Loading...
13-749-012p C& C RIM OIL 'rej 4'� 9j M:, V vj mi �a iMmi ",4j vm I �9 �a �m:Nvftmm'a IN Mod %=I W lummond Q ovir rr• • W • MmDWASD AGREEMENT 1D# 21513 • r i Y W • ' W•rf ••fi W • r•Yr • 6'701 S.W. 58TH PLACE, SOUTH MIAMI , 6'L CONTRACTOR'S ADDITIONAL RESPONSIBILITIES FOR INSTALLATION OF WATER & SEWER FACILITIES (NOT A PART OF M-DWASD NOTES NOR APPROVAL) 1. SUBMIT SHOP DRAWINGS TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL. ALL COMPONENTS OF THE WATER AND SEWER FACILITIES SHALL COMPLY WITH THE MIAMI-DADE WATER k SEWER DEPARTMENT (M-DWASD) APPROVED MATERIALS LIST, NO EXCEPTIONS. 2. CONTRACTOR SHALL PREPARE AND PERMIT, AS REQUIRED, ALL MAINTENANCE OF TRANSPORTATION (MDT) PUNS RELATED TO ANY AND ALL OF THE CONSTRUCTION OF THE FACILITIES OUTLINED IN THESE PLANS. J. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION PERMITS, SUCH AS: PUBLIC WORKS, F -DOT, ETC. 4. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS WITH ALL PERTINENT GOVERNMENTAL AGENCIES AND SHALL PROVIDE THE ENGINEER OF RECORD WITH WRITTEN NOTIFICATIONS AND/OR PHONE CALLS AT LEAST 48 HOURS PRIOR TO EACH INSPECTION. 5. CONTRACTOR SHALL ARRANGE AND PAY FOR DENSITY TESTS AS PER M-DWASD SPECIFICATIONS, TO BE SUBMITTED TO THE ENGINEER OF RECORD FOR APPROVAL. 6. THE CONTRACTOR SHALL HIRE A PROFESSIONAL LAND SURVEYOR TO PREPARE ALL AS-BUILTS REQUIRED BY M-DWASD, AS WELL AS, PROCESS ALL AS-BUILTS THROUGH M-DWASD FOR REVIEW AND APPROVAL. 7. THE CONTRACTOR SHALL PROVIDE THE ENGINEER OF RECORD WITH ALL REQUIRED BACTERIOLOGICAL SAMPLES, BACKFLOW DEVICE TESTS/INSPECTION REPORTS, CERTIFICATIONS, PRESSURE TESTS, AS-BUILTS, COMPACTION REPORTS AND ANY OTHER CONSTRUCTION RELATED ITEMS REQUIRED GY MIAMI-DADE WATER k SEWER DEPARTMENT IN A TIMELY FASHION FOR REVIEW AND APPROVAL. M, IT IS THE RESPONSIBILITY OF THE CONTRACTOR INSTALLING THE WATER AND SEWER FACILITIES TO COORDINATE WITH THE GENERAL CONTRACTOR AND OWNER FOR ANY WORK TO BE PERFORMED MY MIAMI-DADE WATER k SEWER DEPARTMENT FORCES AT THE OWNER'S EXPENSE. COORDINATION INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: 1) DEALING WITH M-DWASD OFFICIALS AT THE DEGINNING OF THE PROJECT TO ENSURE THAT THE M-DWASD WORK WILL NOT IMPACT THE PROJECT SCHEDULE 2) OBTAINING ANY CHECKS OR OTHER FORMS OF PAYMENT FROM THE DEVELOPER, 3) PROVIDING THE OWNER AND ENGINEER OF RECORD WITH M-OWASD'S ANTICIPATED WORK SCHEDULE. 9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL ALL CONCRETE SLABS AND BOLLARDS REQUIRED BY MIAMI-DADE WATER k SEWER DEPARTMENT AS PER =THEIR CURRENT STANDARD DETAILS. 10, IT IS THE RESPONSIBILITY OF THE CONTRACTOR INSTALLING THE WATER AND SEWER FACILITIES TO COORDINATE WITH THE GENERAL CONTRACTOR AND OWNER WITH REGARDS TO THE WATER METER INSTALLATION EXPECTATIONS TO AVOID DELAYS AND POSSIBLE LIABILITIES. 11, IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR INSTALLING THE WATER AND SEWER FACILITIES TO INITIATE THE PREPARATION OF ALL WATER k SEWER CONVEYANCE DOCUMENTS IN A TIMELY FASHION TO NOT IMPACT THE PROJECT SCHEDULE. ALL TASKS AND TIME FRAMES ASSOCIATED WITH THE CONSTRUCTION, INSPECTION AND CLOSE-OUT (CONVEYANCE DOCUMENTS) PHASES OF THE WATER AND SEWER FACILITIES INSTALLATION, SHALL BE INCORPORATED WITHIN THE OVERALL PROJECT SCHEDULE. CIVIL SITE DEVELOPMENT PLANS EXISTING LEGEND e AERIAL TARGET Q FORCE MAIN MANHOLE Q SANITARY SEWER MANHOLE 0 ALUMINUM LIGHT POST 0 FORCE MAIN VALVE SIAMESE CONNECTION 0-0 ALUMINUM LIGHT POST (SINGLE) a F.P.L ELECTRIC MANHOLE i SIGN POST w ALUMINUM LIGHT POST (DOUBLE) QQ F.P.L. TRANSFORMER PAD SPRINKLER PUMP WATER do SEWER PROFILES ALUMINUM LIGHT POST (TRIPLE) ■ FPL F.P.L. TRANSMISSION POLE O STANDPIPE Wk Q GAS MANHOLE ® STORM SEWER MANHOLE PAVING do GRADING PLAN ALUMINUM LIGHT POST (QUAD) GAS METER Q STREET LIGHT HAND HOLE E- ANCHOR/GUY WIRE GAS PUMP ® SWALE INLET DRAINAGE PLAN BACKFLOW PREVENTER ASSEMBLY GAS VALVE p TELEPHONE BOX (SOUTHERN BELL) Co CABLE TELEVISION BOX QG GREASE TRAP MANHOLE <e> TELEPHONE HAND HOLE ® CATCH BASIN Q GROUND LIGHTING Q TELEPHONE MANHOLE (S0. BELL) ---rt-- CENTERLINE • Gp GUARD POST TELEPHONE PAYPHONE 0=0 CHECK VALVE ASSEMBLY '�> IRRIGATION HAND HOLE Q TRAFFIC HAND HOLE PAVEMENT MARKING & SIGNAGE PLAN CIRCULAR DRAIN 0 IRRIGATION VALVE Q TRAFFIC UTILITY BOX O COLUMN (CIRCULAR) 1j MAILBOX TRAFFIC SIGNAL POST EROSION do SEDIMENT CONTROL DETAILS COLUMN (SOUARE) ® MONITOR WELL 4 UNDERGROUND UTILITY MARKER w o CONCRETE LIGHT POLE - -Id MONUMENT LINE Qu UNKNOWN UTILITY MANHOLE o -0--o CONCRETE LIGHT POLE (DOUBLE) P-5 INLET UNKNOWN UTILITY HAND HOLE ■ cpp CONCRETE POWER POLE P-6 INLET WATER MANHOLE ® CONTROL POINT Qh PARKING METIER ® WATER METER CURB INLET cc PEDESTRIAN CROSSING SIGNAL ' WATER VALVE ELECTRIC BOX opm PERMANENT REFERENCE MONUMENT *LO WOOD LIGHT POLE ® ELECTRIC HAND HOLE 9 POST INDICATOR VALVE • WOOD POWER POLE +y� ELEVATIONS (SEE NOTES FOR DATUM) Q=0 VACUUM BREAKER ASSEMBLY HANDICAP PARKING FIRE HYDRANT --IE-- PROPERTY LINE Loi STROLLER PARKING p FLAGPOLE p SANITARY SEWER CLEANOUT 11 FLOW LINE ABBREVIATIONS: DC denotes DEPRESSED CURB F.I.P. denotes FOUND IRON RIPE R denotes RADIUS F.N.D. denotes FOUND NAIL k BRASS DI5C denotes DELTA ANGLE S.N.D. denotes SET LB -17 NAIL k BRASS DISC denotes AMC DISTANCE CL. denotes CLEAR T denotes rANGENT DISTANCE ENCR, denotes ENCROACHMENT PCP denotes PERMANENT CONTROL POINT � denotes ASPHALT PAVEMENT PRM denotes PERMANENT REFERENCE MONUMENT mak. denotes NON -VEHICULAR ACCESS LINE PB denotes PUT TOOK PG denotes PAGE D () denotes DEED DISTANCE POC denotes POINT OF COMMENCEMENT (L) denotes DISTANCE BY LEGAL DESCRIPTION POB denotes POINT OF BEGINNING (M) denotes MEASURED DISTANCE OHW denotes OVERHEAD UTILITY WIRES (R) denotes RECORD OR PUTTED DISTANCE ORB denotes OFFICIAL RECORDS BOOK PC denotes POINT OF CURVATURE C.M.P. denotes CORRUGATED METAL PIPE CBS denotes CONCRETE BLOCK STRUCTURE 1_3pp denotes TREE NUMBERS CONC denotes CONCRETE UNK denotes UNDERGROUND UNKNOWN UTILITY CLF denotes CHAINL/NK FfNCf SIP. denotes SET IRON PIPE k LB -17 CAP WF denotes WOOD FENCE CIVIL SITE DEVELOPMENT PLANS sw 67TH ST �P OJ 4 OC 77 0 MO AAV VENERA V i\� N IGNACIO AVE � W E S SCALE: I"=300' LOCATION SKETCH_ SEC.25-TWP.54-RNG.40 p r e p a r e d b y SCHWEBKE-SHISKIN & ASSOCIATES, INC. 