6835 SW 67 ST EB-09-019-062 0 P m
CONCAASONRY COLUMN BEYOND
CC.SE PLAN&SCHEDULE
OR n INF.SEE PLAN&SCHED. EEL COL.BEYOND ro
TAUPECOLUMN BEYOND MAS/GONG.COLUMN
OR PE SEE PLAN&SCHED. -/-BEYOND EL.SEE PLAN SEE PLAN FOR I SEE CC.SE PLAN&SCHEDULE 'n
EL SEE PLAN I PLAN N
DOUBLE W.W.F. APPLICABLE SURFACE TYPE
F" 4" EL.SEE PLAN STD.HOOK (CONC.SLAB,GRADE, STEEL COL(SEE SCHEDULE) EL.SEE LAN
GONG.SLAB FOR REINF. SLOPE ON. F PAVERS ON SAND,ETC.) EL.SEE PLAN CONC,S FILLED SOLID W GONG. r-I
I 5 CONT. CC.SE PLAN&SCHEDULE -- - N ,-,- z (REINF NOT OWN / o
SEE PLAN&SCHED. vWwi 5 I N 3. I 1 \.J It
SLOPED STD.HOOK _-,-,-, - 3/16" I STD.H OK Y� '--{ (p a,
EL SEE PLAN I - - El.SEE PLAN
SEE PLAN FOR EL SEE PLAN - , ,-,-, -,-,- III -.-.-.-.-,-.-.-, n O
APPLICABLE SURFACE TYPE _ - OMPACTEO ?--LI
# (CONC.SLAB,GRADE = VAPOR BARRIER _ FILL I O
PAVERS ON SAND,Etc. �5 CONT. I = 1 VAPOR BARRIER VAPOR BARRIER /2\ 11/2" WEEP HOLES I 8° �{ O
VAPOR BARRIER ,L"„5 I • 3 1 3"
I I ENCASE COL.IN �I <1 m
-COMPACTED FILL fl31flflAB fl09AV 8' 2#5 CONT. CONIC.BELOW I BASE PLATE(SEE SCHEDULE) C m
SLAB AS SHOWN - ���"'V JJ •o
�5 CONT. I I _ENCASE STEEL COLUMN NON-SHRINK GROUT AS REQ'D °
1 D.HOOK EL.SEE PLAN N CONCRETE BEYOND N o
I SEE TYP.WALL CMU WA
SECTION I JCONT FOOTING DETAIL I 1 X 1'-4"LONG SE P &SCHEDULE w
1 SCALE 3/4" = 1'-0" I CONIC.FTG. -- , 11 SEE SCHED FOR TOP BARS �
• BEYOND I IF APPUCA13LE
CONIC.FTG. r J SEE ppLA co
• SEE PLAN VAPOR BARRIER &SCHER. °Jj L� 4-3/4"DIA ANCH.BOLTS O
CONIC.FTG. &SCHEDULE _ FTG.,SEE PLAN AND _ j "z O SEE PLAN&SCHEDULE CONIC.FTG. 1 �5 SEE SOI STATEMENT SECTION COL&FTG, SEE SOIL I SEE PLAN SEE SOIL STATEMENT SCHEDULE O SEE SOIL STATEMENT &SCHEDULE SECTION SCALE 3/4" = 1'-0' U I CL STATEMENT m
" SEE SOIL STATEMENT SCALE 3/4" = 1'-0' SECTION I •�
G
SECTION I WELDED WIRE SCALE 3/4' = 1'-0" U
SCALE 3/4" = 1'-0' 2 CONC.PLAN• r J vWwi Ev FABRIC EL.SEE PLAN TYP. STEEL C 0 L N TO CONIC.FIG.
STD.HOOK ct
&SGHEDHLE ' x^x -x_x- FOOTING DETAIL SEE PLAN
SEE SOIL STATEMEM -x-x x-x &SCHEDULE S
CONC.IVASONRY COLUMN BEYOND _ - TTTFTT_- -L o
FOR RREINF.SEE PLAN&SCHED. SECTION 4 - - - -iL- SEE SOIL STAT EN
1 5 CONT.
