractor prior to digging for field verification. The Owner and the Landscape Architect shall not be responsible for any damages to utility or irrigation lines (see Roadway Plans for more utility notes). —Landscape Contractor is to verify all current drawings and check for discrepancies and bring to the attention of the Architect prior to commencing with the work. —All unattended and unplanted tree pits are to be properly barricaded and flagged during installation. —All planting plans are issued as directives for site layout. Any deviations, site changes, et cetera are to be brought to the attention of the Architect for clarification prior to installation. 15TING SUBSOIL MIAMI rjulLt)i G sp-c n0iii raS'Fy$ Q V E 0 6 FINISH GRADE LOT 17 DATE :NOVEMBER, 2011 SCALE' SHOWN DRAWN. M. CASTELLON DESIGN BY' JR Jos NO= L-2 O N2 �M O M L6 J W Z W a coo 0 W J 0 r � a L6 Z W a J Q Z0 Z U a W U) Z o� M di 1 U <C) DATE :NOVEMBER, 2011 SCALE' SHOWN DRAWN. M. CASTELLON DESIGN BY' JR Jos NO= L-2 �M O M L6 J W Z W a W J 0 r � a L6 Z W a J V Z0 Z U a W U) Z o� M DATE :NOVEMBER, 2011 SCALE' SHOWN DRAWN. M. CASTELLON DESIGN BY' JR Jos NO= L-2