Loading...
3Agenda Item No:3. City Commission Agenda Item Report Meeting Date: January 7, 2020 Submitted by: Quentin Pough Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: A Resolution authorizing the City Manager to negotiate and enter into a contract with Stantec Consulting Services Inc. to complete professional engineering and design construction documents for the conversion of a residential property into a public park. 3/5 (City Manager-Parks & Recreation Dept.) Suggested Action: Attachments: Memo-New Park Construction Design.docx Resolution-re Stantec New_Park_Construction_Design ContractCArev.docx Proposal-SM Ludlum Glades Park.pdf Stantec Professional Service Agreement.pdf Property Boundary Survey.pdf 1 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor & Members of the City Commission FROM:Steven Alexander, City Manager Via: Quentin Pough, Director of Parks & Recreation DATE:January 7, 2020 SUBJECT:A Resolution authorizing the City Manager to instruct and to pay Stantec to complete professional engineering and design construction documents for the conversion of a residential property into a public park. BACKGROUND:Pursuant to the Professional Services Agreement provided by the city for professional general engineering and architectural services, city staff desires to engage Stantec for professional construction documents related to the conversion of a recently purchased property located at 7435 SW 66 Avenue (14,810 SF) into a public park. As the next firm listed in the City’s rotation, Stantec, Inc. has submitted a proposal to provide contract documents for the conversion of a property into a public park. All improvements within this project shall be in accordance with the American with Disabilities Act (ADA). Additional improvements include but are not limited to pavilion(s), playground, half- court basketball court, floating dock or ramp for non-motorized boat operators, and more. In summary, the scope of work entails a comprehensive environmental field review, surveys and reports; two (2) community input meetings; multiple conceptual designs for public and staff review; project management and permit coordination with City of South Miami, Miami-Dade County Department of Regulatory and Economic Resources (DRER) and US Army Corps of Engineers (USACE); specs and bid package preparation, final signed and sealed construction documents, anticipated/preliminary construction costs, as well as post assistance with pre-bid conference(s) and construction administration services. The anticipated length of service for this design project (Tasks 1 through 6) is approximately 10 to 12 months commencing after the notice to proceed. EXPENSE:Amount not to exceed $118,745. ACCOUNT:The total expenditure shall be charged to account number 301-2000-572- 6450, which has a balance of $856,555 before this request was made. 2 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM ATTACHMENTS:Resolution Project Proposal – Stantec Professional Service Agreement – Stantec Property Boundary Survey 3 Page 1 of 2 RESOLUTION NO.: _______________1 2 A Resolution authorizing the City Manager to negotiate and enter into a contract with3 Stantec Consulting Services Inc. to complete professional engineering and design 4 construction documents for the conversion of a residential property into a public park. 5 6 WHEREAS, pursuant to the Professional Services Agreement provided by the City for 7 professional general engineering and architectural services, City staff desires to engage Stantec for 8 professional construction documents related to the conversion of a recently purchased property 9 located at 7435 SW 66 Avenue (14,810 SF) into a public park; and10 11 WHEREAS, all improvements within this project shall be in accordance with the American 12 with Disabilities Act (ADA). Additional improvements for public discussion include but are not limited 13 to pavilion(s), playground, half-court basketball court, floating dock or ramp for non-motorized boat 14 operators, and more; and15 16 WHEREAS, in summary, the scope of work entails a comprehensive environmental field 17 review, surveys and reports; two (2) community input meetings; multiple conceptual designs for 18 public and staff review; project management and permit coordination with City of South Miami, 19 Miami-Dade County Department of Regulatory and Economic Resources (DRER) and US Army Corps 20 of Engineers (USACE); specs and bid package preparation, final signed and sealed construction 21 documents, anticipated/preliminary construction costs, as well as post assistance with pre-bid 22 conference(s) and construction administration services; and23 24 WHEREAS, the total expenditure shall not exceed $118,745. The total expenditure in the 25 amount of $118,745 shall be charged to account number 301-2000-572-6450, which has a balance 26 of $856,555 before this request was made. 27 28 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY 29 OF SOUTH MIAMI, FLORIDA THAT:30 31 Section 1:The City Manager is authorized to negotiate and enter into acontract with Stantec 32 Consulting Services Inc. in an amount not to exceed $118,745 to complete professional engineering 33 and design construction documents for the conversion of a residential property into a public park, 34 located at 7435 SW 66 Avenue. 