CONIC.STAB FOR REINF. SCALE 3/4" = 1'-0" SEC TI O N
1 5 CONi. SCALE 3/4"
8 d
EL.SEE PLAN SEE PLAN&SCHED. � I 1=T-III- T
-,-,-,-,-.- SLOPE DN. CONIC.STAB FOR REINF. E PLAN 9 '
SEE PLAN&SCHED. CONC./MASO ERY COLUMN BEYOND
CONIC.MASONRY COLUMN BEYOND OR INF.SEE PLAN&SCHED.
'�I IIL-ITT_II—III I •����_-+-+-+-•-•-,-•-,-•-•-,-,-,_ OR INF.SEE PLAN&SCHED. SECTION
1 L SCALE 3/4" = 1'-0"
VAPOR BARRIER �I _ _ _ _ _ _ _ _ _
CONC./MASONRY COLUMN BEYOND 1 #5 CONI. �r �a
FOR REINF.SEE PLAN&SCHED. - II-III—L=III=IIITIII=III=III=III-III-III-11 �" III-I I-
L=L=1I1=11' VAPOR BARRIER -� I 1 EL.SEE PLAN EL.SEE PAN
_ CONIC.SLAB FOR REINF.
- GONG.SLAB FOR REINF. D. q
TF Tr 1 - LT1. SEE PLAN&SCHED. W/2 CONIC.SILL CONIC.MASONRY COLUMN BEYOND v 0 V^'
L I TIT=TI-I� TT� - SEE PLAN&SCHED. CC.SE PLAN&SCHEDULE W 2 5 CONTINUOUS. / m v •.° Fo,i7
SEE TYP.WALL - - - -"'- - / # OR REINF.SEE PLAN&SCHED. q e v
FOOTING DETAIL. STD.HOOK tl
EL SEE PLAN I STD.HOOK EL.SEE PLAN - - EL SEE PLAN ����bC v r~
CONC.FTG. CONIC.FTG. -+-_- — --— �— '�y.1 v m e„v o
J ICONC,BEAM CONIC.BEAM '�v •d°' v 0.v 0
_ / SEE PLAN AND SCHEDULE T /M SEE PLAN AND SCHEDULE 1�
BEEEOPIDgN CONIC.FTG. SEE�pOLNpN 1111'-III, =+1--- - I- Tr I BOTHOWAYS AT WALL C01TERIJNE. "g 7+•,q m� w b�m
&SCHED. SCHED. 77TT 1 8'CONIC.WALL W 41312" �- ,C v v
' &SCHEDULE 'll, L- BOTH WAYS AT WILL CEMERLINE. 4 012°TOP. I
SEE SOIL STATEMEM VAPOR BARRIE - 6"GONG.SLAB W/#4 012" VAPOR BARRIER v v•0'0 I.
SECTION SEE PLAN B" --+- o "5 P I°w'o 0.
1 �5 CONT I BOTi.BOTH WAYS. 1 �5 CONT. z"' o v v•� 6 b
9 L= EL.SEE PLAN EL SEE PLAN _ q p vq v o
CONIC.SLAB FOR REINF. _ _ p G ❑y
SCALE 3/4" = 1"-0" -� SEE PLAN&SCHED. �_- - CONIC.SLAB FOR REINF. L�11 -III-�=�I N GONG.WALL m•°pLL o m o
1=1 I=J�1—lII—I 1 1111-T=1T_I--LTI-1 I SEE PLAN&SCHED. -I I- p,
LI I EL SEE PLAN -�T 4L A%a
I I EL K01 POND i EL K01 POND ll1-III- SEE PLAN AND SCHEDULE v b p,o A v o
L I I— 'II I I SE ARCH.DWGS. —III11L NI p
-CONC.WALL W/#4012 ll •p°m 0 v
CONIC.SLAB ON GRAD ° 11 I= BOTH WAYS AT WALL CENTERLINE. II HL o
Rp�7N� _
SE 8'PLAN. F'CMU WALL T f I T MEMBRANE 3 I "CONIC.WALL W -III-�T=FL
FOR REINF.SEE PLAN&SCHED. NN N WATER P 0 f —L=L
SEE PLAN WATE,fjEMBRANEO L' I L= #4012"
E SEE LAN rn I llT BOTH WAYS AT WALL CENTERLINE.