3240 CORPORATE WAY, MIRAMAR, FL., 33025 F-- NOTE TO CONTRACTOR (NOT A PART OF M-DWASD NOTES NOR APPROVAL) • THIS PROJECT LIES OUTSIDE OF THE DESIGNATED LIMITS OF WELLFIELD PROTECTION AREAS ("CONE OF INFLUENCE") AS DEFINED BY MIAMI-DADE COUNTY. Drawing Index Sheet Title Qj CID Number COVER C--1 EXISTING CONDITIONS PLAN C-2 WATER do SEWER PLAN do PROFILE C-3 WATER do SEWER PROFILES C-4 WATER do SEWER DETAILS C-5 PAVING do GRADING PLAN C-6 PAVING & GRADING PLAN C--7 sw 67TH ST �P OJ 4 OC 77 0 MO AAV VENERA V i\� N IGNACIO AVE � W E S SCALE: I"=300' LOCATION SKETCH_ SEC.25-TWP.54-RNG.40 p r e p a r e d b y SCHWEBKE-SHISKIN & ASSOCIATES, INC. 3240 CORPORATE WAY, MIRAMAR, FL., 33025 F-- NOTE TO CONTRACTOR (NOT A PART OF M-DWASD NOTES NOR APPROVAL) • THIS PROJECT LIES OUTSIDE OF THE DESIGNATED LIMITS OF WELLFIELD PROTECTION AREAS ("CONE OF INFLUENCE") AS DEFINED BY MIAMI-DADE COUNTY. Drawing Index Sheet Title TEL: Sheet Number COVER C--1 EXISTING CONDITIONS PLAN C-2 WATER do SEWER PLAN do PROFILE C-3 WATER do SEWER PROFILES C-4 WATER do SEWER DETAILS C-5 PAVING do GRADING PLAN C-6 PAVING & GRADING PLAN C--7 DRAINAGE PLAN C-8 CROSS—SECTIONS C -9 - -9PAVING, PA VING,GRADING do DRAINAGE DETAILS C-10 PAVING, GRADING do DRAINAGE DETAILS C-11 PAVING, GRADING & DRAINAGE DETAILS C-12 PAVEMENT MARKING & SIGNAGE PLAN C-13 EROSION & SEDIMENT CONTROL PLAN C-14 EROSION do SEDIMENT CONTROL DETAILS C--15 POOL DECK JOINT PLAN C-16 *NOT PART OF M—DWASD APPROVAL LAND PLANNERS -ENGINEERS -LAND SURVEYORS (LB & PA #87) TEL: (305)652-7010 FAX: (305)652-8284 FLOOD CRITERIA NOTES (NOT A PART OF M—DWASD NOTES NOR APPROVAL) 1. MIAMI-DADE COUNTY FLOOD CRITERIA = 6.5' N.G.V.D. 2.FEMA FLOOD ELEVATION = FLOOD ZONE X (UNSHADED) PER MAP NO. 12086CO458L MAP REVISED ON 9/1112009. 3.14IAMI-DADE COUNTY AVERAGE OCT. W.T. = 3.0' N.G.V.D. LEGAL DESCRIPTION: LOTS 10 THRU 17, IN BLOCK 8, REALTY SECURITIES CORPORATIONS TOWNSITE OF LARKINS, ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT BOOK 2, PAGE 105, OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA. LYING AND BEING IN SECTION 25, TOWNSHIP 54 SOUTH, RANGE 40 EAST, CITY OF SOUTH MIAMI, MIAMI-DADE COUNTY, FLORIDA. LU O 0 C) C) O r k i•. • • • `R E"'r, A y IONAL D ESIGN AND CONSTRUCTION, INC. 3990 North Powerline Road Ft. Lauderdale, FL 33309 Voice: 954.566.3885 Fax: 954.566.3335 O U LU W ryry W J Ny W ~ MW J 0 M W � M M W J J W LL W z F- X U ti LL ~ M J f.Ih POC MJ W z� m < O 15 Lj� I -LW 2 F- -i � W O J t d a 0 z � T a. 0 o CL W J N LL. .� 0U 00 � IL 0 i_ 2 E CL WCl) W ■ C6 n o Z F- D � LGLr a W U 0 O W- O i2 UJ E lJ i2 E W W- W 0 �YLC�.i2CYL z t 2 V) Z� OG�CCL�E�, J12C�k LAND SURVEYORS z CIVIL ENGINEERS LAND PLANNERS Z LD#87 CA#87 O 0 3240 CORPORATE WAY ixMIRAMAR, FL 35025 �5 TEL: (305)652--7010 o FAX: o )652--8284 U .� Sezl �0 J, NqL W L wrys Lpz b13= O r TE OF W `rte erDa o 2 26, 4VI F n LL :,.CFL Ptl•�';'5Dfi35-j� ���� PROJECT"Ntf BER W 0. 1320MPCP O (r °- FILE No. : -------- DRAWN J.A.O. LU REVIEWED: H.J.N.. z CHECKED: H.J.N. w DATE : 07-02-13 z ISSUE / REVISIONS Z - - F- SHEET TITLE CIVIL FACILITIES COVER SHEET SHEET NUMBER C-1