35 36 Section 2:If any section clause, sentence, or phrase of this resolution is for any reason held 37 invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the 38 validity of the remaining portions of this resolution.39 40 Section 3: This resolution shall become effective immediately upon adoption.41 42 PASSED AND ADOPTED this _______ day of _______________, 2020.43 44 4 ATTEST:APPROVED:45 46 _____________________________________________________47 CITY CLERK MAYOR48 49 READ AND APPROVED AS TO FORM COMMISSION VOTE:50 LANGUAGE, LEGALITY AND EXECUTION Mayor Stoddard51 THEREOF Vice Mayor Harris52 Commissioner Gil53 ____________________________Commissioner Liebman 54 CITY ATTORNEY Commissioner Welsh55 5 Ponce de Leon Boulevard, Suite 900 Coral Gables, Florida 33134 Tel: (305) 445-2900 December 10, 2019 City of South Miami Parks & Recreation Department 5800 SW 66th Street Miami, FL 33143 Main: (305) 668-3867 Attention: Mr. Quentin Pough, CPRP, CPSI Director of Parks and Recreation Reference: Ludlum Glades Park – 7435 SW 66 Ave City of South Miami, Florida Dear Mr. Pough: We are pleased to present this proposal for professional engineering services. We understand that the City of South Miami would like to convert the recently purchased residential property located at 7435 SW 66th Ave (14,810 SF) into a public park. We also understand that the City has included construction funds under Fiscal Year 2020/2021 and therefore would like to bid the project in October 2020. SCOPE OF SERVICES: TASK 1 – Due Diligence Phase Consultant shall review existing documents such as as-built drawings, property records, permit history and City of South Miami information to serve as a benchmark for existing site conditions. Any documentation regarding the property that is available to the City shall be submitted to us for review of that data. Prior to this field review, a desktop environmental review of pertinent environmental databases will be reviewed to determine potential natural resources that may be in the project area. A comprehensive environmental field review shall be performed to determine the potential impacts involving construction on the environment. This will include a jurisdictional wetland review of the project area to determine the presence/absence and/or extent of jurisdictional wetlands on-site; a protected species survey to determine the presence/absence of and/or utilization by any federal or state listed species. In addition, if determined necessary a benthic survey of the waterway will be performed to determine the presence/absence of protected marine resources including but not limited to seagrasses and corals. It is anticipated this comprehensive review could be accomplished in one 8-hr field day. The results of this field review will be documented in a report which shall be included in the application packages to the jurisdictional agencies involved during the permitting phase. This report will include representative photographs of the project area, maps documenting the location of the project area, exhibits documenting the aerial extent of any jurisdictional wetland resources in the vicinity, and exhibits documenting any other natural resources pertinent to the permit reviews. We will obtain a topographic and tree survey of the project area and a geotechnical report for use in our design. See attached sub-consultant proposals. 6 December 10, 2019 Page 2 of 4 TASK 2 - Conceptual Design Phase Up to three conceptual design plans for the development of the Ludlum Glades Park will be prepared for use at two public input sessions. Conceptual plans will be based on the site survey, including general topographic information and tree locations. High quality trees will be retained within the conceptual designs; however, it is assumed all existing structures will be removed or replaced. Conceptual design plans will be for illustrative purposes only and will convey anticipated uses as determined by the Parks & Recreation Department, to include: • Half-court basketball court • Pavilion(s) • Tot-lot • Floating dock or ramp for non-motorized boat operators • Sidewalks • Landscape Areas TASK 3 – Community Input Meetings on Conceptual Design Phase Following completion of the conceptual designs, Stantec will host two public input meetings for community review. These will be held at a location determined by the Parks and Recreation Department. It is understood that the Department will provide public notification to neighborhoods surrounding the park project and will be responsible for costs associated with any meeting venue fees or equipment usage. Public input meetings will be informal; however, they will gather written comments and/or a project survey to formalize community feedback. Prior to the meetings, illustrations and any survey forms will be provided to the Department for distribution to residents that may be unable to attend the public meetings. A summary of each meeting and overall results/feedback will be provided to the Department prior to completing the Design Development Phase. TASK 4 – Design Development Phase Following public input, one final conceptual plan will be refined and reviewed with the Parks & Recreation Department for confirmation on final design plans. During this process, additional items may be added to the design. It is also assumed that principles of CPTED and xeriscaping should be included. Ensuring ADA accessibility and considerations for durability and maintenance will be incorporated into the final concept plan. An opinion of probable cost will also be included in this phase. TASK 5 – Construction Documents Phase This phase will provide plans and specifications for Landscape, Hardscape, Furnishings, and Irrigation Site Development drawings in