CONCRETE BEAM _ I -IL1Lo Ili -ni II- I
'j SEE PLAN&SCHEDULE -' -111-� ,. - - I-jT_ I I- „, "'~ 1-� I IL� 1I — I I- I L FIG.,SEE PLAN AND O
"CONC.WALL W X41312" I —L- w .III ICI= I -=1 _ _•_ SCHEDULE a
VAPOR BARRIER SEE PLAN
B. BOTH WAYS AT WALL CEMERLINE. I I �* T 1 I I I I� "'� 3" III- W
_ -Tr=� iI I-I= SEE SOIL
EL SEE PLAN J J I J 1 J L CL. TT' STATEMENT
8"CONIC.WALL W {j4®12" CONIC.SLAB FOR REINF. L= ' CONIC.FTG. GONG.FTG. SEE CPLAN ONG.FTG.
BOTH WAYS AT EA SID�OT'WALL I 1 1/2° SEE PLAN&SCHED. I- SEE PLAN SEE PLAN SEE PLAN
N� EL H01 POND L1113 I SECTION SEE SOIL STATEMENT SEE SOIL STATEMENT SECTION
WATEREMBRA�E III- SEE SOIL STATEMENT SCALE 3/4" = 1'-0" SEE SOIL STATEMENT /4" = 1'_O'• 3
M SCALE 3 w
11 ITT SECTION
Mull SCALE 3/4" = 1'-0" 1 2
I CONC&SONRY COLUMN BEYOND
OR rcRCEINF.SEE PLAN&SCHED. CC SEE PLAN&SCHEDULE I^�
ICI Il CC SEE PLAN&SCHEDULE EL.SEE PLAN Hof
EL.SEE PLAN EL SEE PLAN
If
i CONCRETE SLAB SEE PLAN
_ CONIC.SLAB FOR REINF. CC SEE PLAN&SCHEDULE CONCRETE SLAB SEE PLAN J
STD.HOOK -•�{ � - SEE PLAN&SCHED. •I 8"X8`CONIC.SILL {
_- L-_ I /2#5 CONTINUOUS. EL SEE PLAN T
EL SEE PLAN I STD.HOOK i CONCRETE SLAB SEE PLAN 2/5 CON. 'I EL ARIES i 5 EL VARI
CONIC.FTC. V� w
`COE PLAN SCHEDULE SCHEDULE ,I SEE PLAN -• _-_ J � I „`y ' I• '"'"
SEE SOIL STATEMENT -.r-��•- B"CONIC.WALL W/.�CENTE El YARIF
_ ALL
BOTH WAYS AT W CENTERLINE. I n U
SEE SOIL STATEMENT CONIC.SLAB FOR REINF.
SECTI �N -
I SEE PLAN&SCHED. I
VAPOR BARRIER (j4 012"BOTT.BOTH WAYS. I CONCRETE BEAM
SCALE 3/4 I #5 CONT. — SEE PLAN&SCHEDULE °
SEE PLAN 6" #5 CONT. "\"� "LOAD BEARING CMU WALL I
FOR REINF.SEE PLAN AND
CONCRETE BEAM SCHEDULE TYP.U.O.N.
WATERPROOFING SEE PLAN&SCHEDULE
MEMBRANE T-I I
B"x 8°CONIC.CAP RAKED _ ,� SECTION
X 2(5 CON'.&2 CORNER 20 O E+
X 2'-6(5X 2'-6°CORNER BARS =1 SCALE 3/4" = 1'-0" w
CONC.SLAB ON GRAD ° I EL SEE PLAN 11- TFT I-I I' �,' " -I 1 I-I 1= 1— L- 05®12"TOP.
