Loading...
6835 SW 67 ST EB-09-019-056 0 c m CONTINUOUS HARDWARE CLOTH CONTINUOUS SEALANT SMOOTH STUCCO ROOFING CEMENT vi JAMS AS DETAILED o SCHEDULED DOOR FINISH ON C.M.U. METAL STUD RUNNER SECURELY JAMB AS DETAILED CONTINUOUS GALVANIffD METAL 8'C.M.U.ORCONCRETE R'( .-L R-30 BATT INSULATION ATTACHED TO SLAB PARAPET WIST NLESS STEELS TO EET w� ��vv POOL DECK SEE FINISH METAL SCREWS WI STAINLESS STEEL •'T 5!B'GYPSUM BOARD PLINTH AS DETAILED SCHEDULE AND NEOPRENE WASHERS,SET IN t• STONE BULL NOSE LEAD SHIELDS 12'O.C. n O v S�B'TYPE'X'GYPSUM BOARD AROUND COPPING (TYP')SEf 25/e'25GAlKiE GALVANZED R-19 BATT INSULATION SHALL BE SAME LEVEL COUNTER FLASHING FLANGE IN STEEL COLUMN A3 BARS @ 12-DRILL CONTINUOUS FULL BED OF SEALANT ®PI P METAL STUDS @16'O.C. 0 CARPEfIWOOD H PINTO CONC.x 4' \y m 3'C0NTIN000S FLOORING AND SETANCHOR BARS 1X3 WOOD URRINGEILINGON HORIZONTAL METAL EPDXYTERRAZO INEPDXYGROUT. LIGHT WEIGHT INSULATING o 1X3 W000 FURRING STRIPS @ CONTINUOUS SEALED JOINT � FRAMING MEMBER FLOORING _ STEEL COLUMN(SEE CONCRETESYSTEM e METAL STUD RUNNER SECURELY STRUCTURAL PLANS) CONTINUOUS 2-PLY F.G.FELT STRIPS 3'/'25GPllGE GALVANZED " co METAL STUDS wl-Ye ATTPDHED TO SLAB .::..,�' ;'..5 VlATERLINETILE SET ON ROOFING CEMENT, ECURE FLASHING AND FELT L GYPSUM BOARD AT EACH SIDE TOP OF SLAB DECK EXPOSED PORTION Wl FIBRATED STRIPPING VATHTIN-TAGGED WATERLINE ALUMINUM ROOF COATING MASONRY NAILS O P.T.Zz4 - O o a O .,b CONTINUOUS04 P.T.WOOD v WATER PROOFSTUCCO MILLED CANT STRIP FIRE-RATED PARTITION ASSEMBLY U.LMA65 CONCRETE SLAB(SEE � � � No.25 CHANNEL SHAPED STUDS AT I6.O.C.WITH ONE FULL LENGTH LAYER OF 5B'TYPICAL'%"GYPSUM BOARD APPLIED CONCREEALAB(SE GS) VERTICAL ATTACHED WITH PLONG Not DRYWALL SCREWS TO EACH SIDE.SCREWS ARE B'O.C.AROUND PERIMETER AND � � � PLYWOOD OR LIGHTWEIGHT CONCRETE TO LEVEL All. PROFILESAS SHOWN FOR BID P.T.WOOD BLOCKING m 12"O.C.ON INTERMEDIATE STUDS. COLD PROCESS ROOFING MEMBRANE .. NOTE:ALL FLOORING MATERIALS FINISHED FLODRS VdTH OISSIMIIAR THICKNESSIN PURPOSE,MANUFACTURER SHALL PROVIDE AS PRODUCT CONTROL APP ROVED BY NOTE:PROVIDE 20-GAUGE GALVANIZED THICKNESS SHALL BE FINISH MATERIALS SHOP DRAWINGS FOR APPROVAL. MIAMI COUNTY 30U FELT HOT MOPPED OVER A�aI ((�++�.