coordination with the City’s Parks and Recreation Department and Stantec team including Engineering Grading, Drainage. One 50% design review meeting with the Parks and Recreation Department is anticipated within the Schedule. Stantec will select one or two pre-fabricated park shelters and review submittals during construction phase. (size and location to be coordinated during task 4). Shelters will include electrical power/outlets but no lighting. Site lighting design is not included as the park will be closed at sunset. TASK 6 - Permitting Phase Our services include plan submittal to the required permitting agencies (Miami Dade DERM, City of South Miami and the US Army Corps of Engineers (USACE)) for their review and approval. We will provide 7 December 10, 2019 Page 3 of 4 complete permit applications with all environmental documentation pertaining to existing habitat and protected species utilization to supplement the permit applications, address agency comments and re-issue plans as required. Anticipated Environmental Permits: - DERM Class III Permit: The Class III permit is needed for construction within non-tidal canals or areas under the direct control of Miami-Dade County, such as canal rights-of-way, canal maintenance easements and reservations. - USACE NWP No. 36: Boat Ramps: dependent on USACE claiming jurisdiction over surface water as WOTUS The consultant will respond to as many as two (2) rounds of reasonable requests for additional information from each of the above referenced agencies regarding the application submittal packages. These services include pre-application and coordination meetings with some of the agencies. Any significant plan revisions caused by changing agency criteria after our initial design is reviewed with each appropriate agency and similar factors outside the Consultant’s control, additional meetings or coordination will be considered as Additional Services. Application, review fees, and permit fees can be paid for from the $2,000 allowance. Any amounts in addition to the $2,000 will be a City Responsibility. TASK 7 – Bidding Assistance Phase Bidding assistance and bid review services will be provided in this phase including preparing our documents for City advertisement and distribution, attending one pre-bid conference, answering RFI’s, and review/recommend responsive bidder list to the City for contractor selection. TASK 8 – Construction Assistance Phase This phase includes attendance at weekly site meetings, on site presence to observe the progress of the work, site reporting of observations, review of contractor’s request for payment, Shop Drawing review, substantial and final completion reviews. Stantec will perform construction observations during construction activities based to one visit a week for 16 weeks (limited to 64 hours). Project close out will include turn-over of copies of Stantec project documents, final payment requisition, warranty and contractor as-built document reviews. Exclusions: • On-site or Off-site water and sewer upgrades or extensions • Lighting. • Bathroom/storage building • Change of zoning or land use approvals • Asbestos survey • Traffic studies or traffic impact statements 8 December 10, 2019 Page 4 of 4 Terms and Conditions: All terms and conditions shall be per our Professional Service Agreement for Professional General Engineering and Architectural Services as authorized by Resolution 060-17-14861. Our fees shall be as follows. Task 1 (Lump Sum) ....................................................................... $17,335 Task 2 (Lump Sum) ........................................................................ $9,695 Task 3 (Lum Sum) .......................................................................... $3,400 Task 4 (Lump Sum) ....................................................................... $12,810 Task 5 (Lump Sum) ....................................................................... $28,710 Task 6 (Lump Sum) .......................................................................$15,200 Task 7 (Lump Sum) ........................................................................ $3,880 Task 8 (Lump Sum) ........................................................................$25,115 Permit Fee Allowance (if needed) .................................................. $2,000 Reimbursables (presentation boards if needed) .............................. $600 TOTAL: $118,745 We are ready to begin working on this assignment upon your authorization to proceed. If acceptable to you, we will accept a signed copy of this form as your written authorization to proceed. Thank you, Stantec Consulting Services Inc. Sean Compel, P.E., LEED AP, ENV SP Senior Associate Tel: 305-445-2900 sean.compel@stantec.com City of South Miami Approved by: ____________________ ______________________ ______________ Signature Print Name Date V:\2156\business_development\215681119 City of South Miami\ludlum glades park\south_miami_Ludlum Glades Park R1.docx 9 Stantec Consulting Services Inc.Fee Worksheet - Page 1 DATE:9-Dec-19 PROJECT:Ludlum Glades Park Due Diligence - Task 1 Principal Senior Project Manager Senior Biol/LA/Engi neer Engineer Intern Senior CAD Tech Clerical Site visit and photo log 2 2 Site investigation and review of existing asbuilts 2 8 Environmental Survey 8 18 Desktop Review & Prepare Biological Report 2 4 16 Sub-Total Hours 2 16 0 44 0 0 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Labor Cost $360 $2,720 $0 $4,180 $0 $0 $7,260 Geotechnical:$2,275 Survey:$7,800 $17,335 