Loading...
6835 SW 67 ST EB-09-019-062 0 P m CONCAASONRY COLUMN BEYOND CC.SE PLAN&SCHEDULE OR n INF.SEE PLAN&SCHED. EEL COL.BEYOND ro TAUPECOLUMN BEYOND MAS/GONG.COLUMN OR PE SEE PLAN&SCHED. -/-BEYOND EL.SEE PLAN SEE PLAN FOR I SEE CC.SE PLAN&SCHEDULE 'n EL SEE PLAN I PLAN N DOUBLE W.W.F. APPLICABLE SURFACE TYPE F" 4" EL.SEE PLAN STD.HOOK (CONC.SLAB,GRADE, STEEL COL(SEE SCHEDULE) EL.SEE LAN GONG.SLAB FOR REINF. SLOPE ON. F PAVERS ON SAND,ETC.) EL.SEE PLAN CONC,S FILLED SOLID W GONG. r-I I 5 CONT. CC.SE PLAN&SCHEDULE -- - N ,-,- z (REINF NOT OWN / o SEE PLAN&SCHED. vWwi 5 I N 3. I 1 \.J It SLOPED STD.HOOK _-,-,-, - 3/16" I STD.H OK Y� '--{ (p a, EL SEE PLAN I - - El.SEE PLAN SEE PLAN FOR EL SEE PLAN - , ,-,-, -,-,- III -.-.-.-.-,-.-.-, n O APPLICABLE SURFACE TYPE _ - OMPACTEO ?--LI # (CONC.SLAB,GRADE = VAPOR BARRIER _ FILL I O PAVERS ON SAND,Etc. �5 CONT. I = 1 VAPOR BARRIER VAPOR BARRIER /2\ 11/2" WEEP HOLES I 8° �{ O VAPOR BARRIER ,L"„5 I • 3 1 3" I I ENCASE COL.IN �I <1 m -COMPACTED FILL fl31flflAB fl09AV 8' 2#5 CONT. CONIC.BELOW I BASE PLATE(SEE SCHEDULE) C m SLAB AS SHOWN - ���"'V JJ •o �5 CONT. I I _ENCASE STEEL COLUMN NON-SHRINK GROUT AS REQ'D ° 1 D.HOOK EL.SEE PLAN N CONCRETE BEYOND N o I SEE TYP.WALL CMU WA SECTION I JCONT FOOTING DETAIL I 1 X 1'-4"LONG SE P &SCHEDULE w 1 SCALE 3/4" = 1'-0" I CONIC.FTG. -- , 11 SEE SCHED FOR TOP BARS � • BEYOND I IF APPUCA13LE CONIC.FTG. r J SEE ppLA co • SEE PLAN VAPOR BARRIER &SCHER. °Jj L� 4-3/4"DIA ANCH.BOLTS O CONIC.FTG. &SCHEDULE _ FTG.,SEE PLAN AND _ j "z O SEE PLAN&SCHEDULE CONIC.FTG. 1 �5 SEE SOI STATEMENT SECTION COL&FTG, SEE SOIL I SEE PLAN SEE SOIL STATEMENT SCHEDULE O SEE SOIL STATEMENT &SCHEDULE SECTION SCALE 3/4" = 1'-0' U I CL STATEMENT m " SEE SOIL STATEMENT SCALE 3/4" = 1'-0' SECTION I •� G SECTION I WELDED WIRE SCALE 3/4' = 1'-0" U SCALE 3/4" = 1'-0' 2 CONC.PLAN• r J vWwi Ev FABRIC EL.SEE PLAN TYP. STEEL C 0 L N TO CONIC.FIG. STD.HOOK ct &SGHEDHLE ' x^x -x_x- FOOTING DETAIL SEE PLAN SEE SOIL STATEMEM -x-x x-x &SCHEDULE S CONC.IVASONRY COLUMN BEYOND _ - TTTFTT_- -L o FOR RREINF.SEE PLAN&SCHED. SECTION 4 - - - -iL- SEE SOIL STAT EN 1 5 CONT. CONIC.STAB FOR REINF. SCALE 3/4" = 1'-0" SEC TI O N 1 5 CONi. SCALE 3/4" 8 d EL.SEE PLAN SEE PLAN&SCHED. � I 1=T-III- T -,-,-,-,-.