--••�� ,�y METAL STUDS@ 16'O.C.WIVPLYWOOD COORDINATED W/OWNER/ CONCRETE SLAB ORYO BACKING BOARD DIRECTLY BEHIND KITCHEN ARCHITECT CABINETS. S GRADE PLYWOOD SHEATHINHEATHIN G � TOP OF DECK A a 0 0 TYPICAL INTERIOR PARTITION SECTION 2 TYPICAL STEEL COLUMN DETAIL 3 LEVELING OF DISIMILAR FLOORING MATERIALS DET. 4 POOL COPPING DETAIL(TYP) TYPICAL COUNTERFLASHING DETAIL N ° O .T.S. O N.T.S. O N.T.S. O N.T.S. O N.T.S. TRACK BRACKET OR REGULAR ANGLE PRFAB.OVERFLOW WATER SCUPPER 2z6 P.T.WOOD JAMBANCHORED TO CONCRETE WITH 518-BOLTS COUNTERSUNK@ 12- '1301'ETWC' 6 3C' O.0&6'FROM TOP AND BOTTOM SEALANT •Y. „• 'A':....•�`. p z u;O m;amy v om,"o„q O TA d G'g�}w p•�v vov-•5�N�p,o-,q Ap oWwv�.•rpK v 0 BLOCK SMOOTH STUCCO CONCRETE SEE o 9 FlNSHONIr CMU ROUNDHEAD 24'O.C.E 5 ON STRUCTU RAL DRAWINGS p b 0 Am , b SEALANT WRAP LEAD LASHING FROMRAOR&TOPOF flCONTINOUS WALL(TYP) FU RI NG STRI PS@24'0.) q IN TAR PAPER PLATE 1BGARAGEDOOR PANE mb m o&SMOOTH FINISHYICA SXV PREFAB. PPF 0 P. b A n�o C m qo V v{ OR +v CONCRETE SLAB ;OVERFLOWSO LEAD FLASHING v SLOP EXTERI v°m POP PROVIDE HOT ASPHALT SCHEDULED INSULATION MOTH STUCCO FlNISH o u o SCHEDULEDWINDOW GARAGE DOOR 'I fi'SACK(SEE PLUMBING PLAN) WOOD BLOCKING 4 0 SMM ISH 4' ATTACHQ STEEL SCREWS(YP.) v OOTH STUCCO FIN 1%B P.T.MOLDING TRANSLUCENf oN8CMU WAIL TP) 0 10 U m 0,0 v s,L DOOR _ CONTINUOUS SEALANT AROUND OR FLOORING EXTERIOR BLOCK OVER MORTAR BED m WALLWISMOOTH OPENING • 'SECTION' STRUCTURAL CONCRETE SLAB. STUCCO FINISH MIRSIDEROON .�.e .•.�' SMOOTH STUCCO FINISH PRFAB. SEE STRUCTURAL DRAWINGS &B'GYPSUM BOARD ON SCHEDULED WINDOW C, OVERFLOW NOTE: WOOD FURRING Q WATER SCLAPFR TRACKS,MOTOR&ADDITIONALWEIGHT MUST BE N a' INTERIOR COORDINATED WITH DOOR MANUFACTURER EXTERIOR 'ELEVATION' BEFORE ANY WORK IS STARTED. 0 0 SIZE OF STAINLESS STEEL SCREWS TO BE C.M.U.WALL DETERMINED BYSIM&WEIGHT OF VENEER SCHEDULED INSULATION O STONE WATER DEATIL(TYP) O TYPICAL VENT PENETRATION DETAIL O GARAGE DOOR DETAILS TYPICAL WINDOW SILL DETAIL 10 TYPICAL WINDOW HEAD DETAIL N EXTERIOR INTERIOR - 113 P.T.FURRING STRIPS AROUND DOOROPENINGS INSTALLATION BY DOOR 113 P.T.FURRING STRIPS MANUFACTURERTOOOMPLYWI r SCHEDULED DOOR sf'GYPSUM BOARD P.T.WOOD BLOCKNG ANCHORED TO AROUNDOPENINGS PRODUCT CONTROL APPROVAL Ih TAI ' FLOOR FINISH MATERIALVlI BIILLNOSE WALL BEYOND %'GYPSUM BOARD CONCRETE BLOCK INTERIOR @STEPS s SCHEDULED DOOR - - - SCHEDULED DOOR �E"GYPSUMBOARO (SEE SCHEDULE FOR FINISH) STRUC.SLAB COORDINATE SLAB RECESSWIDOOR FOLD COPPER PAN#2.OVER - "T” SEE STRUC.PLAN5 MANUFACTURER BEFORE FORMING BLOCK WALLS WITH SIDES TO a iz4 W000 BUCK(OR LARGER) CONCRETE STUCCO (1)-b4WOODSTUD °a: Q Q FULLY BEGIN SEALANT SCHEDULED DOOR FLOOR FINISH MATERIAL RISERS SCHEDULED EXTERIOR tl �:.' .