Conceptual Design Phase - Task 2 Principal Senior Project Manager Senior LA/Engineer Engineer Intern Senior CAD Tech Clerical Conceptual Design Phase - Public Input 4 8 15 40 4 General Coordination & Management 4 4 Sub-Total Hours 4 12 19 0 40 4 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Labor Cost $720 $2,040 $2,755 $0 $4,000 $180 $9,695 Community Meeting Task 3 Principal Senior Project Manager Senior LA/Engineer Engineer Intern Senior CAD Tech Clerical Preparation & Attendance 8 0 8 4 General Coordination & Management 4 4 Sub-Total Hours 0 4 12 0 8 4 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Labor Cost $0 $680 $1,740 $0 $800 $180 $3,400 Design Development Task 4 Principal Senior Project Manager Senior LA/Engineer Engineer Intern Senior CAD Tech Clerical Design Development 4 24 60 Coordination 3 4 Cost estimate 2 4 4 Sub-Total Hours 4 29 0 8 64 0 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Labor Cost $720 $4,930 $0 $760 $6,400 $0 $12,810 Construction Documents Task 5 Principal Senior Project Manager Senior LA/Engineer Engineer Intern Senior CAD Tech Clerical Project coordination 2 2 Landscape/hardscape 4 24 80 Cover sheet, Key Sheet & notes 2 2 3 Geometry 1 2 6 12 Drainage and Grading 1 2 8 12 Electrical Design (power/outlets)1 6 4 16 20 Notes and Specifications on plans 2 6 8 12 Quantities & Cost Estimate 2 6 4 Sub-Total Hours 7 42 10 48 143 0 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Due Diligence Phase Sub-Total: Due Diligence Total: Community Meeting Sub-Total: Conceptual Design Phase Sub-Total: FEE WORKSHEET Design Development Sub-Total: 10 Stantec Consulting Services Inc.Fee Worksheet - Page 2 Labor Cost $1,260 $7,140 $1,450 $4,560 $14,300 $0 $28,710 $28,710 Permit Assistance Phase Task 6 Principal Senior Project Manager Senior Biol/ LA/Engineer Engineer Intern Senior CAD Tech Clerical DERM Pre-Appl Meeting 2 4 Prepare DERM Application Package 8 DERM Submittal Meeting 2 8 Response To DERM Comments 8 In House Permit Meetings 2 8 USACE Pre-App Meeting 2 4 Prepare USACE Application Package 8 Response to USACE Comments 8 Comments and revisions (2 Submittals)6 16 30 Sub-Total Hours 8 10 52 16 30 0 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Labor Cost $1,440 $1,700 $7,540 $1,520 $3,000 $0 $15,200 Bidding Assistance Task 7 Principal Senior Project Manager Senior LA/Engineer Engineer Intern Senior CAD Tech Clerical Attend pre-bid conference 4 Assist with answering questions 4 4 6 Review bids 2 6 2 Coordination 2 2 Sub-Total Hours 0 12 0 10 8 2 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 45.00$ Labor Cost $0 $2,040 $0 $950 $800 $90 $3,880 Construction Phase - Task 8 Principal Senior Project Manager Senior LA/Engineer Engineer Intern Senior CAD Tech Construction Inspector Pre-construction Meeting 3 3 Project Coordination Meetings - Weekly (assume 4 months)64 24 Field Observations during construction activities (assume 1 visit a week for 16 weeks)64 Shop Drawing Review 4 4 12 Quantity/Pay requisition review 4 12 Punch List Inspection 4 4 4 Closeout 4 2 Sub-Total Hours 0 83 7 42 0 80 Billing Rate 180.00$ 170.00$ 145.00$ 95.00$ 100.00$ 75.00$ Labor Cost $0 $14,110 $1,015 $3,990 $0 $6,000 $25,115 Construction Phase Sub-total:$25,115 $116,145 $2,000 $600 Total Fee:$118,745 Construction Documents Total: Bidding Assistance Phase Sub-Total: Construction Phase Sub-Total: Reimbursables (Presentations Board) Pemit fee allowance: Construction Documents Sub-Total: Pemitting Phase Sub-Total: Sub-Total All Services: 11 L O N G I T U D E SURVEYORS LONGITUDE SURVEYORS 7769 nw 48 street suite 375 ▪ doral, FL 33166 ▪ ph: 305.463.0912 ▪ f ax: 305.513.5680 Tuesday, November 26, 2019 VIA EMAIL: carlos.herdocia@stantec.com 7435 SW 66 Avenue Carlos M. Herdocia, P.E., LEED AP Stantec 901 Ponce de Leon Boulevard, Suite 900 Coral Gables, FL 33134 RE: Surveying services for 7435 SW 66 Avenue, City of South Miami, FL Dear Mr. Herdocia, Pursuant to your request regarding a fee estimate for Surveying and Mapping services for the above-referenced project, LONGITUDE SURVEYORS, LLC (LS) is pleased to submit the following Proposal for your consideration. A. Scope of Work: Longitude will perform a Topographic/Bathymetric/Tree Survey to include the following information: • Longitude Surveyors will set horizontal and vertical control around the land side perimeter of the area of interest. • Right-of-Way and property lines for the project area will be shown graphically. • Longitude Surveyors will collect sidewalks, curbs, catch basins, signs, entrances, trees, and any other significant above-ground improvements. • Longitude will collect elevations equivalent to a 100-foot grid. • Longitude will collect existing drainage information such as rim elevation, pipe size, pipe material, pipe direction, and inverts. • Longitude will collect canal cross-sections extending arm’s length into the canal. The canal cross-sections will be adjacent to the property line, extending five feet beyond the property line. • Longitude will locate trees and palms within Survey limits having a 3-inch diameter or greater at breast height (DBH) or being 12-feet in height or greater to include the following for each: scientific name, common name, diameter at breast height (DBH), height of tree, and canopy. LS will collect elevation at the base of each tree within Survey limits. • The Survey will be geo-referenced to the State Plane Coordinate System, based on the North American Datum of 1983/2011. • All elevations will be referenced to the National Geodetic