SEE PLAN. 12"CMU WALL, L" -
SEE LAN I I FOR REINF.SEE PLAN&SCHED. 1 STD.HOOK 1-1-1 El SEE PLAN CONC./MASONRY COLUMN SECTION 6" 2 CONC./MASONRY COLUMN
r BEYOND SEE PLAN&SCHED. 9 BEYOND SEE PLAN&SCHED. z N
EL SEE PLAN 5 .-.-.-•-•-+-^-' I I I IT p I SCALE 3/4•, 1•-0„ W� "�.J f0
jTr 1=I III- -n =1 I I. �_I 11=1T— - I—I SECTIONy
—CONCRETE BEAM 8" _I I 1 WATER Roo NG -11
SEE PLAN&SCHEDULE II �I- I- MEMBRANE II B"CONIC.WALL W �j4®12" i :f4®12"BOTT.BOTH WAYS. SCALE 3/4"
L _ I BOTH WAYS AT WALL CEMERLINE:- m E-
VAPOR BARRIER :L- III- III III TD.HOOK
EL COORD.W/
II -I�I-III- m T0.HOOK CC SEE PLAN&SCHEDULE W 00 O
�I-Ii,- m II 8"CONIC.MASONRY WALL -I { ARCH.DWGS. z O
I i SEE PLAN&SCHEDULE \ EL.SEE PLAN
i 3 1 �8"X 8"CONIC.CAP
12"CONIC.WALL W q4®12" I 4012" <3� L- _I L— EL SE LAN W/2{J5 CONT. { CONCRETE SLAB SEE PLAN
BOTH WAYS AT FA SID�OF WALL I I N° I EL SEE PLAN CONC.FTG. CONIC.FIG. 6EYONU °
CONTINUOUS FROM 8"GONG,WALL I II I' &SCHEDULE SEE PLAN&SCHEDULE SEE PLAN&SCHEDULE WALL REINF.SEE PLAN i=
I 11 TTFI >,i.+ F-•-• n &SCHEDULE "I '�
EL VARIES
SEE SOIL STATEMENT SECTION SEE SOIL STATEMENT SEE CPO &SCHED. 2 15 CONT I
WATERPROOFING 1 5 5 m
MEMBRANE I I I I SCALE 3/4" = 1'-0' \i n v
EL.SEE PLAN I 1
SECTION III 1 1 I1 II_i SEFCONC BEA 09bf 1
�5 CONT. CONCRETE BEAM a a a a
-I it I — CC SEE PLAN&SCHEDULE SEE PLAN&SCHEDULE
SCALE 3/4" = 1'-0" 14 = - =1 FOR REINF.SEE PLAN&SCHED. 1#5 CON. EL.SEE PLAN CONCRETE BEAM �
STD.HOOK L_ _ III I ——
E SEE PLAN CONCRETE SLAB SEE PLAN SEE PLAN&SCREDUL 5 M' Bi
I -�CEE FTG. X4®12°W/STD.HOOK FOR SLAB REINFORCEMEIN.
L T•' _ L-. SEE PLAN SEE PLAN,NP.U.O.N. EL.SEE PLAN It I
SEE PLAN&SCHEDULE &SCHEDULE g 2 4 CONT -- L. =./MASONRY COLUMN
1 n EL VARIES 1 1 STEEL COL B_11T26 --_ BEYOND SEE PLAN&SCHED
CONIC.SLAB-/ FILLED SOLID C.