- SLOPE DN. CONIC.STAB FOR REINF. E PLAN 9 ' SEE PLAN&SCHED. CONC./MASO ERY COLUMN BEYOND CONIC.MASONRY COLUMN BEYOND OR INF.SEE PLAN&SCHED. '�I IIL-ITT_II—III I •����_-+-+-+-•-•-,-•-,-•-•-,-,-,_ OR INF.SEE PLAN&SCHED. SECTION 1 L SCALE 3/4" = 1'-0" VAPOR BARRIER �I _ _ _ _ _ _ _ _ _ CONC./MASONRY COLUMN BEYOND 1 #5 CONI. �r �a FOR REINF.SEE PLAN&SCHED. - II-III—L=III=IIITIII=III=III=III-III-III-11 �" III-I I- L=L=1I1=11' VAPOR BARRIER -� I 1 EL.SEE PLAN EL.SEE PAN _ CONIC.SLAB FOR REINF. - GONG.SLAB FOR REINF. D. q TF Tr 1 - LT1. SEE PLAN&SCHED. W/2 CONIC.SILL CONIC.MASONRY COLUMN BEYOND v 0 V^' L I TIT=TI-I� TT� - SEE PLAN&SCHED. CC.SE PLAN&SCHEDULE W 2 5 CONTINUOUS. / m v •.° Fo,i7 SEE TYP.WALL - - - -"'- - / # OR REINF.SEE PLAN&SCHED. q e v FOOTING DETAIL. STD.HOOK tl EL SEE PLAN I STD.HOOK EL.SEE PLAN - - EL SEE PLAN ����bC v r~ CONC.FTG. CONIC.FTG. -+-_- — --— �— '�y.1 v m e„v o J ICONC,BEAM CONIC.BEAM '�v •d°' v 0.v 0 _ / SEE PLAN AND SCHEDULE T /M SEE PLAN AND SCHEDULE 1� BEEEOPIDgN CONIC.FTG. SEE�pOLNpN 1111'-III, =+1--- - I- Tr I BOTHOWAYS AT WALL C01TERIJNE. "g 7+•,q m� w b�m &SCHED. SCHED. 77TT 1 8'CONIC.WALL W 41312" �- ,C v v ' &SCHEDULE 'll, L- BOTH WAYS AT WILL CEMERLINE. 4 012°TOP. I SEE SOIL STATEMEM VAPOR BARRIE - 6"GONG.SLAB W/#4 012" VAPOR BARRIER v v•0'0 I. SECTION SEE PLAN B" --+- o "5 P I°w'o 0. 1 �5 CONT I BOTi.BOTH WAYS. 1 �5 CONT. z"' o v v•� 6 b 9 L= EL.SEE PLAN EL SEE PLAN _ q p vq v o CONIC.SLAB FOR REINF. _ _ p G ❑y SCALE 3/4" = 1"-0" -� SEE PLAN&SCHED. �_- - CONIC.SLAB FOR REINF. L�11 -III-�=�I N GONG.WALL m•°pLL o m o 1=1 I=J�1—lII—I 1 1111-T=1T_I--LTI-1 I SEE PLAN&SCHED. -I I- p, LI I EL SEE PLAN -�T 4L A%a I I EL K01 POND i EL K01 POND ll1-III- SEE PLAN AND SCHEDULE v b p,o A v o L I I— 'II I I SE ARCH.DWGS. —III11L NI p -CONC.WALL W/#4012 ll •p°m 0 v CONIC.SLAB ON GRAD ° 11 I= BOTH WAYS AT WALL CENTERLINE. II HL o Rp�7N� _ SE 