Vertical Datum of 1929 (NGVD29), unless Client provides written notice at time of Notice to Proceed (NTP). B. Deliverables: LS will prepare four (4) signed and sealed paper copies and a pdf file of the resulting Survey. C. Survey Limits: 7435 SW 66 Avenue, Miami, Florida 33143, (City of South Miami new park), as per attached Exhibit provided by Client. D. Fee: The total professional fee to complete this task shall be a lump sum of $7,800.00. I agree that by signing below “I APPROVE AND ACCEPT” this proposal as a legal binding contract. By: Date: (Authorized Signature) Title: (Typed or printed name) Respectfully Yours, Eduardo M. Suarez, PSM/President 12 13 2051 NW 112th AVENUE, STE. 126 ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 June 4, 2019 Mr. Carlos Herdocia, PE 901 Ponce de Leon Boulevard/ Ste. 900 Coral Gables, FL 33134 Phone: 305.445.2900 Cell: 786.502.0701 Email: carlos.herdocia@stantec.com Re: Proposal for Geotechnical Exploration Services Proposed City of South Miami Park 7435 SW 66th Avenue South Miami, FL 33143 Dear Mr. Herdocia: Nutting Engineers of Florida, Inc. (NE) is pleased to present this proposal for performing geotechnical exploration services for the referenced project. Per your email dated November 14, 2019 and review of the site plan provided, we understand that plans for this project include construction of a new gazebo, new restroom building, and boat ramp at the referenced site. Based on your request for proposal and our understanding of the project, we propose the following scope of work and fee schedule. SCOPE OF WORK We propose to perform one Standard Penetration Test (SPT) boring in general accordance with ASTM D-1586 specifications to a depth of 25 feet in the area of the proposed construction. Additionally, we propose to perform one South Florida Water Management District (SFWMD) usual type open-hole exfiltration test to a depth of 15 feet in an effort to measure the hydraulic conductivity of the existing soils at specific test locations for site drainage evaluation by others. The proposed tests will be performed at locations identified by Stantec personnel. At the completion of the on-site work, the soil samples will be returned to our laboratory. We will provide an engineering report including a description of our findings and general site preparation and foundation design recommendations for support of the proposed structures. In order to provide information concerning the engineering properties of the soils encountered, it is anticipated that tests may be performed to determine natural water content, orga nic content, and sieve analysis on representative soil samples collected from the site. The engineering report will include graphic logs of the test borings and a test boring location plan. We assume the site is accessible to truck mounted drilling equip ment and that underground utilities will be cleared by others prior to our performing the on-site work. Miami Dade County Tier 2 CBE Palm Beach County SBE SFWMD SBE Small Business Administration SBE for Federal Projects 14 Stantec Proposed City of South Miami Park 7435 SW 66th Avenue, South Miami, FL Page 2 of 4 2051 NW 112th AVENUE ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 FEE SCHEDULE The above indicated scope of work will be performed for an estimated cost of $2,275.00 based on the following rates and quantities: Technician site visit, utility clearance Lump Sum $100.00 Mobilization of equipment/ crew 1 @ $350.00 $350.00 SPT borings* (truck mounted drill rig) Lump Sum $400.00 Casing Lump Sum $100.00 SFWMD exfiltration test Lump Sum $400.00 Project Engineer Lump Sum $750.00 Principal Engineer Lump Sum $125.00 Clerical/ Administration Lump Sum $50.00 We anticipate being able to begin this work within approximately two business days of receiving written authorization to proceed. The on-site work should take one business day to complete. The test report should be available within approximately 12 - 15 business days after the on-site work is completed. NE has been offering geotechnical engineering, environmental sciences, materials testing, an d structural inspection services for 50 years in South Florida and the Treasure Coast during which time we have worked on many similar projects. Our commitment to practical, cost effective solutions supported by responsive client services distinguishes ou r firm and enables us to solve your most demanding technical challenges. Another value added component NE brings to your project is our staff of experienced professionals including geotechnical engineers, environmental specialists, field personnel who are certified and have been trained to provide a wide range of consulting services, and our dedicated administrative staff. Our laboratory is checked annually by the Construction Materials Engineering Council (CMEC) and is certified to perform geotechnical engineering and materials testing services for the Florida Department of Transportation (FDOT). Note that we carry one million dollar professional liability and one million dollar general liability insurance. Thank you for providing us the opportunity t o present this proposal. We look forward to working with you on this and future projects. Respectfully submitted, NUTTING ENGINEERS OF FLORIDA, INC. Scott Ersland Adrian Ramirez Division Manager Engineering Intern Reports and invoices will be addressed to the client as listed below unless other instructions are provided in writing with this executed proposal. The undersigned, as an authorized representative