Res No 052-21-15672RESOLUTION NO. 052-21-15677
A Resolution of the Mayor and City Commission regarding the design of the Pedestrian
Bridge Overpass at US-1 and SW 71st Street.
WHEREAS, During the Commission Meeting of February 2, 2021, the Commission passed
a resolution authorizing the City Manager to enter into a contract for design services with A&P
Consulting Transportation (APCTE) for the Pedestrian Bridge Overpass at US-1 and SW 7151
Street; and
WHEREAS During the Commission Meeting on April 20, 2021, APCTE, along with the
Architect, V3 Architectural Group, presented two bridge design renderings; and
WHEREAS, In order to move forward with the project, the City Manager would like to
have input from Mayor and Commission regarding option 1 or option 2; and
NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE
CITY OF SOUTH MIAMI, FLORIDA THAT:
Section 1. The foregoing recitals are hereby ratified and confirmed as being true and they
are incorporated into this resolution by reference as if set forth in full herein.
Section 2. The Mayor and Commission select Option 1 of the design rendering for the
pedestrian bridge.
Section 3. Corrections. Conforming language or technical scrivener -type corrections
may be made by the City Attorney for any conforming amendments to be incorporated into the
final resolution for signature.
Section 4. Severability. If any section clause, sentence, or phrase of this resolution is for
any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall
not affect the validity of the remaining portions of this resolution.
Section S. Effective Date. This resolution shall become effective immediately upon
adoption.
PASSED AND ADOPTED this 41h day of May, 2021.
ATTEST: APPZD:
" (� v
A��-
CITY 6kRK MAYOR
Paee 1 of 2
Res. No. 052-21-15672
READ AND APP
LANGUAGE, I,P
D AS TO FORM, COMMISSION VOTE: §-0
Y AND Mayor Philips:
Yqa
Commissioner Corey:
Yea
Commissioner Harris:
Yea
Commissioner Liebman:
Yea
Commissioner Gil:
yea
Page 2 of 2
Agenda Item No:5.
City Commission Agenda item Report
Meeting Date: May 4, 2021
Submitted by: Samantha Fraga-Lopez
Submitting Department: City Manager
Item Type: Resolution
Agenda Section:
Subject:
A Resolution of the Mayor and City Commission regarding the design of the Pedestrian Bridge Overpass at
US-1 and SW 71 st Street. 3/5
Suggested Action:
Attachments:
Memo_Pedestrian_Bridge_Alternatives.docx
Reso_Pedestrian_Bridge_Altematives.docx
CITY OF SOUTH MIAMI PEDESTRIAN BRIDGE —OPTION 1.pdf
CITY OF SOUTH MIAMI PEDESTRIAN BRIDGE —OPTION 2.pdf
CITY OF SOUTH MIAMI
SouthfMiami OFFICE OF THE CITY MANAGER
THE CITY OF PLEASANT LIVING INTER -OFFICE MEMORANDUM
To: The Honorable Mayor & Members of the City Commission
FROM: Shari Karnali, City Manager
DATE: May 4, 2021
SUBJECT: A Resolution of the Mayor and City Commission regarding the design of
the Pedestrian Bridge Overpass at US-1 and SW 7151 Street.
BACKGROUND: During the Commission Meeting of February 2, 2021, the Commission
passed a resolution authorizing the City Manager to enter into a contract
for design services with A&P Consulting Transportation (APCTE) for the
Pedestrian Bridge Overpass at US-1 and SW 71St Street.
During the Commission Meeting on April 20, 2021, APCTE, along with the
Architect, V3 Architectural Group, presented two bridge design
renderings. In order to move forward with the project, the City Manager
would like to have input from Mayor and Commission regarding option 1
or option 2.
ATTACHMENTS: Resolution
Option 1
Option 2
2
%d�
m
!=,1�
�-.::
L a
r ��
�x � N r
o�
L— a�
�a
/�i/ 7 a
�o
'�— � w
>o
!A
LLd
W
2
� �—� U U
c
Air
f: •1�
h /
l�
s
A
:'M
= I
AIF
t
11
it
r
3
Z
O
F
a
O
w
C7
O
K
m
Z
a
��
y�
w
o�
w
a�
_¢
�a
a _
�o
x �,
Fw
�o
OQ
w�
LLa
>Ow
FZ
—O
O U
�l ,
F � Y+ l
rm,
3
pg
1
JI
ry
:1 A
ri
IN
N