8'PLAN. F'CMU WALL T f I T MEMBRANE 3 I "CONIC.WALL W -III-�T=FL FOR REINF.SEE PLAN&SCHED. NN N WATER P 0 f —L=L SEE PLAN WATE,fjEMBRANEO L' I L= #4012" E SEE LAN rn I llT BOTH WAYS AT WALL CENTERLINE. CONCRETE BEAM _ I -IL1Lo Ili -ni II- I 'j SEE PLAN&SCHEDULE -' -111-� ,. - - I-jT_ I I- „, "'~ 1-� I IL� 1I — I I- I L FIG.,SEE PLAN AND O "CONC.WALL W X41312" I —L- w .III ICI= I -=1 _ _•_ SCHEDULE a VAPOR BARRIER SEE PLAN B. BOTH WAYS AT WALL CEMERLINE. I I �* T 1 I I I I� "'� 3" III- W _ -Tr=� iI I-I= SEE SOIL EL SEE PLAN J J I J 1 J L CL. TT' STATEMENT 8"CONIC.WALL W {j4®12" CONIC.SLAB FOR REINF. L= ' CONIC.FTG. GONG.FTG. SEE CPLAN ONG.FTG. BOTH WAYS AT EA SID�OT'WALL I 1 1/2° SEE PLAN&SCHED. I- SEE PLAN SEE PLAN SEE PLAN N� EL H01 POND L1113 I SECTION SEE SOIL STATEMENT SEE SOIL STATEMENT SECTION WATEREMBRA�E III- SEE SOIL STATEMENT SCALE 3/4" = 1'-0" SEE SOIL STATEMENT /4" = 1'_O'• 3 M SCALE 3 w 11 ITT SECTION Mull SCALE 3/4" = 1'-0" 1 2 I CONC&SONRY COLUMN BEYOND OR rcRCEINF.SEE PLAN&SCHED. CC SEE PLAN&SCHEDULE I^� ICI Il CC SEE PLAN&SCHEDULE EL.SEE PLAN Hof EL.SEE PLAN EL SEE PLAN If i CONCRETE SLAB SEE PLAN _ CONIC.SLAB FOR REINF. CC SEE PLAN&SCHEDULE CONCRETE SLAB SEE PLAN J STD.HOOK -•�{ � - SEE PLAN&SCHED. •I 8"X8`CONIC.SILL { _- L-_ I /2#5 CONTINUOUS. EL SEE PLAN T EL SEE PLAN I STD.HOOK i CONCRETE SLAB SEE PLAN 2/5 CON. 'I EL ARIES i 5 EL VARI CONIC.FTC. V� w `COE PLAN SCHEDULE SCHEDULE ,I SEE PLAN -• _-_ J � I „`y ' I• '"'" SEE SOIL STATEMENT -.r-��•- B"CONIC.WALL W/.�CENTE El YARIF _ ALL BOTH WAYS AT W CENTERLINE. I n U SEE SOIL STATEMENT CONIC.SLAB FOR REINF. SECTI �N - I SEE PLAN&SCHED. I VAPOR BARRIER (j4 012"BOTT.BOTH WAYS. I CONCRETE BEAM SCALE 3/4 I #5 CONT. — SEE PLAN&SCHEDULE ° SEE PLAN 6" #5 CONT. "\"� "LOAD BEARING CMU WALL I FOR REINF.SEE PLAN AND CONCRETE BEAM SCHEDULE TYP.U.O.N. WATERPROOFING SEE PLAN&SCHEDULE MEMBRANE T-I I B"x 8°CONIC.CAP RAKED _ ,� SECTION X 2(5 CON'.&2 CORNER 20 O E+ X 2'-6(5X 2'-6°CORNER BARS =1 SCALE 3/4" = 1'-0" w CONC.SLAB ON GRAD ° I EL SEE PLAN 11- TFT I-I I' �,' " -I 1 I-I 1= 1— L- 05®12"TOP. SEE PLAN. 12"CMU WALL, L" - SEE LAN I I FOR REINF.SEE PLAN&SCHED. 