of the entity listed below, approves this proposal and agrees to be bound by the terms and conditions contained in this proposal. Deposit amounts are collected at time of written authorization to proceed. If you are a first time client, we request that the balance due for these services be paid at the t ime of report completion. Once your account is established, our terms are net 30 days. Any invoices over 30 days will be assessed a 1 1/2 percent service charge per month until paid in full. 15 Stantec Proposed City of South Miami Park 7435 SW 66th Avenue, South Miami, FL Page 3 of 4 2051 NW 112th AVENUE ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 PLEASE ENTER INFORMATION LEGIBLY BELOW SO IT CAN BE UTILIZED FOR PROJECT SET-UP: SIGNATURE: ____________________________________________ DATE: _______________________________ PRINT NAME: ______________________________________________TITLE: __________________________ COMPANY NAME: ____________________________________________________________________________ ADDRESS: ___________________________________________________________________________________ ___________________________________________________________________________________________ PHONE: __________________________________________ FAX: ______________________________________ EMAIL: _____________________________________________________________________________________ General Terms and Conditions For the purpose of this project, the addressee of this proposal will be known as the Client. The client is expected to furnish NUTTING ENGINEERS OF FLORIDA, INC. (“NE”), with accurate information including sketch of survey and/or site plan, construction drawings/specifications as appropriate, details of proposed construction including the proposed structural system and loads or existing construction problem information and site accessibility information as appropriate. Other information requirements may be detailed in the enclosed proposal. IF ANY CONDITIONS CHANGE such as building layout, loading, project specifications/design, or unusual site conditions are observed, NE should be notified immediately in writing about the changed condition for possible review and comment. Should the Client wish to impose other conditions and requirements beyond those contained in this proposal such as in a separate contract, we reserve the option to modify contract language, fee amounts, to remove our proposal from consideration or other measures as may be indicated. Delivery – Scheduled upon receipt of written authorization to proceed and deposit unless other arrangements are agreed to in writing. Additional report copies can be provided for a nominal fee to the Client. NE will exercise appropriate measures to ensure project completion within a reasonable time frame subject to existing workloads. However, NE will not be held responsible for unavailability of necessary project data and site access within the time frame agreed upon for the investigation. Project delivery may be delayed if the ENTIRE signed proposal and deposit are not received in a timely manner. The ENTIRE signed quotation should be returned along with the requested project information. This unsigned proposal is valid for 60 days. Payment - No deposit required with signed agreement. Directing NE to proceed with the work shall constitute acceptance of the terms of NE’s proposal and these General Terms and Conditions. Balance due upon delivery of report. Interest at the rate of 18% per annum or the highest rate allowable by law whichever is less, will be added to all amounts not paid within 30 days after date of invoice. All attorney fees and expenses associated with collection of past due invoices will be paid by Client. Insurance – NE maintains Workers' Compensation and Employer's Liability Insurance in conformance with state law. In addition, we maintain Comprehensive General Liability Insurance and Automobile Liability Insurance with bodily injury limits of $1,000,000.00 and property damage limits of $1,000,000.00. A certificate of insurance can be supplied evidencing such coverage which contains a clause providing that fifteen days written notice be given prior to cancellation. Right-of-Entry - Unless otherwise agreed, Client will furnish right-of-entry on the property for NE to make the planned borings, surveys, and/or explorations. NE will not be responsible for removing fences, earth berms, vegetation or other obstructions for purposes of our investigation. NE will take reasonable precautions to minimize damage to the property caused by its equipment and sampling procedures, but the cost of restoration or damage which may result from the planned operations is not included in the contracted amount. If Client desires to restore the property to its former condition, NE will accomplish this and add the cost to its fee. Client agrees to waive all claims arising from or related to the failure to provide NE with proper access to conduct its work. Damage to Existing Man-made Objects - It shall be the responsibility of the Owner or his duly authorized representative to disclose the presence and accurate location of all hidden or obscure man-made objects relative to routes of access, field tests, sampling, or boring locations. When cautioned, advised or given data in writing that reveal the presence or potential presence of underground or over-ground obstructions, such as utilities, septic tanks, etc., NE will give special instructions to its field personnel. In addition, Client waives any claim against