< ' .� 6o FINISH SCHEDULED FLOORING WOOD JAMB WIWOOD DOORa. a. (SEE SCHEDULE FOR FINISH) STOP \-\ O E� .• :. p. e RPM (3}51fi'METAL STONE BULL CONCRETE SLAB AS PER STUDS I6'O.C. STRUCTURAL WOODJANB CONTINUOUS SEALANT AROUND OPENING PLASTIC CORNER BEAD AROUND Q C.M.U.WALL OPENING \\\\ \/\/\\/\/\\\/\�\\\\\/\�\\\\\ %\ w STONE KICK TO ° n `>'a'GYPSUM BOARD \�L� \\\`�l�/\\ /�\ �" C F SMOOTH STUCCO �I MATCH FLOOR .. .. FRAMEWIDTH W Do <'a INSTALLATION BY DOOR a�. . d�. C.M.U.WALL FINISH OPENINGWDTH OD O MANUFACTURER TO COMPLY W/ EXTERIOR Z CO 17) PRODUCT CONTROL APPROVAL. N.T.S.TYPICAL EXTERIOR DOOR THRESHOLD DETAIL 12 TYPICAL INTERIOR DOOR HEAD/JAMB DETAIL 13 TYPICAL DOOR JAMB @ INTERIOR C.M.U.WALL 14 TYPICAL EXTERIOR DOOR JAMB DETAIL 15 BULLNOSE STEP DETAIL(TYP) DETAIL O SCALE 314'=1- 0 N.T.S. aaaa 2'FINE GRAIN SAND COMPACTED B'C.M.U.WALL NOTE:COORDINATE HEIGHTS WITH OWNEq SCHEDULED DUCTILE IRON 4'CONT.TRENCH DRAIN AND CABINET MANUFACTURER W DRIVEWAYMATERIAL INLAY GRATE STONETILEIGRANRE TOP&BACK SPLASH AS LOCK DOWN INTERIOR RIOR z SELECTED BYOWNER 4',2mAUGE METAL STUDS O RED DOT BUILT-IN BOLT SCHEDULED DRIVEWAYMATERIAL ON Y FINE SAND FOR REINFORCING SEE LOCK BLOCKFOR W ON G CRUSHED LIME ROCK BASE ON WELL STRUCT.PLANS UPPER CABINETS ' GRATELOCK POLYOpMNCHANNEL COMPACTED EARTH T095%DENSITY 7FINE SCHEDULED DRIVEWAY I•-I aaaa DOWN MATERIAL FIN.GRADE. t' x SLOPE GRAIN SAND ,�-1... .....:..... — - MORTAR AT ',= Zz4 HORIZONTALW00DMEMBER 95%DENSITY ° PERIMETER. - STUDS SECURELY FASTENED BETWEEN COMPACTED '�� 8'XS'CONC. BULLNOSE MATERIAL 0 14z'�CEBB �... SUB-BASE _ _ I—I I—I I=III CURB.W11p5 CONT. SAME AS TOP C O —III—III—III—III—III—III— TIE BEAM,SEE STRUCTURAL _ (—II-( III—T-711—T?-111-111—II DRAWINGS p ao 6"THICK CRUSHED LIMEROCK § BASECABINETS &'THICK CRUSHED LIMEROCK BASE COMPACTED TO 95% ALUM.CABINET @B.B.O. BASECOMPA) D1095% I I— I I—III— I DENSITY(MIN.) AREABYOTHERS 95%DENSITY —III III—I 95%DENSITY COMPACTED SUB-BASE FINISH AS PER O III— 95%DENSITY COMPACTED ROOM FINISH SCHEDULE SUB-SASE FINISH AS PER •� ROOM FINISH SCHEDULE ...:. ...::....'...,.. .d U CONTINUOUS2z4 P.T. Td O BOTTOM PLATE ,b b U a sheet no. �s DRIVEWAY DRAIN DETAIL(TYP) 17 TRENCH DRAIN DETAIL @ GARAGE(TYP) 18 BRICK PAVER DETAIL(TYP) 1s B.B.Q. DETAIL(TYP) 20 KITCHEN CABINET PARTITION DETAIL(TYP) A- 13 N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. 13 OF 13