1 STD.HOOK 1-1-1 El SEE PLAN CONC./MASONRY COLUMN SECTION 6" 2 CONC./MASONRY COLUMN r BEYOND SEE PLAN&SCHED. 9 BEYOND SEE PLAN&SCHED. z N EL SEE PLAN 5 .-.-.-•-•-+-^-' I I I IT p I SCALE 3/4•, 1•-0„ W� "�.J f0 jTr 1=I III- -n =1 I I. �_I 11=1T— - I—I SECTIONy —CONCRETE BEAM 8" _I I 1 WATER Roo NG -11 SEE PLAN&SCHEDULE II �I- I- MEMBRANE II B"CONIC.WALL W �j4®12" i :f4®12"BOTT.BOTH WAYS. SCALE 3/4" L _ I BOTH WAYS AT WALL CEMERLINE:- m E- VAPOR BARRIER :L- III- III III TD.HOOK EL COORD.W/ II -I�I-III- m T0.HOOK CC SEE PLAN&SCHEDULE W 00 O �I-Ii,- m II 8"CONIC.MASONRY WALL -I { ARCH.DWGS. z O I i SEE PLAN&SCHEDULE \ EL.SEE PLAN i 3 1 �8"X 8"CONIC.CAP 12"CONIC.WALL W q4®12" I 4012" <3� L- _I L— EL SE LAN W/2{J5 CONT. { CONCRETE SLAB SEE PLAN BOTH WAYS AT FA SID�OF WALL I I N° I EL SEE PLAN CONC.FTG. CONIC.FIG. 6EYONU ° CONTINUOUS FROM 8"GONG,WALL I II I' &SCHEDULE SEE PLAN&SCHEDULE SEE PLAN&SCHEDULE WALL REINF.SEE PLAN i= I 11 TTFI >,i.+ F-•-• n &SCHEDULE "I '� EL VARIES SEE SOIL STATEMENT SECTION SEE SOIL STATEMENT SEE CPO &SCHED. 2 15 CONT I WATERPROOFING 1 5 5 m MEMBRANE I I I I SCALE 3/4" = 1'-0' \i n v EL.SEE PLAN I 1 SECTION III 1 1 I1 II_i SEFCONC BEA 09bf 1 �5 CONT. CONCRETE BEAM a a a a -I it I — CC SEE PLAN&SCHEDULE SEE PLAN&SCHEDULE SCALE 3/4" = 1'-0" 14 = - =1 FOR REINF.SEE PLAN&SCHED. 1#5 CON. EL.SEE PLAN CONCRETE BEAM � STD.HOOK L_ _ III I —— E SEE PLAN CONCRETE SLAB SEE PLAN SEE PLAN&SCREDUL 5 M' Bi I -�CEE FTG. X4®12°W/STD.HOOK FOR SLAB REINFORCEMEIN. L T•' _ L-. SEE PLAN SEE PLAN,NP.U.O.N. EL.SEE PLAN It I SEE PLAN&SCHEDULE &SCHEDULE g 2 4 CONT -- L. =./MASONRY COLUMN 1 n EL VARIES 1 1 STEEL COL B_11T26 --_ BEYOND SEE PLAN&SCHED CONIC.SLAB-/ FILLED SOLID C. SEE SOIL STATEMENT SEE SOIL STATEMENT SEE PLAN&SCHED. SEE SCHEDULE&PLAN 1/2"JOINT SECTIONI 8°LOAD BEARING CMU WAll 1 SECTION " ON BEAM SECTION /� n OR SLAB REINFORCEMENT •O W/SEALANT 1 �5 CONT. SCALE 3/4" = 1'-0" I FOR REINF.SEE PLAN AND I SCALE 3 4'• _ ,'—o" 21 EE P &SCHEDULE SCALE 3/4" = 1'-0" 2v 8°LOAD BEARING CMU WALL SEE PLAN,TYP.U.O.N. M WW F 5 SCHEDULE TYP.U.O.N. / 2)p10 TEKS/I SCREWS FOR REINF.SEE PLAN AND SECTION Q •r1 THR RUNNER INTO COLD SCHEDULE TYP.U.O.N. SCALE 3/4" = 1'-0" 2 8 a a a a EL.SEE PLAN EL.COORD.W/ FORMED STEEL JOIST AT BOTH SIDES ' &SCHEDULE .