NE arising from damage to existing man-made objects. Warranty and Limitation of Liability - NE shall perform services for Client in a professional manner, using that degree of care and skill ordinarily exercised by and consistent with the standards of competent consultants practicing in the same or a similar locality as the project. In the event any portion of the services fails to comply with this warranty obligation and NE is promptly notified in writing prior to one year after completion of such portion of the services, NE will re-perform such portion of the services, or if re-performance is impracticable, NE will refund the amount of compensation paid to NE for such portion of the services. This warranty is in lieu of all other warranties. No other warranty, expressed or implied, including warranties of merchantability and fitness for a particular purpose is made or intended by the proposal for consulting services, by furnishing an oral response of the findings made or by any representations made regarding the services included in this agreement. In no event shall NE or any of its professional employees be liable for any special, indirect, incidental or consequential loss or damages, including but not limited to impact and delay claims. The remedies set forth herein are exclusive and the total liability of consultant whether in contract, tort (including negligence whether sole or concurrent), or otherwise arising out of, connected with or resulting from the services provided pursuant to this Agreement shall not exceed the total fees paid by Client or $50,000.00, whichever is greater. At additional cost, Client may obtain a higher limit prior to commencement of services. PURSUANT TO §558.0035, FLORIDA STATUTES, NE’S INDIVIDUAL EMPLOYEES AND/OR AGENTS MAY NOT BE HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE ARISING OUT OF, CONNECTED WITH, OR RESULTING FROM THEIR SERVICES PROVIDED PURSUANT TO THIS AGREEMENT. Indemnification – Client agrees to defend, indemnify and save harmless NE from all claims, including negligence claims, suits, losses, personal injuries, death and property liability resulting from NE’s performance of the proposed work, whether such claims or damages are caused in part by NE, and agrees to reimburse NE for expenses in connection with any such claims or suits, including reasonable attorney’s fees. Client’s obligation to indemnify is limited to $2 million per occurrence, which Client agrees bears a reasonable commercial relationship to the Work undertaken by NE. Client further agrees that these general conditions are a part of the Work’s specifications or bid documents, if any. 16 Stantec Proposed City of South Miami Park 7435 SW 66th Avenue, South Miami, FL Page 4 of 4 2051 NW 112th AVENUE ∙ MIAMI, FLORIDA 33172 ∙ 305-824-0060 ∙ FAX 305-824-8827 St. Lucie 772-408-1050 ∙ Broward 954-941-8700 ∙ Palm Beach 561-736-4900 Sampling or Testing Location - Unless specifically stated to the contrary, the unit fees included in this proposal do not include costs associated with professional land surveying of the site or the accurate horizontal and vertical locations of tests. Field tests or boring locations described in our report or shown on our sketches are based on specific information furnished to us by others and/or estimates made in the field by our technicians. Such dimensions, depths or elevations should be considered as approximations unless otherwise stated in the report. It is understood that all drilling locations are accessible to conventional truck mounted drilling equipment unless otherwise specified by the client. If unscheduled remobilizations or use of portable or all terrain equipment is required additional charges will apply. NE will attempt to clear utilities at our excavation/test locations by manual drilling to 3' below land surface (BLS). Any utilities/obstructions present at client specified test locations or below 3' BLS will be the responsibility of the client. Sample Handling and Retention – Generally soil test samples are retained for approximately three months after which time they will be discarded unless written instructions to the contrary are received from the client. Legal Jurisdiction - The parties agree that any actions brought to enforce any provision of this Agreement shall only be brought in a court of competent jurisdiction located in Palm Beach County, Florida. Any and all causes of action arising out of NE's performance of the Work, including but not limited to claims for indemnity, contribution and equitable subrogation, shall be deemed to have accrued and the applicable statutes of limitations shall commence to run not later than the date of NE's last invoice for the Work performed hereunder. Force Majeure - NE shall not be held responsible for any delay or failure in performance of any part of this Agreement to the extent such delay or failure is caused by fire, flood, explosion, war, strike, embargo, government requirement, civil or military authority, acts of God, act or omission of subcontractors, carriers, client or other similar causes beyond its control. Documents - NE shall be entitled to rely upon the accuracy and completeness of all surveys, reports and information furnished by the client. If conditions different from those described in our report are found at the site, NE should be notified in writing immediately upon discovery. NE reserves the right to revise conclusions and recommendations presented in the final report should additional information regarding the project