SEE SOIL STATEMENT SEE SOIL STATEMENT SEE PLAN&SCHED. SEE SCHEDULE&PLAN
1/2"JOINT SECTIONI 8°LOAD BEARING CMU WAll 1 SECTION " ON BEAM SECTION /� n OR SLAB REINFORCEMENT •O
W/SEALANT 1 �5 CONT. SCALE 3/4" = 1'-0" I FOR REINF.SEE PLAN AND I SCALE 3 4'• _ ,'—o" 21 EE P &SCHEDULE SCALE 3/4" = 1'-0" 2v 8°LOAD BEARING CMU WALL SEE PLAN,TYP.U.O.N. M
WW F 5 SCHEDULE TYP.U.O.N. / 2)p10 TEKS/I SCREWS FOR REINF.SEE PLAN AND SECTION Q •r1
THR RUNNER INTO COLD SCHEDULE TYP.U.O.N. SCALE 3/4" = 1'-0" 2 8 a a a a
EL.SEE PLAN EL.COORD.W/ FORMED STEEL JOIST AT BOTH SIDES
' &SCHEDULE .-.-,-.- 1• ARCH.DWGS. CONIC.BEAM BEYOND S E C TI O N
I SEE PLAN&SCHEDULE CONCRETE SLAB SEE PLAN
"X 8°CONIC.CAP EL.SEE PLAN EL SEE PLAN USE 60CSE14 BY UNIMJST \ SCALE 3 4" = 1'-0" 2 7
=TIC W/2�5 CONT. 60CR16 STEEL RUNNER C L FOR ED STF,E GIST EL.SEE PLAN / o Ld U M
=11i- tlBEYON CONCRETE SLAB SEE PLAN CONCRETE SLAB SEE PLAN a p M L _
BY UNIMAST OR EQUAL OR SIMILAR®16 0.�.
• I• W/(31 1/4"DIA TAPCONS W/(3)1/4"DIA TAPCONS
VAPOR BARRIER I 1• � WS 14 p �
SCR SAT FA.METAL STUD SCREWS o
8'CMU WALL, I ((60CSE14 BY UNIMAST)W// 2"EMBEDM IN GONG. n EL VARIF II FOR REINF.SEE PLAN&SCHED. 2°DEEP EMBEDM.IN CO VC. I FOR SLAB REINFORCEMENT
�+ I OR SHEATHING SEE STIR NOTES, SEE PLAN,TYP.U.O.N.
�5 CON'. ° W/X10 TEK5�1 SCREWS BY
1 1 STEEL COL BEYOND 1 BUILDEX OR SIMILAR
SECTION n g C.INTO EA.METAL STUD L
FOR REINF.SEE PLAN&SCHED. I FILLED SOLID W/CONIC. �BOVE' �� L:
q SEE SCHEDULE&PLAN v 'd
SCALE 3/4" = Y-0' 7 CONCRETE BEAM CONCRETE BEAM EL.SEE PLAN U -N
II EL E PLAN SEE PLAN&SCHEDULE SEE PLAN&SCHEDULE SECTION 25 16 -N N O
I
��� I SCALE 3/4" = 1'-O' F-, F^
EL.SEE PLAN I Leg IGNACIO J. CALVO
d d U P
&SCHEDULE n 1: III M STRUCTURAL ENGINEER
CONIC.SLAB 3 16
SEE PLAN&SCHED. EL.SEE PLAN sheet 110.
CONC./MASONRY COLUMN 8"LOAD BEARING CMU WALL STEEL COL BEYO D FLORIDA LICENSE NO. 56755
SECTION BEYOND SEE PLAN&SCHED. I OR REINF.SEE PLAN AND f I FILLED SOLID W�CONC. 1800 S.W. 27th. Ave. #401
TL 1, 8"LOAD BEARING CMU WALL 22 SECTION SCHEDULE TYP.U.O.N. SEE SCHEDULE&PIAN Miami, Florida 33145
_III;IIII i, FOR REINF.SEE PLAN AND SCALE 3 a" _ ,'–o' 23
SCHEDULE PP.U.O.N. / SCALE 3/4" = 1'-0' SECTION
M U 1 Ph: (305) 648-9008
24 FOR SLAB REINFORCEMEM 3 6 SECTION Fox:(305) 648-9128 (6
SCALE 3/4" = 1'-0" 29 V
SEE PLAN,TYP.U.O.N. �TLELEEL CO BEy/0 D SCALE 3/4" = 1'-0' E-MAIL: ijcpe0beIIsouth.net P. E N°5 6 7 5 5
SEE SCH�DULE&PLAN
7 OF 10