-.-,-.- 1• ARCH.DWGS. CONIC.BEAM BEYOND S E C TI O N I SEE PLAN&SCHEDULE CONCRETE SLAB SEE PLAN "X 8°CONIC.CAP EL.SEE PLAN EL SEE PLAN USE 60CSE14 BY UNIMJST \ SCALE 3 4" = 1'-0" 2 7 =TIC W/2�5 CONT. 60CR16 STEEL RUNNER C L FOR ED STF,E GIST EL.SEE PLAN / o Ld U M =11i- tlBEYON CONCRETE SLAB SEE PLAN CONCRETE SLAB SEE PLAN a p M L _ BY UNIMAST OR EQUAL OR SIMILAR®16 0.�. • I• W/(31 1/4"DIA TAPCONS W/(3)1/4"DIA TAPCONS VAPOR BARRIER I 1• � WS 14 p � SCR SAT FA.METAL STUD SCREWS o 8'CMU WALL, I ((60CSE14 BY UNIMAST)W// 2"EMBEDM IN GONG. n EL VARIF II FOR REINF.SEE PLAN&SCHED. 2°DEEP EMBEDM.IN CO VC. I FOR SLAB REINFORCEMENT �+ I OR SHEATHING SEE STIR NOTES, SEE PLAN,TYP.U.O.N. �5 CON'. ° W/X10 TEK5�1 SCREWS BY 1 1 STEEL COL BEYOND 1 BUILDEX OR SIMILAR SECTION n g C.INTO EA.METAL STUD L FOR REINF.SEE PLAN&SCHED. I FILLED SOLID W/CONIC. �BOVE' �� L: q SEE SCHEDULE&PLAN v 'd SCALE 3/4" = Y-0' 7 CONCRETE BEAM CONCRETE BEAM EL.SEE PLAN U -N II EL E PLAN SEE PLAN&SCHEDULE SEE PLAN&SCHEDULE SECTION 25 16 -N N O I ��� I SCALE 3/4" = 1'-O' F-, F^ EL.SEE PLAN I Leg IGNACIO J. CALVO d d U P &SCHEDULE n 1: III M STRUCTURAL ENGINEER CONIC.SLAB 3 16 SEE PLAN&SCHED. EL.SEE PLAN sheet 110. CONC./MASONRY COLUMN 8"LOAD BEARING CMU WALL STEEL COL BEYO D FLORIDA LICENSE NO. 56755 SECTION BEYOND SEE PLAN&SCHED. I OR REINF.SEE PLAN AND f I FILLED SOLID W�CONC. 1800 S.W. 27th. Ave. #401 TL 1, 8"LOAD BEARING CMU WALL 22 SECTION SCHEDULE TYP.U.O.N. SEE SCHEDULE&PIAN Miami, Florida 33145 _III;IIII i, FOR REINF.SEE PLAN AND SCALE 3 a" _ ,'–o' 23 SCHEDULE PP.U.O.N. / SCALE 3/4" = 1'-0' SECTION M U 1 Ph: (305) 648-9008 24 FOR SLAB REINFORCEMEM 3 6 SECTION Fox:(305) 648-9128 (6 SCALE 3/4" = 1'-0" 29 V SEE PLAN,TYP.U.O.N. �TLELEEL CO BEy/0 D SCALE 3/4" = 1'-0' E-MAIL: ijcpe0beIIsouth.net P. E N°5 6 7 5 5 SEE SCH�DULE&PLAN 7 OF 10