become available. All permits will be obtained by others unless otherwise specified in this proposal or in writing to NE. NE has no liability for consequences of information not provided or unavailable or otherwise not reviewed or known from the normal sources customarily examined by NE in such investigations within the time frame allowed for this investigation under this agreement. The client, entities identified in writing on the address portion of our report, design team professionals engaged by our client and building official staff are entitled to use and rely upon NE’S reports for purposes of the current project. Other parties are not authorized to use or rely upon NE’S reports unless NE so states in writing. NE - General Contract Terms and Conditions May 2017 17 Nutting Environmental of Florida, Inc. (NEF) has performed a wide variety of environmental consulting services throughout Florida for thousands of clients in both private and public sectors for 30 years. NEF was formed in 1987 as a sister company to Nutting Engineers of Florida, Inc. which has successfully provided expert geotechnical, construction materials testing and structural inspection services to many of the same clients throughout Florida since 1967. Our goal is to provide exceptional service responding to client needs through the rapid, expert and cost effective performance of projects. We are well experienced through decades of diverse and at times challenging service in environmental due diligence evaluations (ASTM Phase I and Phase II Environmental Site Assessments), contamination assessments (Site Assessment Reports (SAR) in accordance with Chapter 62-780 FAC) and the preparation and implementation of Remedial Action Plans (RAP) as well as many other contamination assessment related activities (e.g. groundwater monitoring, storage tank removal, dewatering support, etc.). We bring integrity, creativity and flexibility in seeking both innovative and effective solutions for our clients. We are well known in Florida and beyond; our client base consists of a wide variety of private-sector and public agency clients and including local and national lenders, local businesses, national retail chains, multinational corporations, developers, contractors, local, county, state and federal agencies, real estate investors and insurance companies. Some of the services we perform include:  Phase I and Phase II Environmental Site Assessments  Peer Review of ESA Reports for Financial Institutions and Other Clients  Transaction Screening Process  Storage Tank Removal and Tank Closure Assessments  Design & Implementation of Remedial Action Plans (RAP)  Contamination Assessment Activities  Interim Source Removal Activities (ISR)  Assistance with Dewatering Permitting  Vapor Intrusion Studies  Hydrogeologic Evaluations  Groundwater Monitoring for Solid Waste and HazMat Permit Requirements We are very interested in expanding our working relationship with you. If you have any questions, or would like additional information, please contact Lisa Romano, Project Coordinator, at our Boynton Beach office at (561) 732-7200 or via email at lisar@nutting.biz Introducing Nutting Environmental of Florida, Inc. 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 BLANCO SURVEYORS INC.SINCE 1987Engineers ● Land Surveyors ● Planners ● LB # 0007059555 NORTH SHORE DRIVEMIAMI BEACH, FL 33141Email: blancosurveyorsinc@yahoo.comFax: (305) 865-7810(305) 865-1200 FLOOD ZONE: AHPANEL: 0458DATE:SCALE:COMMUNITY # 120658 DWN. BY:SUFFIX: LFEMA DATE: 09 / 11 / 09 BASE: 9'JOB No.NOT VALID UNLESS EMBOSSED WITHSURVEYOR'S SEALREVISED:4/1/191" = 30'R.BELLO19 - 288D xxSURVEYOR'S NOTES:1) OWNERSHIP SUBJECT TO OPINION OF TITLE.2) NOT VALID WITHOUT THE SIGNATURE AND RAISED SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER.3) THE SURVEY DEPICTED HERE IS NOT COVERED BY PROFESSIONAL LIABILITY INSURANCE.4) LEGAL DESCRIPTION PROVIDED BY CLIENT.5) UNDERGROUND ENCROACHMENTS NOT LOCATED.6) ELEVATIONS ARE BASED ON NATIONAL GEODETIC VERTICAL DATUM OF 1929.7) OWNERSHIP OF FENCES ARE UNKNOWN.8) THERE MAY BE ADDITIONAL RESTRICTIONS NOT SHOWN ON THIS SURVEY THAT MAY BE FOUND IN THE PUBLIC RECORDS OFTHIS COUNTY.9) CONTACT THE APPROPRIATE AUTHORITY PRIOR TO ANY DESIGN WORK FOR BUILDING AND ZONING INFORMATION.10) EXAMINATION OF THE ABSTRACT OF TITLE WILL HAVE TO BE MADE TO DETERMINE RECORDED INSTRUMENTS, IF ANY,AFFECTING THIS PROPERTY.11) ELEVATIONS BASED OFF OF BM# LOC# ELEV. ADDITIONS OR DELETIONS TO SURVEY MAPS OR REPORTS BY OTHER THAN THE SIGNNG PARTY OR PARTIES IS PROHIBITED WITHOUT WRITTEN CONSENT OF THE SIGNING PARTY OR PARTIES.BEARINGS WHEN SHOWN ARE REFERRED TP AM ASSUMED VALUE OF SAID PB: 65 PG: 55THPROPERTY ADDRESS: 7435 SW 66 AVE., SOUTH MIAMI, FL. 33143CERTIFIED TO: LOTT & LEVINE, AND GEORGE J. LOTTOLD REPUBLIC NATIONAL TITLE INSURANCE COMPANYTHE CITY OF SOUTH MIAMILEGAL DESCRIPTION: LOT B, LUDLAM PARK ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT BOOK 65, PAGE 55 OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA.N89°05'46"E62.21' (P&M)Δ=19°28'16"R=75.00'A=25.49'N00°54'14"W 122.89' (P&M)S35°25'02"E 79.57' (P&M)S89°08'56"W 126.65' (P&M)Δ=89°56'50"R=25.00'=39.25A'A'Δ=19°28'11"=350.00 '8.93R=1185' R/W C A N A LTRACT ''C''31.25'53.75'27.10'5.00'2.30'2.30'13.72'0.65'21.10'13.30'20.30'14.40'ONE STORY CBSRESIDENCE # 7435TRACT "B"18.00'21.00'10.00'22.00'8.00'4.00'19.00'10.00'11.00'16.00'16.00'A/CNOTE: - WOOD DOCK INTO A 5' C.M.E ON EAST PROPERTY LINE.- CHAIN LINK FENCE INTO 5' DRAINAGE EASEMENT ON NORTH PROPERTY LINE.35